Data Centers: Outsource or Own?
Presented by:
Rachel Dines, Forrester Research, Inc.
Christopher Nicolini, Windstream Hosted Solutions




    Nov. 17, 2011
Introduction

               Today’s Presenters:

         Rachel Dines, Research Analyst
       Forrester Research, Inc.



      Chris Nicolini, Data Center Operations Director
        Windstream Hosted Solutions


                                                        2
Data center facilities are the most
                                  expensive investment in infrastructure
                                  — before making this big decision, make sure you
                                  have explored all the options!


3   © 2011 Forrester Research, Inc. Reproduction Prohibited
Agenda


Current trends in data center facilities

Key factors to consider when sourcing your facility

Best practices for data center site selection

Recommendations




4   © 2011 Forrester Research, Inc. Reproduction Prohibited
More than a quarter expect to increase spend on
            data center and IT facilities
             “How do you expect your firm’s spending on data center and IT facilities to
                               change over the next 12 months?”


                                                                        49%
                                                                                            On average, companies devote 19.3%
                                                                                             of their hardware/infrastructure IT
                                                                                            budget to data center and IT facilities


                                                                                         26%



                                              9%                                                                8%
                                                                                                                        5%
                  3%


            Decrease                   Decrease                   Stay about         Increase             Increase Don’t know
            more than                  5%-10%                      the same          5%-10%               more than
              10%                                                                                           10%
                                                  Base: 2100 IT decision-makers at enterprises and SMBs worldwide
        5     © 2011 Forrester Research, Inc. Reproduction Prohibited

Source: Forrsights Hardware Survey, Q3 2011
Overall trends

!  Interest in data center outsourcing is increasing due to:
    –  Lower initial cost.
    –  Improved speed to market.
    –  Consolidation of smaller computer rooms and facilities.
    –  Expansion as older data centers run out of capacity.
    –  Business continuity requirements.
!  Still, there are valid reasons to build your own data center




6   © 2011 Forrester Research, Inc. Reproduction Prohibited
The use of colocation and managed services for
provisioning recovery sites is on the rise
                                    “How do you provision your recovery site?”

                                             We own the site                                                          46%
Shared fixed-site IT infrastructure at a
                                                                                                         31%
           service provider
                                                Colocation site                        17%

            Multi-tenancy managed hosting                                          13%
    Dedicated fixed-site IT infrastructure
                                                                               9%
           at a service provider
                   Dedicated managed hosting                               7%

                                                    Cloud-based         4%

                                                               Other    4%
                 Base: 180 disaster recovery decision-makers and influencers at business globally with a recovery site
                                                    (multiple responses accepted)

7    © 2011 Forrester Research, Inc. Reproduction Prohibited
     Source: Forrester/Disaster Recovery Journal November 2010 Global Disaster Recovery Preparedness Online Surveys
Agenda


Current trends in data center facilities

Key factors to consider when sourcing your facility

Best practices for data center site selection

Recommendations




8   © 2011 Forrester Research, Inc. Reproduction Prohibited
The spectrum of data center sourcing options


 In-house                                Outsourced


                                                                 Infrastructure
                                                                  outsourcing/
Own and operate                                                    managed
  data center                                                  services/ hosting




                                      Colocate data                                IaaS/Cloud or
                                         center                                    strategic right-
                                                                                      sourcing

 Less managed                                                                            More managed



 9   © 2011 Forrester Research, Inc. Reproduction Prohibited
Key considerations:
                                                                                  power


                                Build
                                                                        Outsource
     !  Power is limited by what
        the utility company can                                !  Better access to power
        deliver to your location.                              !  More competitive rates on
     !  Power costs will be at the                                power
        local commercial rate.                                 !  Wholesalers: actual power
                                                                  costs at industrial or lower
                                                                  negotiated rate
                                                               !  Retailers: flat rate for a
                                                                  fixed capacity circuit,
                                                                  which includes markup
10   © 2011 Forrester Research, Inc. Reproduction Prohibited
Key considerations:
cost model                                                                Outsource
                                                                !  Costs are low or nonexistent
                                                                   upfront (usually equivalent to
                           Build                                   first month’s rent).
 !  Costs are high upfront, then                                !  Ongoing costs are for rent and
    continued maintenance, power,                                  power and are much more
    and security costs are ongoing.                                predictable.
 !  Costs can be unpredictable                                  !  Costs are predominantly
    due to break/fix and                                           operational expenditure.
    maintenance.
 !  Infrastructure and power costs
    will be higher due to less
    purchasing power.
 !  Costs are predominantly
    capital expenditure.
 11   © 2011 Forrester Research, Inc. Reproduction Prohibited
Key considerations: flexibility and control

                                                                            Outsource
                                Build
                                                                 !  Changes in requirements can
     !  Slower to accommodate
                                                                    be accommodated very quickly
        changes in IT/business
                                                                    as colocation providers are
        requirements (power, space,
                                                                    constantly building out
        etc.)
                                                                    additional space.
     !  Time-to-market for initial build
                                                                 !  Construction is often modular,
        can take years for a traditional
                                                                    easy, and quick to expand.
        facility.
                                                                 !  Time-to-market is measured in
     !  More control over operating
                                                                    weeks.
        environment (maintenance
        windows, temperature, access                             !  Less control over the facility
        control, cooling systems,
        infrastructure, etc.)

12     © 2011 Forrester Research, Inc. Reproduction Prohibited
Other key points to consider

                           Build
!  It’s hard to plan for a life span of
                                                                          Outsource
   20-plus years.
                                                               !  Outsourced data centers are run
!  Building out too much space can
                                                                  by professionals with extensive
   be costly, as it is inefficient to run
                                                                  experience running mission-
   an empty site.
                                                                  critical facilities.
!  Most companies don’t have the
                                                               !  Outsourced facilities house an
   expertise on staff to design and
                                                                  ecosystem of potential partners
   build a facility.
                                                                  (network providers, trading
!  Bringing multiple network                                      platforms, hosting providers,
   providers to your facility will be                             cloud providers, etc.).
   costly.
                                                               !  Outsourcing commodity services
                                                                  can allow you to concentrate on
                                                                  more strategic ones
13   © 2011 Forrester Research, Inc. Reproduction Prohibited
Agenda


 Current trends in data center facilities

 Key factors to consider when sourcing your facility

 Best practices for data center site selection

 Recommendations




14   © 2011 Forrester Research, Inc. Reproduction Prohibited
Where in the world should you put your data center?

 !  Most companies prefer to keep their data centers close to their
    corporate headquarters, however consider the following…
       –  Companies with headquarters in expensive (real estate and
          power costs) or risky regions should consider locating their
          data centers elsewhere
       –  The majority of IT systems today can be managed remotely
       –  For tasks that require a physical presence
          (i.e., racking and stacking, swapping
          tapes, etc) consider using a data center
          provider’s “remote hands”




15   © 2011 Forrester Research, Inc. Reproduction Prohibited
Checklist data center site selection

 "  Cost of labor, real estate, utilities, and taxes

 "  Natural and manmade threats

 "  Economic and political risk

 "  Availability, stability, and reliability of power and space

 "  Telecommunications availability

 "  Accessibility of the location

 "  Ability to utilize green technologies
 "  Availability of local talent




16   © 2011 Forrester Research, Inc. Reproduction Prohibited
Fewer companies locate the recovery site beyond
  1000 miles
            What is the distance between your primary data center and your
                         furthest backup data center, in miles?
   Greater than 1000                                                                                 20%
          miles                                                                13%
500 to less than 1000                                                            13%
         miles                                                                             17%
250 miles to less than                                                           13%
      500 miles                                                                   14%
 100 to less than 250                                                                              2007 (n=238)
                                                                6%
         miles                                                           11%                       2010 (n=180)
 50 miles to less than                                                10%
      100 miles                                                         11%
 25 miles to less than                                                                15%
       50 miles                                                                       15%

     Less than 25 miles                                                                                   22%
                                                                                                        21%
            Base: Disaster recovery decision makers and influencers at businesses globally with a recovery site
                                     (percentages may not total 100 due to rounding)
17    © 2011 Forrester Research, Inc. Reproduction Prohibited
Agenda


 Current trends in data center facilities

 Key factors to consider when sourcing your facility

 Best practices for data center site selection

 Recommendations




18   © 2011 Forrester Research, Inc. Reproduction Prohibited
Recommendations for getting started
     Define business requirements

     •  Before you begin, make sure you know the business requirements for
        your facility:
        •  Availability and resiliency (Tier III or Tier IV?)
        •  Future growth (ability to accommodate acquisitions or new products,
           etc.).
        •  Speed to market (how quickly do you need to be able to provision new
           capacity?)

     Start capacity planning

     •  However you provision your data center, knowing your current and future
        capacity is key to achieving ROI.

     Plan for future flexibility

     •  Even if you plan today for future IT growth, business requirements are
        constantly changing.
     •  Plan with your data center provider or architect your facility for flexibility.

19   © 2011 Forrester Research, Inc. Reproduction Prohibited
Operational Insights



Chris Nicolini, Director of Data Center Operations
        for Windstream Hosted Solutions




                                              20
Windstream Corp. Snapshot"
     S&P 500 company with full suite of IP-based voice and data services, MPLS
     networking, data center and managed hosting services and communication
                  systems to businesses and government agencies

•    $4 billion in annual revenues
•    10,000 employees
•    29 states and District of Columbia
•    Data centers: 13
•    60,000 route miles of local
     and long-haul fiber network




                                       21"
Presence




     22
Trusted by Top Brands
Biotech/Healthcare   Technology   Retail/Consumer   Banking/Finance   Digital Media




                                                                                      23
Data Center Overview
!    Tier II and III, SAS 70 Type II compliant data centers
!    System + System uninterruptible power supply (“UPS”) systems, and carrier
     neutral network connections
!    Heating, ventilation and air conditioning (“HVAC”) systems to maintain
     temperature and humidity within strict tolerances
!    Hardened facilities with automated facility management tools
!    Fire control with early warning smoke detection, clean agent suppression and/
     or dry-pipe sprinkler system
!    24 x 365 NOC & facilities staff provide for high security externally and internally
!    Service Level Agreement (“SLA”) backed guarantee of 100% power availability
!    Modular builds - most expansions are less than four years old (10k sf or larger)
!    24-36 in raised floor no open systems or racks




                                                                                      24
Build vs. Buy
           Costs of building Data Center Space
                            $1250 - $2000 / sqft – Initial Cost
Redundant Internet



                1000 sqft data center = $1.25 -$2.0 Million in CAPEX

                *Maintenance & Repair = $150K - $250K / year

                Human Capital = $150K - $400K / year

                Utility Power Cost = $300K-600K / year

* Does not include maintenance on IT / Network Equipment
- All costs except utility power are fixed in the short term           25
Distractions from your core
competency

 !    Facility Infrastructure Maintenance
 !    Capacity Management
 !    Physical Security




                                            26
Infrastructure Maintenance
 !    Facility Maintenance is a full time function

      !    Generator (M, Q, A)
      !    ATS (A & 5yr)
      !    Switchgear (A & 5 yr)
      !    UPS (Q and A)
      !    Batteries (Q, A, and 5 yr)
      !    PDU (Annual)
      !    HVAC (Q)
      !    Fire (S & A)

 M = Monthly, Q = Quarterly, S = Semi-Annual, A = Annual, and 5 yr = 5 year



                                                                              27
Capacity Management

Areas often overlooked:

   Power
      !    Redundancy at the Panel, PDU, UPS, Gen, and Utility
      !    Seasonality - 35% swing causes overages


   Internet Capacity
      !    Circuits sized for average speeds are overwhelmed by
           seasonal traffic or single upstream provider outage


   HVAC
      !    Power Density growth


                                                                  28
Physical Security
    !      24/7 staffing for security takes a lot of effort

Redundant Internet                                 Redundant Internet
    !      Complete Physical Security is hard to achieve
          !      Camera system storage is time consuming and expensive
          !      Card and Biometric systems require constant monitoring /
                 maintenance
          !      Documentation for Receiving / Shipping of packages and critical
                 media is difficult


    !      Compliance Concerns
          !      SSAE 16 Standards are very high
          !      Compliance standards are “Order Qualifiers” for hosting providers




                                                                                     29
Summary




          Q&A


                30
31

Mais conteúdo relacionado

Mais procurados

Dynamic Case Management: Taming Untamed Processes with SpringCM and Forrester...
Dynamic Case Management: Taming Untamed Processes with SpringCM and Forrester...Dynamic Case Management: Taming Untamed Processes with SpringCM and Forrester...
Dynamic Case Management: Taming Untamed Processes with SpringCM and Forrester...
Roger Bottum
 
Emc World Evergreen Preso 5 16 07 With Demo Slides
Emc World Evergreen Preso 5 16 07 With Demo SlidesEmc World Evergreen Preso 5 16 07 With Demo Slides
Emc World Evergreen Preso 5 16 07 With Demo Slides
BlueFish
 
Line Card: IT Solutions
Line Card: IT SolutionsLine Card: IT Solutions
Line Card: IT Solutions
ConRes
 
Evolve Com Tec Presentation
Evolve Com Tec PresentationEvolve Com Tec Presentation
Evolve Com Tec Presentation
samanthahubbard
 
EMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
EMC: Business Continuity a Disaster Recovery pre virtuálne prostrediaEMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
EMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
ASBIS SK
 
Datacenter transformation - Dion van der Arend
Datacenter transformation - Dion van der ArendDatacenter transformation - Dion van der Arend
Datacenter transformation - Dion van der Arend
HPDutchWorld
 
Dmg emc-avamar-optimized-backup-recovery-dedupe[1]
Dmg emc-avamar-optimized-backup-recovery-dedupe[1]Dmg emc-avamar-optimized-backup-recovery-dedupe[1]
Dmg emc-avamar-optimized-backup-recovery-dedupe[1]
Nitesh Bhat
 
Distributed Enterprise Solutions
Distributed Enterprise SolutionsDistributed Enterprise Solutions
Distributed Enterprise Solutions
seanbrookes
 

Mais procurados (19)

Sas Predictive Asset Maintenance
Sas   Predictive Asset MaintenanceSas   Predictive Asset Maintenance
Sas Predictive Asset Maintenance
 
The business value o f la ge scal e serve r consol i d a t i o n
The business value o f la ge  scal e serve r consol i d a t i o nThe business value o f la ge  scal e serve r consol i d a t i o n
The business value o f la ge scal e serve r consol i d a t i o n
 
Dynamic Case Management: Taming Untamed Processes with SpringCM and Forrester...
Dynamic Case Management: Taming Untamed Processes with SpringCM and Forrester...Dynamic Case Management: Taming Untamed Processes with SpringCM and Forrester...
Dynamic Case Management: Taming Untamed Processes with SpringCM and Forrester...
 
Emc World Evergreen Preso 5 16 07 With Demo Slides
Emc World Evergreen Preso 5 16 07 With Demo SlidesEmc World Evergreen Preso 5 16 07 With Demo Slides
Emc World Evergreen Preso 5 16 07 With Demo Slides
 
Hadoop World 2011: Big Data Analytics – Data Professionals: The New Enterpris...
Hadoop World 2011: Big Data Analytics – Data Professionals: The New Enterpris...Hadoop World 2011: Big Data Analytics – Data Professionals: The New Enterpris...
Hadoop World 2011: Big Data Analytics – Data Professionals: The New Enterpris...
 
Line Card: IT Solutions
Line Card: IT SolutionsLine Card: IT Solutions
Line Card: IT Solutions
 
Cloud Computing and eDiscovery: What is in it for you? By ESG's Brian Babinea...
Cloud Computing and eDiscovery: What is in it for you? By ESG's Brian Babinea...Cloud Computing and eDiscovery: What is in it for you? By ESG's Brian Babinea...
Cloud Computing and eDiscovery: What is in it for you? By ESG's Brian Babinea...
 
Evolve Com Tec Presentation
Evolve Com Tec PresentationEvolve Com Tec Presentation
Evolve Com Tec Presentation
 
EMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
EMC: Business Continuity a Disaster Recovery pre virtuálne prostrediaEMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
EMC: Business Continuity a Disaster Recovery pre virtuálne prostredia
 
DATA CENTER ADVISORY SERVICES
DATA CENTER ADVISORY SERVICESDATA CENTER ADVISORY SERVICES
DATA CENTER ADVISORY SERVICES
 
Big Data Challenges
Big Data ChallengesBig Data Challenges
Big Data Challenges
 
Total Economic Impact™ IBM System Storage SAN, Volume Controller
Total Economic Impact™ IBM System Storage SAN, Volume ControllerTotal Economic Impact™ IBM System Storage SAN, Volume Controller
Total Economic Impact™ IBM System Storage SAN, Volume Controller
 
Challenges faced by small and medium business
Challenges faced by small and medium businessChallenges faced by small and medium business
Challenges faced by small and medium business
 
10 fn s33
10 fn s3310 fn s33
10 fn s33
 
Black Watch Data
Black Watch DataBlack Watch Data
Black Watch Data
 
Datacenter transformation - Dion van der Arend
Datacenter transformation - Dion van der ArendDatacenter transformation - Dion van der Arend
Datacenter transformation - Dion van der Arend
 
Dmg emc-avamar-optimized-backup-recovery-dedupe[1]
Dmg emc-avamar-optimized-backup-recovery-dedupe[1]Dmg emc-avamar-optimized-backup-recovery-dedupe[1]
Dmg emc-avamar-optimized-backup-recovery-dedupe[1]
 
Distributed Enterprise Solutions
Distributed Enterprise SolutionsDistributed Enterprise Solutions
Distributed Enterprise Solutions
 
The Evolution of Converged Infrastructure - White Paper 2009
The Evolution of Converged Infrastructure - White Paper 2009The Evolution of Converged Infrastructure - White Paper 2009
The Evolution of Converged Infrastructure - White Paper 2009
 

Semelhante a Windstream Webinar: “Data Centers: Outsource or Own?” with Forrester Research

Why Server Virtualization Demands an End-user’s Perspective
Why Server Virtualization Demands an End-user’s PerspectiveWhy Server Virtualization Demands an End-user’s Perspective
Why Server Virtualization Demands an End-user’s Perspective
Compuware APM
 
Cloud Computing, Business Models, Geilo April 2009
Cloud Computing, Business Models, Geilo April 2009Cloud Computing, Business Models, Geilo April 2009
Cloud Computing, Business Models, Geilo April 2009
Francis D'Silva
 
Robert LeBlanc - Why Big Data? Why Now?
Robert LeBlanc - Why Big Data? Why Now?Robert LeBlanc - Why Big Data? Why Now?
Robert LeBlanc - Why Big Data? Why Now?
Mauricio Godoy
 
Can Your Offshore Provider Help In Business Transformation?
Can Your Offshore Provider Help In Business Transformation?Can Your Offshore Provider Help In Business Transformation?
Can Your Offshore Provider Help In Business Transformation?
Semalytix
 
November 21, 2006. Call in at 10:55 a.m. Eastern Time
November 21, 2006. Call in at 10:55 a.m. Eastern TimeNovember 21, 2006. Call in at 10:55 a.m. Eastern Time
November 21, 2006. Call in at 10:55 a.m. Eastern Time
webhostingguy
 

Semelhante a Windstream Webinar: “Data Centers: Outsource or Own?” with Forrester Research (20)

Why Server Virtualization Demands an End-user’s Perspective
Why Server Virtualization Demands an End-user’s PerspectiveWhy Server Virtualization Demands an End-user’s Perspective
Why Server Virtualization Demands an End-user’s Perspective
 
Forrester
ForresterForrester
Forrester
 
Cloud Computing, Business Models, Geilo April 2009
Cloud Computing, Business Models, Geilo April 2009Cloud Computing, Business Models, Geilo April 2009
Cloud Computing, Business Models, Geilo April 2009
 
Robert LeBlanc - Why Big Data? Why Now?
Robert LeBlanc - Why Big Data? Why Now?Robert LeBlanc - Why Big Data? Why Now?
Robert LeBlanc - Why Big Data? Why Now?
 
Windstream Webinar: The Evolution of the Data Center
Windstream Webinar: The Evolution of the Data CenterWindstream Webinar: The Evolution of the Data Center
Windstream Webinar: The Evolution of the Data Center
 
Can Your Offshore Provider Help In Business Transformation?
Can Your Offshore Provider Help In Business Transformation?Can Your Offshore Provider Help In Business Transformation?
Can Your Offshore Provider Help In Business Transformation?
 
Net App Scores 100% For Midrange Storage Market Solutions
Net App Scores 100% For Midrange Storage Market SolutionsNet App Scores 100% For Midrange Storage Market Solutions
Net App Scores 100% For Midrange Storage Market Solutions
 
November 21, 2006. Call in at 10:55 a.m. Eastern Time
November 21, 2006. Call in at 10:55 a.m. Eastern TimeNovember 21, 2006. Call in at 10:55 a.m. Eastern Time
November 21, 2006. Call in at 10:55 a.m. Eastern Time
 
Peter Coffee CIO Forum 20100406
Peter Coffee CIO Forum 20100406Peter Coffee CIO Forum 20100406
Peter Coffee CIO Forum 20100406
 
SAS and Netezza Enzee universe presentation_20_june2011
SAS and Netezza Enzee universe presentation_20_june2011SAS and Netezza Enzee universe presentation_20_june2011
SAS and Netezza Enzee universe presentation_20_june2011
 
Data Center Decisions: Build versus Buy
Data Center Decisions: Build versus BuyData Center Decisions: Build versus Buy
Data Center Decisions: Build versus Buy
 
Netapp - An Agile Data Infrastructure to Power Your Cloud
Netapp - An Agile Data Infrastructure to Power Your CloudNetapp - An Agile Data Infrastructure to Power Your Cloud
Netapp - An Agile Data Infrastructure to Power Your Cloud
 
Query at Speed of Thought
Query at Speed of ThoughtQuery at Speed of Thought
Query at Speed of Thought
 
01 roland top storage trends_praha_02
01 roland top storage trends_praha_0201 roland top storage trends_praha_02
01 roland top storage trends_praha_02
 
Top 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaTop 10 Data Center Success Criteria
Top 10 Data Center Success Criteria
 
Data Center Infrastructure Trends
Data Center Infrastructure TrendsData Center Infrastructure Trends
Data Center Infrastructure Trends
 
Mdm dg bestpractices techgig dc final cut - copy
Mdm dg bestpractices  techgig dc final cut - copyMdm dg bestpractices  techgig dc final cut - copy
Mdm dg bestpractices techgig dc final cut - copy
 
Delivering Analytics at The Speed of Transactions with Data Fabric
Delivering Analytics at The Speed of Transactions with Data FabricDelivering Analytics at The Speed of Transactions with Data Fabric
Delivering Analytics at The Speed of Transactions with Data Fabric
 
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
 
Cloud Computing - Why and How? (by Forrester Research, Inc.)
Cloud Computing - Why and How? (by Forrester Research, Inc.)Cloud Computing - Why and How? (by Forrester Research, Inc.)
Cloud Computing - Why and How? (by Forrester Research, Inc.)
 

Mais de Windstream Enterprise

White Paper: Windstream's Position on Security Compliance
White Paper: Windstream's Position on Security ComplianceWhite Paper: Windstream's Position on Security Compliance
White Paper: Windstream's Position on Security Compliance
Windstream Enterprise
 
White Paper: Windstream Leveraging Funding for EHR While Meeting HIPAA Requir...
White Paper: Windstream Leveraging Funding for EHR While Meeting HIPAA Requir...White Paper: Windstream Leveraging Funding for EHR While Meeting HIPAA Requir...
White Paper: Windstream Leveraging Funding for EHR While Meeting HIPAA Requir...
Windstream Enterprise
 

Mais de Windstream Enterprise (15)

Windstream Webinar: Maximizing Your IT Budget
Windstream Webinar: Maximizing Your IT BudgetWindstream Webinar: Maximizing Your IT Budget
Windstream Webinar: Maximizing Your IT Budget
 
Windstream Webinar: Making Your Business More Productive With MPLS Networking...
Windstream Webinar: Making Your Business More Productive With MPLS Networking...Windstream Webinar: Making Your Business More Productive With MPLS Networking...
Windstream Webinar: Making Your Business More Productive With MPLS Networking...
 
Windstream Webinar: Demystifying VoIP for Business
Windstream Webinar: Demystifying VoIP for BusinessWindstream Webinar: Demystifying VoIP for Business
Windstream Webinar: Demystifying VoIP for Business
 
Windstream Webinar: The Latest Trends in Virtualization: Is the cloud right f...
Windstream Webinar: The Latest Trends in Virtualization: Is the cloud right f...Windstream Webinar: The Latest Trends in Virtualization: Is the cloud right f...
Windstream Webinar: The Latest Trends in Virtualization: Is the cloud right f...
 
Maximizing it budget
Maximizing it budgetMaximizing it budget
Maximizing it budget
 
Windstream Webinar: Debunking Network Security Myths
Windstream Webinar: Debunking Network Security MythsWindstream Webinar: Debunking Network Security Myths
Windstream Webinar: Debunking Network Security Myths
 
White Paper: Windstream's Position on Security Compliance
White Paper: Windstream's Position on Security ComplianceWhite Paper: Windstream's Position on Security Compliance
White Paper: Windstream's Position on Security Compliance
 
White Paper: Windstream Leveraging Funding for EHR While Meeting HIPAA Requir...
White Paper: Windstream Leveraging Funding for EHR While Meeting HIPAA Requir...White Paper: Windstream Leveraging Funding for EHR While Meeting HIPAA Requir...
White Paper: Windstream Leveraging Funding for EHR While Meeting HIPAA Requir...
 
Product Information: Cloud Services
Product Information: Cloud ServicesProduct Information: Cloud Services
Product Information: Cloud Services
 
White Paper: Windstream's Position on Security Compliance
White Paper: Windstream's Position on Security ComplianceWhite Paper: Windstream's Position on Security Compliance
White Paper: Windstream's Position on Security Compliance
 
White Paper: Leveraging Funding for EHR
White Paper: Leveraging Funding for EHRWhite Paper: Leveraging Funding for EHR
White Paper: Leveraging Funding for EHR
 
White Paper: Is Your Network Safe Behind Just a Firewall?
White Paper: Is Your Network Safe Behind Just a Firewall?White Paper: Is Your Network Safe Behind Just a Firewall?
White Paper: Is Your Network Safe Behind Just a Firewall?
 
White Paper: Analyzing MPLS from an ROI Perspective
White Paper: Analyzing MPLS from an ROI PerspectiveWhite Paper: Analyzing MPLS from an ROI Perspective
White Paper: Analyzing MPLS from an ROI Perspective
 
Case Study: Windstream Healthcare Christus St. Michael
Case Study: Windstream Healthcare Christus St. MichaelCase Study: Windstream Healthcare Christus St. Michael
Case Study: Windstream Healthcare Christus St. Michael
 
Case Study: Windstream Capitol Broadcasting
Case Study: Windstream Capitol BroadcastingCase Study: Windstream Capitol Broadcasting
Case Study: Windstream Capitol Broadcasting
 

Último

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Último (20)

Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 

Windstream Webinar: “Data Centers: Outsource or Own?” with Forrester Research

  • 1. Data Centers: Outsource or Own? Presented by: Rachel Dines, Forrester Research, Inc. Christopher Nicolini, Windstream Hosted Solutions Nov. 17, 2011
  • 2. Introduction Today’s Presenters: Rachel Dines, Research Analyst Forrester Research, Inc. Chris Nicolini, Data Center Operations Director Windstream Hosted Solutions 2
  • 3. Data center facilities are the most expensive investment in infrastructure — before making this big decision, make sure you have explored all the options! 3 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 4. Agenda Current trends in data center facilities Key factors to consider when sourcing your facility Best practices for data center site selection Recommendations 4 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 5. More than a quarter expect to increase spend on data center and IT facilities “How do you expect your firm’s spending on data center and IT facilities to change over the next 12 months?” 49% On average, companies devote 19.3% of their hardware/infrastructure IT budget to data center and IT facilities 26% 9% 8% 5% 3% Decrease Decrease Stay about Increase Increase Don’t know more than 5%-10% the same 5%-10% more than 10% 10% Base: 2100 IT decision-makers at enterprises and SMBs worldwide 5 © 2011 Forrester Research, Inc. Reproduction Prohibited Source: Forrsights Hardware Survey, Q3 2011
  • 6. Overall trends !  Interest in data center outsourcing is increasing due to: –  Lower initial cost. –  Improved speed to market. –  Consolidation of smaller computer rooms and facilities. –  Expansion as older data centers run out of capacity. –  Business continuity requirements. !  Still, there are valid reasons to build your own data center 6 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 7. The use of colocation and managed services for provisioning recovery sites is on the rise “How do you provision your recovery site?” We own the site 46% Shared fixed-site IT infrastructure at a 31% service provider Colocation site 17% Multi-tenancy managed hosting 13% Dedicated fixed-site IT infrastructure 9% at a service provider Dedicated managed hosting 7% Cloud-based 4% Other 4% Base: 180 disaster recovery decision-makers and influencers at business globally with a recovery site (multiple responses accepted) 7 © 2011 Forrester Research, Inc. Reproduction Prohibited Source: Forrester/Disaster Recovery Journal November 2010 Global Disaster Recovery Preparedness Online Surveys
  • 8. Agenda Current trends in data center facilities Key factors to consider when sourcing your facility Best practices for data center site selection Recommendations 8 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 9. The spectrum of data center sourcing options In-house Outsourced Infrastructure outsourcing/ Own and operate managed data center services/ hosting Colocate data IaaS/Cloud or center strategic right- sourcing Less managed More managed 9 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 10. Key considerations: power Build Outsource !  Power is limited by what the utility company can !  Better access to power deliver to your location. !  More competitive rates on !  Power costs will be at the power local commercial rate. !  Wholesalers: actual power costs at industrial or lower negotiated rate !  Retailers: flat rate for a fixed capacity circuit, which includes markup 10 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 11. Key considerations: cost model Outsource !  Costs are low or nonexistent upfront (usually equivalent to Build first month’s rent). !  Costs are high upfront, then !  Ongoing costs are for rent and continued maintenance, power, power and are much more and security costs are ongoing. predictable. !  Costs can be unpredictable !  Costs are predominantly due to break/fix and operational expenditure. maintenance. !  Infrastructure and power costs will be higher due to less purchasing power. !  Costs are predominantly capital expenditure. 11 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 12. Key considerations: flexibility and control Outsource Build !  Changes in requirements can !  Slower to accommodate be accommodated very quickly changes in IT/business as colocation providers are requirements (power, space, constantly building out etc.) additional space. !  Time-to-market for initial build !  Construction is often modular, can take years for a traditional easy, and quick to expand. facility. !  Time-to-market is measured in !  More control over operating weeks. environment (maintenance windows, temperature, access !  Less control over the facility control, cooling systems, infrastructure, etc.) 12 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 13. Other key points to consider Build !  It’s hard to plan for a life span of Outsource 20-plus years. !  Outsourced data centers are run !  Building out too much space can by professionals with extensive be costly, as it is inefficient to run experience running mission- an empty site. critical facilities. !  Most companies don’t have the !  Outsourced facilities house an expertise on staff to design and ecosystem of potential partners build a facility. (network providers, trading !  Bringing multiple network platforms, hosting providers, providers to your facility will be cloud providers, etc.). costly. !  Outsourcing commodity services can allow you to concentrate on more strategic ones 13 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 14. Agenda Current trends in data center facilities Key factors to consider when sourcing your facility Best practices for data center site selection Recommendations 14 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 15. Where in the world should you put your data center? !  Most companies prefer to keep their data centers close to their corporate headquarters, however consider the following… –  Companies with headquarters in expensive (real estate and power costs) or risky regions should consider locating their data centers elsewhere –  The majority of IT systems today can be managed remotely –  For tasks that require a physical presence (i.e., racking and stacking, swapping tapes, etc) consider using a data center provider’s “remote hands” 15 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 16. Checklist data center site selection "  Cost of labor, real estate, utilities, and taxes "  Natural and manmade threats "  Economic and political risk "  Availability, stability, and reliability of power and space "  Telecommunications availability "  Accessibility of the location "  Ability to utilize green technologies "  Availability of local talent 16 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 17. Fewer companies locate the recovery site beyond 1000 miles What is the distance between your primary data center and your furthest backup data center, in miles? Greater than 1000 20% miles 13% 500 to less than 1000 13% miles 17% 250 miles to less than 13% 500 miles 14% 100 to less than 250 2007 (n=238) 6% miles 11% 2010 (n=180) 50 miles to less than 10% 100 miles 11% 25 miles to less than 15% 50 miles 15% Less than 25 miles 22% 21% Base: Disaster recovery decision makers and influencers at businesses globally with a recovery site (percentages may not total 100 due to rounding) 17 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 18. Agenda Current trends in data center facilities Key factors to consider when sourcing your facility Best practices for data center site selection Recommendations 18 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 19. Recommendations for getting started Define business requirements •  Before you begin, make sure you know the business requirements for your facility: •  Availability and resiliency (Tier III or Tier IV?) •  Future growth (ability to accommodate acquisitions or new products, etc.). •  Speed to market (how quickly do you need to be able to provision new capacity?) Start capacity planning •  However you provision your data center, knowing your current and future capacity is key to achieving ROI. Plan for future flexibility •  Even if you plan today for future IT growth, business requirements are constantly changing. •  Plan with your data center provider or architect your facility for flexibility. 19 © 2011 Forrester Research, Inc. Reproduction Prohibited
  • 20. Operational Insights Chris Nicolini, Director of Data Center Operations for Windstream Hosted Solutions 20
  • 21. Windstream Corp. Snapshot" S&P 500 company with full suite of IP-based voice and data services, MPLS networking, data center and managed hosting services and communication systems to businesses and government agencies •  $4 billion in annual revenues •  10,000 employees •  29 states and District of Columbia •  Data centers: 13 •  60,000 route miles of local and long-haul fiber network 21"
  • 22. Presence 22
  • 23. Trusted by Top Brands Biotech/Healthcare Technology Retail/Consumer Banking/Finance Digital Media 23
  • 24. Data Center Overview !  Tier II and III, SAS 70 Type II compliant data centers !  System + System uninterruptible power supply (“UPS”) systems, and carrier neutral network connections !  Heating, ventilation and air conditioning (“HVAC”) systems to maintain temperature and humidity within strict tolerances !  Hardened facilities with automated facility management tools !  Fire control with early warning smoke detection, clean agent suppression and/ or dry-pipe sprinkler system !  24 x 365 NOC & facilities staff provide for high security externally and internally !  Service Level Agreement (“SLA”) backed guarantee of 100% power availability !  Modular builds - most expansions are less than four years old (10k sf or larger) !  24-36 in raised floor no open systems or racks 24
  • 25. Build vs. Buy Costs of building Data Center Space $1250 - $2000 / sqft – Initial Cost Redundant Internet 1000 sqft data center = $1.25 -$2.0 Million in CAPEX *Maintenance & Repair = $150K - $250K / year Human Capital = $150K - $400K / year Utility Power Cost = $300K-600K / year * Does not include maintenance on IT / Network Equipment - All costs except utility power are fixed in the short term 25
  • 26. Distractions from your core competency !  Facility Infrastructure Maintenance !  Capacity Management !  Physical Security 26
  • 27. Infrastructure Maintenance !  Facility Maintenance is a full time function !  Generator (M, Q, A) !  ATS (A & 5yr) !  Switchgear (A & 5 yr) !  UPS (Q and A) !  Batteries (Q, A, and 5 yr) !  PDU (Annual) !  HVAC (Q) !  Fire (S & A) M = Monthly, Q = Quarterly, S = Semi-Annual, A = Annual, and 5 yr = 5 year 27
  • 28. Capacity Management Areas often overlooked: Power !  Redundancy at the Panel, PDU, UPS, Gen, and Utility !  Seasonality - 35% swing causes overages Internet Capacity !  Circuits sized for average speeds are overwhelmed by seasonal traffic or single upstream provider outage HVAC !  Power Density growth 28
  • 29. Physical Security !  24/7 staffing for security takes a lot of effort Redundant Internet Redundant Internet !  Complete Physical Security is hard to achieve !  Camera system storage is time consuming and expensive !  Card and Biometric systems require constant monitoring / maintenance !  Documentation for Receiving / Shipping of packages and critical media is difficult !  Compliance Concerns !  SSAE 16 Standards are very high !  Compliance standards are “Order Qualifiers” for hosting providers 29
  • 30. Summary Q&A 30
  • 31. 31