SlideShare uma empresa Scribd logo
1 de 31
Baixar para ler offline
Building Performance Evaluation Meta-Analysis
Insights from Social Housing Projects
Federico Seguro
improving the use of energy in buildings
Insights from Social Housing Projects: BPE meta analysis i
improving the use of energy in buildings
!
!
!
!
!
!
!
!
!
!
!
CONTACT DETAILS
Main!Contact:!!Federico!Seguro,!Energy!Specialist!
Email:!federico.seguro@nef.org.uk!
Tel:!01908!665555!
Direct:!01908!354530!
!
Prepared by: Federico Seguro Date: 22/12/2015
Edited by: Luke Smith Date: 22/12/2015
Authorised by: Malcolm Hanna Date: 22/12/2015
1
CONTENTS
Synopsis 1
1. Background 4
2. Context Setting 7
General data 7
Organisational data 8
Occupancy data 8
Property and construction data 8
Building services 10
3. Performance Gap 12
Fabric testing 12
Energy system commissioning 17
Thermo-hygrometric comfort & IAQ 22
4. Process & Culture 24
Process review 24
Learnings 27
References 29
Synopsis
In England there were 30,590 new homes added to the social rented
sector in 2013/14 which represented 25% of all new homes that year
(DCLG, 2014). In contrast to private developers, Registered Providers (RPs)
typically demonstrate a greater understanding of the risks associated with
failing to deliver upon the designed performance targets of a new
dwelling. This is due to the fact that in most cases the RPs are responsible
for the resident that occupies the home and also the long term
management and maintenance of the property.
It is clear from this study that many RPs are aware of the key role that
skills, training and leadership play in bridging the performance gap.
However, what is less understood is the business case in terms of best
practices and success factors that should underpin a social housing
development throughout its whole lifecycle, from the specification of
procurement and design, to the implementation of construction,
handover, operation and maintenance (O&M).
The Building Performance Evaluation (BPE) programme was an £8m
competition funded by Innovate UK (formerly, Technology Strategy Board)
to evaluate and assess the post-construction and in-use performance of
both domestic and non-domestic buildings. There were 52 new housing
projects funded in total, of which 54% (28 projects) were led by RPs.
The National Energy Foundation (NEF) has been commissioned by
Innovate UK to undertake an analysis of the data arising from all 28 of the
RP led projects. These 28 projects are made up of 83 test dwellings in
total. Termed the BPE Social Housing Meta-Analysis, the primary
objectives have been to identify the following:
key success factors (where things worked well and not so well);
practices which resulted in a significant performance gap;
Abbreviations: BPE, Building Performance Evaluation; BUS, Building User Satisfaction; CHP,
Combined Heat and Power; COP, Coefficient of Performance; DHW, Domestic Hot Water;
DomEARM, Domestic Energy Assessment and Reporting Methodology; IAQ, Indoor Air
Quality; MCS, Microgeneration Certification Scheme; M&E, Mechanical & Electrical; MV,
mechanical ventilation; MVHR, mechanical ventilation with heat recovery, NEF, National
Energy Foundation; O&M, operation and maintenance; RPs, Registered Providers; SAP,
Standard Assessment Procedure; TRV, thermostatic radiator valves; TSB, Technology
Strategy Board.
Insights from Social Housing Projects: BPE meta analysis
2
relative impact of specific attributes such as defects and building
services on the performance gap.
The ultimate objective of the study was to inform the wider sector and
empower RPs towards taking a lead and becoming champions in
combating the performance gap between designed and as-built.
This Executive Report condenses the key findings that emerged from the
extensive NEF BPE Meta-Analysis. The headline findings of a series of
critical subject areas are outlined below.
Fabric performance
1. The average as-built external wall U-value of 0.220 W m-2
K-1
exceeds
the average design U-value of 0.164 W m-2
K-1
, with 9 properties (32%)
failing to meet Part L1a backstop. Regular on-site inspections are
recommended to make sure that the build is being delivered in line with
design specifications, in particular with respect to insulation installation.
2. The air tightness of 46% of the BPE test dwellings was below the
design intent. All of them performed within the mandatory limits. The
average air leakage rate of 4.4 m3
h-1
m-2
@ 50 Pa outperformed the
average design specification of 4.93 m3
h-1
m-2
@ 50 Pa.
Energy system commissioning
3. Conventional space heating systems such as fossil fuel boilers were
associated with a marginal occurrence of issues (0.20 per installation). In
contrast, up to 1.60 issues were reported per heat pump system
installed.
4. 67% of the plots analysed opted for a mechanical ventilation with
heat recovery (MVHR) system as ventilation strategy yet its applicability
in social housing is questionable given a number of issues mainly
attributable to occupants’ interference, symptomatic of lack of training,
and inadequate maintenance regime (1.14 issues per installation). Also,
when looked at alongside the mean air leakage rate of 4.4 m3
h-1
m-2
@
50 Pa, where 3.0 m3
h-1
m-2
@ 50 Pa is deemed the threshold for MHVR,
the manner in which design and specification decisions are being made
appears ineffective.
5. Sub-optimal design and control specifications are at the root of many
issues encountered in solar thermal systems, with a notable lack of
coordination between contractors and installers reported (0.50 issues
per installation). Solar photovoltaic emerges as a more reliable
technology, well supported by third party quality assurance schemes
(0.17 issues per installation).
Comfort and IAQ monitoring
6. A limited number of test dwellings experienced under heating and
hygrometric issues from inadequate relative humidity levels (14 and 12
test dwellings). This is crucial for the RPs’ potentially fuel poor household
target.
7. Overheating was more frequent (33 test dwellings), mainly due to
occupant window opening behaviour, sub-optimal building design and
glazing specifications.
8. Poor indoor air quality (IAQ) levels were generally monitored in
mechanically ventilated buildings due to ineffective mechanical
ventilation systems or occupants switching off the MV units because of
the noise (total issues in 19 test dwellings).
Process and Culture
9. The process review and impact assessment found Soft Landings
reported as a useful framework, underpinning successful procurements
and best practice.
Insights from Social Housing Projects: BPE meta analysis
3
10. Very few issues were reported by the project evaluators in relation to
the Design Phase of any project. This is perhaps partly symptomatic of
the conscious environmental design that lies at the heart of the BPE
projects but also evidence of a failure to recognise the importance of
early design and specification decisions on the long term performance of
buildings. Remarkably, only 5 of the 28 projects highlighted that
substantial problems occurred across the Construction Phase which had
a considerably negative impact on the final product.
11. O&M stands out as the most critical phase where ongoing occupant
support is often missing (16 references to bad practice) whilst an
accessible induction was generally provided at the Handover Phase (19
references to good practice)
12. All projects converge on the added value associated with BPE studies
and although recognising the steep learning curve, many noted the
sizable opportunities to transfer the skills gained into future
developments.
Building diagnostics
13. The overall building performance evaluation methodology prescribed
by the BPE programme comes out as a powerful means of bridging the
gap between designed and actual energy use that ought to be at the
forefront of the political agenda towards meeting the Government CO2
targets and commitment to ensuring new homes perform as designed.
Insights from Social Housing Projects: BPE meta analysis
4
1. Background
The National Energy Foundation (NEF) has been commissioned to
undertake a meta-analysis of the social housing projects carried out as
part of the £8m Building Performance Evaluation (BPE) Programme run
from 2010 to 2014 by Innovate UK (formerly Technology Strategy Board).
There were 28 BPE projects in total which included the participation of a
Housing Association as key actor. Each of these has been extensively
reviewed and the associated findings were condensed according to:
key success factors (where things worked well);
practices which resulted in a significant performance gap;
relative impact of specific attributes such as defects and building
services on the performance gap.
The study targets a specific user, namely Registered Providers (RPs)
(formerly known as Registered Social Landlords). RPs are different from
many housing developers in that as owners of new properties they have
long term maintenance responsibilities i.e. very clear means, and usually
capability, to apply lessons from BPE projects into new developments. An
additional benefit is that across the sector RPs have been very receptive to
recognise that there is a significant performance gap between new build
specifications and real life operation. Many RPs recognise that new in-
house and supply chain skills are necessary to deliver energy efficient, and
affordable, social housing. What is generally less understood is:
the relative importance of the cause and effect of performance
gaps, as well as the associated costs of mitigation / operation;
‘best practice’, or ‘success factors’ at the process (specification,
procurement, through to validation tests, handover and operation
and maintenance), as well as at a technology level, to bridge the
performance gap;
the economic (business) case for taking action / incurring costs to
mitigate the situation.
The 28 BPE projects reviewed as part of the meta-analysis sorted by
project ID, study phase, lead organisation and tenure type are listed in
Table 1. Phase 1 projects covered the post completion and early
occupation phases (6-9 months from handover) whilst Phase 2 projects
focused on in-use and post-occupancy typically covering two heating
seasons.
The NEF Meta-Analysis consisted of 3 tiers of analysis at an intra-project
level providing different levels of information for each project:
A second phase concerned the aggregation of the findings at an inter-
project level to come up with the anonymised findings presented in this
Report.
In this regard, it is recognised that the exemplary projects part of the BPE
programme outperform the current common practice, a caveat is that
they cannot be considered representative of the UK new construction
sector, also in the light of the limited sample of projects i.e. the findings
are not statistically significant.
> General data
> Organisational
data
> Occupancy data
> Property data
> Construction data
> Building services
> Energy performance
assessment
> Fabric testing
> Building services
> Thermo-hygrometric
comfort
> Indoor Air Quality
> Procurement process
> Design process
> Construction process
> O&M process
> Handover
> Commissioning
> Soft landings
> Summary Matrix
Context Performance Gap Process & Culture
> Aggregation of the findings
Intra-project tier
Inter-project tier
Insights from Social Housing Projects: BPE meta analysis
5
Table 1: List of RP / social housing driven BPE projects under review as part of the Meta-Analysis.
Project ID Project name BPE
phase
Lead organisation Tenure No of
properties
450013
450040
Land at Dormary Court 1-2 Joseph Rowntree Housing Trust Mixed 4 houses + 2
bungalows
450018
450050
Lyndhurst Crescent, Swindon 1-2 NPS North East Limited Social rent 13 houses
450014
450070
PassivHaus Bungalow Development, Houghton-le-
Spring
1-2 Gentoo Group Rent 28 bungalows
450016
450020
Building Performance of High Density Apartments 1-2 A2Dominion Homes Limited Mixed 23 flats
450019
450066
Future Works social housing Passive House
prototypes
1-2 bere:architects Freehold 2 houses
450021 Cross Lane Development, Barnsley 1 Sheffield Hallam University Mixed 18 rental + 4
shared
ownership
450038 Hastoe HA - 14 Passivhaus at Wimbish 2 Hastoe Housing Association Mixed 6 flats + 8
houses
450054 Bloom Court 2 Hanover (Scotland) Housing Association Social lease 6 houses
450055 The Glasgow House 1 Glasgow Housing Association None 2 houses
450056 The Quarries Sheltered Housing 1 Dunedin Canmore Housing Association Rent 58 flats
450065 Knights Place Passivhaus Housing for Exeter City
Council
2 Gale & Snowden Architects Limited Rent 18 blocks
450069 Monitoring of an estate near Rotherham 2 Verco Social housing 24 houses
450071
450080
Dungannon Passivhaus 1-2 Choice Housing Social housing 5 houses
450073 Scotland's Housing Expo 2 Architecture and Design Scotland Mixed 52 houses
450076 Rowan House Passivhaus Social Housing for Exeter
City Council
2 Gale & Snowden Architects Limited Rent 3 flats
Insights from Social Housing Projects: BPE meta analysis
6
Project ID Project name BPE
phase
Lead organisation Tenure No of
properties
450079 A New Code 4 Approach - High Fabric Insulation with
Simple Heating Service
1 South Western Housing Society Social lease 10 houses + 2
flats
450081 Tigh-Na-Cladach affordable housing: 1 Passivhaus
home & 2 low-energy homes
2 Glasgow School of Arts Shared ownership 15 houses
450082
450105
Cross Street, Gainsborough 1-2 Longhurst Group Social rent 7 houses
450083 In-use and Post Occupancy Evaluation in Low Carbon
Apartments
2 Connect Housing Social rent 14 flats
450093 Lea Field Court 1 Joseph Rowntree Housing Trust Mixed 13 houses
450096 Thames Valley Houses in Feltham 2 Thames Valley Charitable Housing
Association
Social rent 10 houses
450098 Derwenthorpe 1 Joseph Rowntree Housing Trust Mixed 540 houses
450099 Sinclair Meadows Carbon Negative Community
Village, Reed Street
2 Four Housing Group (Berwick & North) Rent 9 houses + 12
flats
450100 Bryan House scheme, Bicester 1 Sanctuary Housing Association Rent 7 houses + 16
flats
450101 Garscube Road Housing - 3 sheltered flats and 3
mainstream flats
2 Queens Cross Housing Association
Limited
Rent 117 houses
and flats
450102 Seager Distillery Site Housing Development 2 AECOM Mixed 38 social
rented flats
and 92 private
flats
450103 Aberfawr Terrace, Abertridwr, Caerphilly 2 United Welsh Housing Association Social rent 13 houses + 8
flats
450104 Barrhead, Murray Place 2 Hanover (Scotland) Housing Association
Ltd
Leasehold 16 houses
Insights from Social Housing Projects: BPE meta analysis
7
2. Context Setting
General data
BPE Phases
Of the 28 RP led projects that have been reviewed, 25% (7) belonged to BPE
Phase 1 Post construction and early occupation; 50% (14) to Phase 2 In-use
performance and post occupancy evaluation; and 25% (7) undertook both Phase
1 and Phase 2 (Figure on the right).
Building Procurement Contract
The majority of RP led projects (12) have been procured on a Design and Build
basis. In 6 cases the type of building procurement contract was not stated
(Figure at the bottom).
Tenure
Mixed ownership (8 projects) was the most common type of tenure, followed
by Standard (7) and Social (5) Rent.
21%
43%
4%
4%
7%
4%
7%
4%
4%
4%
Not stated
Design and build
Traditional, with standard JCT
Unusual procurement being the project a test construction
JCT Traditional Intermediate Form of Building Contract
Partnering scheme
Traditional
NEC3 Engineering and Construction Option A 2005
Traditional + Design and Build post planning
Traditional procurement using SBCC 2008
29%
7%
18%
7%
25%
4% 4%
7%
Mixed Social housing Social rent Social lease Rent Leasehold Freehold Other
25%
Phase 1 only
50%
Phase 2 only
25%
Phase 1-2
Insights from Social Housing Projects: BPE meta analysis
8
Organisational data
Experienced in sustainable building design
8 project teams declared former experience in sustainable building
design
3 project teams didn’t have previous experience in this field
Insufficient evidence to make a call in the other 17 projects
Experienced in social housing
9 project teams already dealt with social housing
1 project team didn’t
Insufficient evidence to make a call in the other 18 projects
Occupancy data
Occupancy type
17 projects of mixed use
6 projects for eldery
1 project with sheltered occupants
Property and construction data
Focus BPE dwellings
In total, 83 properties undertook the BPE study - each project on average
consisted of 2 test dwellings.
41 houses
29 flats/apartments
8 bungalows
1 cottage
4 unknown property types
Construction Standard
26 CSH Level 4
15 National Technical Standard
12 Passivhaus
12 CSH Level 5
6 Ecohomes – excellent
5 CSH Level 3
3 Green Guide to Housing Specification
2 CSH Level 6
28%
11%
61%
Experienced in sustainable building
design
Not experienced in sustainable
building design
Not stated
32%
4%
64%
Experienced in social housing
Not experienced in social housing
Not stated
7%
61%
4%
21%
7%
Unknown
Mixed
Sheltered
Elderly
Other
Insights from Social Housing Projects: BPE meta analysis
9
BPE dwellings characterised in relation to the property type and the construction standard: across each project (above) and in total terms (below).
0
1
2
3
4
5
6
7
8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
NooffocusBPEdwellings
Project ID
Property type vs Construction Standard
Cottage House Flat/ Apartment
Bungalow Unknown National Technical Standard
Passivhaus CSH Level 3 CSH Level 4
CSH Level 5 CSH Level 6 Green Guide to Housing Specification
Ecohomes - excellent
1%
49%
35%
10%
5%
Cottage
House
Flat/ Apartment
Bungalow
Unknown
Property type
2%
18%
14%
6%
31%
14%
2%
4%
7%
Unknown
National Technical Standard
Passivhaus
CSH Level 3
CSH Level 4
CSH Level 5
CSH Level 6
Green Guide to Housing Specification
Ecohomes - excellent
Construction Standard
Average
Insights from Social Housing Projects: BPE meta analysis
10
Building thermal mass
The thermal inertia of the BPE test dwellings was categorised according to the
construction type specified by the BPE evaluators (heavy vs lightweight). In total,
30 projects reported a heavyweight construction; 22 were described as
lightweight and 31 did not declare the thermal mass.
Main glazing type
The projects have shown an approximately even spread in terms of glazing
types. Triple glazing was the most common being reported in 37 test dwellings,
followed by double glazing in 30 dwellings. In 16 cases the type of glazing was
not declared.
Building services
Primary space heating systems
The most recurring space heating systems were the traditional fossil
fuel fired combi and standard boilers
Electric heating was a common alternative in particular in Passivhaus
certified properties typically reliant upon electrically integrated heat
pumps
Exhaust and air-source heat pumps were the most common types of
heat pumps in use (10% and 6%)
Although still uncommon in the domestic sector, combined heat and
power (CHP) was used in 9 of the BPE test dwellings
Space heating controls
Time and temperature resulted the most common space heating
control in place, followed by thermostat and thermostatic radiator
valves (TRVs)
5% of the BPE test dwellings did not specify the type of control in use
37%
27%
36% Unknown
Lightweight
Heavyweight
19%
29%
7%
23%
22% Unknown
Double glazing
Double glazing low-e
Triple glazing
Triple glazing low-e
2%
23% 24% 7% 2% 6% 14% 10% 11%
2
19 20
6
2
5
12
8 9
Not stated Fossil fuel
boiler
(standard)
Fossil fuel
boiler
(combi)
Biomass
boiler
(combi)
Ground
source
heat pump
Air source
heat pump
Electric
heating
Exhaust air
heat pump
Communal
heating
CHP
5% 16% 2%
28% 42% 5% 2%
4
13
2
23
35
4 2
Not stated Thermostat Time clock Thermostat
and TRV
Time and
temperature
control
None Other
Insights from Social Housing Projects: BPE meta analysis
11
Domestic hot water systems
Domestic hot water (DHW) was predominantly supplied from the main
heating system
Electric water heating occurred in 13 dwellings
Fossil fuel standard boilers run in 12 properties
Passive and mechanical ventilation (MV) systems
The majority of ventilation systems in place consisted of mechanical
ventilation with heat recovery (MVHR) (67%)
Mechanical ventilation with no heat recovery was marginal (5%)
24% of the test dwellings had extract only and relied upon natural
ventilation
Renewables
80% of the properties exploited renewable sources to cover a part of
the energy demand
Solar thermal was exploited in 28 of the properties, solar photovoltaic in
23 properties. Both systems operated in 15 properties
Design U-values
All of the properties have design U-values within the Part L1A limiting fabric
parameters.
Min: 0.088 W m-2
K-1
(wall); 0.076 W m-2
K-1
(floor); 0.074 W m-2
K-1
(roof)
Max: 0.280 W m-2
K-1
(wall); 0.250 W m-2
K-1
(floor); 0.190 W m-2
K-1
(roof)
Average: 0.164 W m-2
K-1
(wall); 0.142 W m-2
K-1
(floor); 0.122 W m-2
K1
(roof)
24%
10%
14%
1%
7%
10%
16%
5%
2%
11%
20
8
12
1
6
8
13
4
2
9
Fossil fuel boiler (combi)
Exhaust air heat pump
Fossil fuel boiler (standard)
Hot water cylinder
Biomass boiler (combi)
Not stated
Electric water heater/immersion heater
Air source heat pump
Ground source heat pump
Communal heating CHP
2%
5%
67%
1%
24%
2
4
56
1
20
None
Mechanical ventilation
MVHR
Passive ventilation
Extract only
20%
34%
28%
18% None
Solar thermal
Solar photovoltaic
Solar thermal and photovoltaic
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
DesignU-Value(Wm-2K-1)
Main wall Main ground floor Main roof
Part L1A - walls
Part L1A - floors
Part L1A - roof
Insights from Social Housing Projects: BPE meta analysis
12
3. Performance Gap
Fabric testing
U-value testing – Introduction
At the core of the performance gap, underperforming building envelopes deviating from the design intent result in higher transmission losses through the building
fabrics and contribute to building energy use being higher than originally predicted (ZCH, 2014a; 2014b). This might be due to a number of reasons such as flawed
design calculations, quality of materials below what expected or inaccuracies of testing equipment.
The charts below compare the design vs as built thermal transmittances of external walls and roof/ceilings in the dwellings object of U-value testing. The two
doughnut-charts at the bottom summarise the respective incidence of the performance gap across the test dwellings in terms of number of properties below and
above (0-25% / 25-50% / 50-100% and +100%) the design U-value. The key findings are finally discussed.
71%
26%
14%
20%
332%
207%
154%
26%
25%
0%
-8%
-23%
8%
-8%
-29%
-36%
-14%
36%
-13%
7%
-7%
113%
80%
20%
163%
153%
61%
-22%
19%
17%
31%
14%
28%33%
6%
162%
37%
4%
20%
190%
-14%
-33%
-43%
4%
91%
-8%
-44%
-15%
-100%
-50%
0%
50%
100%
150%
200%
250%
300%
350%
400%
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
P22/1
P24/1
P24/2
P26/1
P18/2
P14/1
P18/1
P16/1
P16/2
P12/1
P12/1
P23/1
P23/1
P23/2
P06/1
P06/2
P11/4
P17/1
P05/1
P05/2
P15/4
P20/1
P20/1
P20/2
P13/3
P07/1
P02/1
P15/1
P19/1
P19/2
P19/3
P19/4
P19/5
P19/6
P21/1
P27/2
P01/1
P01/2
P23/1
P10/1
P08/1
P08/2
P17/3
P04/2
P09/1
P03/1
P04/1
P15/2
Thermaltransmittance(Wm-2K-1)
BPE test dwelling ID
Design vs As Built External Wall U-values
Design U-value As built U-value Part L1A limit
Insights from Social Housing Projects: BPE meta analysis
13
78% 44%
620%
392%
15%
146%
14%
-31%
100%
-100%
0%
100%
200%
300%
400%
500%
600%
700%
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
P12/1
P26/1
P09/1
P01/1
P12/1
P20/1
P15/2
P15/1
P04/1
Thermaltransmittance(Wm-2K-1)
BPE test dwelling ID
Design vs As Built Roof/Ceiling U-values
Design U-value As built U-value Part L1A limit
Performance gap frequency - wall U-values Performance gap frequency - roof U-values
11%
Below as-design
22%
0-25% above target
11%
25-50% above target
11%
50-100% above target
44%
+100% above target
33%
Below as-design
27%
0-25% above target
15%
25-50% above target
8%
50-100% above target
17%
+100% above target
Insights from Social Housing Projects: BPE meta analysis
14
U-value testing – Key Findings
Walls
o In 33% of the BPE test dwellings the external walls were performing in line or below the target U-value. This witnesses the value of these exemplary
buildings that are pioneering a shift of culture within the UK domestic building stock.
o The overall average as-built U-value of 0.220 W m-2
K-1
exceeds the average design U-value of 0.164 W m-2
K-1
.
o 9 properties were above PartL1a fabric limit of 0.30 W m-2
K-1
.
Roofs and ceilings
o 1 out of the 9 properties under review was below the design U-value.
o The overall average as built U-value goes beyond the building regulations backstop.
o This is where the major opportunity for improvement lies and stresses the urgency of improved insulation detailing on both warm and cold roofs, in
particular with regard to discontinuities in the loft insulation layer often interrupted as an after-thought through service penetrations.
Floors
o 3 properties carried out ground floor U-value testing, with design targets in the region of 0.10 to 0.20 W m-2
K-1
and actual performance varying from 0.10
to 0.405 W m-2
K-1
.
Recommendations
o Energy conscious design and the implementation of quality control systems on a par with the Passivhaus Certification system as key leverages to bridge
the gap between design specifications and in‐situ measured values.
o Service penetrations to be concentrated in carefully controlled zones.
o Skilled workmanship.
o Construction databases to better reflect the thermo-physical characteristics of the construction materials on the market and address materials
underperforming compared to their specifications.
Air tightness testing – Introduction
Whilst ventilation plays a key role for pollutant dilution and to mitigate condensation phenomena, uncontrolled air infiltration through the building fabric
(background ventilation) can give rise to thermal discomforts and excessive ventilation losses increasing the building energy consumption. The Building Regulation
Approved Document L1a sets out a binding air leakage rate of 10 m3
m-2
h-1
at a 50 Pa pressure differential. However, mechanically ventilated buildings levering on
the ‘build tight-ventilate right’ principle can aim at values as low as 0.50 m3
m- 2
h-1
as specified by the Passivhaus standard. The average air infiltration rate In the
UK domestic building stock is estimated at approximately 11.5 m3
m- 2
h-1
(Stephen, 2000).
The in-situ air tightness tests undertaken in 74 BPE test dwellings have been compared against the design intention using an average when multiple tests were
carried out. The results are plotted in the chart below and then aggregated in the doughnut chart. The key findings are finally discussed.
Insights from Social Housing Projects: BPE meta analysis
15
43%
65%
71%
45%
102%
38%
-15%
-10%
-42%
-15%
48%
118%
89%
233%
66%
40%
40%
75%
135%
193%
706%
-33%
-19%
28%
83%
98%
19%
100%
100%
183%
158%
-3%
13%
24%
-3%
81%
87%
30%
1%
1%
83%
-5%
56%56%
39%
52%
23%
12%
-46%
3%
-60%
-58%
-47%
-37%
-21%
-40%
-21%
-53%
-48%
-7%
-26%
-63%
-65%
-62%
-92%
-63%
-58%
-42%
-43%
-43%
-46%
-41%
-44%
-60%
-2.0
-1.0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
Fabricairpermeability(m3m-2h-1@50Pa)
Design vs In Situ Air Tightness
Designed air tightness In situ air tightness testing Part L1a limit Average UK
[Equipment fault?]
Insights from Social Housing Projects: BPE meta analysis
16
Air tightness testing – Key Findings
o Nearly half of the BPE test dwellings reviewed successfully perform to a high standard and as per the design intent
o BPE test dwellings were very airtight by UK standards. The average in-situ air leakage is as low as 4.4 m3
m- 2
h-1
@ 50 Pa and below the average design
specification of 4.93 m3
m- 2
h-1
@ 50 Pa.
o Apart from one test possibly biased by a technical fault, all tests perform below backstop Part L1a target and the UK average air permeability.
Recommendations
o Maximise air tightness and design a bespoke ventilation build tight-ventilate right strategy.
o Embed an airtightness testing strategy within the construction programme to implement at pre-determined time steps.
o Avoid supplementary controllable ventilators typically placed as an after-thought by the installer as their impact on the thermal performance of the
building envelope is frequently poorly understood.
o Be mindful of progressive drops in airtightness levels due to degradation of seals over time.
o Airtightness targets to be well communicated, evaluate training for on-site personnel.
o Co-ordination between building contractors and Mechanical & Electrical (M&E) contractors to prevent unwanted air leakage paths to accommodate
service outlets.
o Take into account the impact of how the occupant operates natural ventilation on indoor environmental conditions.
Performance gap frequency - Air Tightness
46%
Below as-design
11%
0-25% above target
12%
25-50% above target
18%
50-100% above target
14%
+100% above target
Insights from Social Housing Projects: BPE meta analysis
17
Energy system commissioning
Introduction
Commissioning plays a pivotal role in running the building energy systems in conformance with the design intent and prevent problems from deteriorating over
time if not promptly addressed. The key issues flagged by the BPE evaluators across a variety of building services & technologies have been analysed to give RPs
an understanding of which problems are more likely to occur in relation to specified systems.
Building services &
renewables
Energy system # test dwellings # key issues reported # key issues per installation Ranking
(*legend)
Passive/mechanical
ventilation
MVHR 56 64 1.14 -
Mechanical 4 3 0.75
Extract 20 5 0.25 +
Passive 1 1 1.00
None (natural) 2 0 0.00
Total 73 0.88
Space heating Fossil fuel boiler (combi) 20 4 0.20 +
Exhaust air heat pump 8 9 1.13 -
Fossil fuel boiler (standard) 19 8 0.42 +
Biomass boiler (combi) 6 6 1.00 -
Not stated 2 0 0.00
Electric heating 12 0 0.00 +
Air source heat pump 5 8 1.60 -
Ground source heat pump 2 2 1.00
Communal heating CHP 9 6 0.67 -
Total 43 0.52
DHW Fossil fuel boiler (combi) 20 3 0.15 +
Exhaust air heat pump 8 3 0.38 +
Fossil fuel boiler (standard) 12 3 0.25 +
Biomass boiler (combi) 6 0 0.00 +
Not stated 8 1 0.13 +
Electric water heater/immersion heater 13 3 0.23 +
Air source heat pump 4 2 0.50 +
Ground source heat pump 2 0 0.00 +
Communal heating CHP 9 0 0.00 +
Hot water cylinder 1 0 0.00
Total 15 0.18
Renewables Solar photovoltaic 23 4 0.17 +
Solar thermal and photovoltaic 15 9 0.60
Solar thermal 28 14 0.50 -
None 17 0 0.00
Total 27 0.33
Insufficient sample
+ Low # of issues
– High # of issues
Insights from Social Housing Projects: BPE meta analysis
18
General Findings
Reported issues have been grouped under the general headings of services
design / operation and maintenance / installation / value engineering /
commissioning / occupants / handover / controls.
Overall, services design and installation together cover half of the total issues
reported, symptomatic of shortage of skills and training within the sector. O&M
follows with 30 issues reported, highlighting its importance throughout the
building service life and the crucial requirements for ongoing support after
handover, often neglected. Problems related to commissioning and controls are
less common, those related to occupants, handover and insufficient value
engineering marginal.
Building services & renewables
Ventilation
o Small number of issues reported per extract only systems due to the low degree of technical complexity – care when choosing the exhaust outlet location.
o Under-performance of the mechanical extraction units – endemic issue within the UK building stock?
o Insufficient sample of installs to come up with robust findings in relation to mechanical ventilation and ground source heat pumps.
o MVHR does not appear ready for widespread adoption within the social housing sector (see separated focus).
Space heating
o Combi and standard fuel boilers provide simple and well-established systems to supply the building heating energy demand with marginal occurrence of
issues – potentially exemplifying the contrast between how the industry copes well with something established and relatively badly with newer
technologies stressing the crucial need of training. In respect to heat pumps in particular, the huge diversity of configurations (DECC, 2014) does not help.
o Electric heating is often suitable in properties with a very limited space heating demand (e.g. <15 kWh m-2
) – minimal issues due to ease of use and low
maintenance requirements.
o Insufficient sample of installs to come up with robust findings in relation to ground source heat pumps.
Domestic hot water
o Very few issues reported – all systems generally reliable for DHW production. Combi boilers are one of the success stories.
Renewables
o Solar photovoltaic systems have experienced few issues being a well-established technology supported by quality assurance schemes such as the
Microgeneration Certification Scheme (MCS).
o Solar thermal tells a different story (see separated focus).
25%
Services design
25%
Installation
19%
O&M
10%
Commissioning
8% - Controls
4% - Occupants
4% -Handover
3% - Value engineering 3% Other
Occurrence of building services issues
Insights from Social Housing Projects: BPE meta analysis
19
MVHR – Key findings
Heat recovery integrated mechanical ventilation is projected to achieve the
next steps in energy savings in high energy performance buildings where
ventilation heat loss covers a predominant quota of the overall building energy
demand (Fabrizio et al., 2014). However, their current applicability in social
housing is questionable as evidenced by the frequent occurrence of issues
captured by the BPE evaluators.
On average, 1.14 issues were reported per MVHR-equipped property. In
particular, O&M by vulnerable households was problematic and coupled with
system unbalancing often led MVHR to underperforming.
MVHR common issues Recommendations
Unbalanced system supply-extract (human error /
faulty equipment)
- Check filters.
- Re-balance the airflow rates.
- Test that the manufacturers supplied fans meet the minimum flow rates originally intended.
- Recommissioning or replace underperforming fans.
- Be aware of potential discrepancies in test results attributable to differences in the equipment used to undertake
the duct flow measurements, and of the weather conditions that might have affected the results (typically, very windy
days)
- Building Regs to steer in relation to flow measurements and commissioning procedures.
Blocked filters - Filter cleaning every six months as a term of contract with the maintenance team.
- Evaluate variable speed systems or CO2
detection sensors.
Occupants do not know how to operate the system - Educate occupants and show how the filters can be changed to those interested.
- Ongoing technical support.
Occupants’ interference - Knowledge transfer on optimal window opening, MVHR operation and kitchen extracts.
- Lock vents in a fixed position.
- Re-commission the system.
Difficulty of access for maintenance Ensure ease of access to the platform where the unit is installed.
Excessive system resistance and noise, leading
occupants to turning off the units
- Improved ductwork connections (flexible-rigid) at ceiling terminals avoiding bends and offsets.
- Verify if the air intake louvres are blocked causing pressure loss and the fans running more intensively to
compensate
- Educate the user to operate the system more efficiently.
Over-pressurisation of the external fabrics - Balance volume flow rate for extract and supply.
- Make sure air transfer paths via door undercuts are not excessively small (e.g. < 5 mm).
0.00 0.20 0.40 0.60 0.80 1.00 1.20
Key issues per property with MVHR installed
Servicesdesign-0.30
O&M-0.32
Installation-0.23
Valueengineering-0.02
Commissioning-0.14
Other-0.04
Occupants-0.07
Insights from Social Housing Projects: BPE meta analysis
20
Space heating – Key findings
Heat pumps were associated with a number of issues in particular at the installation phase. Frequent problems occurred in heat pumps and biomass boilers in
relation to the services design. The design of the controls not being fit for the elderly or users with restricted mobility have been reported across properties
running CHP and heat pump systems, although a correlation between the issue and the system in place does not necessarily exist.
Energy system Common issues Recommendations
All heat pumps Low installation standard e.g. unit / fan speed switch
inaccessible
Contract MCS accredited installers, on the basis of sufficient post-installation support and
maintenance guarantee through service contracts.
Incorrect temperature readings Verify that the external temperature sensor isn’t exposed to direct sunlight and compressor
and immersion sensors are correctly placed.
Unbalanced underfloor systems, inadequate flow
temperatures, lack of controls/system communication
- Training.
- Re-commissioning, collect documentation and commissioning reports.
Occupants’ interference / disengagement - Improve owner and user knowledge.
- Improve customer care, prompt response and repair services.
System performance deteriorating over time Detail maintenance schedule and seasons commissioning.
Inefficiencies during very cold weather – Coefficient of
Performance (COP) is too low
Evaluate the potential mismatch between expected (typically predetermined in the Eurovent
Certification) and real operating conditions to ensure that a heat pump averagely operates
at an appropriate output.
Biomass boilers Underperformance against manufacture’s specs,
inefficiencies and distribution losses
- Recognise that SAP indications do not necessarily reflect actual distribution efficiencies.
- Insulate ductwork.
- Evaluate if the heat demand is sufficient to offset the district heating system inefficiencies.
Inadequate temperature control zoning Refer to Domestic Heating Compliance Guide.
Restricted access to space heating programmers for
users with restricted mobility
Allow sufficient headroom for comfortable access to the programmer.
CHP Controls not user-friendly Aim at user-friendly control panels, educate the users and provide ongoing support.
Distribution losses Ensure all pipes leading from the unit have been insulated.
0.13
0.50
0.20
0.500.13
0.33
0.20
0.22
0.50
0.17
0.40
0.22
0.200.25
0.200.13
0.20
0.50
0.20
0.22
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
Exhaust air heat pump Biomass boiler (combi) Air source heat pump Ground source heat pump Communal heating CHP
Key issues per property - specified space heating energy systems
Controls
Handover
Occupants
Commissioning
Value engineering
Installation
O&M
Services design
* low sample
Insights from Social Housing Projects: BPE meta analysis
21
Solar thermal – Key findings
A considerable number of the issues emerged from the review of solar thermal
systems are associated with sub-optimal design and controls specifications that
result in incorrect setup, unforeseen failures and cost uplifts. An optimal
control system should be specified as part of the procurement relying upon
third party accredited professionals. Particular attention also on roof integrated
technologies that trade-off aesthetics with more problematic maintenance
needs and costs.
Solar thermal common issues Recommendations
Over simplistic controls settings not tuned to the
solar irradiance levels
Contract accredited manufacturers / installers e.g., an M&E contractor with MCS certification could be required as part
of the design specification and detailed control units specified in the procurement.
Immersion heater inefficient operating regime Re-commissioning.
Integrated design Understand the implications throughout the system lifespan in terms of potential failure rates, maintenance
requirements and the costs associated.
Overheating in summer Continuous solar thermal pipework insulation of adequate specification.
Controls in inaccessible loft User access to readings may assist remote faults diagnosis speeding up trouble shooting.
Poor coordination between installers /
main contractor’s plumbing and heating contractor
Soft landings.
0.000 0.100 0.200 0.300 0.400 0.500 0.
Key issues per property with solar thermal installed
O&M-0.036
Installation-0.036
Valueengineering-0.036
Commissioning-0.036
Controls-0.214
Servicesdesign-0.143
Insights from Social Housing Projects: BPE meta analysis
22
Thermo-hygrometric comfort & IAQ
Introduction
Thermo-hygrometric comfort refers to a status of thermal neutrality experienced by an individual whose mechanisms of behavioural and vasodilation
thermoregulation are inactive i.e. a psycho-physic feeling of wellbeing and satisfaction perceived in relation to the surrounding environment. Indoor Air Quality
(IAQ) is typically acceptable at CO2 concentration levels below 1000 ppm.
Temperature, humidity and CO2 levels monitored in the BPE test dwellings have been reviewed and categorised in relation to:
Monitoring data indicating that the building suffers from under heating.
Monitoring data indicating that the building is slow to warm up (start-up period) and poor temperature control when heating is on.
Monitoring data identifies overheating as a concern.
Monitored humidity levels fall outside accepted comfort levels (40-70%, CIBSE) for a significant percentage of the time.
Monitored CO2 concentration indicative of poor air quality (>1000 ppm, ASHRAE).
Responses to the building user satisfaction (BUS) surveys have been not deemed a representative proxy of comfort due to subjective and psychological biases
such as the forgiveness factor linked to previous housing experienced by vulnerable households.
0
5
10
15
20
25
30
35
40
45
Under heating
Overheating
Hygrometric issues
Poor IAQ
Yes No Insufficient data
Thermo-hygrometric discomfort and poor IAQ occurrence across the BPE test dwellings
Insights from Social Housing Projects: BPE meta analysis
23
Key findings
Although findings might be undermined by different comfortable metrics used by BPE evaluators to call an under-over heating / poor IAQ scenario, overheating
ultimately emerges as the key issue faced by RPs and typically traces back to deficiencies in the building design (sub-optimal orientation and glazing
specifications). Crucially for the potentially fuel poor households targeted by RPs, under heating and hygrometric issues are less common. Poor IAQ is reported
more frequently, in relation to mechanical ventilation systems not working effectively or insufficient window opening in naturally ventilated buildings, although
this might have been affected by the reduced body of evidence.
Issue Common causes Recommendations
Under heating Fuel poverty. Uncomfortable ambient air temperatures maintained for a
significant percentage of the time within the property to save on bills.
- The problem should not arise if the building was performing as designed.
- Contact dedicated helplines e.g. NEF Affordable Warmth Network.
Occupant’s preference for low ambient air temperatures / high natural
ventilation rates.
Discourage natural ventilation in mechanically ventilated buildings.
Occupant window opening behaviour. Awareness raising actions in particular with mechanical ventilation in place.
Space heating controls difficult to operate. Knowledge transfer and practical demonstrations.
Faulty indoor air temperature sensors. N.a. – the test is biased.
Overheating Occupant window opening behaviour – summer. - Understand the psychological drivers behind.
- Awareness raising actions in particular with mechanical ventilation in
place.
- Recalibrate the air change rates via the MVHR system to compete with
natural ventilation.
Occupant’s preference for high ambient air temperatures with secondary
heating sources (generally electrical) on outside of the heating period.
Awareness raising.
Heat waves. N.a.
Building design – orientation, glazing-to-wall ratio, incorrect glazing
specifications (g-value), contributing to excessive solar gain.
Best practice and common sense in building design.
Failure in the mechanical ventilation system summer bypass. Re-commissioning.
Hygrometric issues Too dry – relative humidity dropping below the CIBSE recommended lower
limits due to windows regularly opened in winter resulting in additional
heating loads or during prolonged unoccupied periods
Understand how the occupants interact with windows.
Too wet – condensation and mould formation in wet rooms. Improve ventilation regime. Verify if the ventilation boost typically actioned
via the bathroom light switch is working.
Poor IAQ Ineffective mechanical ventilation. Regular maintenance of the MVHR filters.
Occupants switching off MV unit being too loud. Advise occupants of the purpose of the MVHR system.
Occupancy levels higher than expected / sedentary lifestyle of
residents.
Put in place ventilation systems identifying poor IAQ via sensors and
mitigating it automatically.
Leaky duct. Detect leakage and fix.
Insights from Social Housing Projects: BPE meta analysis
24
4. Process & Culture
Process review
Introduction
Each project’s phase (procurement, design, construction, O&M, handover) has been reviewed in the light of what worked well and what less to come up with a
good/bad practice split (radar chart), which was then allocated to a relative impact factor – high, medium or low (square charts). Albeit the findings are strictly
built upon the evidence supplied by the BPE evaluators, subjective calls were in some cases necessary.
Key findings
The conscious environmental design at the heart of the projects resulted in the predominance of good practices reported during the Design Phase. Notably, only 5
projects flagged relevant problems in relation to the Construction Phase – which in the majority of cases were considered of good standard despite all the
unforeseen events that can arise during the construction process. O&M is where the major problems have been reported and is probably what RPs should
prioritise with a view to address the performance gap, with understanding the variables that govern the occupant behaviour standing potentially out as the
biggest challenge to face up. The Handover Phase was generally positive in the way occupants are introduced to the building. Overall a high level of correlation
between the original design intent and the delivered project has resulted in high quality, low carbon social housing schemes.
Process Rating and Impact Assessment
0
2
4
6
8
10
12
14
16
18
20
Procurement
Design
ConstructionO&M
Handover
Good practice Bad Practice Insufficient data
5 - Unknown
9 - High impact
3 - Unknown
1 - High impact
1 - Medium impact
9 - Insufficient data
12
GoodpracticeBadpractice
7
ProcurementProcess rating
Insights from Social Housing Projects: BPE meta analysis
25
2 - Unknown
10 - High impact
5 - Medium impact
4 - Unknown
2 - High impact
2 - Medium impact
3 - Insufficient data
19
GoodpracticeBadpractice
6
Handover
8 - Unknown
3 - High impact
3 - Medium impact
1 - Low impact
3 - Unknown
5 - High impact
2 - Medium impact
1 - Low impact
2 - Insufficient data
10
GoodpracticeBadpractice
16
O&M
1 - Unknown
14 - High impact
3 - Medium impact
3 - Unknown
3 - High impact
1 - Low impact
3 - Insufficient data
20
GoodpracticeBadpractice
5
Construction
15 - High impact
1 - Medium impact
2 - Unknown
10 - Insufficient data
18
Goodpractice
Design
Insights from Social Housing Projects: BPE meta analysis
26
Best Practice throughout Construction Process
PROCUREMENT
DESIGN
CONSTRUCTION
HANDOVER
O&M
Appoint a clerk of works – regular on-site inspections to check that the
build is being delivered in line with design specifications. Particular
attention to insulation installation.
In-situ thermal performance tests, in particular air-tightness.
Set up a formal change management process to ensure that any deviations
from designs are discussed and performance repercussions managed.
No blame culture.
Minimise deviations from the original scheme design or specification.
Shared agreement on specific design decisions prior to the appointment of
the building contractor.
Contract design team with a track record in environmental design.
Collaborative approach and collective experience to tackle the challenges
faced up throughout the construction process.
Evaluate the case for retentions to achieve the design intentions.
Sustainable building design approached at early stages, stemming from a holistic
approach to the occupants’ quality of life and the environment – sustainability
certification systems as a possible integrated steer to sustainable design principles.
‘Fabric first’ design approach. Aim at cost optimal levels of energy performance (EPBD
recast 2010/31/EU).
Participatory design.
Multi-disciplinary design team.
‘Soft Landings’ handover events and introductory workshops with design
and technical team, client, maintenance staff, and tenants, including
feedback sessions to engage residents. Advice should be given in a non-
technical manner that is accessible to laypeople, in particular in relation
to novel technologies.
Handover of tenant information pack upon arrival at the property
including ‘quick start’ guide, complete User Guide and operation manual.
Training for occupants and maintenance team, at the outset and during
occupation. Feedback workshop during the first year after handover. User-
friendly user guide to provide simple operation details.
Dedicated Customer Care for 1 year following occupation. Set up a repairs
helpline to reporting operational problems to cover defects liability periods.
Be aware of possible forgiveness factor and residents reluctance to
complain.
Insights from Social Housing Projects: BPE meta analysis
27
Learnings
The key learning points from the projects have been captured in relation to methodological, organisational, technological, constructional and occupational
insights. Although more time consuming and challenging than common practice, there is a particular convergence on two points namely the transferability of the
skills gained into future developments and the recognition of the added value of the final end products.
Learning points
Methodological Organisational
Standardised MV commissioning process
Mandatory annual duct flow measurements
Design replicability
Location of MVHR
Knowledge transfer architect-contractors
Partnership, quality, and attention to detail in the realisation process
New performance requirements, both energy and health
Collaborative value of partnership arrangements
Clear communication within the design team
Communication design team-contractor
Building design with people in mind
Identify back up design strategies
Identify design mitigation actions
Effective client-architect-contractor communication
Agreements to be made prior to site
Shared agenda and sustainable targets from the project's outset
Getting the partners around the table as early as possible
Understand in advance design, installation and supply chain requirements of new
systems and technologies
Undertake intensive research and development
Fabric first approach
Sort out details during the design phase
Improved attention to space requirements for systems in the initial design
Shared holistic approach to major changes
Need for more detailed design specifications for installation and commissioning
Designed and actual energy use gap
Rethinking on ventilation/ heating
Handover best timing
Exhaust Air Heat Pumps not appropriate for social housing
Benefits of Passivhaus framework and processes
Passivhaus reliability
Passivhaus benefits on IAQ
Underestimated extra-effort
Worthwhile extra-effort
Transferability of the skills acquired
Trained service providers
Resource constraints faced by training opportunities
Service providers to motivate environmentally responsible behaviour
Feeling of fulfilment and satisfaction
Communication contractor-sub contractors
Raise the bar for future projects
Too ambitious goals set
Risk understanding, communication and management
Strategic value of collaboration
Soft landings
BPE evidence in support of remedial works requests to sub-contractors
Revised processes in other developments
Pro-actively manage responsibilities in the delivery of sustainable housing
instead of delegating to developer/contractors
Transferable skills for future housing developments
Insights from Social Housing Projects: BPE meta analysis
28
Technological Constructional
Under-performance of MVHR systems
Building diagnostics
Monitoring-based fine tuning
Heating controls should be suitable for residents
MVHR need for improved design specifications (rigid ductwork, summer bypass and
units sizing) and installation (on-site clerk of work)
BPE as effective building diagnostics tool to verify and improve building
performance
Critical evaluation of control mechanisms and technology level in place
Reconsider the use of more conventional heating and ventilation systems
Construction rigorously aligned with design
Minimise as-built variations from design
On-site inspections as per approved design
Accredited M&E installers
Robust management of the overall construction process
Occupational
In-use monitoring
Environmentally responsible occupants
Forgiveness factor
Review future handover practices
Hold regular meetings with residents association to identify problems
Regular contact occupant-housing staff
More effective occupant education
Soft Landings
The final step of the analysis focused on a review of the Soft Landings approach.
Of the 15 projects that have provided sufficient information to address this
research question, 80% (12 projects) successfully provided evidence of the key
principles underpinning the Soft Landings approach.
Soft Landings review
43%
Satisfactory
11%
Unsatisfactory
46%
Insufficient data
Insights from Social Housing Projects: BPE meta analysis
Meta-analysis keywords. Created with wordle.net.
References
DCLG, 2014. Affordable housing supply in England: 2013 to 2014.
Department for Communities and Local Government.
DECC, 2014. Preliminary data from the RHPP heat pump metering
programme. Department of Energy & Climate Change.
Directive 2010/31/EU of the European Parliament and of the Council of 19
May 2010 on the energy performance of buildings (recast); June 18, 2010.
Fabrizio, E., Seguro, F., Filippi, M., 2014. Integrated HVAC and DHW
production systems for Zero Energy Buildings, Renewable & Sustainable
Energy Reviews 40, 515-541, Doi: 10.1016/j.rser.2014.07.193.
Stephen, R., 2000. Airtightness in UK dwellings. BRE, Garston.
ZCH, 2014a. Closing the gap between design & as-built performance.
Evidence Review Report. Zero Carbon Hub, London.
ZCH, 2014b. Closing the gap between design & as-built performance. End
of term report. Zero Carbon Hub, London.

Mais conteúdo relacionado

Mais procurados

Scape project presentation - Scalable Preservation Environments
Scape project presentation - Scalable Preservation EnvironmentsScape project presentation - Scalable Preservation Environments
Scape project presentation - Scalable Preservation EnvironmentsSCAPE Project
 
Dr Callum Rae - A New Approach to Energy Centre Design
Dr Callum Rae -  A New Approach to Energy Centre DesignDr Callum Rae -  A New Approach to Energy Centre Design
Dr Callum Rae - A New Approach to Energy Centre DesignHurley Palmer Flatt
 
Deep-Learning and HPC to Boost Biomedical applications for health
Deep-Learning and HPC to Boost Biomedical applications for healthDeep-Learning and HPC to Boost Biomedical applications for health
Deep-Learning and HPC to Boost Biomedical applications for healthBig Data Value Association
 
tranSMART Community Meeting 5-7 Nov 13 - Session 5: eTRIKS - Science Driven D...
tranSMART Community Meeting 5-7 Nov 13 - Session 5: eTRIKS - Science Driven D...tranSMART Community Meeting 5-7 Nov 13 - Session 5: eTRIKS - Science Driven D...
tranSMART Community Meeting 5-7 Nov 13 - Session 5: eTRIKS - Science Driven D...David Peyruc
 
Lynx industry use case. Pilot 3: Compliance Assurance for Geothermal Energy P...
Lynx industry use case. Pilot 3: Compliance Assurance for Geothermal Energy P...Lynx industry use case. Pilot 3: Compliance Assurance for Geothermal Energy P...
Lynx industry use case. Pilot 3: Compliance Assurance for Geothermal Energy P...Lynx Project
 
Automatic Preservation Watch
Automatic Preservation WatchAutomatic Preservation Watch
Automatic Preservation WatchSCAPE Project
 
The significance of ifpug base functionality types in effort estimation cig...
The significance of ifpug base functionality types in effort estimation   cig...The significance of ifpug base functionality types in effort estimation   cig...
The significance of ifpug base functionality types in effort estimation cig...IWSM Mensura
 
86. june 9 introduction
86. june 9 introduction86. june 9 introduction
86. june 9 introductionleann_mays
 

Mais procurados (9)

Scape project presentation - Scalable Preservation Environments
Scape project presentation - Scalable Preservation EnvironmentsScape project presentation - Scalable Preservation Environments
Scape project presentation - Scalable Preservation Environments
 
Dr Callum Rae - A New Approach to Energy Centre Design
Dr Callum Rae -  A New Approach to Energy Centre DesignDr Callum Rae -  A New Approach to Energy Centre Design
Dr Callum Rae - A New Approach to Energy Centre Design
 
Deep-Learning and HPC to Boost Biomedical applications for health
Deep-Learning and HPC to Boost Biomedical applications for healthDeep-Learning and HPC to Boost Biomedical applications for health
Deep-Learning and HPC to Boost Biomedical applications for health
 
tranSMART Community Meeting 5-7 Nov 13 - Session 5: eTRIKS - Science Driven D...
tranSMART Community Meeting 5-7 Nov 13 - Session 5: eTRIKS - Science Driven D...tranSMART Community Meeting 5-7 Nov 13 - Session 5: eTRIKS - Science Driven D...
tranSMART Community Meeting 5-7 Nov 13 - Session 5: eTRIKS - Science Driven D...
 
Project management
Project managementProject management
Project management
 
Lynx industry use case. Pilot 3: Compliance Assurance for Geothermal Energy P...
Lynx industry use case. Pilot 3: Compliance Assurance for Geothermal Energy P...Lynx industry use case. Pilot 3: Compliance Assurance for Geothermal Energy P...
Lynx industry use case. Pilot 3: Compliance Assurance for Geothermal Energy P...
 
Automatic Preservation Watch
Automatic Preservation WatchAutomatic Preservation Watch
Automatic Preservation Watch
 
The significance of ifpug base functionality types in effort estimation cig...
The significance of ifpug base functionality types in effort estimation   cig...The significance of ifpug base functionality types in effort estimation   cig...
The significance of ifpug base functionality types in effort estimation cig...
 
86. june 9 introduction
86. june 9 introduction86. june 9 introduction
86. june 9 introduction
 

Destaque

Characteristics and performance of MVHR systems
Characteristics and performance of MVHR systemsCharacteristics and performance of MVHR systems
Characteristics and performance of MVHR systemsInnovate UK
 
Housing and Homelessness: What We Can Learn From Our History
Housing and Homelessness: What We Can Learn From Our HistoryHousing and Homelessness: What We Can Learn From Our History
Housing and Homelessness: What We Can Learn From Our HistoryWellesley Institute
 
Homes for All: Social Housing in Toronto and Canada
Homes for All: Social Housing in Toronto and CanadaHomes for All: Social Housing in Toronto and Canada
Homes for All: Social Housing in Toronto and CanadaWellesley Institute
 
Introduction to Housing: Housing And Delivery Processes
Introduction to Housing: Housing And Delivery ProcessesIntroduction to Housing: Housing And Delivery Processes
Introduction to Housing: Housing And Delivery ProcessesAllona Alejandre
 
Implementation Evaluation of Canada’s At Home / Chez Soi Housing First Program
Implementation Evaluation of Canada’s At Home / Chez Soi Housing First Program Implementation Evaluation of Canada’s At Home / Chez Soi Housing First Program
Implementation Evaluation of Canada’s At Home / Chez Soi Housing First Program FEANTSA
 
12-15-2015
12-15-201512-15-2015
12-15-2015Pr Group
 
Residential Design Studio مقرر تصميم سكني
 Residential Design Studio مقرر تصميم سكني Residential Design Studio مقرر تصميم سكني
Residential Design Studio مقرر تصميم سكنيDr.Ahmad Alansari
 
Chapter 1 housing and human needs
Chapter 1 housing and human needsChapter 1 housing and human needs
Chapter 1 housing and human needslbonner1987
 
research about design basics of residential towers - حلقة بحث عن اسس تصميم ال...
research about design basics of residential towers - حلقة بحث عن اسس تصميم ال...research about design basics of residential towers - حلقة بحث عن اسس تصميم ال...
research about design basics of residential towers - حلقة بحث عن اسس تصميم ال...Abdulwahab Jarrah
 
International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)irjes
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)Eveana Crystle
 
دراسة مشروع اسكان - تصميم معماري4 - سنة3 Housing
دراسة مشروع اسكان - تصميم معماري4 - سنة3 Housingدراسة مشروع اسكان - تصميم معماري4 - سنة3 Housing
دراسة مشروع اسكان - تصميم معماري4 - سنة3 HousingIbrahem Qasim
 
اسس تصميم المبانى التجارية الادارية السكنية
اسس تصميم المبانى التجارية الادارية السكنيةاسس تصميم المبانى التجارية الادارية السكنية
اسس تصميم المبانى التجارية الادارية السكنيةelaria hosny
 
Rural housing in india
Rural housing in indiaRural housing in india
Rural housing in indiakumaresan2704
 

Destaque (20)

Characteristics and performance of MVHR systems
Characteristics and performance of MVHR systemsCharacteristics and performance of MVHR systems
Characteristics and performance of MVHR systems
 
Housing and Homelessness: What We Can Learn From Our History
Housing and Homelessness: What We Can Learn From Our HistoryHousing and Homelessness: What We Can Learn From Our History
Housing and Homelessness: What We Can Learn From Our History
 
Homes for All: Social Housing in Toronto and Canada
Homes for All: Social Housing in Toronto and CanadaHomes for All: Social Housing in Toronto and Canada
Homes for All: Social Housing in Toronto and Canada
 
Types of house
Types of houseTypes of house
Types of house
 
Types Of Houses
Types Of HousesTypes Of Houses
Types Of Houses
 
Real Estate Development Yanbu
Real Estate Development YanbuReal Estate Development Yanbu
Real Estate Development Yanbu
 
Introduction to Housing: Housing And Delivery Processes
Introduction to Housing: Housing And Delivery ProcessesIntroduction to Housing: Housing And Delivery Processes
Introduction to Housing: Housing And Delivery Processes
 
Implementation Evaluation of Canada’s At Home / Chez Soi Housing First Program
Implementation Evaluation of Canada’s At Home / Chez Soi Housing First Program Implementation Evaluation of Canada’s At Home / Chez Soi Housing First Program
Implementation Evaluation of Canada’s At Home / Chez Soi Housing First Program
 
12-15-2015
12-15-201512-15-2015
12-15-2015
 
Residential Design Studio مقرر تصميم سكني
 Residential Design Studio مقرر تصميم سكني Residential Design Studio مقرر تصميم سكني
Residential Design Studio مقرر تصميم سكني
 
Chapter 1 housing and human needs
Chapter 1 housing and human needsChapter 1 housing and human needs
Chapter 1 housing and human needs
 
research about design basics of residential towers - حلقة بحث عن اسس تصميم ال...
research about design basics of residential towers - حلقة بحث عن اسس تصميم ال...research about design basics of residential towers - حلقة بحث عن اسس تصميم ال...
research about design basics of residential towers - حلقة بحث عن اسس تصميم ال...
 
International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)
 
دراسة مشروع اسكان - تصميم معماري4 - سنة3 Housing
دراسة مشروع اسكان - تصميم معماري4 - سنة3 Housingدراسة مشروع اسكان - تصميم معماري4 - سنة3 Housing
دراسة مشروع اسكان - تصميم معماري4 - سنة3 Housing
 
Types houses
Types housesTypes houses
Types houses
 
Type of houses
Type of housesType of houses
Type of houses
 
Housing powerpoint
Housing powerpointHousing powerpoint
Housing powerpoint
 
اسس تصميم المبانى التجارية الادارية السكنية
اسس تصميم المبانى التجارية الادارية السكنيةاسس تصميم المبانى التجارية الادارية السكنية
اسس تصميم المبانى التجارية الادارية السكنية
 
Rural housing in india
Rural housing in indiaRural housing in india
Rural housing in india
 

Semelhante a Insights from social housing projects: building performance evaluation

ENERGY IN BUILDINGs 50 BEST PRACTICE INITIATIVES
ENERGY IN BUILDINGs  50 BEST PRACTICE INITIATIVESENERGY IN BUILDINGs  50 BEST PRACTICE INITIATIVES
ENERGY IN BUILDINGs 50 BEST PRACTICE INITIATIVESJosh Develop
 
Solar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónSolar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónASCAME
 
Monitoring Based Commissioning - A Must in The World of High Energy Efficiency
Monitoring Based Commissioning - A Must in The World of High Energy EfficiencyMonitoring Based Commissioning - A Must in The World of High Energy Efficiency
Monitoring Based Commissioning - A Must in The World of High Energy EfficiencyPaul Malfara
 
Improving Technical Installations in Buildings
Improving Technical Installations in BuildingsImproving Technical Installations in Buildings
Improving Technical Installations in BuildingsLeonardo ENERGY
 
Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt
 
Do Trade-Offs Improve Energy Efficiency
Do Trade-Offs Improve Energy EfficiencyDo Trade-Offs Improve Energy Efficiency
Do Trade-Offs Improve Energy EfficiencyBrett Dillon
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentCenter for Energy and Environment
 
LBNL 11th Fyp Presentation
LBNL 11th Fyp PresentationLBNL 11th Fyp Presentation
LBNL 11th Fyp PresentationJulian Wong
 
LBNL China 11th 5YP Energy Connservation Progress
LBNL China 11th 5YP Energy Connservation ProgressLBNL China 11th 5YP Energy Connservation Progress
LBNL China 11th 5YP Energy Connservation ProgressJulian Wong
 
Results from minnesota’s existing building commissioning program
Results from minnesota’s existing building commissioning programResults from minnesota’s existing building commissioning program
Results from minnesota’s existing building commissioning programCenter for Energy and Environment
 
BreakingBarriers_SummaryReport
BreakingBarriers_SummaryReportBreakingBarriers_SummaryReport
BreakingBarriers_SummaryReportSi Gibson
 
Sustainable building designs
Sustainable building designsSustainable building designs
Sustainable building designsTantish QS, UTM
 

Semelhante a Insights from social housing projects: building performance evaluation (20)

federal reserve.
federal reserve.federal reserve.
federal reserve.
 
Climate change paper genge and kerr
Climate change paper genge and kerrClimate change paper genge and kerr
Climate change paper genge and kerr
 
ENERGY IN BUILDINGs 50 BEST PRACTICE INITIATIVES
ENERGY IN BUILDINGs  50 BEST PRACTICE INITIATIVESENERGY IN BUILDINGs  50 BEST PRACTICE INITIATIVES
ENERGY IN BUILDINGs 50 BEST PRACTICE INITIATIVES
 
Solar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónSolar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda Cayón
 
Monitoring Based Commissioning - A Must in The World of High Energy Efficiency
Monitoring Based Commissioning - A Must in The World of High Energy EfficiencyMonitoring Based Commissioning - A Must in The World of High Energy Efficiency
Monitoring Based Commissioning - A Must in The World of High Energy Efficiency
 
22212 exe summ
22212 exe summ22212 exe summ
22212 exe summ
 
Improving Technical Installations in Buildings
Improving Technical Installations in BuildingsImproving Technical Installations in Buildings
Improving Technical Installations in Buildings
 
Christian Koch
Christian KochChristian Koch
Christian Koch
 
Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12
 
Do Trade-Offs Improve Energy Efficiency
Do Trade-Offs Improve Energy EfficiencyDo Trade-Offs Improve Energy Efficiency
Do Trade-Offs Improve Energy Efficiency
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the Envrinment
 
1 james russell
1 james russell1 james russell
1 james russell
 
18 - Bechtel.pdf
18 - Bechtel.pdf18 - Bechtel.pdf
18 - Bechtel.pdf
 
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
Low Carbon Housing and Supply Chain Development - Dr Andrew PlattenLow Carbon Housing and Supply Chain Development - Dr Andrew Platten
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
 
LBNL 11th Fyp Presentation
LBNL 11th Fyp PresentationLBNL 11th Fyp Presentation
LBNL 11th Fyp Presentation
 
LBNL China 11th 5YP Energy Connservation Progress
LBNL China 11th 5YP Energy Connservation ProgressLBNL China 11th 5YP Energy Connservation Progress
LBNL China 11th 5YP Energy Connservation Progress
 
Results from minnesota’s existing building commissioning program
Results from minnesota’s existing building commissioning programResults from minnesota’s existing building commissioning program
Results from minnesota’s existing building commissioning program
 
BreakingBarriers_SummaryReport
BreakingBarriers_SummaryReportBreakingBarriers_SummaryReport
BreakingBarriers_SummaryReport
 
Sustainable building designs
Sustainable building designsSustainable building designs
Sustainable building designs
 
Building the Case-for Net Zero
Building the Case-for Net ZeroBuilding the Case-for Net Zero
Building the Case-for Net Zero
 

Mais de Innovate UK

@Iuk comp mediatoolkit_jul20
@Iuk comp mediatoolkit_jul20@Iuk comp mediatoolkit_jul20
@Iuk comp mediatoolkit_jul20Innovate UK
 
UK - Norway plugin vehicle roundtable summary report
UK - Norway plugin vehicle roundtable summary reportUK - Norway plugin vehicle roundtable summary report
UK - Norway plugin vehicle roundtable summary reportInnovate UK
 
Plugin vehicle 2025 stakeholder success vision updated October 2017
Plugin vehicle 2025 stakeholder success vision updated October 2017Plugin vehicle 2025 stakeholder success vision updated October 2017
Plugin vehicle 2025 stakeholder success vision updated October 2017Innovate UK
 
Plugin vehicle stakeholder vision September 2017
Plugin vehicle stakeholder vision September 2017Plugin vehicle stakeholder vision September 2017
Plugin vehicle stakeholder vision September 2017Innovate UK
 
Innovate UK's monitoring services procurement - engagement event slides
Innovate UK's monitoring services procurement - engagement event slidesInnovate UK's monitoring services procurement - engagement event slides
Innovate UK's monitoring services procurement - engagement event slidesInnovate UK
 
Innovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK
 
Company pitching Powerpoint slide template
Company pitching Powerpoint slide templateCompany pitching Powerpoint slide template
Company pitching Powerpoint slide templateInnovate UK
 
Horizon 2020 space – Mapping of UK university expertise and resources against...
Horizon 2020 space – Mapping of UK university expertise and resources against...Horizon 2020 space – Mapping of UK university expertise and resources against...
Horizon 2020 space – Mapping of UK university expertise and resources against...Innovate UK
 
Innovate uk Horizons Sustainable Economy Framework,
Innovate uk Horizons Sustainable Economy Framework,Innovate uk Horizons Sustainable Economy Framework,
Innovate uk Horizons Sustainable Economy Framework,Innovate UK
 
The Wales Space Strategy John Whalley
The Wales Space Strategy John WhalleyThe Wales Space Strategy John Whalley
The Wales Space Strategy John WhalleyInnovate UK
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingInnovate UK
 
Rft f data for apr 2016 charts
Rft f data for apr 2016 chartsRft f data for apr 2016 charts
Rft f data for apr 2016 chartsInnovate UK
 
European Long-term Ecosystem and Socio Ecological Research Infrastructure (eL...
European Long-term Ecosystem and Socio Ecological Research Infrastructure (eL...European Long-term Ecosystem and Socio Ecological Research Infrastructure (eL...
European Long-term Ecosystem and Socio Ecological Research Infrastructure (eL...Innovate UK
 
The economic impact of the marine and maritime sector on the UK in 2011/12
The economic impact of the marine and maritime sector on the UK in 2011/12The economic impact of the marine and maritime sector on the UK in 2011/12
The economic impact of the marine and maritime sector on the UK in 2011/12Innovate UK
 
Autocar, Low Carbon Vehicles: The UK's innovation success story
Autocar, Low Carbon Vehicles: The UK's innovation success story Autocar, Low Carbon Vehicles: The UK's innovation success story
Autocar, Low Carbon Vehicles: The UK's innovation success story Innovate UK
 
Design for Future Climate: Adapting Buildings, June 2010
Design for Future Climate: Adapting Buildings, June 2010 Design for Future Climate: Adapting Buildings, June 2010
Design for Future Climate: Adapting Buildings, June 2010 Innovate UK
 

Mais de Innovate UK (16)

@Iuk comp mediatoolkit_jul20
@Iuk comp mediatoolkit_jul20@Iuk comp mediatoolkit_jul20
@Iuk comp mediatoolkit_jul20
 
UK - Norway plugin vehicle roundtable summary report
UK - Norway plugin vehicle roundtable summary reportUK - Norway plugin vehicle roundtable summary report
UK - Norway plugin vehicle roundtable summary report
 
Plugin vehicle 2025 stakeholder success vision updated October 2017
Plugin vehicle 2025 stakeholder success vision updated October 2017Plugin vehicle 2025 stakeholder success vision updated October 2017
Plugin vehicle 2025 stakeholder success vision updated October 2017
 
Plugin vehicle stakeholder vision September 2017
Plugin vehicle stakeholder vision September 2017Plugin vehicle stakeholder vision September 2017
Plugin vehicle stakeholder vision September 2017
 
Innovate UK's monitoring services procurement - engagement event slides
Innovate UK's monitoring services procurement - engagement event slidesInnovate UK's monitoring services procurement - engagement event slides
Innovate UK's monitoring services procurement - engagement event slides
 
Innovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing pack
 
Company pitching Powerpoint slide template
Company pitching Powerpoint slide templateCompany pitching Powerpoint slide template
Company pitching Powerpoint slide template
 
Horizon 2020 space – Mapping of UK university expertise and resources against...
Horizon 2020 space – Mapping of UK university expertise and resources against...Horizon 2020 space – Mapping of UK university expertise and resources against...
Horizon 2020 space – Mapping of UK university expertise and resources against...
 
Innovate uk Horizons Sustainable Economy Framework,
Innovate uk Horizons Sustainable Economy Framework,Innovate uk Horizons Sustainable Economy Framework,
Innovate uk Horizons Sustainable Economy Framework,
 
The Wales Space Strategy John Whalley
The Wales Space Strategy John WhalleyThe Wales Space Strategy John Whalley
The Wales Space Strategy John Whalley
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefing
 
Rft f data for apr 2016 charts
Rft f data for apr 2016 chartsRft f data for apr 2016 charts
Rft f data for apr 2016 charts
 
European Long-term Ecosystem and Socio Ecological Research Infrastructure (eL...
European Long-term Ecosystem and Socio Ecological Research Infrastructure (eL...European Long-term Ecosystem and Socio Ecological Research Infrastructure (eL...
European Long-term Ecosystem and Socio Ecological Research Infrastructure (eL...
 
The economic impact of the marine and maritime sector on the UK in 2011/12
The economic impact of the marine and maritime sector on the UK in 2011/12The economic impact of the marine and maritime sector on the UK in 2011/12
The economic impact of the marine and maritime sector on the UK in 2011/12
 
Autocar, Low Carbon Vehicles: The UK's innovation success story
Autocar, Low Carbon Vehicles: The UK's innovation success story Autocar, Low Carbon Vehicles: The UK's innovation success story
Autocar, Low Carbon Vehicles: The UK's innovation success story
 
Design for Future Climate: Adapting Buildings, June 2010
Design for Future Climate: Adapting Buildings, June 2010 Design for Future Climate: Adapting Buildings, June 2010
Design for Future Climate: Adapting Buildings, June 2010
 

Último

代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改atducpo
 
Carero dropshipping via API with DroFx.pptx
Carero dropshipping via API with DroFx.pptxCarero dropshipping via API with DroFx.pptx
Carero dropshipping via API with DroFx.pptxolyaivanovalion
 
April 2024 - Crypto Market Report's Analysis
April 2024 - Crypto Market Report's AnalysisApril 2024 - Crypto Market Report's Analysis
April 2024 - Crypto Market Report's Analysismanisha194592
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Unveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystUnveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystSamantha Rae Coolbeth
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxStephen266013
 
04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationships04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationshipsccctableauusergroup
 
Ukraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSUkraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSAishani27
 
Data-Analysis for Chicago Crime Data 2023
Data-Analysis for Chicago Crime Data  2023Data-Analysis for Chicago Crime Data  2023
Data-Analysis for Chicago Crime Data 2023ymrp368
 
Generative AI on Enterprise Cloud with NiFi and Milvus
Generative AI on Enterprise Cloud with NiFi and MilvusGenerative AI on Enterprise Cloud with NiFi and Milvus
Generative AI on Enterprise Cloud with NiFi and MilvusTimothy Spann
 
BabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxBabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxolyaivanovalion
 
BigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptxBigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptxolyaivanovalion
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiVIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
Week-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionWeek-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionfulawalesam
 
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Callshivangimorya083
 
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiSuhani Kapoor
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAroojKhan71
 
CebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptxCebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptxolyaivanovalion
 

Último (20)

代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
 
Carero dropshipping via API with DroFx.pptx
Carero dropshipping via API with DroFx.pptxCarero dropshipping via API with DroFx.pptx
Carero dropshipping via API with DroFx.pptx
 
April 2024 - Crypto Market Report's Analysis
April 2024 - Crypto Market Report's AnalysisApril 2024 - Crypto Market Report's Analysis
April 2024 - Crypto Market Report's Analysis
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Unveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystUnveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data Analyst
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docx
 
04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationships04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationships
 
Ukraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSUkraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICS
 
Data-Analysis for Chicago Crime Data 2023
Data-Analysis for Chicago Crime Data  2023Data-Analysis for Chicago Crime Data  2023
Data-Analysis for Chicago Crime Data 2023
 
Generative AI on Enterprise Cloud with NiFi and Milvus
Generative AI on Enterprise Cloud with NiFi and MilvusGenerative AI on Enterprise Cloud with NiFi and Milvus
Generative AI on Enterprise Cloud with NiFi and Milvus
 
BabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxBabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptx
 
BigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptxBigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptx
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
 
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiVIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
 
Week-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionWeek-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interaction
 
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
 
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
 
CebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptxCebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptx
 

Insights from social housing projects: building performance evaluation

  • 1. Building Performance Evaluation Meta-Analysis Insights from Social Housing Projects Federico Seguro improving the use of energy in buildings
  • 2. Insights from Social Housing Projects: BPE meta analysis i improving the use of energy in buildings ! ! ! ! ! ! ! ! ! ! ! CONTACT DETAILS Main!Contact:!!Federico!Seguro,!Energy!Specialist! Email:!federico.seguro@nef.org.uk! Tel:!01908!665555! Direct:!01908!354530! ! Prepared by: Federico Seguro Date: 22/12/2015 Edited by: Luke Smith Date: 22/12/2015 Authorised by: Malcolm Hanna Date: 22/12/2015
  • 3. 1 CONTENTS Synopsis 1 1. Background 4 2. Context Setting 7 General data 7 Organisational data 8 Occupancy data 8 Property and construction data 8 Building services 10 3. Performance Gap 12 Fabric testing 12 Energy system commissioning 17 Thermo-hygrometric comfort & IAQ 22 4. Process & Culture 24 Process review 24 Learnings 27 References 29 Synopsis In England there were 30,590 new homes added to the social rented sector in 2013/14 which represented 25% of all new homes that year (DCLG, 2014). In contrast to private developers, Registered Providers (RPs) typically demonstrate a greater understanding of the risks associated with failing to deliver upon the designed performance targets of a new dwelling. This is due to the fact that in most cases the RPs are responsible for the resident that occupies the home and also the long term management and maintenance of the property. It is clear from this study that many RPs are aware of the key role that skills, training and leadership play in bridging the performance gap. However, what is less understood is the business case in terms of best practices and success factors that should underpin a social housing development throughout its whole lifecycle, from the specification of procurement and design, to the implementation of construction, handover, operation and maintenance (O&M). The Building Performance Evaluation (BPE) programme was an £8m competition funded by Innovate UK (formerly, Technology Strategy Board) to evaluate and assess the post-construction and in-use performance of both domestic and non-domestic buildings. There were 52 new housing projects funded in total, of which 54% (28 projects) were led by RPs. The National Energy Foundation (NEF) has been commissioned by Innovate UK to undertake an analysis of the data arising from all 28 of the RP led projects. These 28 projects are made up of 83 test dwellings in total. Termed the BPE Social Housing Meta-Analysis, the primary objectives have been to identify the following: key success factors (where things worked well and not so well); practices which resulted in a significant performance gap; Abbreviations: BPE, Building Performance Evaluation; BUS, Building User Satisfaction; CHP, Combined Heat and Power; COP, Coefficient of Performance; DHW, Domestic Hot Water; DomEARM, Domestic Energy Assessment and Reporting Methodology; IAQ, Indoor Air Quality; MCS, Microgeneration Certification Scheme; M&E, Mechanical & Electrical; MV, mechanical ventilation; MVHR, mechanical ventilation with heat recovery, NEF, National Energy Foundation; O&M, operation and maintenance; RPs, Registered Providers; SAP, Standard Assessment Procedure; TRV, thermostatic radiator valves; TSB, Technology Strategy Board. Insights from Social Housing Projects: BPE meta analysis
  • 4. 2 relative impact of specific attributes such as defects and building services on the performance gap. The ultimate objective of the study was to inform the wider sector and empower RPs towards taking a lead and becoming champions in combating the performance gap between designed and as-built. This Executive Report condenses the key findings that emerged from the extensive NEF BPE Meta-Analysis. The headline findings of a series of critical subject areas are outlined below. Fabric performance 1. The average as-built external wall U-value of 0.220 W m-2 K-1 exceeds the average design U-value of 0.164 W m-2 K-1 , with 9 properties (32%) failing to meet Part L1a backstop. Regular on-site inspections are recommended to make sure that the build is being delivered in line with design specifications, in particular with respect to insulation installation. 2. The air tightness of 46% of the BPE test dwellings was below the design intent. All of them performed within the mandatory limits. The average air leakage rate of 4.4 m3 h-1 m-2 @ 50 Pa outperformed the average design specification of 4.93 m3 h-1 m-2 @ 50 Pa. Energy system commissioning 3. Conventional space heating systems such as fossil fuel boilers were associated with a marginal occurrence of issues (0.20 per installation). In contrast, up to 1.60 issues were reported per heat pump system installed. 4. 67% of the plots analysed opted for a mechanical ventilation with heat recovery (MVHR) system as ventilation strategy yet its applicability in social housing is questionable given a number of issues mainly attributable to occupants’ interference, symptomatic of lack of training, and inadequate maintenance regime (1.14 issues per installation). Also, when looked at alongside the mean air leakage rate of 4.4 m3 h-1 m-2 @ 50 Pa, where 3.0 m3 h-1 m-2 @ 50 Pa is deemed the threshold for MHVR, the manner in which design and specification decisions are being made appears ineffective. 5. Sub-optimal design and control specifications are at the root of many issues encountered in solar thermal systems, with a notable lack of coordination between contractors and installers reported (0.50 issues per installation). Solar photovoltaic emerges as a more reliable technology, well supported by third party quality assurance schemes (0.17 issues per installation). Comfort and IAQ monitoring 6. A limited number of test dwellings experienced under heating and hygrometric issues from inadequate relative humidity levels (14 and 12 test dwellings). This is crucial for the RPs’ potentially fuel poor household target. 7. Overheating was more frequent (33 test dwellings), mainly due to occupant window opening behaviour, sub-optimal building design and glazing specifications. 8. Poor indoor air quality (IAQ) levels were generally monitored in mechanically ventilated buildings due to ineffective mechanical ventilation systems or occupants switching off the MV units because of the noise (total issues in 19 test dwellings). Process and Culture 9. The process review and impact assessment found Soft Landings reported as a useful framework, underpinning successful procurements and best practice. Insights from Social Housing Projects: BPE meta analysis
  • 5. 3 10. Very few issues were reported by the project evaluators in relation to the Design Phase of any project. This is perhaps partly symptomatic of the conscious environmental design that lies at the heart of the BPE projects but also evidence of a failure to recognise the importance of early design and specification decisions on the long term performance of buildings. Remarkably, only 5 of the 28 projects highlighted that substantial problems occurred across the Construction Phase which had a considerably negative impact on the final product. 11. O&M stands out as the most critical phase where ongoing occupant support is often missing (16 references to bad practice) whilst an accessible induction was generally provided at the Handover Phase (19 references to good practice) 12. All projects converge on the added value associated with BPE studies and although recognising the steep learning curve, many noted the sizable opportunities to transfer the skills gained into future developments. Building diagnostics 13. The overall building performance evaluation methodology prescribed by the BPE programme comes out as a powerful means of bridging the gap between designed and actual energy use that ought to be at the forefront of the political agenda towards meeting the Government CO2 targets and commitment to ensuring new homes perform as designed. Insights from Social Housing Projects: BPE meta analysis
  • 6. 4 1. Background The National Energy Foundation (NEF) has been commissioned to undertake a meta-analysis of the social housing projects carried out as part of the £8m Building Performance Evaluation (BPE) Programme run from 2010 to 2014 by Innovate UK (formerly Technology Strategy Board). There were 28 BPE projects in total which included the participation of a Housing Association as key actor. Each of these has been extensively reviewed and the associated findings were condensed according to: key success factors (where things worked well); practices which resulted in a significant performance gap; relative impact of specific attributes such as defects and building services on the performance gap. The study targets a specific user, namely Registered Providers (RPs) (formerly known as Registered Social Landlords). RPs are different from many housing developers in that as owners of new properties they have long term maintenance responsibilities i.e. very clear means, and usually capability, to apply lessons from BPE projects into new developments. An additional benefit is that across the sector RPs have been very receptive to recognise that there is a significant performance gap between new build specifications and real life operation. Many RPs recognise that new in- house and supply chain skills are necessary to deliver energy efficient, and affordable, social housing. What is generally less understood is: the relative importance of the cause and effect of performance gaps, as well as the associated costs of mitigation / operation; ‘best practice’, or ‘success factors’ at the process (specification, procurement, through to validation tests, handover and operation and maintenance), as well as at a technology level, to bridge the performance gap; the economic (business) case for taking action / incurring costs to mitigate the situation. The 28 BPE projects reviewed as part of the meta-analysis sorted by project ID, study phase, lead organisation and tenure type are listed in Table 1. Phase 1 projects covered the post completion and early occupation phases (6-9 months from handover) whilst Phase 2 projects focused on in-use and post-occupancy typically covering two heating seasons. The NEF Meta-Analysis consisted of 3 tiers of analysis at an intra-project level providing different levels of information for each project: A second phase concerned the aggregation of the findings at an inter- project level to come up with the anonymised findings presented in this Report. In this regard, it is recognised that the exemplary projects part of the BPE programme outperform the current common practice, a caveat is that they cannot be considered representative of the UK new construction sector, also in the light of the limited sample of projects i.e. the findings are not statistically significant. > General data > Organisational data > Occupancy data > Property data > Construction data > Building services > Energy performance assessment > Fabric testing > Building services > Thermo-hygrometric comfort > Indoor Air Quality > Procurement process > Design process > Construction process > O&M process > Handover > Commissioning > Soft landings > Summary Matrix Context Performance Gap Process & Culture > Aggregation of the findings Intra-project tier Inter-project tier Insights from Social Housing Projects: BPE meta analysis
  • 7. 5 Table 1: List of RP / social housing driven BPE projects under review as part of the Meta-Analysis. Project ID Project name BPE phase Lead organisation Tenure No of properties 450013 450040 Land at Dormary Court 1-2 Joseph Rowntree Housing Trust Mixed 4 houses + 2 bungalows 450018 450050 Lyndhurst Crescent, Swindon 1-2 NPS North East Limited Social rent 13 houses 450014 450070 PassivHaus Bungalow Development, Houghton-le- Spring 1-2 Gentoo Group Rent 28 bungalows 450016 450020 Building Performance of High Density Apartments 1-2 A2Dominion Homes Limited Mixed 23 flats 450019 450066 Future Works social housing Passive House prototypes 1-2 bere:architects Freehold 2 houses 450021 Cross Lane Development, Barnsley 1 Sheffield Hallam University Mixed 18 rental + 4 shared ownership 450038 Hastoe HA - 14 Passivhaus at Wimbish 2 Hastoe Housing Association Mixed 6 flats + 8 houses 450054 Bloom Court 2 Hanover (Scotland) Housing Association Social lease 6 houses 450055 The Glasgow House 1 Glasgow Housing Association None 2 houses 450056 The Quarries Sheltered Housing 1 Dunedin Canmore Housing Association Rent 58 flats 450065 Knights Place Passivhaus Housing for Exeter City Council 2 Gale & Snowden Architects Limited Rent 18 blocks 450069 Monitoring of an estate near Rotherham 2 Verco Social housing 24 houses 450071 450080 Dungannon Passivhaus 1-2 Choice Housing Social housing 5 houses 450073 Scotland's Housing Expo 2 Architecture and Design Scotland Mixed 52 houses 450076 Rowan House Passivhaus Social Housing for Exeter City Council 2 Gale & Snowden Architects Limited Rent 3 flats Insights from Social Housing Projects: BPE meta analysis
  • 8. 6 Project ID Project name BPE phase Lead organisation Tenure No of properties 450079 A New Code 4 Approach - High Fabric Insulation with Simple Heating Service 1 South Western Housing Society Social lease 10 houses + 2 flats 450081 Tigh-Na-Cladach affordable housing: 1 Passivhaus home & 2 low-energy homes 2 Glasgow School of Arts Shared ownership 15 houses 450082 450105 Cross Street, Gainsborough 1-2 Longhurst Group Social rent 7 houses 450083 In-use and Post Occupancy Evaluation in Low Carbon Apartments 2 Connect Housing Social rent 14 flats 450093 Lea Field Court 1 Joseph Rowntree Housing Trust Mixed 13 houses 450096 Thames Valley Houses in Feltham 2 Thames Valley Charitable Housing Association Social rent 10 houses 450098 Derwenthorpe 1 Joseph Rowntree Housing Trust Mixed 540 houses 450099 Sinclair Meadows Carbon Negative Community Village, Reed Street 2 Four Housing Group (Berwick & North) Rent 9 houses + 12 flats 450100 Bryan House scheme, Bicester 1 Sanctuary Housing Association Rent 7 houses + 16 flats 450101 Garscube Road Housing - 3 sheltered flats and 3 mainstream flats 2 Queens Cross Housing Association Limited Rent 117 houses and flats 450102 Seager Distillery Site Housing Development 2 AECOM Mixed 38 social rented flats and 92 private flats 450103 Aberfawr Terrace, Abertridwr, Caerphilly 2 United Welsh Housing Association Social rent 13 houses + 8 flats 450104 Barrhead, Murray Place 2 Hanover (Scotland) Housing Association Ltd Leasehold 16 houses Insights from Social Housing Projects: BPE meta analysis
  • 9. 7 2. Context Setting General data BPE Phases Of the 28 RP led projects that have been reviewed, 25% (7) belonged to BPE Phase 1 Post construction and early occupation; 50% (14) to Phase 2 In-use performance and post occupancy evaluation; and 25% (7) undertook both Phase 1 and Phase 2 (Figure on the right). Building Procurement Contract The majority of RP led projects (12) have been procured on a Design and Build basis. In 6 cases the type of building procurement contract was not stated (Figure at the bottom). Tenure Mixed ownership (8 projects) was the most common type of tenure, followed by Standard (7) and Social (5) Rent. 21% 43% 4% 4% 7% 4% 7% 4% 4% 4% Not stated Design and build Traditional, with standard JCT Unusual procurement being the project a test construction JCT Traditional Intermediate Form of Building Contract Partnering scheme Traditional NEC3 Engineering and Construction Option A 2005 Traditional + Design and Build post planning Traditional procurement using SBCC 2008 29% 7% 18% 7% 25% 4% 4% 7% Mixed Social housing Social rent Social lease Rent Leasehold Freehold Other 25% Phase 1 only 50% Phase 2 only 25% Phase 1-2 Insights from Social Housing Projects: BPE meta analysis
  • 10. 8 Organisational data Experienced in sustainable building design 8 project teams declared former experience in sustainable building design 3 project teams didn’t have previous experience in this field Insufficient evidence to make a call in the other 17 projects Experienced in social housing 9 project teams already dealt with social housing 1 project team didn’t Insufficient evidence to make a call in the other 18 projects Occupancy data Occupancy type 17 projects of mixed use 6 projects for eldery 1 project with sheltered occupants Property and construction data Focus BPE dwellings In total, 83 properties undertook the BPE study - each project on average consisted of 2 test dwellings. 41 houses 29 flats/apartments 8 bungalows 1 cottage 4 unknown property types Construction Standard 26 CSH Level 4 15 National Technical Standard 12 Passivhaus 12 CSH Level 5 6 Ecohomes – excellent 5 CSH Level 3 3 Green Guide to Housing Specification 2 CSH Level 6 28% 11% 61% Experienced in sustainable building design Not experienced in sustainable building design Not stated 32% 4% 64% Experienced in social housing Not experienced in social housing Not stated 7% 61% 4% 21% 7% Unknown Mixed Sheltered Elderly Other Insights from Social Housing Projects: BPE meta analysis
  • 11. 9 BPE dwellings characterised in relation to the property type and the construction standard: across each project (above) and in total terms (below). 0 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 NooffocusBPEdwellings Project ID Property type vs Construction Standard Cottage House Flat/ Apartment Bungalow Unknown National Technical Standard Passivhaus CSH Level 3 CSH Level 4 CSH Level 5 CSH Level 6 Green Guide to Housing Specification Ecohomes - excellent 1% 49% 35% 10% 5% Cottage House Flat/ Apartment Bungalow Unknown Property type 2% 18% 14% 6% 31% 14% 2% 4% 7% Unknown National Technical Standard Passivhaus CSH Level 3 CSH Level 4 CSH Level 5 CSH Level 6 Green Guide to Housing Specification Ecohomes - excellent Construction Standard Average Insights from Social Housing Projects: BPE meta analysis
  • 12. 10 Building thermal mass The thermal inertia of the BPE test dwellings was categorised according to the construction type specified by the BPE evaluators (heavy vs lightweight). In total, 30 projects reported a heavyweight construction; 22 were described as lightweight and 31 did not declare the thermal mass. Main glazing type The projects have shown an approximately even spread in terms of glazing types. Triple glazing was the most common being reported in 37 test dwellings, followed by double glazing in 30 dwellings. In 16 cases the type of glazing was not declared. Building services Primary space heating systems The most recurring space heating systems were the traditional fossil fuel fired combi and standard boilers Electric heating was a common alternative in particular in Passivhaus certified properties typically reliant upon electrically integrated heat pumps Exhaust and air-source heat pumps were the most common types of heat pumps in use (10% and 6%) Although still uncommon in the domestic sector, combined heat and power (CHP) was used in 9 of the BPE test dwellings Space heating controls Time and temperature resulted the most common space heating control in place, followed by thermostat and thermostatic radiator valves (TRVs) 5% of the BPE test dwellings did not specify the type of control in use 37% 27% 36% Unknown Lightweight Heavyweight 19% 29% 7% 23% 22% Unknown Double glazing Double glazing low-e Triple glazing Triple glazing low-e 2% 23% 24% 7% 2% 6% 14% 10% 11% 2 19 20 6 2 5 12 8 9 Not stated Fossil fuel boiler (standard) Fossil fuel boiler (combi) Biomass boiler (combi) Ground source heat pump Air source heat pump Electric heating Exhaust air heat pump Communal heating CHP 5% 16% 2% 28% 42% 5% 2% 4 13 2 23 35 4 2 Not stated Thermostat Time clock Thermostat and TRV Time and temperature control None Other Insights from Social Housing Projects: BPE meta analysis
  • 13. 11 Domestic hot water systems Domestic hot water (DHW) was predominantly supplied from the main heating system Electric water heating occurred in 13 dwellings Fossil fuel standard boilers run in 12 properties Passive and mechanical ventilation (MV) systems The majority of ventilation systems in place consisted of mechanical ventilation with heat recovery (MVHR) (67%) Mechanical ventilation with no heat recovery was marginal (5%) 24% of the test dwellings had extract only and relied upon natural ventilation Renewables 80% of the properties exploited renewable sources to cover a part of the energy demand Solar thermal was exploited in 28 of the properties, solar photovoltaic in 23 properties. Both systems operated in 15 properties Design U-values All of the properties have design U-values within the Part L1A limiting fabric parameters. Min: 0.088 W m-2 K-1 (wall); 0.076 W m-2 K-1 (floor); 0.074 W m-2 K-1 (roof) Max: 0.280 W m-2 K-1 (wall); 0.250 W m-2 K-1 (floor); 0.190 W m-2 K-1 (roof) Average: 0.164 W m-2 K-1 (wall); 0.142 W m-2 K-1 (floor); 0.122 W m-2 K1 (roof) 24% 10% 14% 1% 7% 10% 16% 5% 2% 11% 20 8 12 1 6 8 13 4 2 9 Fossil fuel boiler (combi) Exhaust air heat pump Fossil fuel boiler (standard) Hot water cylinder Biomass boiler (combi) Not stated Electric water heater/immersion heater Air source heat pump Ground source heat pump Communal heating CHP 2% 5% 67% 1% 24% 2 4 56 1 20 None Mechanical ventilation MVHR Passive ventilation Extract only 20% 34% 28% 18% None Solar thermal Solar photovoltaic Solar thermal and photovoltaic 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 DesignU-Value(Wm-2K-1) Main wall Main ground floor Main roof Part L1A - walls Part L1A - floors Part L1A - roof Insights from Social Housing Projects: BPE meta analysis
  • 14. 12 3. Performance Gap Fabric testing U-value testing – Introduction At the core of the performance gap, underperforming building envelopes deviating from the design intent result in higher transmission losses through the building fabrics and contribute to building energy use being higher than originally predicted (ZCH, 2014a; 2014b). This might be due to a number of reasons such as flawed design calculations, quality of materials below what expected or inaccuracies of testing equipment. The charts below compare the design vs as built thermal transmittances of external walls and roof/ceilings in the dwellings object of U-value testing. The two doughnut-charts at the bottom summarise the respective incidence of the performance gap across the test dwellings in terms of number of properties below and above (0-25% / 25-50% / 50-100% and +100%) the design U-value. The key findings are finally discussed. 71% 26% 14% 20% 332% 207% 154% 26% 25% 0% -8% -23% 8% -8% -29% -36% -14% 36% -13% 7% -7% 113% 80% 20% 163% 153% 61% -22% 19% 17% 31% 14% 28%33% 6% 162% 37% 4% 20% 190% -14% -33% -43% 4% 91% -8% -44% -15% -100% -50% 0% 50% 100% 150% 200% 250% 300% 350% 400% 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 P22/1 P24/1 P24/2 P26/1 P18/2 P14/1 P18/1 P16/1 P16/2 P12/1 P12/1 P23/1 P23/1 P23/2 P06/1 P06/2 P11/4 P17/1 P05/1 P05/2 P15/4 P20/1 P20/1 P20/2 P13/3 P07/1 P02/1 P15/1 P19/1 P19/2 P19/3 P19/4 P19/5 P19/6 P21/1 P27/2 P01/1 P01/2 P23/1 P10/1 P08/1 P08/2 P17/3 P04/2 P09/1 P03/1 P04/1 P15/2 Thermaltransmittance(Wm-2K-1) BPE test dwelling ID Design vs As Built External Wall U-values Design U-value As built U-value Part L1A limit Insights from Social Housing Projects: BPE meta analysis
  • 15. 13 78% 44% 620% 392% 15% 146% 14% -31% 100% -100% 0% 100% 200% 300% 400% 500% 600% 700% 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 P12/1 P26/1 P09/1 P01/1 P12/1 P20/1 P15/2 P15/1 P04/1 Thermaltransmittance(Wm-2K-1) BPE test dwelling ID Design vs As Built Roof/Ceiling U-values Design U-value As built U-value Part L1A limit Performance gap frequency - wall U-values Performance gap frequency - roof U-values 11% Below as-design 22% 0-25% above target 11% 25-50% above target 11% 50-100% above target 44% +100% above target 33% Below as-design 27% 0-25% above target 15% 25-50% above target 8% 50-100% above target 17% +100% above target Insights from Social Housing Projects: BPE meta analysis
  • 16. 14 U-value testing – Key Findings Walls o In 33% of the BPE test dwellings the external walls were performing in line or below the target U-value. This witnesses the value of these exemplary buildings that are pioneering a shift of culture within the UK domestic building stock. o The overall average as-built U-value of 0.220 W m-2 K-1 exceeds the average design U-value of 0.164 W m-2 K-1 . o 9 properties were above PartL1a fabric limit of 0.30 W m-2 K-1 . Roofs and ceilings o 1 out of the 9 properties under review was below the design U-value. o The overall average as built U-value goes beyond the building regulations backstop. o This is where the major opportunity for improvement lies and stresses the urgency of improved insulation detailing on both warm and cold roofs, in particular with regard to discontinuities in the loft insulation layer often interrupted as an after-thought through service penetrations. Floors o 3 properties carried out ground floor U-value testing, with design targets in the region of 0.10 to 0.20 W m-2 K-1 and actual performance varying from 0.10 to 0.405 W m-2 K-1 . Recommendations o Energy conscious design and the implementation of quality control systems on a par with the Passivhaus Certification system as key leverages to bridge the gap between design specifications and in‐situ measured values. o Service penetrations to be concentrated in carefully controlled zones. o Skilled workmanship. o Construction databases to better reflect the thermo-physical characteristics of the construction materials on the market and address materials underperforming compared to their specifications. Air tightness testing – Introduction Whilst ventilation plays a key role for pollutant dilution and to mitigate condensation phenomena, uncontrolled air infiltration through the building fabric (background ventilation) can give rise to thermal discomforts and excessive ventilation losses increasing the building energy consumption. The Building Regulation Approved Document L1a sets out a binding air leakage rate of 10 m3 m-2 h-1 at a 50 Pa pressure differential. However, mechanically ventilated buildings levering on the ‘build tight-ventilate right’ principle can aim at values as low as 0.50 m3 m- 2 h-1 as specified by the Passivhaus standard. The average air infiltration rate In the UK domestic building stock is estimated at approximately 11.5 m3 m- 2 h-1 (Stephen, 2000). The in-situ air tightness tests undertaken in 74 BPE test dwellings have been compared against the design intention using an average when multiple tests were carried out. The results are plotted in the chart below and then aggregated in the doughnut chart. The key findings are finally discussed. Insights from Social Housing Projects: BPE meta analysis
  • 18. 16 Air tightness testing – Key Findings o Nearly half of the BPE test dwellings reviewed successfully perform to a high standard and as per the design intent o BPE test dwellings were very airtight by UK standards. The average in-situ air leakage is as low as 4.4 m3 m- 2 h-1 @ 50 Pa and below the average design specification of 4.93 m3 m- 2 h-1 @ 50 Pa. o Apart from one test possibly biased by a technical fault, all tests perform below backstop Part L1a target and the UK average air permeability. Recommendations o Maximise air tightness and design a bespoke ventilation build tight-ventilate right strategy. o Embed an airtightness testing strategy within the construction programme to implement at pre-determined time steps. o Avoid supplementary controllable ventilators typically placed as an after-thought by the installer as their impact on the thermal performance of the building envelope is frequently poorly understood. o Be mindful of progressive drops in airtightness levels due to degradation of seals over time. o Airtightness targets to be well communicated, evaluate training for on-site personnel. o Co-ordination between building contractors and Mechanical & Electrical (M&E) contractors to prevent unwanted air leakage paths to accommodate service outlets. o Take into account the impact of how the occupant operates natural ventilation on indoor environmental conditions. Performance gap frequency - Air Tightness 46% Below as-design 11% 0-25% above target 12% 25-50% above target 18% 50-100% above target 14% +100% above target Insights from Social Housing Projects: BPE meta analysis
  • 19. 17 Energy system commissioning Introduction Commissioning plays a pivotal role in running the building energy systems in conformance with the design intent and prevent problems from deteriorating over time if not promptly addressed. The key issues flagged by the BPE evaluators across a variety of building services & technologies have been analysed to give RPs an understanding of which problems are more likely to occur in relation to specified systems. Building services & renewables Energy system # test dwellings # key issues reported # key issues per installation Ranking (*legend) Passive/mechanical ventilation MVHR 56 64 1.14 - Mechanical 4 3 0.75 Extract 20 5 0.25 + Passive 1 1 1.00 None (natural) 2 0 0.00 Total 73 0.88 Space heating Fossil fuel boiler (combi) 20 4 0.20 + Exhaust air heat pump 8 9 1.13 - Fossil fuel boiler (standard) 19 8 0.42 + Biomass boiler (combi) 6 6 1.00 - Not stated 2 0 0.00 Electric heating 12 0 0.00 + Air source heat pump 5 8 1.60 - Ground source heat pump 2 2 1.00 Communal heating CHP 9 6 0.67 - Total 43 0.52 DHW Fossil fuel boiler (combi) 20 3 0.15 + Exhaust air heat pump 8 3 0.38 + Fossil fuel boiler (standard) 12 3 0.25 + Biomass boiler (combi) 6 0 0.00 + Not stated 8 1 0.13 + Electric water heater/immersion heater 13 3 0.23 + Air source heat pump 4 2 0.50 + Ground source heat pump 2 0 0.00 + Communal heating CHP 9 0 0.00 + Hot water cylinder 1 0 0.00 Total 15 0.18 Renewables Solar photovoltaic 23 4 0.17 + Solar thermal and photovoltaic 15 9 0.60 Solar thermal 28 14 0.50 - None 17 0 0.00 Total 27 0.33 Insufficient sample + Low # of issues – High # of issues Insights from Social Housing Projects: BPE meta analysis
  • 20. 18 General Findings Reported issues have been grouped under the general headings of services design / operation and maintenance / installation / value engineering / commissioning / occupants / handover / controls. Overall, services design and installation together cover half of the total issues reported, symptomatic of shortage of skills and training within the sector. O&M follows with 30 issues reported, highlighting its importance throughout the building service life and the crucial requirements for ongoing support after handover, often neglected. Problems related to commissioning and controls are less common, those related to occupants, handover and insufficient value engineering marginal. Building services & renewables Ventilation o Small number of issues reported per extract only systems due to the low degree of technical complexity – care when choosing the exhaust outlet location. o Under-performance of the mechanical extraction units – endemic issue within the UK building stock? o Insufficient sample of installs to come up with robust findings in relation to mechanical ventilation and ground source heat pumps. o MVHR does not appear ready for widespread adoption within the social housing sector (see separated focus). Space heating o Combi and standard fuel boilers provide simple and well-established systems to supply the building heating energy demand with marginal occurrence of issues – potentially exemplifying the contrast between how the industry copes well with something established and relatively badly with newer technologies stressing the crucial need of training. In respect to heat pumps in particular, the huge diversity of configurations (DECC, 2014) does not help. o Electric heating is often suitable in properties with a very limited space heating demand (e.g. <15 kWh m-2 ) – minimal issues due to ease of use and low maintenance requirements. o Insufficient sample of installs to come up with robust findings in relation to ground source heat pumps. Domestic hot water o Very few issues reported – all systems generally reliable for DHW production. Combi boilers are one of the success stories. Renewables o Solar photovoltaic systems have experienced few issues being a well-established technology supported by quality assurance schemes such as the Microgeneration Certification Scheme (MCS). o Solar thermal tells a different story (see separated focus). 25% Services design 25% Installation 19% O&M 10% Commissioning 8% - Controls 4% - Occupants 4% -Handover 3% - Value engineering 3% Other Occurrence of building services issues Insights from Social Housing Projects: BPE meta analysis
  • 21. 19 MVHR – Key findings Heat recovery integrated mechanical ventilation is projected to achieve the next steps in energy savings in high energy performance buildings where ventilation heat loss covers a predominant quota of the overall building energy demand (Fabrizio et al., 2014). However, their current applicability in social housing is questionable as evidenced by the frequent occurrence of issues captured by the BPE evaluators. On average, 1.14 issues were reported per MVHR-equipped property. In particular, O&M by vulnerable households was problematic and coupled with system unbalancing often led MVHR to underperforming. MVHR common issues Recommendations Unbalanced system supply-extract (human error / faulty equipment) - Check filters. - Re-balance the airflow rates. - Test that the manufacturers supplied fans meet the minimum flow rates originally intended. - Recommissioning or replace underperforming fans. - Be aware of potential discrepancies in test results attributable to differences in the equipment used to undertake the duct flow measurements, and of the weather conditions that might have affected the results (typically, very windy days) - Building Regs to steer in relation to flow measurements and commissioning procedures. Blocked filters - Filter cleaning every six months as a term of contract with the maintenance team. - Evaluate variable speed systems or CO2 detection sensors. Occupants do not know how to operate the system - Educate occupants and show how the filters can be changed to those interested. - Ongoing technical support. Occupants’ interference - Knowledge transfer on optimal window opening, MVHR operation and kitchen extracts. - Lock vents in a fixed position. - Re-commission the system. Difficulty of access for maintenance Ensure ease of access to the platform where the unit is installed. Excessive system resistance and noise, leading occupants to turning off the units - Improved ductwork connections (flexible-rigid) at ceiling terminals avoiding bends and offsets. - Verify if the air intake louvres are blocked causing pressure loss and the fans running more intensively to compensate - Educate the user to operate the system more efficiently. Over-pressurisation of the external fabrics - Balance volume flow rate for extract and supply. - Make sure air transfer paths via door undercuts are not excessively small (e.g. < 5 mm). 0.00 0.20 0.40 0.60 0.80 1.00 1.20 Key issues per property with MVHR installed Servicesdesign-0.30 O&M-0.32 Installation-0.23 Valueengineering-0.02 Commissioning-0.14 Other-0.04 Occupants-0.07 Insights from Social Housing Projects: BPE meta analysis
  • 22. 20 Space heating – Key findings Heat pumps were associated with a number of issues in particular at the installation phase. Frequent problems occurred in heat pumps and biomass boilers in relation to the services design. The design of the controls not being fit for the elderly or users with restricted mobility have been reported across properties running CHP and heat pump systems, although a correlation between the issue and the system in place does not necessarily exist. Energy system Common issues Recommendations All heat pumps Low installation standard e.g. unit / fan speed switch inaccessible Contract MCS accredited installers, on the basis of sufficient post-installation support and maintenance guarantee through service contracts. Incorrect temperature readings Verify that the external temperature sensor isn’t exposed to direct sunlight and compressor and immersion sensors are correctly placed. Unbalanced underfloor systems, inadequate flow temperatures, lack of controls/system communication - Training. - Re-commissioning, collect documentation and commissioning reports. Occupants’ interference / disengagement - Improve owner and user knowledge. - Improve customer care, prompt response and repair services. System performance deteriorating over time Detail maintenance schedule and seasons commissioning. Inefficiencies during very cold weather – Coefficient of Performance (COP) is too low Evaluate the potential mismatch between expected (typically predetermined in the Eurovent Certification) and real operating conditions to ensure that a heat pump averagely operates at an appropriate output. Biomass boilers Underperformance against manufacture’s specs, inefficiencies and distribution losses - Recognise that SAP indications do not necessarily reflect actual distribution efficiencies. - Insulate ductwork. - Evaluate if the heat demand is sufficient to offset the district heating system inefficiencies. Inadequate temperature control zoning Refer to Domestic Heating Compliance Guide. Restricted access to space heating programmers for users with restricted mobility Allow sufficient headroom for comfortable access to the programmer. CHP Controls not user-friendly Aim at user-friendly control panels, educate the users and provide ongoing support. Distribution losses Ensure all pipes leading from the unit have been insulated. 0.13 0.50 0.20 0.500.13 0.33 0.20 0.22 0.50 0.17 0.40 0.22 0.200.25 0.200.13 0.20 0.50 0.20 0.22 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 Exhaust air heat pump Biomass boiler (combi) Air source heat pump Ground source heat pump Communal heating CHP Key issues per property - specified space heating energy systems Controls Handover Occupants Commissioning Value engineering Installation O&M Services design * low sample Insights from Social Housing Projects: BPE meta analysis
  • 23. 21 Solar thermal – Key findings A considerable number of the issues emerged from the review of solar thermal systems are associated with sub-optimal design and controls specifications that result in incorrect setup, unforeseen failures and cost uplifts. An optimal control system should be specified as part of the procurement relying upon third party accredited professionals. Particular attention also on roof integrated technologies that trade-off aesthetics with more problematic maintenance needs and costs. Solar thermal common issues Recommendations Over simplistic controls settings not tuned to the solar irradiance levels Contract accredited manufacturers / installers e.g., an M&E contractor with MCS certification could be required as part of the design specification and detailed control units specified in the procurement. Immersion heater inefficient operating regime Re-commissioning. Integrated design Understand the implications throughout the system lifespan in terms of potential failure rates, maintenance requirements and the costs associated. Overheating in summer Continuous solar thermal pipework insulation of adequate specification. Controls in inaccessible loft User access to readings may assist remote faults diagnosis speeding up trouble shooting. Poor coordination between installers / main contractor’s plumbing and heating contractor Soft landings. 0.000 0.100 0.200 0.300 0.400 0.500 0. Key issues per property with solar thermal installed O&M-0.036 Installation-0.036 Valueengineering-0.036 Commissioning-0.036 Controls-0.214 Servicesdesign-0.143 Insights from Social Housing Projects: BPE meta analysis
  • 24. 22 Thermo-hygrometric comfort & IAQ Introduction Thermo-hygrometric comfort refers to a status of thermal neutrality experienced by an individual whose mechanisms of behavioural and vasodilation thermoregulation are inactive i.e. a psycho-physic feeling of wellbeing and satisfaction perceived in relation to the surrounding environment. Indoor Air Quality (IAQ) is typically acceptable at CO2 concentration levels below 1000 ppm. Temperature, humidity and CO2 levels monitored in the BPE test dwellings have been reviewed and categorised in relation to: Monitoring data indicating that the building suffers from under heating. Monitoring data indicating that the building is slow to warm up (start-up period) and poor temperature control when heating is on. Monitoring data identifies overheating as a concern. Monitored humidity levels fall outside accepted comfort levels (40-70%, CIBSE) for a significant percentage of the time. Monitored CO2 concentration indicative of poor air quality (>1000 ppm, ASHRAE). Responses to the building user satisfaction (BUS) surveys have been not deemed a representative proxy of comfort due to subjective and psychological biases such as the forgiveness factor linked to previous housing experienced by vulnerable households. 0 5 10 15 20 25 30 35 40 45 Under heating Overheating Hygrometric issues Poor IAQ Yes No Insufficient data Thermo-hygrometric discomfort and poor IAQ occurrence across the BPE test dwellings Insights from Social Housing Projects: BPE meta analysis
  • 25. 23 Key findings Although findings might be undermined by different comfortable metrics used by BPE evaluators to call an under-over heating / poor IAQ scenario, overheating ultimately emerges as the key issue faced by RPs and typically traces back to deficiencies in the building design (sub-optimal orientation and glazing specifications). Crucially for the potentially fuel poor households targeted by RPs, under heating and hygrometric issues are less common. Poor IAQ is reported more frequently, in relation to mechanical ventilation systems not working effectively or insufficient window opening in naturally ventilated buildings, although this might have been affected by the reduced body of evidence. Issue Common causes Recommendations Under heating Fuel poverty. Uncomfortable ambient air temperatures maintained for a significant percentage of the time within the property to save on bills. - The problem should not arise if the building was performing as designed. - Contact dedicated helplines e.g. NEF Affordable Warmth Network. Occupant’s preference for low ambient air temperatures / high natural ventilation rates. Discourage natural ventilation in mechanically ventilated buildings. Occupant window opening behaviour. Awareness raising actions in particular with mechanical ventilation in place. Space heating controls difficult to operate. Knowledge transfer and practical demonstrations. Faulty indoor air temperature sensors. N.a. – the test is biased. Overheating Occupant window opening behaviour – summer. - Understand the psychological drivers behind. - Awareness raising actions in particular with mechanical ventilation in place. - Recalibrate the air change rates via the MVHR system to compete with natural ventilation. Occupant’s preference for high ambient air temperatures with secondary heating sources (generally electrical) on outside of the heating period. Awareness raising. Heat waves. N.a. Building design – orientation, glazing-to-wall ratio, incorrect glazing specifications (g-value), contributing to excessive solar gain. Best practice and common sense in building design. Failure in the mechanical ventilation system summer bypass. Re-commissioning. Hygrometric issues Too dry – relative humidity dropping below the CIBSE recommended lower limits due to windows regularly opened in winter resulting in additional heating loads or during prolonged unoccupied periods Understand how the occupants interact with windows. Too wet – condensation and mould formation in wet rooms. Improve ventilation regime. Verify if the ventilation boost typically actioned via the bathroom light switch is working. Poor IAQ Ineffective mechanical ventilation. Regular maintenance of the MVHR filters. Occupants switching off MV unit being too loud. Advise occupants of the purpose of the MVHR system. Occupancy levels higher than expected / sedentary lifestyle of residents. Put in place ventilation systems identifying poor IAQ via sensors and mitigating it automatically. Leaky duct. Detect leakage and fix. Insights from Social Housing Projects: BPE meta analysis
  • 26. 24 4. Process & Culture Process review Introduction Each project’s phase (procurement, design, construction, O&M, handover) has been reviewed in the light of what worked well and what less to come up with a good/bad practice split (radar chart), which was then allocated to a relative impact factor – high, medium or low (square charts). Albeit the findings are strictly built upon the evidence supplied by the BPE evaluators, subjective calls were in some cases necessary. Key findings The conscious environmental design at the heart of the projects resulted in the predominance of good practices reported during the Design Phase. Notably, only 5 projects flagged relevant problems in relation to the Construction Phase – which in the majority of cases were considered of good standard despite all the unforeseen events that can arise during the construction process. O&M is where the major problems have been reported and is probably what RPs should prioritise with a view to address the performance gap, with understanding the variables that govern the occupant behaviour standing potentially out as the biggest challenge to face up. The Handover Phase was generally positive in the way occupants are introduced to the building. Overall a high level of correlation between the original design intent and the delivered project has resulted in high quality, low carbon social housing schemes. Process Rating and Impact Assessment 0 2 4 6 8 10 12 14 16 18 20 Procurement Design ConstructionO&M Handover Good practice Bad Practice Insufficient data 5 - Unknown 9 - High impact 3 - Unknown 1 - High impact 1 - Medium impact 9 - Insufficient data 12 GoodpracticeBadpractice 7 ProcurementProcess rating Insights from Social Housing Projects: BPE meta analysis
  • 27. 25 2 - Unknown 10 - High impact 5 - Medium impact 4 - Unknown 2 - High impact 2 - Medium impact 3 - Insufficient data 19 GoodpracticeBadpractice 6 Handover 8 - Unknown 3 - High impact 3 - Medium impact 1 - Low impact 3 - Unknown 5 - High impact 2 - Medium impact 1 - Low impact 2 - Insufficient data 10 GoodpracticeBadpractice 16 O&M 1 - Unknown 14 - High impact 3 - Medium impact 3 - Unknown 3 - High impact 1 - Low impact 3 - Insufficient data 20 GoodpracticeBadpractice 5 Construction 15 - High impact 1 - Medium impact 2 - Unknown 10 - Insufficient data 18 Goodpractice Design Insights from Social Housing Projects: BPE meta analysis
  • 28. 26 Best Practice throughout Construction Process PROCUREMENT DESIGN CONSTRUCTION HANDOVER O&M Appoint a clerk of works – regular on-site inspections to check that the build is being delivered in line with design specifications. Particular attention to insulation installation. In-situ thermal performance tests, in particular air-tightness. Set up a formal change management process to ensure that any deviations from designs are discussed and performance repercussions managed. No blame culture. Minimise deviations from the original scheme design or specification. Shared agreement on specific design decisions prior to the appointment of the building contractor. Contract design team with a track record in environmental design. Collaborative approach and collective experience to tackle the challenges faced up throughout the construction process. Evaluate the case for retentions to achieve the design intentions. Sustainable building design approached at early stages, stemming from a holistic approach to the occupants’ quality of life and the environment – sustainability certification systems as a possible integrated steer to sustainable design principles. ‘Fabric first’ design approach. Aim at cost optimal levels of energy performance (EPBD recast 2010/31/EU). Participatory design. Multi-disciplinary design team. ‘Soft Landings’ handover events and introductory workshops with design and technical team, client, maintenance staff, and tenants, including feedback sessions to engage residents. Advice should be given in a non- technical manner that is accessible to laypeople, in particular in relation to novel technologies. Handover of tenant information pack upon arrival at the property including ‘quick start’ guide, complete User Guide and operation manual. Training for occupants and maintenance team, at the outset and during occupation. Feedback workshop during the first year after handover. User- friendly user guide to provide simple operation details. Dedicated Customer Care for 1 year following occupation. Set up a repairs helpline to reporting operational problems to cover defects liability periods. Be aware of possible forgiveness factor and residents reluctance to complain. Insights from Social Housing Projects: BPE meta analysis
  • 29. 27 Learnings The key learning points from the projects have been captured in relation to methodological, organisational, technological, constructional and occupational insights. Although more time consuming and challenging than common practice, there is a particular convergence on two points namely the transferability of the skills gained into future developments and the recognition of the added value of the final end products. Learning points Methodological Organisational Standardised MV commissioning process Mandatory annual duct flow measurements Design replicability Location of MVHR Knowledge transfer architect-contractors Partnership, quality, and attention to detail in the realisation process New performance requirements, both energy and health Collaborative value of partnership arrangements Clear communication within the design team Communication design team-contractor Building design with people in mind Identify back up design strategies Identify design mitigation actions Effective client-architect-contractor communication Agreements to be made prior to site Shared agenda and sustainable targets from the project's outset Getting the partners around the table as early as possible Understand in advance design, installation and supply chain requirements of new systems and technologies Undertake intensive research and development Fabric first approach Sort out details during the design phase Improved attention to space requirements for systems in the initial design Shared holistic approach to major changes Need for more detailed design specifications for installation and commissioning Designed and actual energy use gap Rethinking on ventilation/ heating Handover best timing Exhaust Air Heat Pumps not appropriate for social housing Benefits of Passivhaus framework and processes Passivhaus reliability Passivhaus benefits on IAQ Underestimated extra-effort Worthwhile extra-effort Transferability of the skills acquired Trained service providers Resource constraints faced by training opportunities Service providers to motivate environmentally responsible behaviour Feeling of fulfilment and satisfaction Communication contractor-sub contractors Raise the bar for future projects Too ambitious goals set Risk understanding, communication and management Strategic value of collaboration Soft landings BPE evidence in support of remedial works requests to sub-contractors Revised processes in other developments Pro-actively manage responsibilities in the delivery of sustainable housing instead of delegating to developer/contractors Transferable skills for future housing developments Insights from Social Housing Projects: BPE meta analysis
  • 30. 28 Technological Constructional Under-performance of MVHR systems Building diagnostics Monitoring-based fine tuning Heating controls should be suitable for residents MVHR need for improved design specifications (rigid ductwork, summer bypass and units sizing) and installation (on-site clerk of work) BPE as effective building diagnostics tool to verify and improve building performance Critical evaluation of control mechanisms and technology level in place Reconsider the use of more conventional heating and ventilation systems Construction rigorously aligned with design Minimise as-built variations from design On-site inspections as per approved design Accredited M&E installers Robust management of the overall construction process Occupational In-use monitoring Environmentally responsible occupants Forgiveness factor Review future handover practices Hold regular meetings with residents association to identify problems Regular contact occupant-housing staff More effective occupant education Soft Landings The final step of the analysis focused on a review of the Soft Landings approach. Of the 15 projects that have provided sufficient information to address this research question, 80% (12 projects) successfully provided evidence of the key principles underpinning the Soft Landings approach. Soft Landings review 43% Satisfactory 11% Unsatisfactory 46% Insufficient data Insights from Social Housing Projects: BPE meta analysis
  • 31. Meta-analysis keywords. Created with wordle.net. References DCLG, 2014. Affordable housing supply in England: 2013 to 2014. Department for Communities and Local Government. DECC, 2014. Preliminary data from the RHPP heat pump metering programme. Department of Energy & Climate Change. Directive 2010/31/EU of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings (recast); June 18, 2010. Fabrizio, E., Seguro, F., Filippi, M., 2014. Integrated HVAC and DHW production systems for Zero Energy Buildings, Renewable & Sustainable Energy Reviews 40, 515-541, Doi: 10.1016/j.rser.2014.07.193. Stephen, R., 2000. Airtightness in UK dwellings. BRE, Garston. ZCH, 2014a. Closing the gap between design & as-built performance. Evidence Review Report. Zero Carbon Hub, London. ZCH, 2014b. Closing the gap between design & as-built performance. End of term report. Zero Carbon Hub, London.