2. MULTIPLE LEAKAGES RECORDED, PREVIOUS REPAIR
ATTEMPTS BY PLASTERING OF SURFACE NOT SUCCESSFUL.
ORIGINALLY PLANNED REPAIRS OF EXISTING RC TANK BY
CLEANING OF PLASTER AND IRONING OF WALLS & ROOF
SLAB - NOT IMPLEMENTED DUE TO DETERIORATED
CONDITION OF THE TANK.
3. Existing RCTank
Status
During the original
construction of existingTank –
concrete cover has not been
provided for roof slab re-bars,
instead – plaster was applied,
which has falling off
repeatedly. High moisture
environment caused severe
corrosion of steel
reinforcement.
4. PlannedConstruction
Method
ExistingTank shell to be used
for construction of new RC
Tank;
-Horizontal PVCWater Stop
between wall kickers in base
slab & wall segments;
--Vertical PVCWater Stop
between 4nrWall segments