Agenda
• Welcome and Introductions
• Project Clean Lake
 Green & Gray Infrastructure
• Green Ambassador – Fairhill/MLK Project
Project Design
Construction & Community Impacts
• Questions & Discussion
Northeast Ohio Regional Sewer District
355square
miles
• Political subdivision of Ohio
• Created in 1972 by Court Order
– Code of Regulations
– Governed by seven Trustees
• Separate and distinct from the City of
Cleveland and Cuyahoga County
Who We Are…
• Sanitary & regional stormwater services to
Cleveland and 61 member communities
– 1 million customers
– 90+ billion gallons treated each year
• Water quality monitoring
• Lake Erie beach monitoring and
maintenance
What We Do…
We Own and Operate 3 Wastewater
Treatment Plants
Westerly
Southerly
Easterly
6
Northeast Ohio Regional Sewer District
Responsibility
• $3 billion in 25 years
• Combined Sewer
Overflow (CSO) control
• Sewer fees
• Regional flooding
and erosion issues
• Impervious
surface fee
Northeast Ohio Regional Sewer District
Responsibility
• Regional flooding
and erosion issues
• Impervious
surface fee
• $3 billion in 25 years
• Combined Sewer
Overflow (CSO) control
• Sewer fees
Project Clean Lake
The Sewer District: COMBINED SEWER OVERFLOW CONTROL
10 10
Dry Weather Flow
to treatment plant
Additional Conveyance
Capacity Available for
wet-weather
Combined Sewer
Overflow Discharge to
Stream/Lake
What is a Combined Sewer?
What is a Combined Sewer
Overflow?
How does a combined
sewer system work?
Separate Sewer System
Street Catch
Basins
Industrial
Wastewater
Domestic
Wastewater
Storm Sewer
WWTP
Flow to WWTP
Sanitary Sewer Lake Erie
Combined Sewer Area
Separate
Sewer Area
NEORSD Service Area & Communities
Combined Sewer Area
126 CSO Locations
Throughout
Combined Sewer
Area
Consent Decree Requires Northeast
Ohio’s CSO Problem Reduced in 25
Years
98%
Capture
0
1
2
3
4
5
6
7
8
9
Baseline (1970s) Current (2011) Target (2036)
9
4.5
0.494
TypicalYear
CSOVolumeRemaining
(BG)
0 to 4 overflows
in typical year
0 to 80+
overflows in
typical year
CSO Consent Decree
25 years of Tunnel Construction
Seven Tunnel Systems
– 21 Miles
– 17’ to 24’ in Diameter
– 100’ to 200’ in Depth
18
2011 – 2020
2021 – 2027
2019 – 2024
2026 –
2035
2017 –
2021
2024 – 2030
Complete
Project Clean
Lake
Project Clean Lake
Euclid Creek Tunnel
Project Clean Lake
Euclid Creek Tunnel
NEORSD GREEN INFRASTRUCTURE
Looking across combined sewer
area for opportunities to manage
stormwater before it enters
combined system
While the Sewer District Does
Large Projects, You Can Also
Manage Your Runoff
On-Site Stormwater
Management Practices
On-Site Stormwater
Management Practices
• Rain Gardens
• Rain Barrels and Cisterns
• Pervious Pavement
• Vegetated Filter Strips
• Add disconnection slideRaingarden
Pervious Pavement
Cistern
Retention Pond
Green roof
On-Site Stormwater Practices
Downspout Disconnection
On-Site Stormwater
Management =
Disconnection and
Distribution
Bioretention
Project LocationProject Location Map
SHAKERHEIGHTS
Project Drainage Area
Combined Sewer
Inlet Laterals
Inlet
Inlet Laterals
Inlet
Storm Sewer
Combined Sewer
Green Infrastructure Concept
Green Infrastructure Concept
Overflow to
Doan Brook
Ponding Depths
0.75-inch rain event
· 1 foot of surface ponding
· 24-hour drawdown time
Rain events larger than 0.75 inches
· 3 feet of surface ponding
· 24- to 36-hour drawdown time
Green Infrastructure Concept
Doan Brook Bank Stabilization
Green Infrastructure Concept
Outlet Pipe to
Bioretention Area
Maximum Height
14 feet
Large Stones to Slow
Down Stormwater
Bioretention
Area
Exposed Aggregate
Concrete
Stamped & Stained
Concrete
Standard Concrete Stained Concrete
NEORSD will maintain the following:
Maintenance Responsibilities
• New storm sewers and new street inlets
• Bioretention basins (includes storm sewer infrastructure
within the bioretention basins)
• Public plaza (includes facility maintenance, litter control, etc.)
Project Schedule
• Construction Start Date: March 2015
• Construction End Date: November 2016
Construction & Community Impact
Pre Construction Coordination
• Pre Construction Inspection/Photographs
• Coordination with residents for access to property (typically
exterior of the home photographed)
• Residential Notification
• 72-hour notification prior to commencement of work
• Access To Property
• Contractor to coordinate & maintain access to drives, if
crossing is to occur
• Maintained with steel road plate
• Issues and Complaints
• NEORSD Customer Service (216)881-8247 8AM-5PM
Maintenance of Traffic
• Tentative Plan (Subject to Change)
based on approval/schedule
• Major Components:
– West bound lane Fairhill Road closed. Detour to be
established around Larchmere Blvd. to MLK Drive.
– No left turn from E. 124th, E. 127th, Kemper Road
and North Moreland Road
– Intersection of MLK and Fairhill channelized to
eastbound Fairhill, left turn only lane, to North MLK
– Pedestrian sidewalk closed along north Fairhill Road
– No street parking allowed
Open Cut Construction
• Noise and dust limited to working hours.
Contractor is responsible for maintaining
work zone.
• Partial restoration of road cuts when sewer
work completed.
Open Cut Construction
Open Cut Construction
Open Cut Construction
Open Cut Construction
Questions/Discussion
Questions & Answers
Question: Where will bus route #48/#48A go?
How will the public be notified of RTA bus route
and/or bus stop location changes?
RTA service alerts are posted at
http://www.riderta.com
RTA Answerline (216) 621-9500 is also available
to help answer RTA related questions.
Questions & Answers
Question: Who do I contact if I have a
question or concern?
NEORSD Customer Service Department
(216) 881-8247 8AM – 5PM
Questions & Answers
Question: What impacts should I expect
from construction of the new storm sewers
within the public right-of-way?
Temporary on-street parking limitations.
Temporary lane closures, detours and limits
to left turns onto Fairhill Road westbound.
Temporary driveway access closures.
Pedestrian sidewalk closures/detours.
Construction dust & noise.
For more information:
• NEORSD Customer Service (216) 881-8247
• Project Clean Lake official homepage:
www.neorsd.org/cso.php

Mais conteúdo relacionado

Mais procurados

Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
Crosstown TO
 
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Crosstown TO
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Crosstown TO
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Crosstown TO
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Crosstown TO
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Crosstown TO
 
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Crosstown TO
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017
Crosstown TO
 
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Crosstown TO
 

Mais procurados (20)

Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
 
Rosehill Vision Committee May 31 2017 Meeting Presentation
Rosehill Vision Committee May 31 2017 Meeting PresentationRosehill Vision Committee May 31 2017 Meeting Presentation
Rosehill Vision Committee May 31 2017 Meeting Presentation
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
 
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
 
Powerpoint - Langley School Pump Station and Force Main Project
Powerpoint  -  Langley School Pump Station and Force Main ProjectPowerpoint  -  Langley School Pump Station and Force Main Project
Powerpoint - Langley School Pump Station and Force Main Project
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity Sewer
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...
 
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community MeetingLakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community Meeting
 
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
 
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017
 
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
 
Lakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community MeetingLakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community Meeting
 

Semelhante a Fairhill/MLK pre-construction public meeting 3-25-2015

LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
Theodore McNeal
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
Crosstown TO
 
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
City of Midland
 

Semelhante a Fairhill/MLK pre-construction public meeting 3-25-2015 (20)

Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Sewer University #SewerU presented by @neorsd
Sewer University #SewerU presented by @neorsdSewer University #SewerU presented by @neorsd
Sewer University #SewerU presented by @neorsd
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream Restoration
 
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
 
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond
I-75 / University Drive: An Interchange Under Pressure Becomes a DiamondI-75 / University Drive: An Interchange Under Pressure Becomes a Diamond
I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond
 
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Roundabout feasibility analysis
Roundabout feasibility analysisRoundabout feasibility analysis
Roundabout feasibility analysis
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
 
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood  Stormwater Improvement Preliminary Design ReviewTucker Avenue Neighborhood  Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
 
Lebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting PresentationLebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting Presentation
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
State of the City 2012
State of the City 2012State of the City 2012
State of the City 2012
 
Downtown Lebanon Visioning Study and Tunnel Project
Downtown Lebanon Visioning Study and Tunnel ProjectDowntown Lebanon Visioning Study and Tunnel Project
Downtown Lebanon Visioning Study and Tunnel Project
 
Quander Road Outfall and Stream Restoration
Quander Road Outfall and Stream RestorationQuander Road Outfall and Stream Restoration
Quander Road Outfall and Stream Restoration
 

Mais de Northeast Ohio Regional Sewer District

Mais de Northeast Ohio Regional Sewer District (20)

Green Infrastructure Policy: An overview
Green Infrastructure Policy: An overviewGreen Infrastructure Policy: An overview
Green Infrastructure Policy: An overview
 
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
 
DWIRS public meeting 2015 March 24
DWIRS public meeting 2015 March 24DWIRS public meeting 2015 March 24
DWIRS public meeting 2015 March 24
 
Water tweetment: How personality can help public services better engage, educ...
Water tweetment: How personality can help public services better engage, educ...Water tweetment: How personality can help public services better engage, educ...
Water tweetment: How personality can help public services better engage, educ...
 
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
 
Dugway Sewer Community Update: April 1, 2014
Dugway Sewer Community Update: April 1, 2014Dugway Sewer Community Update: April 1, 2014
Dugway Sewer Community Update: April 1, 2014
 
NEORSD Lakeshore Blvd Relief Sewer Project
NEORSD Lakeshore Blvd Relief Sewer ProjectNEORSD Lakeshore Blvd Relief Sewer Project
NEORSD Lakeshore Blvd Relief Sewer Project
 
7 ways wastewater treatment is like the first day back to school
7 ways wastewater treatment is like the first day back to school7 ways wastewater treatment is like the first day back to school
7 ways wastewater treatment is like the first day back to school
 
Collinwood Nottingham Dev Corp 072313
Collinwood Nottingham Dev Corp 072313Collinwood Nottingham Dev Corp 072313
Collinwood Nottingham Dev Corp 072313
 
euclid creek tunnel ppt may 2013
euclid creek tunnel ppt may 2013euclid creek tunnel ppt may 2013
euclid creek tunnel ppt may 2013
 
Lakeshore boulevard relief sewer presentation
Lakeshore boulevard relief sewer presentationLakeshore boulevard relief sewer presentation
Lakeshore boulevard relief sewer presentation
 
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwater
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwaterWhole lotta green: Hotel lot, roof in University Circle helps manage stormwater
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwater
 
Whole lot of green: Hotel roof, lot help manage stormwater
Whole lot of green: Hotel roof, lot help manage stormwaterWhole lot of green: Hotel roof, lot help manage stormwater
Whole lot of green: Hotel roof, lot help manage stormwater
 
Euclid creek tunnel ppt apr2013
Euclid creek tunnel ppt apr2013Euclid creek tunnel ppt apr2013
Euclid creek tunnel ppt apr2013
 
Dwirs overview handout
Dwirs overview handoutDwirs overview handout
Dwirs overview handout
 
Dwirs community impact pres 4 4-13-v3
Dwirs community impact pres 4 4-13-v3Dwirs community impact pres 4 4-13-v3
Dwirs community impact pres 4 4-13-v3
 
Euclid creek tunnel ppt mar2013
Euclid creek tunnel ppt mar2013Euclid creek tunnel ppt mar2013
Euclid creek tunnel ppt mar2013
 
Euclid creek tunnel ppt feb2013
Euclid creek tunnel ppt feb2013Euclid creek tunnel ppt feb2013
Euclid creek tunnel ppt feb2013
 
Your Sewer District and social media? How @neorsd is using it, learning from ...
Your Sewer District and social media? How @neorsd is using it, learning from ...Your Sewer District and social media? How @neorsd is using it, learning from ...
Your Sewer District and social media? How @neorsd is using it, learning from ...
 
Euclid Creek Tunnel Community Meeting Nov2012
Euclid Creek Tunnel Community Meeting Nov2012Euclid Creek Tunnel Community Meeting Nov2012
Euclid Creek Tunnel Community Meeting Nov2012
 

Último

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 

Fairhill/MLK pre-construction public meeting 3-25-2015

  • 2. Agenda • Welcome and Introductions • Project Clean Lake  Green & Gray Infrastructure • Green Ambassador – Fairhill/MLK Project Project Design Construction & Community Impacts • Questions & Discussion
  • 3. Northeast Ohio Regional Sewer District 355square miles
  • 4. • Political subdivision of Ohio • Created in 1972 by Court Order – Code of Regulations – Governed by seven Trustees • Separate and distinct from the City of Cleveland and Cuyahoga County Who We Are…
  • 5. • Sanitary & regional stormwater services to Cleveland and 61 member communities – 1 million customers – 90+ billion gallons treated each year • Water quality monitoring • Lake Erie beach monitoring and maintenance What We Do…
  • 6. We Own and Operate 3 Wastewater Treatment Plants Westerly Southerly Easterly 6
  • 7. Northeast Ohio Regional Sewer District Responsibility • $3 billion in 25 years • Combined Sewer Overflow (CSO) control • Sewer fees • Regional flooding and erosion issues • Impervious surface fee
  • 8. Northeast Ohio Regional Sewer District Responsibility • Regional flooding and erosion issues • Impervious surface fee • $3 billion in 25 years • Combined Sewer Overflow (CSO) control • Sewer fees
  • 9. Project Clean Lake The Sewer District: COMBINED SEWER OVERFLOW CONTROL
  • 10. 10 10 Dry Weather Flow to treatment plant Additional Conveyance Capacity Available for wet-weather Combined Sewer Overflow Discharge to Stream/Lake What is a Combined Sewer?
  • 11. What is a Combined Sewer Overflow?
  • 12. How does a combined sewer system work?
  • 13. Separate Sewer System Street Catch Basins Industrial Wastewater Domestic Wastewater Storm Sewer WWTP Flow to WWTP Sanitary Sewer Lake Erie
  • 14. Combined Sewer Area Separate Sewer Area NEORSD Service Area & Communities
  • 15. Combined Sewer Area 126 CSO Locations Throughout Combined Sewer Area
  • 16. Consent Decree Requires Northeast Ohio’s CSO Problem Reduced in 25 Years 98% Capture 0 1 2 3 4 5 6 7 8 9 Baseline (1970s) Current (2011) Target (2036) 9 4.5 0.494 TypicalYear CSOVolumeRemaining (BG) 0 to 4 overflows in typical year 0 to 80+ overflows in typical year
  • 17. CSO Consent Decree 25 years of Tunnel Construction Seven Tunnel Systems – 21 Miles – 17’ to 24’ in Diameter – 100’ to 200’ in Depth
  • 18. 18 2011 – 2020 2021 – 2027 2019 – 2024 2026 – 2035 2017 – 2021 2024 – 2030 Complete Project Clean Lake
  • 21. NEORSD GREEN INFRASTRUCTURE Looking across combined sewer area for opportunities to manage stormwater before it enters combined system
  • 22.
  • 23. While the Sewer District Does Large Projects, You Can Also Manage Your Runoff On-Site Stormwater Management Practices
  • 24. On-Site Stormwater Management Practices • Rain Gardens • Rain Barrels and Cisterns • Pervious Pavement • Vegetated Filter Strips
  • 25. • Add disconnection slideRaingarden Pervious Pavement Cistern Retention Pond Green roof On-Site Stormwater Practices Downspout Disconnection On-Site Stormwater Management = Disconnection and Distribution Bioretention
  • 26.
  • 27. Project LocationProject Location Map SHAKERHEIGHTS
  • 29.
  • 34. Ponding Depths 0.75-inch rain event · 1 foot of surface ponding · 24-hour drawdown time Rain events larger than 0.75 inches · 3 feet of surface ponding · 24- to 36-hour drawdown time
  • 36.
  • 37. Doan Brook Bank Stabilization
  • 38.
  • 39.
  • 41.
  • 42. Outlet Pipe to Bioretention Area Maximum Height 14 feet Large Stones to Slow Down Stormwater Bioretention Area Exposed Aggregate Concrete Stamped & Stained Concrete Standard Concrete Stained Concrete
  • 43. NEORSD will maintain the following: Maintenance Responsibilities • New storm sewers and new street inlets • Bioretention basins (includes storm sewer infrastructure within the bioretention basins) • Public plaza (includes facility maintenance, litter control, etc.)
  • 44. Project Schedule • Construction Start Date: March 2015 • Construction End Date: November 2016
  • 46. Pre Construction Coordination • Pre Construction Inspection/Photographs • Coordination with residents for access to property (typically exterior of the home photographed) • Residential Notification • 72-hour notification prior to commencement of work • Access To Property • Contractor to coordinate & maintain access to drives, if crossing is to occur • Maintained with steel road plate • Issues and Complaints • NEORSD Customer Service (216)881-8247 8AM-5PM
  • 47. Maintenance of Traffic • Tentative Plan (Subject to Change) based on approval/schedule • Major Components: – West bound lane Fairhill Road closed. Detour to be established around Larchmere Blvd. to MLK Drive. – No left turn from E. 124th, E. 127th, Kemper Road and North Moreland Road – Intersection of MLK and Fairhill channelized to eastbound Fairhill, left turn only lane, to North MLK – Pedestrian sidewalk closed along north Fairhill Road – No street parking allowed
  • 48.
  • 49.
  • 50. Open Cut Construction • Noise and dust limited to working hours. Contractor is responsible for maintaining work zone. • Partial restoration of road cuts when sewer work completed.
  • 56. Questions & Answers Question: Where will bus route #48/#48A go? How will the public be notified of RTA bus route and/or bus stop location changes? RTA service alerts are posted at http://www.riderta.com RTA Answerline (216) 621-9500 is also available to help answer RTA related questions.
  • 57. Questions & Answers Question: Who do I contact if I have a question or concern? NEORSD Customer Service Department (216) 881-8247 8AM – 5PM
  • 58. Questions & Answers Question: What impacts should I expect from construction of the new storm sewers within the public right-of-way? Temporary on-street parking limitations. Temporary lane closures, detours and limits to left turns onto Fairhill Road westbound. Temporary driveway access closures. Pedestrian sidewalk closures/detours. Construction dust & noise.
  • 59. For more information: • NEORSD Customer Service (216) 881-8247 • Project Clean Lake official homepage: www.neorsd.org/cso.php