New Bioethanol 2G plant
development opportunity in
Ukraine
About Ukrteplo Group
Main Activities:
• Heat generation. Ukrteplo Group has more than 100 boiler houses with a total installed
capacity of 123 MW, that heats more than 1,3 mln. m2 of housing, hospitals, schools, and other
facilities;
• Growing energy crops;
• Manufacturing of Biomass boilers.
New directions:
• CHP from Biomass (6 and 12 MW of electricity under construction);
• Hydroelectric power plants
• Solar power
• Synthetic gas
• Production of bioethanol
The structure of Ukrteplo Group:
• The structure of Ukrteplo Group includes 34 enterprises
• 16 regions of Ukraine
• More than 800 employees
Main idea of the project
• Key idea - to build a plant for the production of bioethanol using
second generation technology with capacity of 50 000 tons per year.
• Electricity power plant with capacity of 12 MW is planned as a part of
the project to utilize biomass remains with the output of energy to
the network for "green" tariff of 0,12 eur/per 1 kWt-h (that lasts up
to 2030).
• Construction of the plant requires an area of 20 hectares with
industrial infrastructure, water 5000 m3 per day and railway line.
• Zaplaza sugar plant was selected from a lot of different other options
because of a) large water ability b) good infrastructure c) huge
volume of available biomass d) working condition. The plant was
purchased by Ukrteplo Group in 2016.
Key figures
• Nominal output 50 000 MT of bioethanol per year
• Planning working time – 8000 hours per year
• Biomass consumption – 286 000 MT per year
• Capex 75 mln.euro (1500 euro/MT)
• Annual income 32 mln. Euro (68% from bioethanol, 32% from energy
and additional products)
• Planning EBITDA 16 mln. euro per year
• Planning number of employees – 400.
Existing inputs for the project
• Plenty of unused biomass in Ukraine (9,6 mln. Ha, 64,1 mln. MT grain
harvested)
• Developed infrastructure of existing large Zaplaza sugar plant in
Odessa region (3000 MT/day)
• Ukrteplo Group as experienced local partner in Ukraine
• Ability of Ukrteplo Group to co-invest into the project
Biomass availability
• Ukraine has a developed agriculture.
• The area under cultivation in 2015 amounted to 26.5 million hectares or
44% of the country.
Total production in 2015:
• 26.5 million tons of wheat
• 8.2 million tons of barley
• 22.5 million tons of corn
• 10.3 million tons of sunflower
• Available volume of agricultural waste in Ukraine is 33.0 - 35.0 million
tons;
Bioethanol plant with capacity of 50 000 MT per year requires 286 000
MT of straw per year.
• Available volume of agricultural waste in a 50 km radius from the
proposed location of the plant is 350 000 MT per year.
Area with infrastructure
• For this project Ukrteplo Group purchased Zaplaza sugar factory
• Manufacturing plant with remote sites constitute 115 hectares.
• The plant has a connection to two transmission lines of 35 kV and a
transformer substation in working condition.
• Providing process water through the water intake on the river
Kodyma. Water intake possibility 10 000 m3 per day.
• There is a railway line of 5.5 km long, four kilometers pathways inside
the plant, unloading and loading ramps.
• The total area of ​​buildings - 20, 000 square meters.
• Area buildings, suitable for operation - 8 000 square meters.
• The factory is located in the small town Zelenogirsk, Lyubashivskiy
district of Odessa region five kilometers from the railway station
Zaplaza, Odessa railway.
3D factory model
Factory plan and railway lines
Bioethanol advantages in Ukraine
• The demand of bio-ethanol is increasing now
• Bio-ethanol is fuel
• Bio-ethanol has to be added to petrol according to EU Directive
2009/28/EC and to Euro 5 and Euro 6 Standards in amount of 5% now
and 10% until 2020.
• ​Volume of sales of petrol is up to 2 million tons annually in Ukraine
• Demand of bio-ethanol on Ukrainian internal market will grow to
200,000 tons annually next years
• Existing bio-ethanol plants in Ukraine produce up to 120,000 TPY of
first-generation bio-ethanol
• Demands of European market is much higher
Key Financial figures
• -According to various estimates, the cost of the investment project
of bio-ethanol plant construction using second-generation
technology can be from 60 to 100 million US dollars
• Ukrteplo Group intends to invest around 20% into the project using
owned assets including acquired assets. It is 12-18 million US dollars.
Estimated cost of Zaplaza sugar plant is 4,5 million US dollars
• Required part of financing can get complex structure and will consist
of partner's owned assets, third parties investment and credit funds.
• Estimated payback time of the project is 5,2-6,4 years from the
moment of the plant start-up
• The construction time of the plant is estimated to be 18 months
Partnership offer
Who we are looking for:
• Ukrteplo Group is interested in the company-partner with specialized
expertise in construction and operation of 2G bio-ethanol plant
• Ukrteplo Group is interested in the company-partner which will also invest in
the project
• Ukrteplo Group is interested in a partner who can bring and implement his
technologies into the project;
What we offer:
Ukrteplo Group is ready to consider any partnership and cooperation formats:
• Investment in the project
• Joint management of the project
• The joint venture
• Agreement on joint activities
• Any other comfortable format for both partners.
Contacts
Group of Companies «Ukrteplo»
Tropinina str. 5v, Kyiv, 04107
+380 67 3264021
info@ukrteplo.kiev.ua
Roman Shved
Head of CHP and Bioethanol division
r.shved@gmail.com
Mob. +38 067 249 05 17

Mais conteúdo relacionado

Semelhante a Завод по производству биоэтанола второго поколения

Inter RAO - Export company presentation
Inter RAO - Export company presentationInter RAO - Export company presentation
Inter RAO - Export company presentationViacheslav Leonov
 
Progress Towards SugarCane Industry
Progress Towards SugarCane IndustryProgress Towards SugarCane Industry
Progress Towards SugarCane IndustryAbrar Ahmed
 
2015 10 27 irao export general presentation
2015 10 27 irao export general presentation2015 10 27 irao export general presentation
2015 10 27 irao export general presentationquadraru
 
2017 irao export presentation eng
2017 irao export presentation eng2017 irao export presentation eng
2017 irao export presentation engViacheslav Leonov
 
Fortum Klaipėda: huge step towards independence
Fortum Klaipėda: huge step towards independenceFortum Klaipėda: huge step towards independence
Fortum Klaipėda: huge step towards independenceSandra Nagdasova
 
Githunguri Rotary Presentation
Githunguri Rotary PresentationGithunguri Rotary Presentation
Githunguri Rotary Presentationfolkjur
 
Chapter 2 solar energy 2021 part 2
Chapter 2 solar energy 2021 part 2Chapter 2 solar energy 2021 part 2
Chapter 2 solar energy 2021 part 2Prof . Ghada Amer
 
Biotechnics.ltd 16.09.2014
Biotechnics.ltd 16.09.2014Biotechnics.ltd 16.09.2014
Biotechnics.ltd 16.09.2014biotechnics
 
Mining investments opportunities in Argentina
Mining investments opportunities in ArgentinaMining investments opportunities in Argentina
Mining investments opportunities in ArgentinaJulian Patricio Rooney
 
Abengoa's Corporate Presentation
Abengoa's Corporate PresentationAbengoa's Corporate Presentation
Abengoa's Corporate PresentationAbengoa
 
CSP Basque Country Catalog 2016
CSP Basque Country Catalog 2016CSP Basque Country Catalog 2016
CSP Basque Country Catalog 2016Cluster_Energia
 
Energy through biogas in rural pakistan- by talha zubair & engr. eshan ahuja
Energy through biogas in rural pakistan- by talha zubair  &  engr. eshan ahujaEnergy through biogas in rural pakistan- by talha zubair  &  engr. eshan ahuja
Energy through biogas in rural pakistan- by talha zubair & engr. eshan ahujaeshanahuja
 
Biorefinery in Eastern Slovakia
Biorefinery in Eastern SlovakiaBiorefinery in Eastern Slovakia
Biorefinery in Eastern Slovakiaindustrialbiotech
 
Gruppo Bona Dea 2015_eng
Gruppo Bona Dea 2015_engGruppo Bona Dea 2015_eng
Gruppo Bona Dea 2015_engGiordana Campo
 
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...Maghrenov
 
Geothermal Presentation, March 14, 2013, Madrid/ Spain
Geothermal Presentation, March 14, 2013, Madrid/ SpainGeothermal Presentation, March 14, 2013, Madrid/ Spain
Geothermal Presentation, March 14, 2013, Madrid/ SpainThinkGeoEnergy
 
Kevin Sara's Arab world Renewal presentation
Kevin Sara's Arab world Renewal presentationKevin Sara's Arab world Renewal presentation
Kevin Sara's Arab world Renewal presentationCandidSM
 
COGEN Europe presentation: Micro-CHP overview at EU level
COGEN Europe presentation: Micro-CHP overview at EU levelCOGEN Europe presentation: Micro-CHP overview at EU level
COGEN Europe presentation: Micro-CHP overview at EU levelCOGEN Europe
 
Start-ups et PMI : au cœur de la décarbonation du système énergétique dans le...
Start-ups et PMI : au cœur de la décarbonation du système énergétique dans le...Start-ups et PMI : au cœur de la décarbonation du système énergétique dans le...
Start-ups et PMI : au cœur de la décarbonation du système énergétique dans le...Gimélec
 
IEU%20Profile%20%20&%20Investment%20Opportunity_May_2016-2
IEU%20Profile%20%20&%20Investment%20Opportunity_May_2016-2IEU%20Profile%20%20&%20Investment%20Opportunity_May_2016-2
IEU%20Profile%20%20&%20Investment%20Opportunity_May_2016-2Dr. Hossam El-Shazly
 

Semelhante a Завод по производству биоэтанола второго поколения (20)

Inter RAO - Export company presentation
Inter RAO - Export company presentationInter RAO - Export company presentation
Inter RAO - Export company presentation
 
Progress Towards SugarCane Industry
Progress Towards SugarCane IndustryProgress Towards SugarCane Industry
Progress Towards SugarCane Industry
 
2015 10 27 irao export general presentation
2015 10 27 irao export general presentation2015 10 27 irao export general presentation
2015 10 27 irao export general presentation
 
2017 irao export presentation eng
2017 irao export presentation eng2017 irao export presentation eng
2017 irao export presentation eng
 
Fortum Klaipėda: huge step towards independence
Fortum Klaipėda: huge step towards independenceFortum Klaipėda: huge step towards independence
Fortum Klaipėda: huge step towards independence
 
Githunguri Rotary Presentation
Githunguri Rotary PresentationGithunguri Rotary Presentation
Githunguri Rotary Presentation
 
Chapter 2 solar energy 2021 part 2
Chapter 2 solar energy 2021 part 2Chapter 2 solar energy 2021 part 2
Chapter 2 solar energy 2021 part 2
 
Biotechnics.ltd 16.09.2014
Biotechnics.ltd 16.09.2014Biotechnics.ltd 16.09.2014
Biotechnics.ltd 16.09.2014
 
Mining investments opportunities in Argentina
Mining investments opportunities in ArgentinaMining investments opportunities in Argentina
Mining investments opportunities in Argentina
 
Abengoa's Corporate Presentation
Abengoa's Corporate PresentationAbengoa's Corporate Presentation
Abengoa's Corporate Presentation
 
CSP Basque Country Catalog 2016
CSP Basque Country Catalog 2016CSP Basque Country Catalog 2016
CSP Basque Country Catalog 2016
 
Energy through biogas in rural pakistan- by talha zubair & engr. eshan ahuja
Energy through biogas in rural pakistan- by talha zubair  &  engr. eshan ahujaEnergy through biogas in rural pakistan- by talha zubair  &  engr. eshan ahuja
Energy through biogas in rural pakistan- by talha zubair & engr. eshan ahuja
 
Biorefinery in Eastern Slovakia
Biorefinery in Eastern SlovakiaBiorefinery in Eastern Slovakia
Biorefinery in Eastern Slovakia
 
Gruppo Bona Dea 2015_eng
Gruppo Bona Dea 2015_engGruppo Bona Dea 2015_eng
Gruppo Bona Dea 2015_eng
 
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
 
Geothermal Presentation, March 14, 2013, Madrid/ Spain
Geothermal Presentation, March 14, 2013, Madrid/ SpainGeothermal Presentation, March 14, 2013, Madrid/ Spain
Geothermal Presentation, March 14, 2013, Madrid/ Spain
 
Kevin Sara's Arab world Renewal presentation
Kevin Sara's Arab world Renewal presentationKevin Sara's Arab world Renewal presentation
Kevin Sara's Arab world Renewal presentation
 
COGEN Europe presentation: Micro-CHP overview at EU level
COGEN Europe presentation: Micro-CHP overview at EU levelCOGEN Europe presentation: Micro-CHP overview at EU level
COGEN Europe presentation: Micro-CHP overview at EU level
 
Start-ups et PMI : au cœur de la décarbonation du système énergétique dans le...
Start-ups et PMI : au cœur de la décarbonation du système énergétique dans le...Start-ups et PMI : au cœur de la décarbonation du système énergétique dans le...
Start-ups et PMI : au cœur de la décarbonation du système énergétique dans le...
 
IEU%20Profile%20%20&%20Investment%20Opportunity_May_2016-2
IEU%20Profile%20%20&%20Investment%20Opportunity_May_2016-2IEU%20Profile%20%20&%20Investment%20Opportunity_May_2016-2
IEU%20Profile%20%20&%20Investment%20Opportunity_May_2016-2
 

Último

Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 

Último (20)

Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 

Завод по производству биоэтанола второго поколения

  • 1. New Bioethanol 2G plant development opportunity in Ukraine
  • 2. About Ukrteplo Group Main Activities: • Heat generation. Ukrteplo Group has more than 100 boiler houses with a total installed capacity of 123 MW, that heats more than 1,3 mln. m2 of housing, hospitals, schools, and other facilities; • Growing energy crops; • Manufacturing of Biomass boilers. New directions: • CHP from Biomass (6 and 12 MW of electricity under construction); • Hydroelectric power plants • Solar power • Synthetic gas • Production of bioethanol The structure of Ukrteplo Group: • The structure of Ukrteplo Group includes 34 enterprises • 16 regions of Ukraine • More than 800 employees
  • 3. Main idea of the project • Key idea - to build a plant for the production of bioethanol using second generation technology with capacity of 50 000 tons per year. • Electricity power plant with capacity of 12 MW is planned as a part of the project to utilize biomass remains with the output of energy to the network for "green" tariff of 0,12 eur/per 1 kWt-h (that lasts up to 2030). • Construction of the plant requires an area of 20 hectares with industrial infrastructure, water 5000 m3 per day and railway line. • Zaplaza sugar plant was selected from a lot of different other options because of a) large water ability b) good infrastructure c) huge volume of available biomass d) working condition. The plant was purchased by Ukrteplo Group in 2016.
  • 4. Key figures • Nominal output 50 000 MT of bioethanol per year • Planning working time – 8000 hours per year • Biomass consumption – 286 000 MT per year • Capex 75 mln.euro (1500 euro/MT) • Annual income 32 mln. Euro (68% from bioethanol, 32% from energy and additional products) • Planning EBITDA 16 mln. euro per year • Planning number of employees – 400.
  • 5. Existing inputs for the project • Plenty of unused biomass in Ukraine (9,6 mln. Ha, 64,1 mln. MT grain harvested) • Developed infrastructure of existing large Zaplaza sugar plant in Odessa region (3000 MT/day) • Ukrteplo Group as experienced local partner in Ukraine • Ability of Ukrteplo Group to co-invest into the project
  • 6. Biomass availability • Ukraine has a developed agriculture. • The area under cultivation in 2015 amounted to 26.5 million hectares or 44% of the country. Total production in 2015: • 26.5 million tons of wheat • 8.2 million tons of barley • 22.5 million tons of corn • 10.3 million tons of sunflower • Available volume of agricultural waste in Ukraine is 33.0 - 35.0 million tons; Bioethanol plant with capacity of 50 000 MT per year requires 286 000 MT of straw per year. • Available volume of agricultural waste in a 50 km radius from the proposed location of the plant is 350 000 MT per year.
  • 7. Area with infrastructure • For this project Ukrteplo Group purchased Zaplaza sugar factory • Manufacturing plant with remote sites constitute 115 hectares. • The plant has a connection to two transmission lines of 35 kV and a transformer substation in working condition. • Providing process water through the water intake on the river Kodyma. Water intake possibility 10 000 m3 per day. • There is a railway line of 5.5 km long, four kilometers pathways inside the plant, unloading and loading ramps. • The total area of ​​buildings - 20, 000 square meters. • Area buildings, suitable for operation - 8 000 square meters. • The factory is located in the small town Zelenogirsk, Lyubashivskiy district of Odessa region five kilometers from the railway station Zaplaza, Odessa railway.
  • 9. Factory plan and railway lines
  • 10. Bioethanol advantages in Ukraine • The demand of bio-ethanol is increasing now • Bio-ethanol is fuel • Bio-ethanol has to be added to petrol according to EU Directive 2009/28/EC and to Euro 5 and Euro 6 Standards in amount of 5% now and 10% until 2020. • ​Volume of sales of petrol is up to 2 million tons annually in Ukraine • Demand of bio-ethanol on Ukrainian internal market will grow to 200,000 tons annually next years • Existing bio-ethanol plants in Ukraine produce up to 120,000 TPY of first-generation bio-ethanol • Demands of European market is much higher
  • 11. Key Financial figures • -According to various estimates, the cost of the investment project of bio-ethanol plant construction using second-generation technology can be from 60 to 100 million US dollars • Ukrteplo Group intends to invest around 20% into the project using owned assets including acquired assets. It is 12-18 million US dollars. Estimated cost of Zaplaza sugar plant is 4,5 million US dollars • Required part of financing can get complex structure and will consist of partner's owned assets, third parties investment and credit funds. • Estimated payback time of the project is 5,2-6,4 years from the moment of the plant start-up • The construction time of the plant is estimated to be 18 months
  • 12. Partnership offer Who we are looking for: • Ukrteplo Group is interested in the company-partner with specialized expertise in construction and operation of 2G bio-ethanol plant • Ukrteplo Group is interested in the company-partner which will also invest in the project • Ukrteplo Group is interested in a partner who can bring and implement his technologies into the project; What we offer: Ukrteplo Group is ready to consider any partnership and cooperation formats: • Investment in the project • Joint management of the project • The joint venture • Agreement on joint activities • Any other comfortable format for both partners.
  • 13. Contacts Group of Companies «Ukrteplo» Tropinina str. 5v, Kyiv, 04107 +380 67 3264021 info@ukrteplo.kiev.ua Roman Shved Head of CHP and Bioethanol division r.shved@gmail.com Mob. +38 067 249 05 17