CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Electric Research Institute, Mexico) for the UKCCSRC, Edinburgh, 13 November 2015
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Electric Research Institute, Mexico) for the UKCCSRC, Edinburgh, 13 November 2015
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
Semelhante a CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Electric Research Institute, Mexico) for the UKCCSRC, Edinburgh, 13 November 2015
Accelerating to Net Zero with Hydrogen Blending Standards Development in the ...KTN
Semelhante a CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Electric Research Institute, Mexico) for the UKCCSRC, Edinburgh, 13 November 2015 (20)
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Electric Research Institute, Mexico) for the UKCCSRC, Edinburgh, 13 November 2015
1. Dr. José Miguel González Santaló
Dr. M. Vita Peralta Martínez
Dr. Zdzislaw Mazur Czerwiec
November 2015
Carbon Capture, Utilization
and Storage (CCUS)
Roadmap for Mexico
4. 4
Road Map (Incubation)
Framework
agreement
Carbon market
analysis
Link with International
Institutions in CCUS Science
and Technology
National and International
Funding mechanism for
tehcnology implementation
Regulatory framework analysis
INCUBATION
World Bank grant in
progress
Consultancy contracting
process ongoing
5. 5
Creation of Mexican CCUS Center Capacity Building
Regulatory framework adjustments
Permanent monitoring
binding
National financing mechanism and incentives for technolgy development and programs compliance
Aditional International Financing and
Funding mechanism and Carbon Markets
Disemination of the
Technology Implentation Plan
Entailment with stakeholder
Policies to Encourage the Private Sector
Implementation Plan for National CO2 Transport Network
National Policy of CCUS READY
PUBLIC POLICY
Road Map (Public Policy)
Consultancy contracting
process ongoing
Actually planning
A graduate program in planning with
UNAM and Berkeley University
6. 6
Estimation of storage capacity
Potential Fields Analysis, Selection and Priorization
CO2 –EOR strategies
CO2 –EOR Plans
Capture and storage plan from
Power Plants
CO2 Use and Supply Strategy
Use and Supply
review
Use and Supply
review
Use and Supply
review
Road Map (Planning)
PLANNING
7. 7
Road Map
Pilot and demonstration project Power Plants
Site selection for NGCC power plants
Selection of capture technology (Consultancy contracting process ongoing)
Feasibility and design studies
Tender
Construction and commissioning
Operation
Closure and decommissioning
Feasibility and design studies
Tender
PILOT PROJECT-POWER PLANT
DEMONSTRATION PROJECT-POWER PLANT
Environmental studies and
authorizations
Builiding of Plant and CO2
transport network
Public comunication
Commissioning
Injection tests and base line studies
and monitoring
Injection and monitoring
Injection site caracterization
and social involvement
8. 8
Site Selection for first pilot test
Lab Analysis /first pilot
Pilot Testing Design/firt pilot
First pilot
implementation
Monitoring, reporting and
verification (MRV)/First pilot Evaluation
Follow up
CCS-EOR Scaling Plant
CCS-EOR Research
Field scale design
Execution
Operations from comercial scale
projects according to the
implementation plan
Operation and MRV
PILOT PROJECT-EOR
DEMONSTRATION PROJECT-EOR
Road Map
Pilot and demonstration project EOR
10. 10
Road Map (Commercial Scale)
Identification of priority capture plants
CO2 –pipelines feasability analysis
CO2 transport network construction
Construction and commercial operation of CCS and CCS-EOR
CO2 commercialization
MRV
COMMERCIAL SCALE
12. 12
Works on CCS at IIE
POST-COMBUSTION PROGRAM AT IIE(Electrical
Research Institute)
• A bench scale absorption unit to test different amine solvents to know
the behaviour of these and study the different variables and parameters
involved in the process of CO2 capture
• Absorber with 1.7 m high
and 4 inches diameter
• Stripper with 2.15 m high
and 5 inches diameter
• Both columns made with
borosilicate glass Schott®
Duran 3.3
• Packing polypropilene pall
ring 5/8 inches
13. 13
Works on CCS at IIE
OXYCOMBUSTION FURNACE AT IIE
• Purposes:
– Hands on experience with
oxycombustion
– Characterize the
combustion process
– Assess applicability to
Mexico
• Part of IIE’s strategic program for CCS
• 30 KW thermal
• Oxygen delivered by oxygen bottles
• Originally CO2 and steam were also externally produced to
simulate recirculation. Now recirculation is being
implemented
14. 14
• A small gas turbine to investigate the behaviour in operational
conditions using biofuels, CO2 capture, CO2 recirculation and
the use in cogeneration.
Works on CCS at IIE gas turbine
15. 15
CCS Pilot Plant
Objective
To develop a conceptual design for a capture pilot plant, to test
three different technologies, this pilot plant will be located at the
160 MW Poza Rica NGCC (retrofitted plant)
PRE-FEASIBILITY STUDY by Nexant