Profile Summary:
Total work experience: 22 years.(Gulfexperience over 6 years)
A goal-oriented and highly talented with extensive experience in handling variety of projects. Proven
track record in achieving the targets and increasing the profit of the project. Possess good skills in
supervising and organizing.
Hands on experience in companies engaged in manufacturing, mining and construction. Portfolios
handled include Quality, Maintenance of plant & equipment and Project management.
Exposure to National / International standards & codes and handled inspection agencies
independently.Level IIcertified in NDTmethods UT, MPT,LPT, and RT.
Having good technical abilities,problem solving skills and communication skills.
WORK EXPERIENCE
Construction Manager
Larsen &Toubro Atco Saudi, SaudiArabia --July 2011 to August 2015
Job content: Fabrication and erection of structurals, above ground & underground RTR piping,
installation ofoverhead cranes, insulation, plant& machinery equipment erection (Static & Rotary) and
instrumentation works.
Projects: 1. Jubail Export Refinery Project. (ARAMCO)
2. Wasit Gas Program. (ARAMCO)
Responsibilities:
 To ensure and plan resources (Engineers sub-contractor; material requirement) are deployed as per
the stages ofwork.
 Checking on the engineers and sub-contractors for the procedures, quality progress and follow up
on the short falls.
 Preparing weekly look ahead schedules in line with the master plan and foreseeing fronts for
agencies and planning accordingly.
 Co-ordination and follow up of requirements relating to other departments like stores material
reconciliation, purchase, accounts, safety procedures and QC.
 Conducting internal meetings and discussions with all teams for identifying and clarifying scope of
works.
 Managing and solving day to day site issues.
Project Engineer
Pioneers International Construction Co., SaudiArabia --May 2009 to April 2011
Job content: Fabrication and erection of structural, piping &tanks, installation of overhead cranes,
insulation, plumbing, firefighting, plant& machinery equipment erection, installation of HVAC systems
and instrumentation works.
Projects: 1.Rowad Plastics & Saudi Polyolefins Co. (SABIC)
Responsibilities:
 Ensuring proper working ofthe site operations.
 Implementation and strategies ofthe project.
 Planning & scheduling projectactivities.
 Meeting the technical compliance and projectspecifications.
 Preparation ofvarious method statements to execute the job safely.
 Coordination with all the agencies atsite and customer interface.
 Ensuring safety compliance.
Assistant Manager QA/QC
Oilgear Towler Polyhydron Pvt.Ltd.,Belgaum, India -- December 2007 to May 2009
Job content:Fabrication and erection ofstructurals, piping and tanks,instrumentation works.
Responsibilities:
 Scheduling and planning the project activities related to fabrication and machining process.
 Liaising with third party surveyors, Preparing documentation and procedures for ISO 9001:2008
certification.
 Internal Quality audits, Corrective & preventive action plans.
 Preparation of WPS, PQR & welder qualifications.
QA/QC Engineer
Calama Industries Pvt.Ltd, Mumbai, India --September 2003 to January 2007
Job content:Manufacturing and installation of submersible, chemical process and polder pumps.
Responsibilities:
 Incoming material inspection, in process inspection during various stages of manufacturing.
 Handling third party inspections & Periodic calibration of measuring instruments.
 ISO 9001:2000 system implementation.
Mechanical Engineer
Sociedade De Fomento Industrial Pvt. Ltd., Goa, India --March 2002 to April 2003
Job content:Fabrication and erection ofstructurals, piping, tanks, and fabrication of sheetmetal
components required for the plant equipment.
Responsibilities:
 Day today Inspection & maintenance of plant equipments.
 Belt conveyors erection, operation and maintenance, various pvc belt joining processes.
 Pneumatic compressors and Diesel generators maintenance.
 Multistage centrifugal pumps erection, operation and maintenance (including its piping).
QA/QC Engineer
New Standard Engineering Co. Ltd. Mumbai, India--September 1996 to March 2002
Job content:Fabrication and erection of oil recovery equipment, plant and machinery equipment and
structural fabrication.
Responsibilities:
 Implemented and maintained ISO 9001: 2000 & API (American Petroleum Institute)
systems&assisted during Internal Quality Audit of the system.
 Prepared QA plans & handled third party RITES, DGQA, SGS, QUEST, EIL inspections
independently.
 Review of manufacturing/mill test certificates.
QC Engineer
Profiloforms, Pune, India -- November 1994 to September 1996
Job Content:Manufacturers of profile tools.
Responsibilities:
 Preparation of raw material indents.
 Dimensional Inspection and preparation of all reports/documents/ TCs.
Education
 Bachelor of Mechanical Engineering from Karnataka University, Dharwad (1993).
Certifications
 Piping Engineering from IIT,Powai, Mumbai.
 MS Office (Word, Excel, Power point) from Winsoft Information Technology, Mumbai.
 Internal Auditor Training (ISO 9001:2000) from TUV SUD, Belgaum.
 AutoCAD (2D) from EngineersComputer Academy, Belgaum.
 ASNT Level II in UT, MPT, LPT, RT from Trinity Institute of NDT Technology, Bangalore.
 Professional in PPM (MS Project & Primavera) from CADD Centre, Bangalore.
Personal Details
Pass portNo: H2136396 Passport issued in: India (Bangalore)
Pass portissue date: 08-12-2008 Pass port expiry date: 07-12-2018
Gender: Male
Date of birth: 21-10-1969.
Language skills: English, Hindi, Marathi& Kannada (Read, write & speak well)
Address: F-2 Block, 1st Floor, Yuvaraj Apartment,
Maratha colony, Tilakwadi, Belgaum-590006.
The above furnished details are true to my knowledge & belief.
(V.P.KULKARNI)

Mais conteúdo relacionado

Mais procurados

SR. Document controller RESUME
SR. Document controller RESUMESR. Document controller RESUME
SR. Document controller RESUMEMaqbool Ansari
 
Ghulam Muhyuddin (QAQC Engineer)
Ghulam Muhyuddin (QAQC Engineer)Ghulam Muhyuddin (QAQC Engineer)
Ghulam Muhyuddin (QAQC Engineer)Ghulam Muhyuddin
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)deepesh s
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum VitaeSushil Gole
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerMujeebuddin Mohammad
 
CV Abdul Rehman Document Controller
CV Abdul Rehman Document ControllerCV Abdul Rehman Document Controller
CV Abdul Rehman Document ControllerAbdul Rehman
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarGowrijayashankar S V
 
Quality Control Engineer
Quality Control EngineerQuality Control Engineer
Quality Control EngineerSAGAR S U
 
Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQCvignesh k
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorM.ZUBAIR KHAN
 

Mais procurados (20)

SR. Document controller RESUME
SR. Document controller RESUMESR. Document controller RESUME
SR. Document controller RESUME
 
Ghulam Muhyuddin (QAQC Engineer)
Ghulam Muhyuddin (QAQC Engineer)Ghulam Muhyuddin (QAQC Engineer)
Ghulam Muhyuddin (QAQC Engineer)
 
Piping Engineer
Piping EngineerPiping Engineer
Piping Engineer
 
MANAGER.QAQC(MECHANICAL)
MANAGER.QAQC(MECHANICAL)MANAGER.QAQC(MECHANICAL)
MANAGER.QAQC(MECHANICAL)
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
sandeep
sandeepsandeep
sandeep
 
peercv- 1
peercv- 1peercv- 1
peercv- 1
 
Vishal Gawde_CV
Vishal Gawde_CVVishal Gawde_CV
Vishal Gawde_CV
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
CV
CVCV
CV
 
UMAR IQBAL QC.CV
UMAR IQBAL QC.CVUMAR IQBAL QC.CV
UMAR IQBAL QC.CV
 
Naveen Resume.doc
Naveen Resume.docNaveen Resume.doc
Naveen Resume.doc
 
CV_-_V._Chalapati__Doc._Controller
CV_-_V._Chalapati__Doc._ControllerCV_-_V._Chalapati__Doc._Controller
CV_-_V._Chalapati__Doc._Controller
 
CV Abdul Rehman Document Controller
CV Abdul Rehman Document ControllerCV Abdul Rehman Document Controller
CV Abdul Rehman Document Controller
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Quality Control Engineer
Quality Control EngineerQuality Control Engineer
Quality Control Engineer
 
Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQC
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
 

Destaque (20)

CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)
 
Resume - Mangesh Sawant
Resume - Mangesh SawantResume - Mangesh Sawant
Resume - Mangesh Sawant
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineer
 
RESUME_RAJENDRA PRAJAPAT
RESUME_RAJENDRA PRAJAPATRESUME_RAJENDRA PRAJAPAT
RESUME_RAJENDRA PRAJAPAT
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)
 
Nitin Patekar Rsume
Nitin Patekar RsumeNitin Patekar Rsume
Nitin Patekar Rsume
 
hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp
 
PUSPENDU UPDATED
PUSPENDU UPDATED PUSPENDU UPDATED
PUSPENDU UPDATED
 
CV-Shipyard
CV-ShipyardCV-Shipyard
CV-Shipyard
 
Profile_SamuelJaideep_05
Profile_SamuelJaideep_05Profile_SamuelJaideep_05
Profile_SamuelJaideep_05
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)
 
Pratiksha Jadhav_ Resume
Pratiksha Jadhav_ ResumePratiksha Jadhav_ Resume
Pratiksha Jadhav_ Resume
 
Akhil_CV
Akhil_CVAkhil_CV
Akhil_CV
 
Naveen_Resume (2)
Naveen_Resume (2)Naveen_Resume (2)
Naveen_Resume (2)
 
RESUME-01
RESUME-01RESUME-01
RESUME-01
 
MAINTENANCE C V
MAINTENANCE C V MAINTENANCE C V
MAINTENANCE C V
 
Chandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & materialChandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & material
 
CV-NKN-09.05.16
CV-NKN-09.05.16CV-NKN-09.05.16
CV-NKN-09.05.16
 

Semelhante a RESUME_ VIJAY - Saudi (20)

Neel CV_Updated
Neel CV_UpdatedNeel CV_Updated
Neel CV_Updated
 
CV_ABDU RASHEED U
CV_ABDU RASHEED UCV_ABDU RASHEED U
CV_ABDU RASHEED U
 
Resume Tariq mohd
Resume Tariq mohdResume Tariq mohd
Resume Tariq mohd
 
Resume Tariq mohd
Resume Tariq mohdResume Tariq mohd
Resume Tariq mohd
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
cv of murtuza 2016
cv of murtuza 2016cv of murtuza 2016
cv of murtuza 2016
 
DIBIN C1
DIBIN C1DIBIN C1
DIBIN C1
 
CONSTRUCTION ENGINEER
CONSTRUCTION ENGINEERCONSTRUCTION ENGINEER
CONSTRUCTION ENGINEER
 
Updated CV Azimuddin
Updated CV AzimuddinUpdated CV Azimuddin
Updated CV Azimuddin
 
CV_RKSEN_01.11.2016.pdf
CV_RKSEN_01.11.2016.pdfCV_RKSEN_01.11.2016.pdf
CV_RKSEN_01.11.2016.pdf
 
Mohammed Yousuf cv
Mohammed Yousuf cvMohammed Yousuf cv
Mohammed Yousuf cv
 
Update CV
Update CVUpdate CV
Update CV
 
heshamuddin
heshamuddinheshamuddin
heshamuddin
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Present Resume -Mohan (22.12.2016)
Present Resume -Mohan (22.12.2016)Present Resume -Mohan (22.12.2016)
Present Resume -Mohan (22.12.2016)
 
Present Resume -Mohan (22.12.2016)
Present Resume -Mohan (22.12.2016)Present Resume -Mohan (22.12.2016)
Present Resume -Mohan (22.12.2016)
 
updated CV
updated CVupdated CV
updated CV
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical Engineer
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 

RESUME_ VIJAY - Saudi

  • 1. VIJAY KULKARNI E-mail address:vijaypkulkarni@hotmail.com Mobile No: 9035448106 Landline: 0831-2462502 Profile Summary: Total work experience: 22 years.(Gulfexperience over 6 years) A goal-oriented and highly talented with extensive experience in handling variety of projects. Proven track record in achieving the targets and increasing the profit of the project. Possess good skills in supervising and organizing. Hands on experience in companies engaged in manufacturing, mining and construction. Portfolios handled include Quality, Maintenance of plant & equipment and Project management. Exposure to National / International standards & codes and handled inspection agencies independently.Level IIcertified in NDTmethods UT, MPT,LPT, and RT. Having good technical abilities,problem solving skills and communication skills. WORK EXPERIENCE Construction Manager Larsen &Toubro Atco Saudi, SaudiArabia --July 2011 to August 2015 Job content: Fabrication and erection of structurals, above ground & underground RTR piping, installation ofoverhead cranes, insulation, plant& machinery equipment erection (Static & Rotary) and instrumentation works. Projects: 1. Jubail Export Refinery Project. (ARAMCO) 2. Wasit Gas Program. (ARAMCO) Responsibilities:  To ensure and plan resources (Engineers sub-contractor; material requirement) are deployed as per the stages ofwork.  Checking on the engineers and sub-contractors for the procedures, quality progress and follow up on the short falls.  Preparing weekly look ahead schedules in line with the master plan and foreseeing fronts for agencies and planning accordingly.  Co-ordination and follow up of requirements relating to other departments like stores material reconciliation, purchase, accounts, safety procedures and QC.  Conducting internal meetings and discussions with all teams for identifying and clarifying scope of works.  Managing and solving day to day site issues. Project Engineer Pioneers International Construction Co., SaudiArabia --May 2009 to April 2011 Job content: Fabrication and erection of structural, piping &tanks, installation of overhead cranes, insulation, plumbing, firefighting, plant& machinery equipment erection, installation of HVAC systems and instrumentation works. Projects: 1.Rowad Plastics & Saudi Polyolefins Co. (SABIC) Responsibilities:  Ensuring proper working ofthe site operations.  Implementation and strategies ofthe project.  Planning & scheduling projectactivities.  Meeting the technical compliance and projectspecifications.
  • 2.  Preparation ofvarious method statements to execute the job safely.  Coordination with all the agencies atsite and customer interface.  Ensuring safety compliance. Assistant Manager QA/QC Oilgear Towler Polyhydron Pvt.Ltd.,Belgaum, India -- December 2007 to May 2009 Job content:Fabrication and erection ofstructurals, piping and tanks,instrumentation works. Responsibilities:  Scheduling and planning the project activities related to fabrication and machining process.  Liaising with third party surveyors, Preparing documentation and procedures for ISO 9001:2008 certification.  Internal Quality audits, Corrective & preventive action plans.  Preparation of WPS, PQR & welder qualifications. QA/QC Engineer Calama Industries Pvt.Ltd, Mumbai, India --September 2003 to January 2007 Job content:Manufacturing and installation of submersible, chemical process and polder pumps. Responsibilities:  Incoming material inspection, in process inspection during various stages of manufacturing.  Handling third party inspections & Periodic calibration of measuring instruments.  ISO 9001:2000 system implementation. Mechanical Engineer Sociedade De Fomento Industrial Pvt. Ltd., Goa, India --March 2002 to April 2003 Job content:Fabrication and erection ofstructurals, piping, tanks, and fabrication of sheetmetal components required for the plant equipment. Responsibilities:  Day today Inspection & maintenance of plant equipments.  Belt conveyors erection, operation and maintenance, various pvc belt joining processes.  Pneumatic compressors and Diesel generators maintenance.  Multistage centrifugal pumps erection, operation and maintenance (including its piping). QA/QC Engineer New Standard Engineering Co. Ltd. Mumbai, India--September 1996 to March 2002 Job content:Fabrication and erection of oil recovery equipment, plant and machinery equipment and structural fabrication. Responsibilities:  Implemented and maintained ISO 9001: 2000 & API (American Petroleum Institute) systems&assisted during Internal Quality Audit of the system.  Prepared QA plans & handled third party RITES, DGQA, SGS, QUEST, EIL inspections independently.  Review of manufacturing/mill test certificates. QC Engineer Profiloforms, Pune, India -- November 1994 to September 1996 Job Content:Manufacturers of profile tools. Responsibilities:  Preparation of raw material indents.  Dimensional Inspection and preparation of all reports/documents/ TCs.
  • 3. Education  Bachelor of Mechanical Engineering from Karnataka University, Dharwad (1993). Certifications  Piping Engineering from IIT,Powai, Mumbai.  MS Office (Word, Excel, Power point) from Winsoft Information Technology, Mumbai.  Internal Auditor Training (ISO 9001:2000) from TUV SUD, Belgaum.  AutoCAD (2D) from EngineersComputer Academy, Belgaum.  ASNT Level II in UT, MPT, LPT, RT from Trinity Institute of NDT Technology, Bangalore.  Professional in PPM (MS Project & Primavera) from CADD Centre, Bangalore. Personal Details Pass portNo: H2136396 Passport issued in: India (Bangalore) Pass portissue date: 08-12-2008 Pass port expiry date: 07-12-2018 Gender: Male Date of birth: 21-10-1969. Language skills: English, Hindi, Marathi& Kannada (Read, write & speak well) Address: F-2 Block, 1st Floor, Yuvaraj Apartment, Maratha colony, Tilakwadi, Belgaum-590006. The above furnished details are true to my knowledge & belief. (V.P.KULKARNI)