1. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] Aprill 25, 2012
Name-
Mr.WirawitWangkan
Surname
Student
54261523
ID.
Group
IS Company
Name
Engineerin
g Team Jane,Best,Not,Su,Nut,Love,Tew,Mut,Benz and Chat
Members
Product
Design
Sa-tang,Ped,Fon,Tip,Earng,Mind
Team
Members
Weekly Progress
Explain your engineering job of each my project Water sensor flow but to solve
the discrepancy between the joints with a little water from time toPlumbing.
Thousands tape was released in the water. Resulting values are accurate. And the amount
of water used by the tube, led by a Grade 9 level of 1liter. The sensor is connected to
the micro and then displays them as well.
Engineering Analysis
Strong Point
Week Point
Department of Control System and Instrumentation Engineering
KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI
2. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] Aprill 25, 2012
Next Week Job
Department of Control System and Instrumentation Engineering
KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI