No NAME OF HEPP UNIT OUTPUTS
INSTALLED
OUTPUT
LOCATION
OF THE
PROJECT
OWNER SCOPE OF SERVICES PHASE
2.
SANİ BEY
(YEDİGÖZE)
DAM AND HEPP
2 X 159 MW 318 MW TURKIYE
SANKO
HOLDING
− PLANTOPTIMIZATION, DATAAND CHARACTERISTICS
− PREPARING OF THETECHNICAL SPECIFICATION FOR E-MEQUIPMENT
− BIDDING NEGOTIATIONS
− PREPARING OF CONTRACTDOCUMENT
− ENGINEERING, DESIGN AND PROJECTWORKS
− MANUFACTURING OF THEEQUIPMENT
− (FAT) FACTORYACCEPTANCETESTS
− ERECTION OF EQUIPMENT
− FIELD TESTS AND COMMISSIONING WORKS
− FIELD MINISTRYACCEPTANCEAND PERFORMANCE TESTS
UNDER
OPERATION
NAME OF HEPP UNIT OUTPUTS
INSTALLED
OUTPUT
LOCATION
OF THE
PROJECT
OWNER SCOPE OF SERVICES PHASE
ELECTROMECHANICAL
CONTRACTOR
BOYABAT
DAM AND HEPP
3 X 170 MW 510 MW TURKIYE
BOYABAT
ENERJI
DOGAN
DOGUS
UNIT
− PLANT OPTIMIZATION, DATA AND CHARACTERISTICS
− BIDDING NEGOTIATIONS
− PREPARING OF CONTRACT DOCUMENT
− ENGINEERING, DESIGN AND PROJECT WORKS
− TURBINE MODEL ACCEPTANCE TESTS.
− MANUFACTURING OF THE EQUIPMENT
− (FAT) FACTORY ACCEPTANCE TESTS
− ERECTION OF EQUIPMENT
− FIELD TESTS AND COMMISSIONING WORKS
− FIELD MINISTRY ACCEPTANCE AND PERFORMANCE TESTS
UNDER
OPERATION
ANDRITZ/AUSTRIA

Mais conteúdo relacionado

Destaque (20)

LOGO AISEL ONLUS
LOGO AISEL ONLUSLOGO AISEL ONLUS
LOGO AISEL ONLUS
 
Digital Garage Certificate
Digital Garage CertificateDigital Garage Certificate
Digital Garage Certificate
 
Danny
DannyDanny
Danny
 
kondoorvillageoffice
kondoorvillageofficekondoorvillageoffice
kondoorvillageoffice
 
Company Logo
Company LogoCompany Logo
Company Logo
 
Africa Job foto
Africa Job fotoAfrica Job foto
Africa Job foto
 
Valentines Flyer Proposal (3)
Valentines Flyer Proposal (3)Valentines Flyer Proposal (3)
Valentines Flyer Proposal (3)
 
Nova apresentação belcorp
Nova apresentação belcorpNova apresentação belcorp
Nova apresentação belcorp
 
GAVINO BARRERA
GAVINO BARRERAGAVINO BARRERA
GAVINO BARRERA
 
art star quarter page ad 5-4
art star quarter page ad 5-4art star quarter page ad 5-4
art star quarter page ad 5-4
 
Manuel enrique quinillo chivalan seminario 3ro.2014
Manuel enrique quinillo chivalan seminario 3ro.2014Manuel enrique quinillo chivalan seminario 3ro.2014
Manuel enrique quinillo chivalan seminario 3ro.2014
 
Test
TestTest
Test
 
Yes Fevereiro 2013
Yes Fevereiro 2013Yes Fevereiro 2013
Yes Fevereiro 2013
 
N.º 22 jornal da e.s.g.s março de 2002 ano iv
N.º 22 jornal da e.s.g.s   março de 2002 ano ivN.º 22 jornal da e.s.g.s   março de 2002 ano iv
N.º 22 jornal da e.s.g.s março de 2002 ano iv
 
Seguro que no lo tienes
Seguro que no lo tienesSeguro que no lo tienes
Seguro que no lo tienes
 
Md5sum
Md5sumMd5sum
Md5sum
 
Soong HOMME logo(黑底白字标)-1
Soong HOMME logo(黑底白字标)-1Soong HOMME logo(黑底白字标)-1
Soong HOMME logo(黑底白字标)-1
 
Malcha nov12 pajama party flier 2
Malcha nov12 pajama party flier 2Malcha nov12 pajama party flier 2
Malcha nov12 pajama party flier 2
 
CV-English
CV-EnglishCV-English
CV-English
 
A prática da pesquisa científica
A prática da pesquisa científicaA prática da pesquisa científica
A prática da pesquisa científica
 

Semelhante a _1 YEDIGOZE _ BOYABAT DAMS AND HEPPs

1.UBC ENGINEERING REFERENCES -WEB
1.UBC ENGINEERING REFERENCES -WEB1.UBC ENGINEERING REFERENCES -WEB
1.UBC ENGINEERING REFERENCES -WEBUgur Bekir Coskuner
 
Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16Ranjan Roy
 
Irfan Eker CV January 2015
Irfan Eker CV January 2015Irfan Eker CV January 2015
Irfan Eker CV January 2015Irfan Eker
 
Ranjan Roy- 25.10.16
Ranjan Roy- 25.10.16Ranjan Roy- 25.10.16
Ranjan Roy- 25.10.16Ranjan Roy
 
CS Design Engineer
CS Design EngineerCS Design Engineer
CS Design EngineerJOSE MANAHAN
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisNikhil Kumar Rai
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newvasanth morais
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVjignesh kadam
 
eng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORMeng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORMahmed effat
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaSyafiqah Najib
 
8.CV ARIF NIZAR
8.CV ARIF NIZAR8.CV ARIF NIZAR
8.CV ARIF NIZARArif Nizar
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstaramol bakane
 

Semelhante a _1 YEDIGOZE _ BOYABAT DAMS AND HEPPs (20)

1.UBC ENGINEERING REFERENCES -WEB
1.UBC ENGINEERING REFERENCES -WEB1.UBC ENGINEERING REFERENCES -WEB
1.UBC ENGINEERING REFERENCES -WEB
 
Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16
 
Irfan Eker CV January 2015
Irfan Eker CV January 2015Irfan Eker CV January 2015
Irfan Eker CV January 2015
 
Ranjan Roy- 25.10.16
Ranjan Roy- 25.10.16Ranjan Roy- 25.10.16
Ranjan Roy- 25.10.16
 
CS Design Engineer
CS Design EngineerCS Design Engineer
CS Design Engineer
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysis
 
Tony Stewart CV
Tony Stewart CVTony Stewart CV
Tony Stewart CV
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
 
History12.docx
History12.docxHistory12.docx
History12.docx
 
CV Didit Kurniawan 2016
CV Didit Kurniawan 2016CV Didit Kurniawan 2016
CV Didit Kurniawan 2016
 
eng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORMeng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORM
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
C.V 2017
C.V 2017C.V 2017
C.V 2017
 
Soumyajit_Sarkar
Soumyajit_SarkarSoumyajit_Sarkar
Soumyajit_Sarkar
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens Malaysia
 
8.CV ARIF NIZAR
8.CV ARIF NIZAR8.CV ARIF NIZAR
8.CV ARIF NIZAR
 
TOSH
TOSHTOSH
TOSH
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 

_1 YEDIGOZE _ BOYABAT DAMS AND HEPPs

  • 1. No NAME OF HEPP UNIT OUTPUTS INSTALLED OUTPUT LOCATION OF THE PROJECT OWNER SCOPE OF SERVICES PHASE 2. SANİ BEY (YEDİGÖZE) DAM AND HEPP 2 X 159 MW 318 MW TURKIYE SANKO HOLDING − PLANTOPTIMIZATION, DATAAND CHARACTERISTICS − PREPARING OF THETECHNICAL SPECIFICATION FOR E-MEQUIPMENT − BIDDING NEGOTIATIONS − PREPARING OF CONTRACTDOCUMENT − ENGINEERING, DESIGN AND PROJECTWORKS − MANUFACTURING OF THEEQUIPMENT − (FAT) FACTORYACCEPTANCETESTS − ERECTION OF EQUIPMENT − FIELD TESTS AND COMMISSIONING WORKS − FIELD MINISTRYACCEPTANCEAND PERFORMANCE TESTS UNDER OPERATION
  • 2. NAME OF HEPP UNIT OUTPUTS INSTALLED OUTPUT LOCATION OF THE PROJECT OWNER SCOPE OF SERVICES PHASE ELECTROMECHANICAL CONTRACTOR BOYABAT DAM AND HEPP 3 X 170 MW 510 MW TURKIYE BOYABAT ENERJI DOGAN DOGUS UNIT − PLANT OPTIMIZATION, DATA AND CHARACTERISTICS − BIDDING NEGOTIATIONS − PREPARING OF CONTRACT DOCUMENT − ENGINEERING, DESIGN AND PROJECT WORKS − TURBINE MODEL ACCEPTANCE TESTS. − MANUFACTURING OF THE EQUIPMENT − (FAT) FACTORY ACCEPTANCE TESTS − ERECTION OF EQUIPMENT − FIELD TESTS AND COMMISSIONING WORKS − FIELD MINISTRY ACCEPTANCE AND PERFORMANCE TESTS UNDER OPERATION ANDRITZ/AUSTRIA