ABSTRACT
• The aim of this paper is to present an economical design of an X chart for
a short-run production. The process mean starts equal to x0 (in-control ,
State I) and in a random time it shifts to x1>x0 (out-of-control , State II).
The monitoring procedure consists of inspecting a single item at every m
produced ones . If the measurement of the quality characteristic does not
meet the control limits , the process is stopped, adjusted, and additional r-
1 items are inspected retrospectively . The probabilistic model was
developed considering only shifts in the process mean . A direct search
technique is applied to find the optimum parameters which minimizes the
expected cost function.
WHAT LEAD TO FOLLOW THIS PAPER
• The aim is to answer some questions faced by the manufacturers of short-run production (since they want
to produce high quality products) as:
1. How to design an economical on-line control procedure for this kind of production?
2. Which is the best sampling strategy? Inspecting all items or is it less costly not to use any kind of process
control?
3. What are the consequences if the long-run production parameters (on-line) are used to control a process
in a short-run production?
TYPES OF CONTROL CHART
• It is graphical representation of collected information .It detect the variation in
processing and warn if there is any departure from specified departure limit
• CONTROL CHART FOR VARIABLES (measurable quality characteristics )
1. X chart
2. R chart
3. Sigma (o-) chart
• CONTROL CHART FOR ATTRIBUTES ( rigid quality characterstics)
1. P chart
2. U chart
3. Np chart
4. C chart
INTRODUCTION
• According to Hillier (1969) short-run control charts are necessary in the initiation of a new process or during the start up of a
process just brought into statistical control again and for processes whose total outputs are not large enough to use the
conventional control charts constants.
• They classify short-run production in two types: repetitive and non-repetitive.
• Repetitive:- The production is repetitive and many small lot sizes of similar parts are manufactured on the same machine
without major setup operations . Ex:- shirts, shoes (orders of small quantities)
• Non-repetitive:- It require completely different setups of the manufacturing equipment to produce different lots
Ex:- Shipbuilding , product for aerospace shuttle
• Various paper were presented by HILLIER (1964,1967,1969), HILLIER & YANG (1970) for controlling quality for small number
of sample. Quesenberry (1991) has also proposed Q charts to address the problems encountered in short-run control charts
ENROUTING THE ECONOMIC DESIGN
• After efforts of many researcher in order to stabalise the x chart for short run production the ship sailed to
economic analysis
• A new approach to get robust economic design of control chart is proposed by Vommi and Seetala
(2007), where each cost and process parameter can be expressed in a range such that it covers the true
parameter and the best control chart parameters are selected.
• In this context, the purpose of this paper is to present a quality on-line monitoring model for variables in a
short run production that minimize the expected average cost per produced item, through a set of
parameters: sampling interval; control limits, and sample size (to be taken in a retrospective inspection)
NOTATIONS AND ASSUMPTIONS
• To develop the probabilistic model, the following assumptions and notations were considered:
1. The process starts in State I (in-control, process mean xo=0)
2. At random time i, the process mean changes to x1=e (out-of-control, State II) with probability p, 0<p<1. Once out-of-control,
the process remains out-of-control until stoppage for investigation, which means Pðyi ¼ ejyi1 ¼ eÞ ¼ 1. There are
supposedly no shifts in the process variability.
3. At every m produced items, one item is inspected, so is the value of the observable variable at i-th
inspection; is the sampling interval.
4. The process stoppage follows immediately (no lag between the signal and the stoppage) and additional (r-1) items are
inspected retrospectively; the process is adjusted and restarts in-control.
THE PRODUCTION AND MONITORING CYCLE CEASE AFTER PRODUCTION
OF N ITEMS (SEE FIG.). A NEW PRODUCTION CYCLE BEGINS AFTER STATING
THE SIZE N FOR A NEW ORDER, WITH OPTIMUM VALUES OF SAMPLING
INTERVAL M, CONTROL LIMITS D, AND A TOTAL SAMPLE SIZE R.
INVESTIGATION OF PARABOLISTIC MODEL
• Consider items produced in a process and a control system that consist of inspecting a single item at
every m items produced. If /Zkm/>D, the production is stopped and additional (R-1) items are inspected
retrospectively. With the process in-control, let
be the probabilities to manufacture an item with the characteristic of interest, respectively, lower and
higher than the control limits.
• In that case a signal led an erroneous stoppage of the process (a false alarm) and the probability of such
event (called error type I) is given by
PROBABILITIES ASSOCIATED WITH CONTROL LIMIT
COST FUNCTION
• Basically the cost function is mainly categorized in 3 parts
1. total fixed cost
2. Total variable cost
3. Total cost
Cost associated with strategy costs of non-conforming
items
A BRIEF REVIEW OF COST FUNCTION
CONCLUSION
• In this paper the authors propose an
economic design of an X chart for short-
run production considering the
possibility of a retrospective inspection
when the examined item is non-
conforming
VAIBHAV KADU
2015BPR031
3RD YEAR PRODUCTI
SGGSIE&T

Mais conteúdo relacionado

Mais procurados

Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
pikuoec
 
Layout Case Study
Layout Case StudyLayout Case Study
Layout Case Study
Nilam Kabra
 
Control chart qm
Control chart qmControl chart qm
Control chart qm
Ashu0711
 
Theory of production management
Theory of production managementTheory of production management
Theory of production management
RitwickSinha2
 
Layout planning
Layout planningLayout planning
Layout planning
8979473684
 

Mais procurados (19)

Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
 
Unit 5-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 5-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 5-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 5-IE6605 & PRODUCTION PLANNING AND CONTROL
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Layout Case Study
Layout Case StudyLayout Case Study
Layout Case Study
 
Production Management and Scheduling
Production Management and SchedulingProduction Management and Scheduling
Production Management and Scheduling
 
C Charts
C ChartsC Charts
C Charts
 
Cutting Process Control
Cutting Process ControlCutting Process Control
Cutting Process Control
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Line balancing
Line balancing Line balancing
Line balancing
 
Operation management problems
Operation management problemsOperation management problems
Operation management problems
 
Operation management
Operation managementOperation management
Operation management
 
Control chart qm
Control chart qmControl chart qm
Control chart qm
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the following
 
Theory of production management
Theory of production managementTheory of production management
Theory of production management
 
Work
WorkWork
Work
 
Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_
 
Layout planning
Layout planningLayout planning
Layout planning
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Economics cvp analysis
Economics cvp analysisEconomics cvp analysis
Economics cvp analysis
 

Semelhante a Economic design of X chart for short run production

Estimation Of Production And Cost Function
Estimation Of Production And Cost FunctionEstimation Of Production And Cost Function
Estimation Of Production And Cost Function
Pradeep Awasare
 
Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)
Jitesh Gaurav
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
jsembiring
 
Production function
Production function Production function
Production function
Daksh Bapna
 
production analysis by Neeraj Bhandari ( Surkhet.Nepal )
production analysis by Neeraj Bhandari ( Surkhet.Nepal )production analysis by Neeraj Bhandari ( Surkhet.Nepal )
production analysis by Neeraj Bhandari ( Surkhet.Nepal )
Neeraj Bhandari
 
Production analysis by Neeraj Bhandari ( Surkhet.Nepal )
Production analysis by Neeraj Bhandari ( Surkhet.Nepal )Production analysis by Neeraj Bhandari ( Surkhet.Nepal )
Production analysis by Neeraj Bhandari ( Surkhet.Nepal )
Neeraj Bhandari
 

Semelhante a Economic design of X chart for short run production (20)

Ac04606177183
Ac04606177183Ac04606177183
Ac04606177183
 
Control estadistico de calidad
Control estadistico de calidad Control estadistico de calidad
Control estadistico de calidad
 
Control charts
Control chartsControl charts
Control charts
 
CHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxCHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptx
 
Estimation Of Production And Cost Function
Estimation Of Production And Cost FunctionEstimation Of Production And Cost Function
Estimation Of Production And Cost Function
 
Design of an accuracy control system in ship building industry
Design of an accuracy control system in ship building  industryDesign of an accuracy control system in ship building  industry
Design of an accuracy control system in ship building industry
 
Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)
 
STATISTICAL PROCESS CONTROL(PPT).pptx
STATISTICAL PROCESS CONTROL(PPT).pptxSTATISTICAL PROCESS CONTROL(PPT).pptx
STATISTICAL PROCESS CONTROL(PPT).pptx
 
Lean implementation guide (1)
Lean implementation guide (1)Lean implementation guide (1)
Lean implementation guide (1)
 
statistical process control
 statistical process control statistical process control
statistical process control
 
BusinessAdministration2_02.pdf
BusinessAdministration2_02.pdfBusinessAdministration2_02.pdf
BusinessAdministration2_02.pdf
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
.pptx
.pptx.pptx
.pptx
 
Control Charts in Lab and Trend Analysis
Control Charts in Lab and Trend AnalysisControl Charts in Lab and Trend Analysis
Control Charts in Lab and Trend Analysis
 
Production function
Production function Production function
Production function
 
production analysis by Neeraj Bhandari ( Surkhet.Nepal )
production analysis by Neeraj Bhandari ( Surkhet.Nepal )production analysis by Neeraj Bhandari ( Surkhet.Nepal )
production analysis by Neeraj Bhandari ( Surkhet.Nepal )
 
Production analysis by Neeraj Bhandari ( Surkhet.Nepal )
Production analysis by Neeraj Bhandari ( Surkhet.Nepal )Production analysis by Neeraj Bhandari ( Surkhet.Nepal )
Production analysis by Neeraj Bhandari ( Surkhet.Nepal )
 
Statistical Process Control (SPC) - QMS.pptx
Statistical Process Control (SPC) - QMS.pptxStatistical Process Control (SPC) - QMS.pptx
Statistical Process Control (SPC) - QMS.pptx
 
Teori produksi perusahaan
Teori produksi perusahaanTeori produksi perusahaan
Teori produksi perusahaan
 
Statistical Process Control Part 1
Statistical Process Control Part 1Statistical Process Control Part 1
Statistical Process Control Part 1
 

Último

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 

Último (20)

microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 

Economic design of X chart for short run production

  • 1. ECONOMIC DESIGN OF AN X CHART FOR SHORT-RUN PRODUCTION LINDA LEEHO A, , ANDERSONLAE ´ CIO GALINDOTRINDADE * 2009 ELSEVIERB .V. ALL RIGHTS RESERVED. NAME :-VAIBHAV .V. KADU REG NO:- 2015BPR031
  • 2. ABSTRACT • The aim of this paper is to present an economical design of an X chart for a short-run production. The process mean starts equal to x0 (in-control , State I) and in a random time it shifts to x1>x0 (out-of-control , State II). The monitoring procedure consists of inspecting a single item at every m produced ones . If the measurement of the quality characteristic does not meet the control limits , the process is stopped, adjusted, and additional r- 1 items are inspected retrospectively . The probabilistic model was developed considering only shifts in the process mean . A direct search technique is applied to find the optimum parameters which minimizes the expected cost function.
  • 3. WHAT LEAD TO FOLLOW THIS PAPER • The aim is to answer some questions faced by the manufacturers of short-run production (since they want to produce high quality products) as: 1. How to design an economical on-line control procedure for this kind of production? 2. Which is the best sampling strategy? Inspecting all items or is it less costly not to use any kind of process control? 3. What are the consequences if the long-run production parameters (on-line) are used to control a process in a short-run production?
  • 4. TYPES OF CONTROL CHART • It is graphical representation of collected information .It detect the variation in processing and warn if there is any departure from specified departure limit • CONTROL CHART FOR VARIABLES (measurable quality characteristics ) 1. X chart 2. R chart 3. Sigma (o-) chart • CONTROL CHART FOR ATTRIBUTES ( rigid quality characterstics) 1. P chart 2. U chart 3. Np chart 4. C chart
  • 5. INTRODUCTION • According to Hillier (1969) short-run control charts are necessary in the initiation of a new process or during the start up of a process just brought into statistical control again and for processes whose total outputs are not large enough to use the conventional control charts constants. • They classify short-run production in two types: repetitive and non-repetitive. • Repetitive:- The production is repetitive and many small lot sizes of similar parts are manufactured on the same machine without major setup operations . Ex:- shirts, shoes (orders of small quantities) • Non-repetitive:- It require completely different setups of the manufacturing equipment to produce different lots Ex:- Shipbuilding , product for aerospace shuttle • Various paper were presented by HILLIER (1964,1967,1969), HILLIER & YANG (1970) for controlling quality for small number of sample. Quesenberry (1991) has also proposed Q charts to address the problems encountered in short-run control charts
  • 6. ENROUTING THE ECONOMIC DESIGN • After efforts of many researcher in order to stabalise the x chart for short run production the ship sailed to economic analysis • A new approach to get robust economic design of control chart is proposed by Vommi and Seetala (2007), where each cost and process parameter can be expressed in a range such that it covers the true parameter and the best control chart parameters are selected. • In this context, the purpose of this paper is to present a quality on-line monitoring model for variables in a short run production that minimize the expected average cost per produced item, through a set of parameters: sampling interval; control limits, and sample size (to be taken in a retrospective inspection)
  • 7. NOTATIONS AND ASSUMPTIONS • To develop the probabilistic model, the following assumptions and notations were considered: 1. The process starts in State I (in-control, process mean xo=0) 2. At random time i, the process mean changes to x1=e (out-of-control, State II) with probability p, 0<p<1. Once out-of-control, the process remains out-of-control until stoppage for investigation, which means Pðyi ¼ ejyi1 ¼ eÞ ¼ 1. There are supposedly no shifts in the process variability. 3. At every m produced items, one item is inspected, so is the value of the observable variable at i-th inspection; is the sampling interval. 4. The process stoppage follows immediately (no lag between the signal and the stoppage) and additional (r-1) items are inspected retrospectively; the process is adjusted and restarts in-control.
  • 8. THE PRODUCTION AND MONITORING CYCLE CEASE AFTER PRODUCTION OF N ITEMS (SEE FIG.). A NEW PRODUCTION CYCLE BEGINS AFTER STATING THE SIZE N FOR A NEW ORDER, WITH OPTIMUM VALUES OF SAMPLING INTERVAL M, CONTROL LIMITS D, AND A TOTAL SAMPLE SIZE R.
  • 9. INVESTIGATION OF PARABOLISTIC MODEL • Consider items produced in a process and a control system that consist of inspecting a single item at every m items produced. If /Zkm/>D, the production is stopped and additional (R-1) items are inspected retrospectively. With the process in-control, let be the probabilities to manufacture an item with the characteristic of interest, respectively, lower and higher than the control limits. • In that case a signal led an erroneous stoppage of the process (a false alarm) and the probability of such event (called error type I) is given by
  • 11. COST FUNCTION • Basically the cost function is mainly categorized in 3 parts 1. total fixed cost 2. Total variable cost 3. Total cost Cost associated with strategy costs of non-conforming items
  • 12. A BRIEF REVIEW OF COST FUNCTION
  • 13. CONCLUSION • In this paper the authors propose an economic design of an X chart for short- run production considering the possibility of a retrospective inspection when the examined item is non- conforming
  • 14. VAIBHAV KADU 2015BPR031 3RD YEAR PRODUCTI SGGSIE&T