Kerry Centre-Beloit, WI
Stormwater Management and Floodplain Analysis




                                               Presented By:
                                             Ryan Kloth, P.E., CDT

                                     Presented At:
                        WAFSCM Annual Conference – November 4, 2010




     Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
About the Speaker

 • Ryan Kloth, P.E., CDT
           – Member of Water Resources Group at GRAEF for
             5 years
           – Specialties include: Hydrologic and Hydraulic
             Analysis, Floodplain Analysis, Stormwater Design,
             and Best Management Design




Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Discussion Summary

 • Project Details
           – Location, Permits
           – Stormwater Management Aspects
           – Hydraulics/Floodplain Management
             associated with Stream Relocation




Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Location, Permits

           – City of Beloit, Wisconsin
           – 130 Acre parcel-SE corner of Interstate 43
             and Interstate 90
           – Construction for Proposed Conditions in
             two phases due to WDNR Chapter 30
             permit requirements
           – Phase 1-Two permit packages
           – Phase 2-Construction package


Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Location, Permits

           – Package PP-1
           – Paved parking areas
           – Building
           – Driveway connections to existing roadways
           – Stormwater Management Facilities
           – Floodplain Compensatory Areas




Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Location, Permits

           – Package PP-2
           – Completion of paved parking areas
           – Relocation of a portion of Spring Brook




Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Location, Permits

           – Phase 2
           – Ultimate, full build-out conditions
           – Potential development east of the current
             project consisting of additional building and
             paved surfaces.
           – 11.35 Ac. Of impervious area included with
             Phase 1
           – Phase 2-23.60 acres


Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Completed Building




Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
Ultimate Stormwater Conditions




 Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
Proposed Stormwater Conditions




  Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
Stormwater Management Aspects

           – Existing Conditions-Farmland
           – HSG B Soils north of Spring Brook; HSG C
             south of Spring Brook
           – Spring Brook-Tributary to Turtle Creek-
             Bisects site NE-SW
           – Location of Spring Brook and associated
             floodplain restricted development-Spring
             Brook relocated


Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Stormwater Management Aspects

 • Design Criteria
           – Quantity-City of Beloit-100-Yr Post to 10-Yr
             Pre
           – Quality-TSS 80% based on Ave. Annual
             Rainfall compared to no management
             runoff controls
           – Infiltration-Non-res development shall
             infiltrate 60% of pre-development infiltration
             volume

Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Stormwater Management Aspects

 • Design Criteria
           – Exempt from Beloit and NR 151 infiltration
             requirements based on existing soils and
             local groundwater depth in relation to
             proposed basins
           – However, provided bio-infiltration islands
             consisting of engineered soils and
             underdrain systems within green spaces of
             parking areas for treatment and storage

Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Stormwater Management Aspects

           – Detention for Ultimate Conditions req’d a
             3.6 ac-ft expansion of the wet detention
             basin east of the main bldgs in Phase I.
           – Wet detention basins-WDNR Conservation
             Practice 1001.
           – Prop. Cond-Pre-Dev-13.35 cfs/Post Dev-
             8.41 cfs
           – Ult. Cond-Pre-Dev-28.25 cfs/Post-Dev-
             14.60 cfs

Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Stormwater Management Aspects

           – Water Quality-Proposed Conditions-
             88%TSS removal from wet-detention and
             bio-infiltration
           – During Ultimate Conditions the amount of
             TSS removal was 89%




Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Hydraulics/Floodplain Management
associated with Stream Relocation

            – WDNR required hydraulic analysis to
              determine if elevations and velocities would
              increase
            – WDNR provided hydraulic model in 2007
            – Proposed conditions hydraulic based on
              Kerry Centre design
            – Iterations performed to determine
              relocation cross-section-no impacts


 Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Hydraulics/Floodplain Management
associated with Stream Relocation

            – 1400’ of Spring Brook relocated
            – Model provided by WDNR used to develop
              FIRM Map for the Turtle Creek Watershed;
              part of the Rock County floodplain study
              (1982)
            – Model revisions based on survey data




 Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Hydraulics/Floodplain Management
associated with Stream Relocation

            – Model provided 10 and 100-year
              discharges; 2-year flows were not
              developed
            – 2-year flows; water surfaces required as
              part of Chapter 30
            – 2-year was calculated using Conger
              (Regression Analysis) as detailed in Flood-
              Frequency Characteristics of Wisconsin
              Streams


 Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
Stream Relocation Design




Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
Proposed Floodplain/Floodway




 Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
Proposed Floodplain/Floodway




 Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
ACTION PLAN
EMERGENCY
              Hydraulics/Floodplain Management
              associated with Stream Relocation

                • With WDNR approval, we submitted to
                  FEMA to obtain a CLOMR which was
                  required for building occupancy
                • LOMR will be applied for once building
                  is complete




               Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
Thank you!




                                  Questions?

Copyright © 2009 Graef-USA, Inc. All Rights Reserved.

Mais conteúdo relacionado

Mais procurados

Final fall senior design presentation
Final fall senior design presentationFinal fall senior design presentation
Final fall senior design presentation
Julianne Crawford
 
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
StopHermosaBeachOil
 
PortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_StatementPortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_Statement
Debbie Kilbane Fawcett
 

Mais procurados (20)

Full Cycle Tailings Management - Fosterville Gold Mine
Full Cycle Tailings Management - Fosterville Gold MineFull Cycle Tailings Management - Fosterville Gold Mine
Full Cycle Tailings Management - Fosterville Gold Mine
 
Nevada
NevadaNevada
Nevada
 
DRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga Creek
DRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga CreekDRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga Creek
DRBC Docket: XTO Energy Application to Withdraw Surface Water at Oquaga Creek
 
Henri_silalahi_CV2016
Henri_silalahi_CV2016Henri_silalahi_CV2016
Henri_silalahi_CV2016
 
The Chicot Aquifer and the I-49 Connector Project
The Chicot Aquifer and the I-49 Connector ProjectThe Chicot Aquifer and the I-49 Connector Project
The Chicot Aquifer and the I-49 Connector Project
 
New Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaNew Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in Minnesota
 
Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach Communities
 
Final fall senior design presentation
Final fall senior design presentationFinal fall senior design presentation
Final fall senior design presentation
 
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
 
Virginia
VirginiaVirginia
Virginia
 
LP Linked In Resume
LP Linked In ResumeLP Linked In Resume
LP Linked In Resume
 
E triton cs_yates_8.06
E triton cs_yates_8.06E triton cs_yates_8.06
E triton cs_yates_8.06
 
Aldergrove Aquifer Issues
Aldergrove Aquifer IssuesAldergrove Aquifer Issues
Aldergrove Aquifer Issues
 
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case StudyPremier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
 
Contolling Costs And Risks In Construction Of The Trans Alaska Oil Pipeline
Contolling Costs And Risks In Construction Of The Trans Alaska Oil PipelineContolling Costs And Risks In Construction Of The Trans Alaska Oil Pipeline
Contolling Costs And Risks In Construction Of The Trans Alaska Oil Pipeline
 
Lion One Roundup Presentation Jan 2021
Lion One Roundup Presentation Jan 2021Lion One Roundup Presentation Jan 2021
Lion One Roundup Presentation Jan 2021
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
PortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_StatementPortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_Statement
 
H063771
H063771H063771
H063771
 
Rachel Hamblin - Case Studies
Rachel Hamblin - Case StudiesRachel Hamblin - Case Studies
Rachel Hamblin - Case Studies
 

Destaque

đề Tài đầu tư trực tiếp ra nước ngoài của việt nam tài liệu, ebook, giáo trình
đề Tài đầu tư trực tiếp ra nước ngoài của việt nam   tài liệu, ebook, giáo trìnhđề Tài đầu tư trực tiếp ra nước ngoài của việt nam   tài liệu, ebook, giáo trình
đề Tài đầu tư trực tiếp ra nước ngoài của việt nam tài liệu, ebook, giáo trình
Cá Tiên
 

Destaque (13)

Ben howard 2
Ben howard 2Ben howard 2
Ben howard 2
 
Kirstenbosch Botanical Garden
Kirstenbosch Botanical GardenKirstenbosch Botanical Garden
Kirstenbosch Botanical Garden
 
Hartfield,Brandan Resume
Hartfield,Brandan ResumeHartfield,Brandan Resume
Hartfield,Brandan Resume
 
Internet
InternetInternet
Internet
 
Primer encuentro de embajadores ambientales
Primer encuentro de embajadores ambientalesPrimer encuentro de embajadores ambientales
Primer encuentro de embajadores ambientales
 
Linking Great Lakes Beach Water Quality to Land Use
Linking Great Lakes Beach Water Quality to Land UseLinking Great Lakes Beach Water Quality to Land Use
Linking Great Lakes Beach Water Quality to Land Use
 
Question 4
Question 4Question 4
Question 4
 
Menu card outside
Menu card outsideMenu card outside
Menu card outside
 
đề Tài đầu tư trực tiếp ra nước ngoài của việt nam tài liệu, ebook, giáo trình
đề Tài đầu tư trực tiếp ra nước ngoài của việt nam   tài liệu, ebook, giáo trìnhđề Tài đầu tư trực tiếp ra nước ngoài của việt nam   tài liệu, ebook, giáo trình
đề Tài đầu tư trực tiếp ra nước ngoài của việt nam tài liệu, ebook, giáo trình
 
Urban Water Quality Management
Urban Water Quality ManagementUrban Water Quality Management
Urban Water Quality Management
 
Management Case on Culture and Leadership with Coca-Cola's Bozer's example: C...
Management Case on Culture and Leadership with Coca-Cola's Bozer's example: C...Management Case on Culture and Leadership with Coca-Cola's Bozer's example: C...
Management Case on Culture and Leadership with Coca-Cola's Bozer's example: C...
 
5 forces Michael Porters #BBTwisnu
5 forces Michael Porters #BBTwisnu5 forces Michael Porters #BBTwisnu
5 forces Michael Porters #BBTwisnu
 
CURRICULUM VITAE - DR. BENEDEK CSABA
CURRICULUM VITAE - DR. BENEDEK CSABACURRICULUM VITAE - DR. BENEDEK CSABA
CURRICULUM VITAE - DR. BENEDEK CSABA
 

Semelhante a Kerry Centre - Beloit, WI

Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Bappy114
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
Erin Vieira
 
Tyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall - Project Experience
Tyler Hall - Project Experience
Tyler Hall
 
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Dario Gnoato
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13
jhayman09
 
PM.10-EXAMPLE-River Stabilization-Final Plan
PM.10-EXAMPLE-River Stabilization-Final PlanPM.10-EXAMPLE-River Stabilization-Final Plan
PM.10-EXAMPLE-River Stabilization-Final Plan
Philip Martinson
 

Semelhante a Kerry Centre - Beloit, WI (20)

Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
 
A case study in offshore wind farm project management
A case study in offshore wind farm project managementA case study in offshore wind farm project management
A case study in offshore wind farm project management
 
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
 
FONSI
FONSIFONSI
FONSI
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed Puchi
 
ORP FY13 Budget Workshop
ORP FY13 Budget WorkshopORP FY13 Budget Workshop
ORP FY13 Budget Workshop
 
James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
Tyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall - Project Experience
Tyler Hall - Project Experience
 
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13
 
PM.10-EXAMPLE-River Stabilization-Final Plan
PM.10-EXAMPLE-River Stabilization-Final PlanPM.10-EXAMPLE-River Stabilization-Final Plan
PM.10-EXAMPLE-River Stabilization-Final Plan
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
Hydrology and hydraulics for design design
Hydrology and hydraulics for design designHydrology and hydraulics for design design
Hydrology and hydraulics for design design
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Construction Dewatering PowerPoint
Construction Dewatering PowerPointConstruction Dewatering PowerPoint
Construction Dewatering PowerPoint
 
Mc Quirk Sess1 101509
Mc Quirk Sess1 101509Mc Quirk Sess1 101509
Mc Quirk Sess1 101509
 
Cameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationCameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream Restoration
 
Breach Brief Feb 2018, NWRR Symposium
Breach Brief Feb 2018, NWRR SymposiumBreach Brief Feb 2018, NWRR Symposium
Breach Brief Feb 2018, NWRR Symposium
 
Environmental site assessments in Ontario post Kawartha Lakes
Environmental site assessments in Ontario post Kawartha LakesEnvironmental site assessments in Ontario post Kawartha Lakes
Environmental site assessments in Ontario post Kawartha Lakes
 

Mais de Matthew Hahm (6)

Retention Basins: Canada Geese Factories and Shelters
Retention Basins: Canada Geese Factories and SheltersRetention Basins: Canada Geese Factories and Shelters
Retention Basins: Canada Geese Factories and Shelters
 
Water Quality BMPs Near Airports
Water Quality BMPs Near AirportsWater Quality BMPs Near Airports
Water Quality BMPs Near Airports
 
Spring Green 2008 Flooding and Flood Control Options
Spring Green 2008 Flooding and Flood Control OptionsSpring Green 2008 Flooding and Flood Control Options
Spring Green 2008 Flooding and Flood Control Options
 
Moving a Town: The Story of Gays Mills
Moving a Town: The Story of Gays MillsMoving a Town: The Story of Gays Mills
Moving a Town: The Story of Gays Mills
 
Kinnickinnic River Flood Management and Watercourse Rehabilitation
Kinnickinnic River Flood Management and Watercourse RehabilitationKinnickinnic River Flood Management and Watercourse Rehabilitation
Kinnickinnic River Flood Management and Watercourse Rehabilitation
 
Stormwater regulations and their relationship to tmd ls
Stormwater regulations and their relationship to tmd lsStormwater regulations and their relationship to tmd ls
Stormwater regulations and their relationship to tmd ls
 

Kerry Centre - Beloit, WI

  • 1. Kerry Centre-Beloit, WI Stormwater Management and Floodplain Analysis Presented By: Ryan Kloth, P.E., CDT Presented At: WAFSCM Annual Conference – November 4, 2010 Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 2. About the Speaker • Ryan Kloth, P.E., CDT – Member of Water Resources Group at GRAEF for 5 years – Specialties include: Hydrologic and Hydraulic Analysis, Floodplain Analysis, Stormwater Design, and Best Management Design Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 3. Discussion Summary • Project Details – Location, Permits – Stormwater Management Aspects – Hydraulics/Floodplain Management associated with Stream Relocation Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 4. Location, Permits – City of Beloit, Wisconsin – 130 Acre parcel-SE corner of Interstate 43 and Interstate 90 – Construction for Proposed Conditions in two phases due to WDNR Chapter 30 permit requirements – Phase 1-Two permit packages – Phase 2-Construction package Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 5. Location, Permits – Package PP-1 – Paved parking areas – Building – Driveway connections to existing roadways – Stormwater Management Facilities – Floodplain Compensatory Areas Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 6. Location, Permits – Package PP-2 – Completion of paved parking areas – Relocation of a portion of Spring Brook Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 7. Location, Permits – Phase 2 – Ultimate, full build-out conditions – Potential development east of the current project consisting of additional building and paved surfaces. – 11.35 Ac. Of impervious area included with Phase 1 – Phase 2-23.60 acres Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 8. Completed Building Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
  • 9. Ultimate Stormwater Conditions Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
  • 10. Proposed Stormwater Conditions Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
  • 11. Stormwater Management Aspects – Existing Conditions-Farmland – HSG B Soils north of Spring Brook; HSG C south of Spring Brook – Spring Brook-Tributary to Turtle Creek- Bisects site NE-SW – Location of Spring Brook and associated floodplain restricted development-Spring Brook relocated Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 12. Stormwater Management Aspects • Design Criteria – Quantity-City of Beloit-100-Yr Post to 10-Yr Pre – Quality-TSS 80% based on Ave. Annual Rainfall compared to no management runoff controls – Infiltration-Non-res development shall infiltrate 60% of pre-development infiltration volume Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 13. Stormwater Management Aspects • Design Criteria – Exempt from Beloit and NR 151 infiltration requirements based on existing soils and local groundwater depth in relation to proposed basins – However, provided bio-infiltration islands consisting of engineered soils and underdrain systems within green spaces of parking areas for treatment and storage Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 14. Stormwater Management Aspects – Detention for Ultimate Conditions req’d a 3.6 ac-ft expansion of the wet detention basin east of the main bldgs in Phase I. – Wet detention basins-WDNR Conservation Practice 1001. – Prop. Cond-Pre-Dev-13.35 cfs/Post Dev- 8.41 cfs – Ult. Cond-Pre-Dev-28.25 cfs/Post-Dev- 14.60 cfs Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 15. Stormwater Management Aspects – Water Quality-Proposed Conditions- 88%TSS removal from wet-detention and bio-infiltration – During Ultimate Conditions the amount of TSS removal was 89% Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 16. Hydraulics/Floodplain Management associated with Stream Relocation – WDNR required hydraulic analysis to determine if elevations and velocities would increase – WDNR provided hydraulic model in 2007 – Proposed conditions hydraulic based on Kerry Centre design – Iterations performed to determine relocation cross-section-no impacts Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 17. Hydraulics/Floodplain Management associated with Stream Relocation – 1400’ of Spring Brook relocated – Model provided by WDNR used to develop FIRM Map for the Turtle Creek Watershed; part of the Rock County floodplain study (1982) – Model revisions based on survey data Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 18. Hydraulics/Floodplain Management associated with Stream Relocation – Model provided 10 and 100-year discharges; 2-year flows were not developed – 2-year flows; water surfaces required as part of Chapter 30 – 2-year was calculated using Conger (Regression Analysis) as detailed in Flood- Frequency Characteristics of Wisconsin Streams Copyright © 2010 Graef-USA, Inc. All Rights Reserved.
  • 19. Stream Relocation Design Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
  • 20. Proposed Floodplain/Floodway Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
  • 21. Proposed Floodplain/Floodway Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
  • 22. ACTION PLAN EMERGENCY Hydraulics/Floodplain Management associated with Stream Relocation • With WDNR approval, we submitted to FEMA to obtain a CLOMR which was required for building occupancy • LOMR will be applied for once building is complete Copyright © 2009 Graef-USA, Inc. All Rights Reserved.
  • 23. Thank you! Questions? Copyright © 2009 Graef-USA, Inc. All Rights Reserved.