1. CURRICULUM VITAE
Proposed position in assignment: Responsible Contractor
1. Family name: Novaković
2. First name(s): Vladimir
3. Date of birth: 02.04.1975.
4. Nationality: Serbian
5. Civil status: Married
6. Education:
Institution Valjevo Gymnasium,
Date: from (month / year) - to September 1990 -jun.1994
Degree(s) or Diploma(s) obtained: Mathematical WINFREY Developer
Associate
Institution Institution of Civil Engineering, University
of Belgrade
Date: from (month / year - to oktober.1995 -October. 2003
Degree(s) or Diploma(s) obtained: Civil engineer, department of
construction
7. Language skills: (Mark 1 to 5 for competence, 5 being the highest)
Language Reading Speaking Writing
English 4 4 3
Serbian 5 5 5
German 4 2 3
8. Membership of professional bodies: Serbian Chamber of Engineers
9. Other skills (e.g. computer literacy, etc.):
Windows, Office Word, Office Excel, Internet Explorer, TOWER, Planet, PANELPRO, Auto-cad,
Arm-cad, MS Projekt, GALA. Driver ‘’B’’ cat.
10. Present position: leading engineer
11. Years within the firm: 3years
12. Key qualifications (relevant to the programme):
The licenses for the contractor-410 and 414, for the designer 310, Judical expert
engineer for construction, 381
2. 14. Professional Experience Record:
Date: from (month / year) to September 1999 - May 2000.
Location: Belgrade, Slogina No.19
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Head of site
Description: Residential building with total area of 1150m2 and P +
3 + Pk
Date: from (month / year) to June 2000 -September 2001
Location: Zemun, Mica Radakovic 4
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Head of site
Description: 12 familly house a total area of 3000m2 , Po + P + 1
+ Pk, with complete infrastructure
Date: from (month / year) to September 2001 -May 2002
Location: Boulevard of King Alexander no.446, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Head of site
Description: Residential building with a total area of 2000m2 , Po +
P + 4 + M
Date: from (month / year) to July 2002 -August 2003
Location: Dragoslava Srejovića no.74, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Head of site
Description: Four residential buildings with a total area of 2200m2
and P + 2 + Pk
Date: from (month / year) to September 2003 -August 2004
Location: Grcica Milenka No.51, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Supervisory Authority
Description: Commercial property gynecology clinic IVANOVIĆ
Date: from (month / year) to September 2004 -December 2004
Location: Highway Belgrade-Zagreb 300f, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Responsible Contractor
Description: Two aluminum mounting-dismantling workshops on
the principle of '' Future Steel Buildings ''
3. Date: from (month / year) to March 2005 -September 2005
Location: Murmanska street 27, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Responsible Contractor
Description: Residential building of 500 m2
Date: from (month / year) to June 2005 -August 2005
Location: Dragoslava Srejovica street no.72, Belgrade
Company & reference person: '' P.I.N. Inzenjering''d.o.o .;
Slobodan Radakovic
Position: Construction designer
Description: Residential building area of 1200m2
Date: from (month / year) to September 2005 -August 2006
Location: Djevdjelijska street no.53, Belgrade
Company & reference person: '' P.I.N. Inzenjering''d.o.o .;
Slobodan Radakovic
Position: Responsible Contractor
Description: Residential building with total area of 2200m2
Date: from (month / year) to August 2006 -April 2007
Location: Strahinjica Bana street no.14, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: planning and supervisory authority
Description: Upgrading residential building
Date: from (month / year) to September 2006 -August 2007
Location: Highway BB, Bezanijska Kosa, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Responsible Contractor
Description: Office building high class' 'Josipovic Trade' in
Bezanijska Kosa
Date: from (month / year) to (month /
year)
August 2007 -
May 2008 year
Location: Kozjačka street no. 3-5, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Responsible Contractor
Description: Sports center ,, Majdan`` for investor Municipality of
Savski Venac
4. Date: from (month / year) to (month /
year)
may 2008 -
March 2009
Location: Vojvode Brane street no.59, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Responsible Contractor
Description: Residential building in Belgrade area of 1800m2
Date: from (month / year) to June 2008 -July 2008
Location: '' The Municipality of Savski Venac '', Belgrade
Company & reference person: '' The Municipality of Savski Venac '', Belgrade
Position: Member of the Commission
Description: Member of the commission to determine the
contractor for public procurement in the municipality
of Savski Venac
Date: from (month / year) to october2008. -September 2009
Location: Knic, Krusevac
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Supervisory Authority
Description: Eco-agricultural farm in Knić (a dairy farm with
business and supporting facilities) total area of
10000m2
Date: from (month / year) to April 2009 -September 2009
Location: Djevdjelijska street no.55, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Responsible Contractor
Description: Residential building in Belgrade area of 2200m2
finishing work
Date: from (month / year) to September 2009 -August 2010
Location: King Bodin street no. 6, Belgrade
Company & reference person: '' P.I.N. Inženjering''d.o.o .;
Slobodan Radakovic
Position: Responsible Contractor
Description: Office building in Belgrade, 1100m2
5. Date: from (month / year) to September 2012 -May 2013 year
Location: Stepa Stepanovic settlement, 3AL1, Belgrade
Company & reference person: ‘’KOTO’’ d.o.o. ;
Zlatan Tomic
Position: Responsible Contractor
Description: Building 3A-L1 with 38 apartments in total
3584,57m2. Finishing work
Date: from (month / year) to September 2012 -Jun 2013 year
Location: Stepa Stepanovic settlement,2EL4, Belgrade
Company & reference person: ‘’KOTO’’ d.o.o. ;
Zlatan Tomic
Position: Responsible Contractor
Description: Building 2E-L4 with 47 apartments in total
4170.
Date: from (month / year) to September 2012 -Jun 2013 year
Location: Lazarevac K.P.2197 / 14
Company & reference person: ‘’KOTO’’ d.o.o. ; Zlatan Tomic
Position: Responsible Contractor
Description: Collective housing facility for refugees with 48
apartments in total 3177.60. Rough masonry
work
Date: from (month / year) to September 2013 -December 2013
Location: Patriarch Joanikija street, Belgrade
Company & reference person: '' DTD Ribarstvo Ltd. ;
Tomislav Djordjevic
Position: Responsible Contractor
Description: Reconstruction of DTD Fishing, street Patriarch
Joanikija, 4000 m2
Date: from (month / year) to (month /
year)
August 2014 -
still in progress-leading engineer
Location: Golubac fortress, Golubac
Company & reference person: '' JADRAN''AD ;
Position: Responsible Contractor
Description: Visitors' Center with the Golubac fortress.
Finishing and installation works
Date : from (month/ year ) 2014-2015
Location : HE Djerdap
Company & reference person: '' JADRAN''AD ;
Position Responsible Contactor
Description : finishing works
6. Date : from (month/ year ) 2015
Location : Beograd
Company & reference person: '' JADRAN''AD ;
Position Responsible Contactor
Description : Preliminary work on the transposition works
Superstores Beograd
Date : from (month/ year ) 2015-2016
Location : Beograd, Nis
Company & reference person: Agency for bankruptcy
Position Valuer - appraiser
Description : LIVMIN AD, MIN-HOLDING, MIN special
vehicles, FACTORY clay products BABUSNICA
Date : from (month/ year ) 2016
Location : Beograd
Company & reference person: KALMAN DOO
Position Responsible Contactor
Description : The supervisory authority of the embodiment
of the adaptation and construction of
commercial and residential building,
Date : from (month/ year ) Septembar 2014 – 2015 – 2016
Location : Switzerland
Position Associate designer on several residential and
commercial buildings for the Swiss market
15. Others (selected reports and assignments):
• Over twelve years experience in the field of design and finding solutions for economical and
functional structures with the use of the latest solutions and materials in the field of construction
and craft works. Also responsible contractor and the supervisory authority on the construction of
residential and commercial buildings in various locations, including the construction of reinforced
concrete and steel and wooden structures.
• Experience in all aspects of structural engineering, including project planning from the beginning
to the very end of the performance, as well as its design and execution. Preparation of tender,
project and contract documentation, feasibility studies and cost-effectiveness.
• Experience in writing and presenting a tender, project and contract documentation, feasibility
7. studies and cost-effectiveness.
• Knowledge of local engineering and construction standards, laws and regulations, as well as the
latest solutions and materials in the field of building and craft works.
• Experience in making cesh flow, dinamic plans, temporary and final situacion , profitability
projects
Vladimir Novakovic B.Sc.CE
novakovicvladimir@rocketmail.com
065/2270-444,