NORTH CAMPUS GARAGE AND MIAMI INN
SURFACE PARKING LOT RENOVATIONS
ISSUED FOR BIDS
JULY 1, 2016
DRAWING NO. TITLE
V-1.0 EXISTING CONDTIONS PLAN SITE SURVEY
C-1.0 STORMWATER POLLUTION PREVENTION PLAN
C-1.1 PARKING LOT SWPPP NOTES
C-1.2 PARKING LOT SWPPP DETAILS
C-2.0 PARKING LOT DEMOLITION PLAN
C-3.0 PARKING LOT MATERIALS LAYOUT PLAN
C-3.1 PARKING LOT MATERIAL LAYOUT ENLARGEMENTS
C-4.0 PARKING LOT GRADING AND DRAINAGE PLAN
C-4.1 GRADING ENLARGEMENTS
C-5.0 MIAMI INN PARKING LOT IMPROVEMENTS
C-6.0 SITE DETAILS
C-6.1 SITE DETAILS
E-1.0 ELECTRICAL SITE PLAN
E-2.0 ELECTRICAL DETAILS AND SCHEDULES
DRAWING INDEX: PROJECT LOCATION MAP:
MIAMI UNIVERSITY
NORTH CAMPUS
OXFORD, OH
N
PROJECT LOCATION
APPROXIMATE LIMIT OF CAMPUS
ENGINEERING
BUILDING
N
APPROXIMATE
PROJECT LOCATION
APPROXIMATE PROJECT AREA
CONSULTANTS:
SMITHGROUPJJR, INC.
201 DEPOT STREET, 2ND FLOOR
ANN ARBOR, MICHIGAN 48104
T. 734.662.4457
F. 734.662.7520
www.smithgroupjjr.com
CIVIL ENGINEER
PRATER ENGINEERING ASSOCIATES
6130 WILCOX ROAD
DUBLIN, OHIO 43016
T. 614.766.4896
F. 614.766.2354
www.praterengineering.com
ELECTRICAL ENGINEER
PEARSON
HALL
PSYCHOLOGY
BU8ILDING
BENTON
HALL
NORTH CAMPUS
GARAGE
MCKIE FIELD
AT
HAYDEN PARK
SWING
HALL
UNIVERSITY ARCHIVES
AND
WITHROW COURT
BENCHMARK
M-5
N=558687.872
E=1338487.915
Elev=878.35
NOTES
1. BASIS OF BEARING: OFFICIAL MIAMI MONUMENTS (#M-12 AND
#M-5).
2. NO TITLE EXAMINATION/REPORT PROVIDED TO DETERMINE ANY
ADDITIONAL EASEMENTS, RESTRICTIONS, COVENANTS,
CONDITIONS OR ENCUMBRANCES WHICH MAY AFFECT THE LANDS
HEREIN PLATTED.
3. SANITARY AND STORM LINE CONNECTION TO BUILDINGS AND
UTILITIES SHOWN PER PLAN (PP) ARE FROM PLANS PROVIDED BY
MIAMI UNIVERSITY. UTILITIES INDICATED AS (PP) MAY BE
ABANDONED, BUT STILL IN PLACE.
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
EXISTING CONDTIONS PLAN
SITE SURVEY
PROJECT NORTH
1" = 20'
V-1.0
Feet
0 20 40
LEGEND
876
876
877
878
876
875
875
875
876
876
876
876
876
876
877
STORM SEWER INLET SILT SACK, TYP.
STORM SEWER INLET SILT SACK, TYP.
STORM SEWER INLET
SILT SACK, TYP.
STORM SEWER INLET
SILT SACK, TYP.
STORM SEWER INLET
SILT SACK, TYP.
STORM SEWER INLET
SILT SACK, TYP.
EROSION EELS, TYP.
EROSION EELS, TYP.
EROSION EELS, TYP.
CONCRETE WASTE
MANAGEMENT
EROSION EELS, TYP.
EROSION EELS, TYP.
CONSTRUCTION
ACCESS ROAD
STORM SEWER INLET SILT SACK, TYP.
SILT FENCE
LIMITS OF CONSTRUCTION
N. CAMPUS PARKING GARAGE
E. WITHROW ST.
25.00'
50.00'
EXISTING PARKING GARAGE ENTRY DRIVE
EXISTING PARKING GARAGE EXIT DRIVE
8.00'
10.00'
LIMITS OF CONSTRUCTION
PROPOSED INDEX CONTOUR (TYP.)
PROPOSED CONTOUR (TYP.)
STORM SEWER INLET SILT SACK
SILT FENCE
CONSTRUCTION ACCESS ROAD
CONCRETE WASTE MANAGEMENT
EROSION EELS
SHEET NOTES
KEYED NOTES
1. SEE SHEETS C-1.1 AND C-1.2 FOR ADDITIONAL NOTES AND DETAILS
RELATED TO EROSION CONTROL MEASURES DEPICTED ON THIS
DRAWING.
2. CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED PRIOR TO
BEGINNING WORK.
3. ACCESS TO AND FROM THE EXISTING PARKING GARAGE SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION. TEMPORARY
CLOSURES WILL ONLY BE ALLOWED AS COORDINATED WITH, AND
APPROVED BY OWNER.
4. SITE SIGNAGE SHALL CONFORM TO MANUAL OF UNIFORM TRAFFIC
CONTROL DEVICES,(MUTCD) LATEST EDITION.
870
870
S1
C-1.2
S2
C-1.2
S3
C-1.2
S5
C-1.2
S4
C-1.2
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
STORMWATER POLLUTION
PREVENTION PLAN
PROJECT NORTH
1" = 20'
C-1.0
Feet
0 20 40
PROJECT NAME: NORTH CAMPUS GARAGE AND MIAMI INN SURFACE PARKING LOT RENOVATIONS
PROJECT ADDRESS: WITHROW STREET, OXFORD, OH, 45056
CONSTRUCTION SITE OPERATORS: WHITING TURNER
SWPPP AUTHOR:
NAME: JOE WYWROT
COMPANY: SMITHGROUPJJR
ADDRESS: 201 DEPOT STREET, SECOND FLOOR, ANN ARBOR, MI 48104
PHONE #: (734) 669-2679
ESTIMATED CONSTRUCTION START DATE: JULY, 2016
ESTIMATED CONSTRUCTION END DATE: AUGUST, 2016
PROJECT DESCRIPTION:
THE PROJECT CONSISTS OF RENOVATION OF A PORTION OF THE MIAMI UNIVERSITY CAMPUS WHICH IS
BOUNDED BY WITHROW STREET TO THE NORTH, THE WITHROW STREET PARKING STRUCTURE TO THE SOUTH,
THE PARKING STRUCTURE ENTRY DRIVE TO THE WEST, AND THE PARKING STRUCTURE EXIT DRIVE TO THE
EAST.
THE PROJECT INCLUDES A COMPLETE RENOVATION OF THE WITHROW STREET PARKING LOT AND A PARTIAL
RENOVATION OF THE MIAMI INN PARKING LOT.
THE IMPROVEMENTS WILL BE CONSTRUCTED WITHIN PROPERTY OWNED BY MIAMI UNIVERSITY.
TOTAL SITE AREA = 1.27 ACRE (55,485 SQUARE FEET)
TOTAL DISTURBED AREA = 1.22 ACRE (53,232 SQUARE FEET)
EXISTING IMPERVIOUSNESS = 46.1%
PROPOSED IMPERVIOUSNESS = 88.7%
EXISTING RUNOFF COEFFICIENT, C(EX) = 0.60
PROPOSED RUNOFF COEFFICIENT, C(PR) = 0.91
TWO SOIL TYPES EXIST ON THE SITE, RUSSELL-MIAMIAN SILTY LOAM AND RUSSEL-URBAN LAND COMPLEX PER
THE USDA SOIL SURVEY FOR BUTLER COUNTY, OHIO
RUNOFF FROM THE PROJECT SITE WILL DISCHARGE TO THE MIAMI UNIVERSITY STORM SEWER SYSTEM.
SEQUENCE OF CONSTRUCTION:
1. OBTAIN ALL REQUIRED PERMITS.
2. INSTALL SILT FENCE, AND OTHER BMP MEASURES ACCORDING TO PLANS AND AS DETERMINED BY A/E
AND/OR MIAMI UNIVERSITY.
3. INSTALL CONSTRUCTION ACCESS DRIVES AT ALL ENTRANCE/EXIT LOCATIONS FROM EXISTING ROADS.
4. REMOVE LAWN AND TOPSOIL ACCORDING TO PLANS.
5. DEMOLISH/REMOVE EXISTING STRUCTURES AND UTILITIES ACCORDING TO PLANS.
6. PERFORM MASS EXCAVATION OPERATIONS, GRADE THE SITE AND INSTALL UTILITIES.
7. INSTALL INLET PROTECTION AT ALL NEW STORM SEWER STRUCTURES AS THEY ARE CONSTRUCTED.
8. CONSTRUCT PARKING LOTS.
9. PERMANENTLY STABILIZE AREAS TO BE VEGETATED IMMEDIATELY AS THEY ARE BROUGHT TO FINAL
GRADE.
10. ONCE THE SITE HAS BEEN FULLY STABILIZED, REMOVE SILT FENCE, INLET PROTECTION DEVICES, AND
OTHER TEMPORARY BMP MEASURES.
STORM WATER POLLUTION PREVENTION PLAN NOTES:
1. FOR PROTECTION OF UNDERGROUND UTILITIES, CALL THE OHIO UTILITIES PROTECTION SERVICE
AT 1-800-362-2764 A MINIMUM OF 48 HOURS PRIOR TO EXCAVATING.
2. ALL MATERIAL AND CONSTRUCTION WILL BE IN ACCORDANCE WITH THE CONSTRUCTION
STANDARDS AND SPECIFICATIONS FOR THE PROJECT. ALL WORK WILL BE IN COMPLIANCE WITH
ALL APPLICABLE FEDERAL AND STATE STANDARDS AND REGULATIONS. IF THERE SHOULD ARISE
ANY CONFLICT BETWEEN ANY NOTES AND/OR DETAILS ON THE APPROVED DRAWINGS OR
SPECIFICATIONS FOR THE PROJECT, THIS NOTE WILL SUPERCEDE AND GOVERN UNLESS THERE IS
A WRITTEN SIGNED DOCUMENTATION STATING OTHERWISE.
3. ALL CONSTRUCTION AND DEMOLITION DEBRIS (C&DD) WASTE SHALL BE DISPOSED OF IN AN OHIO
EPA APPROVED C&DD LANDFILL AS REQUIRED BY OHIO REVISED CODE (ORC) 3714.
4. NO KNOWN TOXIC OR HAZARDOUS MATERIALS EXIST ON SITE. IF SUSPICIOUS OR HAZARDOUS
MATERIAL IS DISCOVERED DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY A/E AND OWNER. ALL TOXIC AND HAZARDOUS MATERIALS SHALL BE
LEGALLY DISPOSED OF PER LOCAL LAWS AND REGULATIONS.
5. IF SOIL CONTAMINATION OCCURS DUE TO PETROLEUM OR OTHER CHEMICAL SPILLS, ALL
CONTAMINATED SOILS SHALL BE TREATED AND/OR DISPOSED OF IN AN OHIO EPA APPROVED
SOLID WASTE MANAGEMENT FACILITY OR HAZARDOUS WASTE TREATMENT, STORAGE OR
DISPOSAL FACILITY (TSDF).
SOIL EROSION AND SEDIMENTATION CONTROL NOTES:
1. UNDER THE RULES OF THE FEDERAL WATER POLLUTION CONTROL ACT (40 CFR 122), THE OHIO WATER
POLLUTION CONTROL ACT (CHAPTER 6111.04), AND OHIO EPA PERMIT NO. OHC000004, THE CONTRACTOR
SHALL ACT AS THE “PERMITTEE” AND WILL BE FULLY RESPONSIBLE FOR ADMINISTERING THE EROSION
CONTROL PROGRAM THROUGHOUT THE DURATION OF THE CONTRACT. UNDER THIS ACT, THE
CONTRACTOR WILL BE RESPONSIBLE FOR SUBMITTING THE NOTICE OF INTENT FORM ((NOI)(NPDES
GENERAL PERMIT)), PAY ALL ASSOCIATED FEES, AND ABIDE BY ALL REQUIREMENTS IDENTIFIED UNDER THIS
ACT AND AS NOTED ON THE PLANS AND SPECIFICATIONS. THE NOI SHALL NOT BE TRANSFERRED TO A
SECOND PARTY WITHOUT PRIOR WRITTEN AUTHORIZATION FROM THE OWNER. THE NOI SHALL BE SENT TO
THE FOLLOWING LOCATION:
OHIO ENVIRONMENTAL PROTECTION AGENCY
OFFICE OF FISCAL ADMINISTRATION
PO BOX 1049
COLUMBUS, OHIO 43216-1049
THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING THE NOI FORM AT LEAST 7 DAYS PRIOR TO
THE COMMENCEMENT OF CONSTRUCTION.
2. ALL PENALTIES AND FINES ASSOCIATED WITH VIOLATIONS ASSOCIATED WITH NOT FILING THE NOI OR
DISCHARGING POLLUTANTS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND ITS
SUBCONTRACTORS.
3. THE A/E WILL PREPARE THE STORMWATER POLLUTION AND PREVENTION PLAN (SWP3) THAT WILL BE
MAINTAINED ON SITE AT ALL TIME BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
SIGNING THE SWP3 AND MAKE ALL NECESSARY REVISIONS IN ACCORDANCE WITH ORC SECTION 6114.04,
OAC CHAPTER 3745-1 AND THE TERMS AND CONDITIONS OF THE NOI. THE CONTRACTOR SHALL PROVIDE
AN EXECUTED COPY OF THE SWP3, INCLUDING ALL REVISIONS, TO THE A/E.
4. THE PERMITTEE SHALL MAINTAIN A WRITTEN DOCUMENT CONTAINING THE SIGNATURES OF ALL
CONTRACTORS AND SUBCONTRACTORS INVOLVED IN THE IMPLEMENTATION OF THE SWP3 AS PROOF
ACKNOWLEDGING THAT THEY UNDERSTAND THE CONDITIONS AND RESPONSIBILITIES OF THE SWP3. THE
DOCUMENT AND ALL SIGNATURES SHALL BE OBTAINED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION
AND SHALL BE KEPT ON SITE WITH THE SWP3.
5. UNDER THE RULES OF THE OHC000004 PART III.G.2.i, THE CONTRACTOR SHALL PROVIDE A “QUALIFIED”
INSPECTOR WHO WILL BE RESPONSIBLE FOR ALL REPORTING AND COMPLIANCE WITH THE SWP3. THE
INSPECTOR'S DUTIES SHALL INCLUDE:
· PERFORM ALL SWP3 INSPECTIONS, REPORTING, AND LOGS. INSPECT ALL EROSION CONTROL MEASURES
WEEKLY AND WITHIN 24 HOURS AFTER ALL RAIN EVENTS THAT EXCEED ½ INCH OVER A 24 HOUR DURATION.
· FOLLOWING EACH INSPECTION, COMPLETE, SIGN AND DATE THE PREPARED CHECKLIST IN ACCORDANCE
WITH PART III.G.2.i.
· MAINTAIN ALL CHECKLISTS ON SITE FOR INSPECTION BY THE STATE WHEN REQUESTED. INSPECTION
RECORDS SHALL BE KEPT FOR 3 YEARS AFTER TERMINATION OF CONSTRUCTION ACTIVITIES IN
ACCORDANCE WITH PART V.G.
6. ALL EROSION CONTROL MEASURES SHALL MEET THE STANDARDS AND SPECIFICATIONS IN THE CURRENT
EDITION OF OHIO'S RAINWATER AND DEVELOPMENT MANUAL AND RELEVANT INFORMATION AND DETAILS
PROVIDED ON THE SWP3. THE FOLLOWING MINIMUM CRITERIA SHALL BE MET BY THE CONTRACTOR:
· TEMPORARY STABILIZATION: COMPLY WITH OHIO EPA PERMIT NO. OHC000004 PART II.B TABLE 2:
TEMPORARY STABILIZATION. TEMPORARY SEED AND MULCH IN ALL AREAS THAT WILL BE INACTIVE FOR 14
DAYS OR MORE AND WHICH DO NOT REQUIRE IMMEDIATE SOIL STABILIZATION. ALL DISTURBED AND
ERODED EARTH SHALL BE REGRADED AND SEEDED WITHIN 7 DAYS. CONTRACTOR SHALL SUBMIT
TEMPORARY SEED MIX FOR APPROVAL.
- ANY DISTURBED AREA WITHIN 50 FEET OF A STREAM AND NOT AT FINAL GRADE SHALL BE
TEMPORARILY SEEDED AND MULCHED WITHIN 2 DAYS OF THE MOST RECENT DISTURBANCE IF THAT
AREA WILL REMAIN IDLE FOR MORE THAN 14 DAYS.
- ALL OTHER DISTURBED AREAS GREATER THAN 50 FEET FROM A STREAM AND NOT AT FINAL GRADE
SHALL BE TEMPORARILY SEEDED AND MULCHED WITHIN 7 DAYS OF THE MOST RECENT
DISTURBANCE IF THAT AREA WILL REMAIN IDLE FOR MORE THAN 14 DAYS.
· PERMANENT STABILIZATION: COMPLY WITH OHIO EPA PERMIT NO. OHC000004 PART II.B TABLE 1:
PERMANENT STABILIZATION.
- ANY AREA THAT WILL LIE DORMANT FOR ONE YEAR OR MORE SHALL RECEIVE PERMANENT
STABILIZATION WITHIN 7 DAYS OF THE MOST RECENT DISTURBANCE.
- ANY AREA WITHIN 50 FEET OF A STREAM AND AT FINAL GRADE SHALL BE SEEDED WITHIN 2 DAYS OF
ACHIEVING FINAL GRADE.
- ALL OTHER AREAS GREATER THAN 50 FEET FROM A STREAM AND AT FINAL GRADE SHALL BE
SEEDED WITHIN 7 DAYS OF ACHIEVING FINAL GRADE.
7. THE CONTRACTOR SHALL CONDUCT ALL EXCAVATION, FILLING, GRADING, CONSTRUCTION, AND CLEAN-UP
OPERATIONS IN A MANNER SUCH THAT SEDIMENT, GENERATED BY WIND, WATER, OR VEHICLES, IS NOT
DISCHARGED INTO ANY STORM SEWER, DRAINAGE DITCH, RIVER, AIR, OR UNDERGROUND UTILITY SYSTEM.
WIND, WATER, AND VEHICULAR EROSION OF SOIL ON PROJECT SITE DUE TO CONSTRUCTION ACTIVITIES
FOR THIS PROJECT WILL NOT BE PERMITTED. PREVENT EROSION OF SOIL AND DEPOSITION OF SEDIMENT
ONTO OTHER PROPERTIES FROM THE PROJECT SITE DUE TO CONSTRUCTION ACTIVITIES FOR THIS
PROJECT. PREVENT WINDBLOWN SOIL FROM LEAVING THE PROJECT SITE. ANY MUD/SEDIMENT FLOW INTO
STREAM CHANNEL AND/OR WETLANDS MUST BE PROMPTLY REMOVED. IF SEDIMENT EXTENDS BEYOND THE
PROJECT LIMITS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AND RESTORATION OF ALL
SURFACES AND UTILITY SYSTEMS TO THE CONDITION THAT EXISTED PRIOR TO THE CONTRACT AWARD.
8. STAGE WORK TO MINIMIZE THE AREA OF EXPOSED SOIL, THEREBY REDUCING THE OPPORTUNITY FOR SOIL
EROSION.
9. SOIL EROSION AND SEDIMENTATION BEST MANAGEMENT PRACTICE (BMP) MEASURES WILL BE INSTALLED
PRIOR TO START OF ANY CONSTRUCTION AND WILL BE MAINTAINED AT ALL TIMES UNTIL CONSTRUCTION
HAS BEEN COMPLETED, INCLUDING ALL GRASS BEING WELL ESTABLISHED AND/OR PERMANENT EROSION
AND SEDIMENTATION BMP MEASURES ARE IN PLACE.
10. ALL BMP MEASURES WILL BE INSTALLED TO THE SATISFACTION OF THE OHIO ENVIRONMENTAL PROTECTION
AGENCY (EPA). THE OHIO EPA MAY REQUIRE WORK TO BE STOPPED AND THE STORM DRAINAGE OUTLET
TO BE PLUGGED, IF CONDITIONS BECOME UNSATISFACTORY.
11. REPAIR ALL BMP MEASURES AS REQUIRED DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE
FOR INSTALLING AND MAINTAINING ALL MEASURES. ANY BMP MEASURE THAT REQUIRES REPAIR OR
MAINTENANCE SHALL BE REPAIRED WITHIN 3 DAYS OF THE INSPECTION. ANY BMP MEASURE NOT MEETING
THE INTENDED FUNCTION OR MISSING MUST BE REPLACED/INSTALLED WITHIN 10 DAYS OF THE INSPECTION
AT NO COST TO THE OWNER.
12. ANY CATCH BASIN THAT RECEIVES STORMWATER FROM CONSTRUCTION ACTIVITIES SHALL RECEIVE INLET
PROTECTION.
- PERIODIC REMOVAL OF COLLECTED SILT AND SEDIMENTATION IS REQUIRED TO MAINTAIN
EFFECTIVENESS OF THE SILT TRAPS, FILTERS, AND BASINS. IF SEDIMENTATION OCCURS, INSTALL
OR CORRECT PREVENTATIVE MEASURES IMMEDIATELY AT NO COST TO THE OWNER. REPLACE ALL
MEASURES DETERMINED TO BE NON-FUNCTIONAL AT NO COST TO THE OWNER.
13. CONTRACTOR IS TO DESIGNATE A SITE DUMP/WASH AREA TO BE APPROVED BY A/E PRIOR TO STARTING
CONSTRUCTION FOR SUCH PURPOSES AS WASHING OUT CONCRETE TRUCKS AND DUMPING
NON-HAZARDOUS WASTE MATERIALS AND FOR MIXING OR STORING CHEMICAL COMPOUNDS FOR
CONSTRUCTION (I.E. FERTILIZERS, CONCRETE, ASPHALT, ETC.), SUBJECT TO THE SUPERVISION OF THE
OHIO EPA. DUMPING OR DISCHARGE OF ANY WASTE MATERIALS TO ANY LUCAS COUNTY SEWERS IS
PROHIBITED. HAZARDOUS WASTES ARE TO BE REMOVED OFF SITE AND PROPERLY DISPOSED OF
CONSISTENT WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS.
14. KEEP DUST DOWN AT ALL TIMES, INCLUDING DURING NON-WORKING PERIODS. SPRINKLE OR TREAT WITH
DUST SUPPRESSANTS, THE SOIL AT THE SITE, HAUL ROADS, AND OTHER AREAS DISTURBED BY
OPERATIONS. CHLORIDE, OIL, OR OTHER NON-WATER MATERIAL IS NOT PERMITTED. PREVENT TRACKING
OR FLOWING OF MUD AND SEDIMENT ONTO PUBLIC OR PRIVATE ROADS OR DRIVES. PROMPTLY REMOVE
ALL MUD AND DIRT THAT ACCUMULATES ONTO PUBLIC ROADS AND PRIVATE DRIVES. STREET CLEANING
SHALL BE PERFORMED AS REQUIRED OR DIRECTED. DRY POWER BROOMING IS NOT PERMITTED.
15. SHOULD IT BE NECESSARY FOR THE CONTRACTOR TO DO ANY DEWATERING DURING THE COURSE OF
CONSTRUCTION, THE CONTRACTOR SHALL FILTER ALL DISCHARGE THROUGH A DISCHARGE FILTER BAG OR
OTHER SEDIMENT CONTROL DEVICE THAT WILL FILTER ALL DISCHARGE WATER. NO DEWATERING
DISCHARGE SHALL BE ALLOWED TO FLOW UNFILTERED FROM THE CONSTRUCTION SITE. ALL STRUCTURES
SHALL BE ASSEMBLED ON VEGETATED SURFACES.
16. AT THE CONTRACTOR'S DISCRETION, TEMPORARY DITCHES MAY BE CONSTRUCTED ACROSS AREAS OF THE
SITE TO IMPROVE SITE DRAINAGE FOLLOWING RAIN EVENTS AND PERIODIC FLOODING. IN ALL CASES,
STONE FILTERS SHALL BE INSTALLED AT ALL OUTLETS ALONG THE LIMITS OF CONSTRUCTION AND SILT
FENCE SHALL BE KEYED INTO THE SIDES OF THE FILTER TO CREATE A CONTINUOUS BARRIER. STONE
FILTERS SHALL ALSO INCLUDE A 5'L X3'W 2'D SUMP EXCAVATED IMMEDIATELY UPSTREAM FROM THE FILTER.
INSTALL STONE FILTERS AND SUMPS 150 FEET APART WITHIN EACH TEMPORARY DITCH.
17. ANY MATERIAL STOCKPILES LEFT OVERNIGHT OUTSIDE A PROTECTED AREA SHALL BE SURROUNDED BY A
SILT FENCE.
IMMEDIATELY PRIOR TO MIAMI UNIVERSITY TAKING RESPONSIBILITY OF THE SITE, THE CONTRACTOR SHALL
18. IMMEDIATELY PRIOR TO MIAMI UNIVERSITY TAKING RESPONSIBILITY OF THE SITE, THE CONTRACTOR SHALL
CLEAN CATCH BASINS AFFECTED BY THE CONSTRUCTION, BOTH WITHIN THE CONTRACT LIMITS AND IN ALL
SURROUNDING ROADS AND LAWN AREAS WHERE SOIL MAY HAVE SPREAD DUE TO CONSTRUCTION
ACTIVITIES.
19. IF EROSION OR SEDIMENTATION OCCURS DUE TO NON-COMPLIANCE WITH THESE REQUIREMENTS,
IMMEDIATELY REMOVE DEPOSITED SEDIMENT OR RESTORE ERODED AREAS AT NO COST TO THE OWNER.
OWNER WILL DEDUCT PAYMENT TO CONTRACTOR EQUIVALENT TO ANY FINES RESULTING FROM
NON-COMPLIANCE WITH APPLICABLE REGULATIONS.
20. IN ADDITION TO THE EROSION CONTROL MEASURES IDENTIFIED ON THE SWP3, ANY SUPPLEMENTAL
MEASURES REQUIRED FOR SITE SPECIFIC REMEDIES SHALL BE CONSTRUCTED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL REFERENCE OHC000004 PART III.G.2.d AND e
IN ITS ENTIRETY.
21. ANY PARTY (TYPICALLY THE GENERAL CONTRACTOR) WHO HAS DAY-TO-DAY OPERATIONAL CONTROL OF
ACTIVITIES AT THIS PROJECT, WHICH ARE NECESSARY TO ENSURE COMPLIANCE WITH THE SWP3 FOR THE
SITE OR OTHER CONDITIONS SET FORTH IN THE PERMIT, MUST FILE A CO-PERMITTEE NOI WITH THE OHIO
EPA. THIS IS THE SOLE RESPONSIBILITY OF THE CO-PERMITTEE AND SHALL BE DONE IN 21 DAYS BEFORE
GROUND IS BROKEN.
EROSION EEL GENERAL NOTES:
1. EROSION EELS™ USED IN PERIMETER CONTROL APPLICATIONS SHALL HAVE A SPECIFICATION MIXTURE 1.1 OR 1.2.
a. MIXTURE SPECIFICATION 1.1. A FILTER MIXTURE COMPRISED OF 50% SHREDDED RUBBER AND 50% WOOD
CHIP PARTICLES BY VOLUME. THE SHREDDED RUBBER SHALL BE WASHED AND PROCESSED TO REMOVE
MOST, IF NOT ALL, METAL COMPONENTS. THE RUBBER SHALL BE DERIVED FROM RECYCLED TIRES AND SHALL
BE SHREDDED TO PRODUCE A MAXIMUM PARTICLE SIZE OF +/- 3/4 INCH. THE WOOD CHIPS SHALL BE
PRODUCED FROM HARDWOOD TREES AND SHALL CONFIRM TO AASHTO CERTIFICATION SPECIFICATION MP
9-03.
b. MIXTURE SPECIFICATION 1.2. A FILTER MIXTURE COMPRISED OF 1/3 SHREDDED RUBBER, 1/3 WOOD CHIPS,
AND 1/3 RECYCLED SYNTHETIC FIBERS. THE SHREDDED RUBBER SHALL BE WASHED AND PROCESSED TO
REMOVE MOST, IF NOT ALL, METAL COMPONENTS. THE RUBBER SHALL BE DERIVED FROM RECYCLED TIRES
AND SHALL BE SHREDDED TO PRODUCE A MAXIMUM PARTICLE SIZE OF +/- 3/4 INCH. THE WOOD CHIPS SHALL
BE PRODUCED FROM HARDWOOD TREES AND SHALL CONFIRM TO AASHTO CERTIFICATION SPECIFICATION MP
9-03. THE SYNTHETIC FIBERS SHALL BE PRODUCED FROM RECYCLED, MANUFACTURED MATERIALS, SUCH AS,
BUT NOT LIMITED TO, PRE-CONSUMER SCRAP CARPET, TIRE CHORD, AND TIRE FIBER MATERIALS.
2. EROSION EELS™ SHALL BE MANUFACTURED FROM A WOVEN GEOTEXTILE COVERING WITH INTERIOR FILTER
MATERIALS SUCH AS 100% SHREDDED RUBBER (MIXTURE SPECIFICATION 1.0, 50% SHREDDED RUBBER/50%
AASHTO-CERTIFIED WOOD CHIPS (MIXTURE SPECIFICATION 1.1).
3. LENGTHS OF EROSION EELS™ SHALL BE EITHER A NOMINAL +/-10 FT. OR +/- 4.5 FT. NOMINAL DIAMETER SHALL BE
+/-9.5 INCHES.
4. EROSION EELS™ CAN BE PLACED AT THE TOP, ON THE FACE, OR AT THE TOE OF SLOPES TO INTERCEPT RUNOFF,
REDUCE FLOW VELOCITY, RELEASE THE RUNOFF AS SHEET FLOW AND PROVIDE REMOVAL OF SEDIMENT FROM THE
RUNOFF.
5. EROSION EELS™ SHALL BE INSTALLED ALONG THE GROUND CONTOUR, AT THE TOE OF SLOPES, AT AN ANGLE TO
THE CONTOUR TO DIRECT FLOW AS A DIVERSION BERM, AROUND INLET STRUCTURES, IN A DITCH AS A CHECK DAM
TO HELP REDUCE SUSPENDED SOLIDS LOADING AND RETAIN SEDIMENT, OR AS A GENERAL FILTER FOR ANY
DISTURBED SOIL AREA.
6. NO TRENCHING IS REQUIRED FOR INSTALLATION OF EROSION EELS™
7. PREPARE BED FOR EEL INSTALLATION BY REMOVING ANY LARGE DEBRIS INCLUDING ROCKS, SOIL CLODS, AND
WOODY VEGETATION. EROSION EELS™ CAN ALSO BE PLACED OVER PAVED SURFACES INCLUDING CONCRETE AND
ASPHALT WITH NO SURFACE PREPARATION REQUIRED.
8. RAKE BED AREA WITH A HAND RAKE OR BY DRAG HARROW.
9. DO NOT PLACE EEL DIRECTLY OVER RILL AND GULLIES UNTIL AREA HAS BEEN HAND-EXCAVATED AND RAKED TO
PROVIDE A LEVEL BEDDING SURFACE. ALL SURFACES SHALL BE UNIFORMLY COMPACTED FOR MAXIMUM SEATING
OF EELS™ IN PLACE.
10. FOR LOCATIONS WHERE EELS™ WILL BE PLACED IN CONCENTRATED FLOWS (SUCH AS CHECK DAMS, INLET
PROTECTION) AND FOR PERIMETER CONTROLS AT PRIMARY DISCHARGE LOCATIONS, BED THE EELS™ IN A FLOCMAT
CRADLE PER THE DETAILED DRAWINGS.
11. FOR DITCH APPLICATIONS, THE MAXIMUM DRAINAGE AREA SHALL BE 10 ACRES.
12. IF MORE THAN ONE EROSION EEL IS PLACED IN A ROW, THE EELS™ SHALL BE OVERLAPPED A MINIMUM OF 12 INCHES
TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT. COMPRESS THE TWO EELS™ OF THE
OVERLAP TIGHTLY TOGETHER EITHER BY HAND OR MANUFACTURER-APPROVED MECHANIZED MEANS.
13. WHEN USED IN DITCHES AS A CHECK DAM, EROSION EELS™ SHALL BE INSTALLED PER MANUFACTURER'S DETAILS.
14. FOR CHECK DAM APPLICATIONS, EROSION EELS™ SHALL BE PLACED PERPENDICULAR TO THE FLOW OF THE WATER.
EROSION EELS™ SHALL CONTINUE UP THE SIDES SLOPES A MINIMUM OF 3 FEET ABOVE THE DESIGN FLOW DEPTH.
15. EROSION EELS™ SHALL REMAIN IN PLACE UNTIL FULLY ESTABLISHED VEGETATION HAS COMPLETELY DEVELOPED
OR UNTIL THE STORAGE CAPACITY/FUNCTIONAL LIFE OF THE EEL HAS BEEN EXHAUSTED (REQUIRING REPLACEMENT
WITH NEW EELS™).
16. ANCHORING POSTS FOR CHECK DAM APPLICATIONS SHALL HAVE A MINIMUM WEIGHT OF 1.25 LBS/FT STEEL T-POSTS
(5 TO 7 FT. LENGTHS) ROLLED FROM HIGH CARBON STEEL. POSTS SHOULD BE HOT-DIP GALVANIZED OR COATED
WITH A WEATHER-RESISTANT PAINT FOR STEEL APPLICATION. POSTS SHOULD BE EQUIPPED WITH A METAL ANCHOR
PLATE. INSTALL PER DETAILS ON THIS SHEET.
17. PLACE T-POSTS THROUGH HANDLE OF BAGS. DO NOT DRIVE POSTS THROUGH EROSION EELS™ . T-POSTS ARE TO BE
EMBEDDED A MINIMUM OF 2 FT INTO GROUND.
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
PARKING LOT SWPPP
NOTES
NO SCALE
C-1.1
10'-0" MAX
18"MIN
ELEVATION
6"
6"
18"MIN
FABRIC ANCHOR DETAIL
DIRECTION OF FLOW
NOTES:
1. TEMPORARY SILT FENCE SHALL BE INSTALLED PRIOR TO ANY GRADING WORK IN THE AREA TO BE PROTECTED. THEY SHALL BE MAINTAINED THROUGHOUT THE
CONSTRUCTION PERIOD AND REMOVED IN CONJUNCTION WITH THE FINAL GRADING AND SITE STABILIZATION.
2. FENCE POSTS SHALL BE WOOD POSTS WITH A MINIMUM CROSS-SECTIONAL AREA OF 3.0 SQ. IN.
STEP 1
STEP 2
STEP 3
FILTER FABRIC
POSTS
FASTENER-MIN. NO. 16 GAUGE WIRE, 4 PER POST REQUIRED (EVENLY SPACED), TYP.
UNDISTURBED SUBGRADE
COMPACTED BACKFILL
EXTENDED FILTER FABRIC TO 6" BELOW GRADE
ATTACHMENT STEPS:
1. PLACE THE END POST OF THE SECOND FENCE INSIDE THE END POST OF THE FIRST FENCE.
2. ROTATE BOTH POSTS AT LEAST 180 DEGREES IN A CLOCKWISE DIRECTION TO CREATE A
TIGHT SEAL WITH THE FABRIC MATERIAL.
3. DRIVE BOTH POSTS A MINIMUM OF 18 INCHES INTO THE GROUND AND BURY THE FLAP.
1'-8"MIN
EXISTING GRADE
2"-3" CRUSHED ROCK (8" DEPTH)
NON-WOVEN GEOTEXTILE FABRIC
EXISTING PAVEMENT
50' MINIMUM LENGTH
LENGTH OF STABILIZED ROAD
50' MINIMUM LENGTH
LENGTH OF STABILIZED ROAD
1
2
3
4
4
1
2
3
2
PLAN VIEW
ELEVATION
25'
WIDTH
MIN.
RECTANGLE INLET FILTERSROUND INLET FILTER
GENERAL NOTES:
1. INLET PROTECTION SHALL BE NON-BLACK IN COLOR AND SHALL HAVE THE NAME
OF THE CONTRACTOR WRITTEN OR ATTACHED TO IT.
2. TEMPORARY INLET SEDIMENT FILTER TO BE INSTALLED ON ALL CATCH BASINS AND
STORM INLETS NOTED ON DRAWINGS. CLEAN FILTER AS NEEDED.
3. INLET FILTERS TO BE FLEXSTORM INLET FILTERS AS MANUFACTURED BY
ADVANCED DRAINAGE SYSTEMS, INC. (800-821-6710) OR SIMILAR PRODUCT.
GALVANIZED STEEL FRAME
LIFT HANDLES
STAINLESS STEEL LOCKING BAND
OVERFLOW FEATURE
GEOTEXTILE FILTER BAG WITH REINFORCED POLYESTER OUTER MESH
REAR CURB GUARD FLAP INCLUDED FOR CURB BOX INLET FILTERS
EROSION EEL™
SHEET FLOW
BUTT JOINT ENLARGEMENT
PLAN VIEW
BUTT ENDS OF EEL TOGETHER AND JOIN
TIGHTLY WITH JUNCTION WRAP (PER BUTT
JOINT ENLARGEMENT THIS SHEET)
ANCHOR LOOP TYP.
(4 PER 10 FT. BAG)
EROSION EEL™
TIE-STRING END OF EELSEWN SEAM EDGE
TO FORM BUTT JOINT, PRESS TIED END OF
EEL AGAINST SEWN EDGE OF ADJACENT EEL
CONSTRUCTION FENCE
EROSION EEL™
FLOCMAT CRADLE UNDER EROSION EEL™
PER MANUFACTURER'S REQUIREMENTS
SECTION VIEW
PLAN
10 MIL.
PLASTIC LINING
STRAW BALE
STAKE
TYP.
TYP.
10' MIN.
8'
(TYPE "ABOVE GRADE"
WITH STRAW BALES)
STAPLE DETAIL
4"
2"
1/8" DIA.
STEEL WIRE10 MIL.
PLASTIC LINING
STRAW BALE
FINISH
GRADE
STAPLES
(2 PER BALE)
BINDING
WIRE
NATIVE MATERIAL
(OPTIONAL)
SECTION B-B
CONCRETE
WASHOUT
3'
3'
PLYWOOD
48" X 24"
PAINTED
WHITE
BLACK LETTERS -
6" HEIGHT
0.5" LAG SCREWS
WOOD POST
3" X 3" X 8'
CONCRETE WASHOUT SIGN DETAIL
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOTES:
1. ACTUAL LAYOUT DETERMINED IN THE FIELD.
2. THE CONCRETE WASHOUT SIGN SHALL BE
INSTALLED WITHIN 30 FT. OF THE TEMPORARY
CONCRETE WASHOUT FACILITY.
(OR EQUIVALENT)
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
NTS.
SILT FENCE
S1
1" = 1'
CONSTRUCTION ACCESS ROAD
S2
NTS.
EROSION EELS
S4
NTS.
STORM SEWER INLET SILT SACK
S3
NTS.
CONSTRUCTION WASTE MANAGEMENT
S5
PARKING LOT SWPPP
DETAILS
AS NOTED
C-1.2
LIMITS OF CONSTRUCTION
FULL DEPTH
PAVEMENT REMOVAL
FULL DEPTH CONCRETE REMOVAL
TOPSOIL STRIPPING
UTILITY REMOVAL
STRUCTURE REMOVAL
TREE PROTECTION FENCE
INLET PROTECTION
CURB REMOVAL
CONSTRUCTION FENCE
(PER MIAMI UNIVERSITY STANDARD)
SHEET NOTES
KEYED NOTES
1. COORDINATE AREA TO STOCKPILE TOPSOIL WITH OWNER.
2. COORDINATE STAGING AREA WITH OWNER.
3. ACCESS TO AND FROM THE EXISTING PARKING GARAGE SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION. TEMPORARY
CLOSURES WILL ONLY BE ALLOWED AS COORDINATED WITH, AND
APPROVED BY OWNER.
4. SALVAGE EXISTING LIGHT POLES,LUMINARIES, AND EXISTING
SIGNAGE TO OWNER.
5. SAWCUT PAVEMENT AT NEAREST EXISTING JOINT. ALL SAWCUT
SECTIONS ARE TO PENETRATE THE STREET 2'.
6. SALVAGE ATM AND RETURN TO OWNER.
7. ACCESS TO AND FROM THE EXISTING PARKING GARAGE SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION. TEMPORARY
CLOSURES WILL ONLY BE ALLOWED AS COORDINATED WITH, AND
APPROVED BY OWNER.
8. SITE SIGNAGE SHALL CONFORM TO MANUAL OF UNIFORM TRAFFIC
CONTROL DEVICES,(MUTCD) LATEST EDITION.
REMOVE LIGHT POLE, TYP.
(SEE NOTE 4)
STRIP TOPSOIL
FULL DEPTH CONCRETE SIDEWALK REMOVAL
REMOVE TELEPHONE UTILITY LINE
SALVAGE EXISTING HANDICAPPED SIGN TO OWNER
(SEE NOTE 4)
REMOVE LIGHT POLE, TYP.
(SEE NOTE 4)
EXISTING CURB TO REMAIN, TYP.
REMOVE LIGHT POLE,TYP.
(SEE NOTE 4)
FULL DEPTH ASPHALT PAVEMENT REMOVAL
STRIP TOPSOIL
EXISTING FIRE HYDRANT TO REMAIN
PROTECT EXISTING
AREAWAY
STRIP TOPSOIL
REMOVE ATM AND CONCRETE PAD
(SEE NOTE 6)
SALVAGE EXISTING ELECTRONIC SIGN TO OWNER
(SEE NOTE 4)
INLET PROTECTION
REMOVE LIGHT POLE, TYP.
(SEE NOTE 4)
INLET PROTECTION
SALVAGE EXISTING SIGN TO OWNER
(SEE NOTE 4)
FULL DEPTH CONCRETE SIDEWALK REMOVAL
SAWCUT, TYP.
(SEE NOTE 5)
SAWCUT, TYP.
(SEE NOTE 5)
SAWCUT, TYP.
(SEE NOTE 5)
SALVAGE EXISTING PARKING LOT SIGN TO OWNER
(SEE NOTE 4)
REMOVE EXISTING CURB, TYP.
EXISTING CURB TO REMAIN, TYP.
SAWCUT AND REMOVE CURB
(SEE NOTE 5)
SAWCUT AND REMOVE CURB
(SEE NOTE 5)
E. WITHROW ST.
N. CAMPUS PARKING GARAGE
2.00'
49.55'
6.28'
6.42'
LIMITS OF CONSTRUCTION
38.23'
39.82'
STORM SEWER REMOVAL
ABANDONED STORM SEWER REMOVAL
6' HIGH CONSTRUCTION FENCE
(PER MIAMI UNIVERSITY STANDARD)
2 X 6" HIGH BY 10' WIDE
CONSTRUCTION SWING GATES
(PER MIAMI UNIVERSITY STANDARD)
6' HIGH CONSTRUCTION FENCE
(PER MIAMI UNIVERSITY STANDARD)
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
PARKING LOT DEMOLITION
PLAN
PROJECT NORTH
1" = 20'
C-2.0
Feet
0 20 40
CONCRETE CURB W/O GUTTER, TYP.
CONCRETE PAVEMENT, TYP.
SEEDED LAWN
ASPHALT PAVEMENT STANDARD DUTY
STONE MULCH
BLUE PAVEMENT MARKING FOR ADA MARKINGS, TYP.
CONCRETE PAVEMENT, TYP.
CONCRETE CURB W/O GUTTER, TYP.
ASPHALT PAVEMENT STANDARD DUTY
CONCRETE CURB W/ GUTTER, TYP.
SEEDED LAWN
STONE MULCH
PROTECT EXISTING AREAWAY
BUTT JOINT, TYP.
CONCRETE CURB W/ GUTTER, TYP.
CONCRETE PAVEMENT, TYP.
BUTT JOINT (TYP.)
BUTT JOINT (TYP.)
SIGN TYPE B, TYP.
LIMITS OF CONSTRUCTION
WHITE PAVEMENT MARKING 4" WIDE, TYP.
EXISTING CURB TO REMAIN
MEET EXISTING WALK, TYP.
MEET EXISTING WALK, TYP.
LIGHTPOLE, TYP.
(SEE ELECTRICAL SITE PLAN)
8.99'
9.00' (TYP.)
18.00'(TYP.)
R4.50'
R2.00'
24.00' (TYP.)
18.00'
25.00'
8.00'
24.00' (TYP.)
136.00'
18.00'24.00'18.00'18.00'24.00'18.00'18.00'24.00'18.00'
9.00'12.00'12.00'
R5.00'
R39.00'
R15.00'
R2.00'
9.00'11.29'
22.00' (TYP.)
9.00'(TYP.)
5.00' (TYP.)
18.00'(TYP.)
BARRIER FREE PAVEMENT MARKING, TYP.
SIGN TYPE A, TYP.
(SEE NOTE 2)
R3.00'
24.00'8.50'
43.98'
R4.00'
CONCRETE PAVEMENT, TYP.
ASPHALT PAVEMENT HEAVY DUTY
SIGN TYPE C, TYP.
(DIRECTING TRAFFIC NORTH)SIGN TYPE B, TYP.
EXISTING CURB TO REMAIN
45°0''
45°0''
4
C-6.0
4
C-6.0
4
C-6.0
SOUTHWEST LAYOUT ENLARGEMENT PLAN
NORTHWEST LAYOUT ENLARGEMENT PLAN
SOUTHEAST ENLARGEMENT PLAN
E. WITHROW ST.
N. CAMPUS PARKING GARAGE
LIGHTPOLE, TYP.
(SEE ELECTRICAL SITE PLAN)
6.83'
ALIGN JOINTS W/ ADJACENT SIDEWALK, V.I.F.
SEEDED LAWN
6.41'
R15.00'
R39.00'
CONCRETE CURB W/O GUTTER, TYP.
CONCRETE CURB W/O GUTTER, TYP.
3
C-3.1
1
C-3.1
17.00'
9.00'
2
C-3.1
ASPHALT PAVEMENT STANDARD DUTY
FLUSH CURB
LIMITS OF CONSTRUCTION
ASPHALT PAVEMENT STANDARD DUTY
CONCRETE PAVEMENT
ASPHALT PAVEMENT HEAVY DUTY
SEEDED LAWN
STONE MULCH
ODOT TYPE 2 STANDARD CURB W/
GUTTER
ODOT TYPE 7 STANDARD CURB W/O
GUTTER
FLUSH CURB
CURB TRANSITION
BARRIERFREE PAVEMENT MARKING
SIGNAGE (SEE NOTE 2)
SIGN TYPE A = BARRIER FREE
SIGN TYPE B = "DO NOT ENTER"
SIGN TYPE C = "ONE-WAY"
LIGHTPOLE, TYP.
(SEE ELECTRICAL PLANS)
TURNING PAVEMENT MARKINGS
(WHITE)
VERIFY IN FIELD
SHEET NOTES
KEYED NOTES
1. ACCESS TO AND FROM THE EXISTING PARKING GARAGE SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION. TEMPORARY
CLOSURES WILL ONLY BE ALLOWED AS COORDINATED WITH, AND
APPROVED BY OWNER.
2. SITE SIGNAGE SHALL CONFORM TO MANUAL OF UNIFORM TRAFFIC
CONTROL DEVICES,(MUTCD) LATEST EDITION.
3. ALL PAVEMENT MARKINGS RELATED TO BARRIERFREE PARKING
STALLS SHALL BE BLUE. ALL OTHER PAVEMENT MARKINGS SHALL
BE WHITE.
4. ALL DIMENSIONS ARE TO FACE OF CURB.
5. RESTORE PARKING GARAGE EXIT/ENTRY DRIVE PAVEMENT
SECTIONS AS NEEDED FOR INSTALLATION OF ELECTRICAL WIRING
FOR NEW SITE LIGHTING.
2
C-6.0
PARKING SUMMARY
58 EXISTING PARKING SPACES
128 PROPOSED PARKING SPACES
-5 BARRIERFREE SPACES INCLUDING 1 VAN ACCESSABLE
SPACE
1
2 TYPICAL PARKING SPACE:
18' LONG AND 9' WIDE
TYPICAL PARALLEL PARKING SPACE:
22' LONG AND 9' WIDE
TYPICAL PARKING DRIVE AISLE:
24' WIDE
5
C-6.0
3
C-6.0
1
C-6.0
7
C-6.0
6
C-6.0
8
C-6.0
9
C-6.0
11
C-6.1
10
C-6.1
V.I.F.
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
PARKING LOT MATERIALS
LAYOUT PLAN
PROJECT NORTH
1" = 20'
C-3.0
Feet
0 20 40
CONCRETE PAVEMENT
CONCRETE CURB W/O GUTTER, TYP.
CONCRETE CURB W/ GUTTER, TYP.
HEAVY DUTY ASPHALT
CONCRETE CURB W/ GUTTER, TYP.
STONE MULCH
BUTT JOINT
EXISTING CURB TO REMAIN
SIGN TYPE B, TYP.
STANDARD DUTY ASPHALT
R15.00' TO F/C
R39.00'TOF/C
24.90'TOF/C(MIN.)
MEET EXISTING CURB TO REMAIN
MEET EXISTING CURB TO REMAIN
1
C-6.0
END CONCRETE CURB W/O GUTTER
BEGIN CONCRETE CURB W/ GUTTER
END CONCRETE CURB W/O GUTTER
BEGIN CONCRETE CURB W/ GUTTER
N. CAMPUS PARKING GARAGE
CONCRETE CURB W/O GUTTER, TYP.
SIGN TYPE B, TYP.
ASPHALT PAVEMENT STANDARD DUTY
CONCRETE CURB W/O GUTTER
ASPHALT PAVEMENT HEAVY DUTY
CONCRETE CURB W/ GUTTER
STONE MULCH
BUTT JOINT
MEET EXISTING CURB TO REMAIN
R4.50'
R15.00'
R39.00'TOF/C
12.00'TOF/C12.00'TOF/C
PAVEMENT MARKING
SIGN TYPE B, TYP.
MEET EXISTING CURB TO REMAIN
SIGN TYPE B, TYP.
1
C-6.0
END CONCRETE CURB W/O GUTTER
BEGIN CONCRETE CURB W/ GUTTER
PARKING GARAGE EXIT DRIVE
SIGN TYPE C, TYP.
N. CAMPUS PARKING GARAGE
LIGHT POLE, TYP.
(SEE ELECTRICAL PLAN)
CONCRETE CURB W/O GUTTER
CONCRETE CURB W/ GUTTER
CONCRETE PAVEMENT
SIGN TYPE A, TYP.
CONCRETE PAVEMENT
CONCRETE CURB W/O GUTTER, TYP.
SEEDED LAWNEXISTING CURB TO REMAIN
CONCRETE CURB W/O GUTTER, TYP.
SEALED EXPANSION JOINT
LINE STRIPING
(WHITE)
EXISTING WALK
LINE STRIPING
(BLUE)
DETECTABLE WARNING
9.00'
9.00'5.00'9.00'9.00'8.00'9.00'
LIGHT POLE, TYP.
(SEE ELECTRICAL PLAN)
5.00' 18.18' FLUSH CURB, TYP.
5.00'
CURB
TRANSITION
CURB
TRANSITION
MEET EXISTING CURB TO REMAIN
TOOLED CONTROL JOINT, TYP.
SEALED EXPANSION JOINT
9
C-6.0
SIGN TYPE A-1, TYP.
5.00'9.00'
PARKING GARAGE ENTRY DRIVE
CONCRETE CURB W/O GUTTER, TYP.
E. WITHROW ST.
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
SCALE: 1"= 10'
NORTHWEST LAYOUT ENLARGEMENT PLAN
1
SCALE: 1"= 10'
SOUTHWEST LAYOUT ENLARGEMENT PLAN
2
SCALE: 1"= 10'
SOUTHEAST LAYOUT ENLARGEMENT PLAN
3
PARKING LOT MATERIAL
LAYOUT ENLARGEMENTS
PROJECT NORTH
1" = 10'
C-3.1
Feet
0 10 20
LIMITS OF CONSTRUCTION
SURFACE SLOPE, TYP.
SURFACE ELEVATION, TYP.
STORM DRAIN INLET
EXISTING STORM STRUCTURE
STORM SEWER PIPE
GRADING BREAKLINE
PROPOSED INDEX CONTOUR, TYP.
PROPOSED CONTOUR, TYP.
EXISTING CONTOUR, TYP.
SHEET NOTES
KEYED NOTES
1. EXISTING RIM ELEVATION SHALL BE FIELD VERIFIED
2. EXISTING INVERT OF EXISTING STRUCTURE SHALL BE FIELD
VERIFIED
3. PROPOSED FIELD INVERT MAY VARY, BASED ON PREVIOUS FILED
VERIFICATIONS OF EXISTING INVERTS AND RIM ELEVATIONS
4. REMOVE EXISTING PIPE; PATCH HOLE AND CORE NEW HOLE FOR
PROPOSED PIPE.
5. EXISTING STORM SEWER STRUCTURES SHALL BE FIELD VERIFIED
AS TO NOT HAVE THEM INTERFERE WITH THE PROPOSED ASPHALT
PAVING. ADJUST STRUCTURES AS NECESSARY TO MEET PROPOSED
ELEVATIONS.
6. ACCESS TO AND FROM THE EXISTING PARKING GARAGE SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION. TEMPORARY
CLOSURES WILL ONLY BE ALLOWED AS COORDINATED WITH, AND
APPROVED BY OWNER.
7. SITE SIGNAGE SHALL CONFORM TO MANUAL OF UNIFORM TRAFFIC
CONTROL DEVICES,(MUTCD) LATEST EDITION.
1
C1.0
D
870
870
870
876
876
877
878
876
875
875
875
TC 876.75 M.E.
TC 877.35 M.E.
TC 878.00 M.E.
TC 878.32 M.E.
TC 878.14 M.E.
TC 877.39 M.E.
TC 876.99 M.E. TC 876.63 M.E.
TC 876.24 M.E. TC 875.78 M.E.
TC 875.31 M.E.
TC 875.28 M.E.
TC 875.24 M.E.
TC 876.13 M.E.
TC 876.51 M.E.
TC 876.39 M.E.
TC 875.82 M.E.
TC 875.43 M.E.
TC 875.13 M.E.
875.58 875.43
875.43
875.16
875.28
875.64
874.75
875.64
875.31
875.65
875.65
875.37
876.11
875.34
875.53
875.63
876.22877.94
878.12
878.65
877.59
876.65
T/C 875.93
T/C 875.93
T/C 876.31
T/C 877.15
T/C ???
T/C 876.72
T/C 876.13
T/C 876.03
T/C 875.84
T/C 876.61
T/C 875.87
T/C 876.15
T/C 876.15
T/C 875.81
T/C 876.14
T/C 875.25
T/C 876.14
T/C 875.66
876
876
876
876
876
876
877
876.13
876.13
875.97
875.80
876.13
875.81
T/C 875.78
-2.1%
-1.7%
-1.6%
-0.8%
-2.4%
-1.2%
-2.4%
-1.7%
-0.6%
EX CB
PR RIM 874.84 (SEE NOTE 5)
EX RIM 875.11 (SEE NOTE 1)
EX CB
PR RIM 874.10 (SEE NOTE 5)
EX RIM 873.49 (SEE NOTE 1)
12" IE 871.39 N (SEE NOTE 2)
PR CB - 1
RIM 875.30
12" IE 870.33 NE (SEE NOTE 3)
12" IE 870.23 SW
PR CB - 2
RIM 874.96
12" IE 870.96 SW (SEE NOTE 3)
PR CB - 3
RIM 875.40
12" IE 871.40 S (SEE NOTE 3)
127 LF 12"
RCP STORM SEWER
@ 0.5%
25 LF
12" RCP STORM SEWER
@ 0.5% MIN
EXISTING STORM
STRUCTURE
SOUTHEAST GRADING ENLARGEMENT PLAN
NORTHWEST GRADING ENLARGEMENT PLAN
SOUTHWEST GRADING ENLARGEMENT PLAN
EX CB
PR RIM 875.10 (SEE NOTE 5)
EX RIM 875.02 (SEE NOTE 1)
12" IE 871.30 E (SEE NOTE 2)
18" IE 864.12 NW
12" IE 871.30 N
74 LF 12"
RCP STORM SEWER
@ 0.5%
(SEE NOTE 4)
EX CB
PR RIM 875.25 (SEE NOTE 5)
EX RIM 875.47 (SEE NOTE 1)
12" IE 869.86 NE (SEE NOTE 2)
24" IE 862.43 NW
18" IE 862.67 SE
24" IE 868.25 SW
15" IE 863.33 S
3
C-4.1
1
C-4.1
2
C-4.1
LIMITS OF CONSTRUCTION
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
PARKING LOT GRADING
AND DRAINAGE PLAN
PROJECT NORTH
1" = 20'
C-4.0
Feet
0 20 40
877
878
TC 877.39 M.E.
TC 877.52 M.E.
TC 877.84 M.E.
TC 878.04 M.E.
TC 878.14 M.E.
TC 878.32 M.E.
TC 878.52 M.E.
T/C 878.65
TC 878.56 M.E.
TC 878.58 M.E.
TC 878.46 M.E.
TC 878.28 M.E.
TC 878.10 M.E.
TC 877.90 M.E.
T/C 878.66
T/C 878.68
T/C 878.56
T/C 878.38
T/C ???
T/C 878.00
878.15
878.18
877.50
T/C 877.94
877.96
878.07
T/C 878.04 877.62
877.94
TC 877.23 M.E.
TC 877.09 M.E.
TC 877.00 M.E.
877.95
878.19
878.08
875
T/C 876.08
875.58
875.43
875.43
T/C 875.93
875.81
T/C 876.31
TC 875.91 M.E.
T/C 876.41
TC 875.97 M.E.
TC 875.75 M.E.
TC 876.45 M.E.
T/C 875.53
875.16
875.20
T/C 875.70
875.28
TC 875.78 M.E.
TC 875.40 M.E.
T/C 875.66
875.64
T/C 876.14
875.99
876.21
876
T/C 875.93
875.64
T/C 876.14
T/C 875.81
875.31
875.14
T/C 875.64
874.92
TC 875.42 M.E.
875.65
T/C 876.15
875.35
T/C 875.85
875.65
T/C 876.15
875.37
T/C 875.87
T/C 875.95
875.45 TC 875.81 M.E.
TC 875.91 M.E.
TC 876.10 M.E.
T/C 876.12
875.62
TC 875.15 M.E.
TC 875.23 M.E.
876
876
876
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
1" = 10'
NORTHWEST GRADING ENLARGEMENT PLAN
1
1" = 10'
SOUTHWEST GRADING ENLARGEMENT PLAN
2
1" = 10'
SOUTHEAST GRADING ENLARGEMENT PLAN
3
GRADING ENLARGEMENTS
PROJECT NORTH
1" = 10'
C-4.1
Feet
0 10 20
REMOVE EXISTING
LINE STRIPING
REMOVE TIMBER
RETAINING WALL (109 LF)
FULL DEPTH TREE
REMOVAL
REMOVE LAWN AND TOPSOIL
TILL 12" BELOW EXISTING
PAVEMENT AND 18" OF
ADJACENT WEARING COURSE
FOR BUTT JOINT
(885 SF)
REMOVE TIMBER
RETAINING WALL (109 LF)
FULL DEPTH TREE
REMOVAL
REMOVE LIGHT POLE
(SALVAGE TO OWNER)
REMOVE TIMBER
RETAINING WALL (109 LF)
FULL DEPTH TREE
REMOVAL
REMOVE LAWN AND TOPSOIL
TILL 12" BELOW EXISTING
PAVEMENT AND 18" OF
ADJACENT WEARING COURSE
FOR BUTT JOINT
(434 SF)
REMOVE LAWN AND TOPSOIL
TILL 12" BELOW EXISTING
PAVEMENT AND 18" OF
ADJACENT WEARING COURSE
FOR BUTT JOINT
(435 SF)
STANDARD DUTY
ASPHALT PAVEMENT
BF BF
NEW PARKING STALL
LINE STRIPING
(9' W X 18' L, TYP.)
2
C-6.0
ASPHALT BUTT JOINT
4
C-6.0
STANDARD DUTY
ASPHALT PAVEMENT
2
C-6.0
ASPHALT BUTT JOINT
4
C-6.0
STANDARD DUTY
ASPHALT PAVEMENT
2
C-6.0
ASPHALT BUTT JOINT
4
C-6.0
12EQUALSPACES@9'WIDE
(108.00')V.I.F.
TOPSOIL STRIPPING
PAVEMENT LINE STRIPING REMOVAL
UTILITY REMOVAL
STRUCTURE REMOVAL
FULL DEPTH TREE REMOVAL
EDGE OF BUTT JOINT
NEW PARKING SPACE LINE STRIPING
STANDARD DUTY ASPHALT PAVEMENT
LEGEND
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
MIAMI INN PARKING LOT
IMPROVEMENTS
PROJECT NORTH
1" = 20'
C-5.0
Feet
0 20 40
SCALE: 1" = 20'
SITE REMOVAL PLAN
1 SCALE: 1" = 20'
LAYOUT AND MATERIALS PLAN
2
NOTE:
1. EXISTING TOPOGRAPHIC SURVEY NOT AVAILABLE FOR MIAMI INN PARKING LOT AREA. FIELD VERIFY EXISTING CONDITIONS.
2. SLOPE ALL NEW PAVEMENT TO DRAIN FOLLOWING THE EXISTING ADJACENT PAVEMENT SLOPES.
4"
2"
EXPANSION OR CONTROL JOINT, TYP.
BROOMING TO BE PERPENDICULAR TO PEDESTRIAN TRAFFIC.
TROWEL CONCRETE BORDER AT ALL EDGES AND JOINTS.
LIGHT BROOM FINISH
NOTE: THIS DETAIL APPLIES TO ALL CONCRETE PAVEMENT,
INCLUDING 6 IN. CONCRETE PAVEMENT.
6"MIN
SUBGRADE
3" - 5" NATURAL LIMESTONE RIP RAP
GEOTEXTILE FABRIC
PARKING GARAGE
SLOPE SUBGRADE @ 1
4" / FOOT
AWAY FROM BUILDING
2"8"2"
ASPHALT TOP COURSE
ASPHALT LEVELING COURSE
COMPACTED AGGREGATE BASE
COMPACTED SUBGRADE
3"8"2"
ASPHALT TOP COURSE
ASPHALT LEVELING COURSE
COMPACTED AGGREGATE BASE
COMPACTED SUBGRADE
1'-6"
OVERLAP ASPHALT LEVELING
COURSE OF EXISTING PAVEMENT
WITH ASPHALT TOP COURSE OF
NEW PAVEMENT
SAWCUT EXISTING ASPHALT
PAVEMENT TO FULL DEPTH
SAWCUT AND REMOVE 1-1
2" ASPHALT
SURFACE COURSE OF EXISTING
PAVEMENT. FIELD VERIFY DEPTH
EXISTING ASPHALT
SURFACE COURSE
EXISTING AGGREGATE
BASE COURSE EXISTING PAVEMENT NEW PAVEMENT
EXISTING ASPHALT
LEVELING COURSE
6"6"
2"
WIDTH VARIES, SEE PLANS
MATCH
EXISTING
3:1 MAX GRADE
SLOPE VARIES
3:1 MAX GRADE
MATCH
EXISTING
CONCRETE WALK
6x6 6/6 42# /100 S.F.
WELDED WIRE FABRIC
COMPACTED
AGGREGATE BASE
COMPACTED SUBGRADENOTES:
1. CONSTRUCTION JOINTS: SURFACE OF
WALKS TO BE DIVIDED INTO EQUALLY
SPACED BLOCKS @ SIDEWALKS' WIDTHS
INTERVALS.
2. FINISH: BROOM FINISH WITH TOOLED
EDGE AND JOINTS.
3. STRENGTH: 4000 PSI 5% - 7% ENTRAINED
NOTES:
1. AT 90° ANGLE POINTS IN THE CURB LINE,
PLACE EXPANSION JOINTS IN THE "LONG
LEG" 18" FROM THE BACK OF CURB OF THE
"SHORT LEG"
2. ALL REINFORCING #4 REBAR, CONTINUOUS
BETWEEN EXPANSION JOINTS
9"
7
8
"
1'-2"
9"
4"
1'-6"
4"
5"
51
2" 13
4"
R2"
R2"
T/C (TOP OF CURB)
ELEVATION GIVEN
ON PLANS 1"/FT SLOPE
2"2"8"
ASPHALT LEVELING COURSE
ASPHALT SURFACE COURSE
COMPACTED AGGREGATE BASE
SUBGRADE
1" RADIUS5"
1"
1'-6"
1
2"
6"
6"6"
2"
CONCRETE WALK
6x6 6/6 42# /100 S.F.
WELDED WIRE FABRIC
COMPACTED AGGREGATE BASE
COMPACTED SUBGRADE
2"2"8"
COMPACTED AGGREGATE BASE
ASPHALT LEVELING COURSE
ASPHALT SURFACE COURSE
1'-6"
NOTES:
1. CONSTRUCTION JOINTS: SURFACE OF
WALKS TO BE DIVIDED INTO EQUALLY
SPACED BLOCKS @ SIDEWALKS' WIDTHS
INTERVALS.
2. FINISH: BROOM FINISH WITH TOOLED
EDGE AND JOINTS.
3. STRENGTH: 4000 PSI 5% - 7% ENTRAINED
6"
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
SCALE: 1"=1'
STONE MULCH
1
SCALE: 1" = 1'
ASPHALT PAVEMENT STANDARD DUTY
2 SCALE: 1" = 1'
ASPHALT PAVEMENT HEAVY DUTY
3
SCALE: 1"=1'
ASPHALT BUTT JOINT
4 SCALE: 1"=1'
6 IN CONCRETE PAVEMENT
5 SCALE: 1"=1'
CONCRETE TROWEL & BROOM FINISH
6
SCALE: 1"=1'
CURB AND GUTTER
7
SCALE: 1"=1'
CURB WITHOUT GUTTER
8
SCALE: 1"=1'
FLUSH CURB
9
SITE DETAILS
AS NOTED
C-6.0
JOINT SEALANT
TOP OF PAVEMENT
NOTE: BACKER ROD AND SEALANT PER
MANUFACTURER'S RECOMMENDATIONS
FOAM BACKER
ROD
EXPANSION JOINT
MATERIAL
1/4" CONTROL JOINT TO 1/4
DEPTH OF PAVEMENT
COMPACTED SUBGRADE
COMPACTED AGGREGATE BASE
CONCRETE PAVEMENT
FINISH GRADE PER PLAN AND PROFILES
FINAL BACKFILL (GRANULAR FILL UNDER PAVED AREAS, GENERAL SITE FILL UNDER NON-PAVED AREAS)
SLOPE PER OSHA SAFETY STANDARDS
INITIAL BACKFILL (GRANULAR BACKFILL)
PIPE MATERIAL AND SIZE PER PLAN AND PROFILE
BEDDING COURSE (GRANULAR BEDDING)
UNDISTURBED SUBGRADE
KEYED NOTES
O.D. ≤ 12", W = 30"
O.D. = 15" - 24", W = O.D.+18"
O.D. = 30" - 36", W = O.D.+24"
DETAIL NOTES
W = MAX.
TRENCH WIDTH
1'-0"
MIN.
4"
MIN.
O.D.
(614) 766-4896
Dublin, OH, 43016
6130 Wilcox RD.
Site Lighting and Electrical
Prater Engineering Associates, Inc.
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
North Campus Garage
and Miami Inn Surface
Parking Lot Renovations
MIAMI UNIVERSITY
OXFORD, OHIO
Owner:
DATEREVISSUED FOR
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ELECTRICAL ENGINEERING:
CIVIL ENGINEERING:
SCALE: 1"=1'
SEALED EXPANSION JOINT
10
SCALE: 1"=1'
CONTROL JOINT
11
SITE DETAILS
AS NOTED
C-6.1
NTS.
UTILITY TRENCH
13
NTS.
CATCH BASIN
14
North Campus Parking Garage
North Campus Parking Garage

Mais conteúdo relacionado

Mais procurados

Feasibility of ECS accommodation in Residential Plots
Feasibility of ECS accommodation in Residential PlotsFeasibility of ECS accommodation in Residential Plots
Feasibility of ECS accommodation in Residential Plots
Iram Aziz
 
Maharashtra State_Building bye laws (Gist)
Maharashtra State_Building bye laws (Gist)Maharashtra State_Building bye laws (Gist)
Maharashtra State_Building bye laws (Gist)
Khyati Tewari
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders Works
Maja Myall
 

Mais procurados (11)

Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3
Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3
Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
Feasibility of ECS accommodation in Residential Plots
Feasibility of ECS accommodation in Residential PlotsFeasibility of ECS accommodation in Residential Plots
Feasibility of ECS accommodation in Residential Plots
 
Maharashtra State_Building bye laws (Gist)
Maharashtra State_Building bye laws (Gist)Maharashtra State_Building bye laws (Gist)
Maharashtra State_Building bye laws (Gist)
 
Highlights of revised draft dcr 2034
Highlights of revised draft dcr 2034Highlights of revised draft dcr 2034
Highlights of revised draft dcr 2034
 
Cellular Communications Tower Regulations
Cellular Communications Tower RegulationsCellular Communications Tower Regulations
Cellular Communications Tower Regulations
 
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders Works
 
PUNE BYE LAWS
PUNE BYE LAWSPUNE BYE LAWS
PUNE BYE LAWS
 
Development Control Regulations, Mumbai - Key points
Development Control Regulations, Mumbai - Key pointsDevelopment Control Regulations, Mumbai - Key points
Development Control Regulations, Mumbai - Key points
 
Irving Park Elston TIF Establishing Documents
Irving Park Elston TIF Establishing DocumentsIrving Park Elston TIF Establishing Documents
Irving Park Elston TIF Establishing Documents
 

Semelhante a North Campus Parking Garage

15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan
Kevin Stober
 
NMohamed_PortfolioExtract
NMohamed_PortfolioExtractNMohamed_PortfolioExtract
NMohamed_PortfolioExtract
Nazima Mohamed
 
Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)
Sean Roper
 
Final Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaFinal Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur India
NIZAM ISMAIL
 

Semelhante a North Campus Parking Garage (20)

KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
 
Architectural_plans-1.pdf
Architectural_plans-1.pdfArchitectural_plans-1.pdf
Architectural_plans-1.pdf
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
 
SALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design finalSALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design final
 
Binder 161004 - 6500 san pablo ave, oakland (1)
Binder  161004 - 6500 san pablo ave, oakland (1)Binder  161004 - 6500 san pablo ave, oakland (1)
Binder 161004 - 6500 san pablo ave, oakland (1)
 
05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan
 
Photovoltaic Permit Packet
Photovoltaic Permit PacketPhotovoltaic Permit Packet
Photovoltaic Permit Packet
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdf
 
NMohamed_PortfolioExtract
NMohamed_PortfolioExtractNMohamed_PortfolioExtract
NMohamed_PortfolioExtract
 
6320 restrooms
6320 restrooms6320 restrooms
6320 restrooms
 
PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...
PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...
PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...
 
Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)
 
LP-1
LP-1LP-1
LP-1
 
Item vi.a. doyle street mews pc 09 28-2017
Item vi.a. doyle street mews pc 09 28-2017Item vi.a. doyle street mews pc 09 28-2017
Item vi.a. doyle street mews pc 09 28-2017
 
Final Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaFinal Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur India
 
Design estimate.ppt
Design estimate.pptDesign estimate.ppt
Design estimate.ppt
 
Short termim workplan_20100602_part3
Short termim workplan_20100602_part3Short termim workplan_20100602_part3
Short termim workplan_20100602_part3
 

North Campus Parking Garage

  • 1. NORTH CAMPUS GARAGE AND MIAMI INN SURFACE PARKING LOT RENOVATIONS ISSUED FOR BIDS JULY 1, 2016 DRAWING NO. TITLE V-1.0 EXISTING CONDTIONS PLAN SITE SURVEY C-1.0 STORMWATER POLLUTION PREVENTION PLAN C-1.1 PARKING LOT SWPPP NOTES C-1.2 PARKING LOT SWPPP DETAILS C-2.0 PARKING LOT DEMOLITION PLAN C-3.0 PARKING LOT MATERIALS LAYOUT PLAN C-3.1 PARKING LOT MATERIAL LAYOUT ENLARGEMENTS C-4.0 PARKING LOT GRADING AND DRAINAGE PLAN C-4.1 GRADING ENLARGEMENTS C-5.0 MIAMI INN PARKING LOT IMPROVEMENTS C-6.0 SITE DETAILS C-6.1 SITE DETAILS E-1.0 ELECTRICAL SITE PLAN E-2.0 ELECTRICAL DETAILS AND SCHEDULES DRAWING INDEX: PROJECT LOCATION MAP: MIAMI UNIVERSITY NORTH CAMPUS OXFORD, OH N PROJECT LOCATION APPROXIMATE LIMIT OF CAMPUS ENGINEERING BUILDING N APPROXIMATE PROJECT LOCATION APPROXIMATE PROJECT AREA CONSULTANTS: SMITHGROUPJJR, INC. 201 DEPOT STREET, 2ND FLOOR ANN ARBOR, MICHIGAN 48104 T. 734.662.4457 F. 734.662.7520 www.smithgroupjjr.com CIVIL ENGINEER PRATER ENGINEERING ASSOCIATES 6130 WILCOX ROAD DUBLIN, OHIO 43016 T. 614.766.4896 F. 614.766.2354 www.praterengineering.com ELECTRICAL ENGINEER PEARSON HALL PSYCHOLOGY BU8ILDING BENTON HALL NORTH CAMPUS GARAGE MCKIE FIELD AT HAYDEN PARK SWING HALL UNIVERSITY ARCHIVES AND WITHROW COURT
  • 2. BENCHMARK M-5 N=558687.872 E=1338487.915 Elev=878.35 NOTES 1. BASIS OF BEARING: OFFICIAL MIAMI MONUMENTS (#M-12 AND #M-5). 2. NO TITLE EXAMINATION/REPORT PROVIDED TO DETERMINE ANY ADDITIONAL EASEMENTS, RESTRICTIONS, COVENANTS, CONDITIONS OR ENCUMBRANCES WHICH MAY AFFECT THE LANDS HEREIN PLATTED. 3. SANITARY AND STORM LINE CONNECTION TO BUILDINGS AND UTILITIES SHOWN PER PLAN (PP) ARE FROM PLANS PROVIDED BY MIAMI UNIVERSITY. UTILITIES INDICATED AS (PP) MAY BE ABANDONED, BUT STILL IN PLACE. (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: EXISTING CONDTIONS PLAN SITE SURVEY PROJECT NORTH 1" = 20' V-1.0 Feet 0 20 40 LEGEND
  • 3. 876 876 877 878 876 875 875 875 876 876 876 876 876 876 877 STORM SEWER INLET SILT SACK, TYP. STORM SEWER INLET SILT SACK, TYP. STORM SEWER INLET SILT SACK, TYP. STORM SEWER INLET SILT SACK, TYP. STORM SEWER INLET SILT SACK, TYP. STORM SEWER INLET SILT SACK, TYP. EROSION EELS, TYP. EROSION EELS, TYP. EROSION EELS, TYP. CONCRETE WASTE MANAGEMENT EROSION EELS, TYP. EROSION EELS, TYP. CONSTRUCTION ACCESS ROAD STORM SEWER INLET SILT SACK, TYP. SILT FENCE LIMITS OF CONSTRUCTION N. CAMPUS PARKING GARAGE E. WITHROW ST. 25.00' 50.00' EXISTING PARKING GARAGE ENTRY DRIVE EXISTING PARKING GARAGE EXIT DRIVE 8.00' 10.00' LIMITS OF CONSTRUCTION PROPOSED INDEX CONTOUR (TYP.) PROPOSED CONTOUR (TYP.) STORM SEWER INLET SILT SACK SILT FENCE CONSTRUCTION ACCESS ROAD CONCRETE WASTE MANAGEMENT EROSION EELS SHEET NOTES KEYED NOTES 1. SEE SHEETS C-1.1 AND C-1.2 FOR ADDITIONAL NOTES AND DETAILS RELATED TO EROSION CONTROL MEASURES DEPICTED ON THIS DRAWING. 2. CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED PRIOR TO BEGINNING WORK. 3. ACCESS TO AND FROM THE EXISTING PARKING GARAGE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. TEMPORARY CLOSURES WILL ONLY BE ALLOWED AS COORDINATED WITH, AND APPROVED BY OWNER. 4. SITE SIGNAGE SHALL CONFORM TO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES,(MUTCD) LATEST EDITION. 870 870 S1 C-1.2 S2 C-1.2 S3 C-1.2 S5 C-1.2 S4 C-1.2 (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: STORMWATER POLLUTION PREVENTION PLAN PROJECT NORTH 1" = 20' C-1.0 Feet 0 20 40
  • 4. PROJECT NAME: NORTH CAMPUS GARAGE AND MIAMI INN SURFACE PARKING LOT RENOVATIONS PROJECT ADDRESS: WITHROW STREET, OXFORD, OH, 45056 CONSTRUCTION SITE OPERATORS: WHITING TURNER SWPPP AUTHOR: NAME: JOE WYWROT COMPANY: SMITHGROUPJJR ADDRESS: 201 DEPOT STREET, SECOND FLOOR, ANN ARBOR, MI 48104 PHONE #: (734) 669-2679 ESTIMATED CONSTRUCTION START DATE: JULY, 2016 ESTIMATED CONSTRUCTION END DATE: AUGUST, 2016 PROJECT DESCRIPTION: THE PROJECT CONSISTS OF RENOVATION OF A PORTION OF THE MIAMI UNIVERSITY CAMPUS WHICH IS BOUNDED BY WITHROW STREET TO THE NORTH, THE WITHROW STREET PARKING STRUCTURE TO THE SOUTH, THE PARKING STRUCTURE ENTRY DRIVE TO THE WEST, AND THE PARKING STRUCTURE EXIT DRIVE TO THE EAST. THE PROJECT INCLUDES A COMPLETE RENOVATION OF THE WITHROW STREET PARKING LOT AND A PARTIAL RENOVATION OF THE MIAMI INN PARKING LOT. THE IMPROVEMENTS WILL BE CONSTRUCTED WITHIN PROPERTY OWNED BY MIAMI UNIVERSITY. TOTAL SITE AREA = 1.27 ACRE (55,485 SQUARE FEET) TOTAL DISTURBED AREA = 1.22 ACRE (53,232 SQUARE FEET) EXISTING IMPERVIOUSNESS = 46.1% PROPOSED IMPERVIOUSNESS = 88.7% EXISTING RUNOFF COEFFICIENT, C(EX) = 0.60 PROPOSED RUNOFF COEFFICIENT, C(PR) = 0.91 TWO SOIL TYPES EXIST ON THE SITE, RUSSELL-MIAMIAN SILTY LOAM AND RUSSEL-URBAN LAND COMPLEX PER THE USDA SOIL SURVEY FOR BUTLER COUNTY, OHIO RUNOFF FROM THE PROJECT SITE WILL DISCHARGE TO THE MIAMI UNIVERSITY STORM SEWER SYSTEM. SEQUENCE OF CONSTRUCTION: 1. OBTAIN ALL REQUIRED PERMITS. 2. INSTALL SILT FENCE, AND OTHER BMP MEASURES ACCORDING TO PLANS AND AS DETERMINED BY A/E AND/OR MIAMI UNIVERSITY. 3. INSTALL CONSTRUCTION ACCESS DRIVES AT ALL ENTRANCE/EXIT LOCATIONS FROM EXISTING ROADS. 4. REMOVE LAWN AND TOPSOIL ACCORDING TO PLANS. 5. DEMOLISH/REMOVE EXISTING STRUCTURES AND UTILITIES ACCORDING TO PLANS. 6. PERFORM MASS EXCAVATION OPERATIONS, GRADE THE SITE AND INSTALL UTILITIES. 7. INSTALL INLET PROTECTION AT ALL NEW STORM SEWER STRUCTURES AS THEY ARE CONSTRUCTED. 8. CONSTRUCT PARKING LOTS. 9. PERMANENTLY STABILIZE AREAS TO BE VEGETATED IMMEDIATELY AS THEY ARE BROUGHT TO FINAL GRADE. 10. ONCE THE SITE HAS BEEN FULLY STABILIZED, REMOVE SILT FENCE, INLET PROTECTION DEVICES, AND OTHER TEMPORARY BMP MEASURES. STORM WATER POLLUTION PREVENTION PLAN NOTES: 1. FOR PROTECTION OF UNDERGROUND UTILITIES, CALL THE OHIO UTILITIES PROTECTION SERVICE AT 1-800-362-2764 A MINIMUM OF 48 HOURS PRIOR TO EXCAVATING. 2. ALL MATERIAL AND CONSTRUCTION WILL BE IN ACCORDANCE WITH THE CONSTRUCTION STANDARDS AND SPECIFICATIONS FOR THE PROJECT. ALL WORK WILL BE IN COMPLIANCE WITH ALL APPLICABLE FEDERAL AND STATE STANDARDS AND REGULATIONS. IF THERE SHOULD ARISE ANY CONFLICT BETWEEN ANY NOTES AND/OR DETAILS ON THE APPROVED DRAWINGS OR SPECIFICATIONS FOR THE PROJECT, THIS NOTE WILL SUPERCEDE AND GOVERN UNLESS THERE IS A WRITTEN SIGNED DOCUMENTATION STATING OTHERWISE. 3. ALL CONSTRUCTION AND DEMOLITION DEBRIS (C&DD) WASTE SHALL BE DISPOSED OF IN AN OHIO EPA APPROVED C&DD LANDFILL AS REQUIRED BY OHIO REVISED CODE (ORC) 3714. 4. NO KNOWN TOXIC OR HAZARDOUS MATERIALS EXIST ON SITE. IF SUSPICIOUS OR HAZARDOUS MATERIAL IS DISCOVERED DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY A/E AND OWNER. ALL TOXIC AND HAZARDOUS MATERIALS SHALL BE LEGALLY DISPOSED OF PER LOCAL LAWS AND REGULATIONS. 5. IF SOIL CONTAMINATION OCCURS DUE TO PETROLEUM OR OTHER CHEMICAL SPILLS, ALL CONTAMINATED SOILS SHALL BE TREATED AND/OR DISPOSED OF IN AN OHIO EPA APPROVED SOLID WASTE MANAGEMENT FACILITY OR HAZARDOUS WASTE TREATMENT, STORAGE OR DISPOSAL FACILITY (TSDF). SOIL EROSION AND SEDIMENTATION CONTROL NOTES: 1. UNDER THE RULES OF THE FEDERAL WATER POLLUTION CONTROL ACT (40 CFR 122), THE OHIO WATER POLLUTION CONTROL ACT (CHAPTER 6111.04), AND OHIO EPA PERMIT NO. OHC000004, THE CONTRACTOR SHALL ACT AS THE “PERMITTEE” AND WILL BE FULLY RESPONSIBLE FOR ADMINISTERING THE EROSION CONTROL PROGRAM THROUGHOUT THE DURATION OF THE CONTRACT. UNDER THIS ACT, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUBMITTING THE NOTICE OF INTENT FORM ((NOI)(NPDES GENERAL PERMIT)), PAY ALL ASSOCIATED FEES, AND ABIDE BY ALL REQUIREMENTS IDENTIFIED UNDER THIS ACT AND AS NOTED ON THE PLANS AND SPECIFICATIONS. THE NOI SHALL NOT BE TRANSFERRED TO A SECOND PARTY WITHOUT PRIOR WRITTEN AUTHORIZATION FROM THE OWNER. THE NOI SHALL BE SENT TO THE FOLLOWING LOCATION: OHIO ENVIRONMENTAL PROTECTION AGENCY OFFICE OF FISCAL ADMINISTRATION PO BOX 1049 COLUMBUS, OHIO 43216-1049 THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING THE NOI FORM AT LEAST 7 DAYS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 2. ALL PENALTIES AND FINES ASSOCIATED WITH VIOLATIONS ASSOCIATED WITH NOT FILING THE NOI OR DISCHARGING POLLUTANTS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND ITS SUBCONTRACTORS. 3. THE A/E WILL PREPARE THE STORMWATER POLLUTION AND PREVENTION PLAN (SWP3) THAT WILL BE MAINTAINED ON SITE AT ALL TIME BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SIGNING THE SWP3 AND MAKE ALL NECESSARY REVISIONS IN ACCORDANCE WITH ORC SECTION 6114.04, OAC CHAPTER 3745-1 AND THE TERMS AND CONDITIONS OF THE NOI. THE CONTRACTOR SHALL PROVIDE AN EXECUTED COPY OF THE SWP3, INCLUDING ALL REVISIONS, TO THE A/E. 4. THE PERMITTEE SHALL MAINTAIN A WRITTEN DOCUMENT CONTAINING THE SIGNATURES OF ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED IN THE IMPLEMENTATION OF THE SWP3 AS PROOF ACKNOWLEDGING THAT THEY UNDERSTAND THE CONDITIONS AND RESPONSIBILITIES OF THE SWP3. THE DOCUMENT AND ALL SIGNATURES SHALL BE OBTAINED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND SHALL BE KEPT ON SITE WITH THE SWP3. 5. UNDER THE RULES OF THE OHC000004 PART III.G.2.i, THE CONTRACTOR SHALL PROVIDE A “QUALIFIED” INSPECTOR WHO WILL BE RESPONSIBLE FOR ALL REPORTING AND COMPLIANCE WITH THE SWP3. THE INSPECTOR'S DUTIES SHALL INCLUDE: · PERFORM ALL SWP3 INSPECTIONS, REPORTING, AND LOGS. INSPECT ALL EROSION CONTROL MEASURES WEEKLY AND WITHIN 24 HOURS AFTER ALL RAIN EVENTS THAT EXCEED ½ INCH OVER A 24 HOUR DURATION. · FOLLOWING EACH INSPECTION, COMPLETE, SIGN AND DATE THE PREPARED CHECKLIST IN ACCORDANCE WITH PART III.G.2.i. · MAINTAIN ALL CHECKLISTS ON SITE FOR INSPECTION BY THE STATE WHEN REQUESTED. INSPECTION RECORDS SHALL BE KEPT FOR 3 YEARS AFTER TERMINATION OF CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH PART V.G. 6. ALL EROSION CONTROL MEASURES SHALL MEET THE STANDARDS AND SPECIFICATIONS IN THE CURRENT EDITION OF OHIO'S RAINWATER AND DEVELOPMENT MANUAL AND RELEVANT INFORMATION AND DETAILS PROVIDED ON THE SWP3. THE FOLLOWING MINIMUM CRITERIA SHALL BE MET BY THE CONTRACTOR: · TEMPORARY STABILIZATION: COMPLY WITH OHIO EPA PERMIT NO. OHC000004 PART II.B TABLE 2: TEMPORARY STABILIZATION. TEMPORARY SEED AND MULCH IN ALL AREAS THAT WILL BE INACTIVE FOR 14 DAYS OR MORE AND WHICH DO NOT REQUIRE IMMEDIATE SOIL STABILIZATION. ALL DISTURBED AND ERODED EARTH SHALL BE REGRADED AND SEEDED WITHIN 7 DAYS. CONTRACTOR SHALL SUBMIT TEMPORARY SEED MIX FOR APPROVAL. - ANY DISTURBED AREA WITHIN 50 FEET OF A STREAM AND NOT AT FINAL GRADE SHALL BE TEMPORARILY SEEDED AND MULCHED WITHIN 2 DAYS OF THE MOST RECENT DISTURBANCE IF THAT AREA WILL REMAIN IDLE FOR MORE THAN 14 DAYS. - ALL OTHER DISTURBED AREAS GREATER THAN 50 FEET FROM A STREAM AND NOT AT FINAL GRADE SHALL BE TEMPORARILY SEEDED AND MULCHED WITHIN 7 DAYS OF THE MOST RECENT DISTURBANCE IF THAT AREA WILL REMAIN IDLE FOR MORE THAN 14 DAYS. · PERMANENT STABILIZATION: COMPLY WITH OHIO EPA PERMIT NO. OHC000004 PART II.B TABLE 1: PERMANENT STABILIZATION. - ANY AREA THAT WILL LIE DORMANT FOR ONE YEAR OR MORE SHALL RECEIVE PERMANENT STABILIZATION WITHIN 7 DAYS OF THE MOST RECENT DISTURBANCE. - ANY AREA WITHIN 50 FEET OF A STREAM AND AT FINAL GRADE SHALL BE SEEDED WITHIN 2 DAYS OF ACHIEVING FINAL GRADE. - ALL OTHER AREAS GREATER THAN 50 FEET FROM A STREAM AND AT FINAL GRADE SHALL BE SEEDED WITHIN 7 DAYS OF ACHIEVING FINAL GRADE. 7. THE CONTRACTOR SHALL CONDUCT ALL EXCAVATION, FILLING, GRADING, CONSTRUCTION, AND CLEAN-UP OPERATIONS IN A MANNER SUCH THAT SEDIMENT, GENERATED BY WIND, WATER, OR VEHICLES, IS NOT DISCHARGED INTO ANY STORM SEWER, DRAINAGE DITCH, RIVER, AIR, OR UNDERGROUND UTILITY SYSTEM. WIND, WATER, AND VEHICULAR EROSION OF SOIL ON PROJECT SITE DUE TO CONSTRUCTION ACTIVITIES FOR THIS PROJECT WILL NOT BE PERMITTED. PREVENT EROSION OF SOIL AND DEPOSITION OF SEDIMENT ONTO OTHER PROPERTIES FROM THE PROJECT SITE DUE TO CONSTRUCTION ACTIVITIES FOR THIS PROJECT. PREVENT WINDBLOWN SOIL FROM LEAVING THE PROJECT SITE. ANY MUD/SEDIMENT FLOW INTO STREAM CHANNEL AND/OR WETLANDS MUST BE PROMPTLY REMOVED. IF SEDIMENT EXTENDS BEYOND THE PROJECT LIMITS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AND RESTORATION OF ALL SURFACES AND UTILITY SYSTEMS TO THE CONDITION THAT EXISTED PRIOR TO THE CONTRACT AWARD. 8. STAGE WORK TO MINIMIZE THE AREA OF EXPOSED SOIL, THEREBY REDUCING THE OPPORTUNITY FOR SOIL EROSION. 9. SOIL EROSION AND SEDIMENTATION BEST MANAGEMENT PRACTICE (BMP) MEASURES WILL BE INSTALLED PRIOR TO START OF ANY CONSTRUCTION AND WILL BE MAINTAINED AT ALL TIMES UNTIL CONSTRUCTION HAS BEEN COMPLETED, INCLUDING ALL GRASS BEING WELL ESTABLISHED AND/OR PERMANENT EROSION AND SEDIMENTATION BMP MEASURES ARE IN PLACE. 10. ALL BMP MEASURES WILL BE INSTALLED TO THE SATISFACTION OF THE OHIO ENVIRONMENTAL PROTECTION AGENCY (EPA). THE OHIO EPA MAY REQUIRE WORK TO BE STOPPED AND THE STORM DRAINAGE OUTLET TO BE PLUGGED, IF CONDITIONS BECOME UNSATISFACTORY. 11. REPAIR ALL BMP MEASURES AS REQUIRED DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL MEASURES. ANY BMP MEASURE THAT REQUIRES REPAIR OR MAINTENANCE SHALL BE REPAIRED WITHIN 3 DAYS OF THE INSPECTION. ANY BMP MEASURE NOT MEETING THE INTENDED FUNCTION OR MISSING MUST BE REPLACED/INSTALLED WITHIN 10 DAYS OF THE INSPECTION AT NO COST TO THE OWNER. 12. ANY CATCH BASIN THAT RECEIVES STORMWATER FROM CONSTRUCTION ACTIVITIES SHALL RECEIVE INLET PROTECTION. - PERIODIC REMOVAL OF COLLECTED SILT AND SEDIMENTATION IS REQUIRED TO MAINTAIN EFFECTIVENESS OF THE SILT TRAPS, FILTERS, AND BASINS. IF SEDIMENTATION OCCURS, INSTALL OR CORRECT PREVENTATIVE MEASURES IMMEDIATELY AT NO COST TO THE OWNER. REPLACE ALL MEASURES DETERMINED TO BE NON-FUNCTIONAL AT NO COST TO THE OWNER. 13. CONTRACTOR IS TO DESIGNATE A SITE DUMP/WASH AREA TO BE APPROVED BY A/E PRIOR TO STARTING CONSTRUCTION FOR SUCH PURPOSES AS WASHING OUT CONCRETE TRUCKS AND DUMPING NON-HAZARDOUS WASTE MATERIALS AND FOR MIXING OR STORING CHEMICAL COMPOUNDS FOR CONSTRUCTION (I.E. FERTILIZERS, CONCRETE, ASPHALT, ETC.), SUBJECT TO THE SUPERVISION OF THE OHIO EPA. DUMPING OR DISCHARGE OF ANY WASTE MATERIALS TO ANY LUCAS COUNTY SEWERS IS PROHIBITED. HAZARDOUS WASTES ARE TO BE REMOVED OFF SITE AND PROPERLY DISPOSED OF CONSISTENT WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS. 14. KEEP DUST DOWN AT ALL TIMES, INCLUDING DURING NON-WORKING PERIODS. SPRINKLE OR TREAT WITH DUST SUPPRESSANTS, THE SOIL AT THE SITE, HAUL ROADS, AND OTHER AREAS DISTURBED BY OPERATIONS. CHLORIDE, OIL, OR OTHER NON-WATER MATERIAL IS NOT PERMITTED. PREVENT TRACKING OR FLOWING OF MUD AND SEDIMENT ONTO PUBLIC OR PRIVATE ROADS OR DRIVES. PROMPTLY REMOVE ALL MUD AND DIRT THAT ACCUMULATES ONTO PUBLIC ROADS AND PRIVATE DRIVES. STREET CLEANING SHALL BE PERFORMED AS REQUIRED OR DIRECTED. DRY POWER BROOMING IS NOT PERMITTED. 15. SHOULD IT BE NECESSARY FOR THE CONTRACTOR TO DO ANY DEWATERING DURING THE COURSE OF CONSTRUCTION, THE CONTRACTOR SHALL FILTER ALL DISCHARGE THROUGH A DISCHARGE FILTER BAG OR OTHER SEDIMENT CONTROL DEVICE THAT WILL FILTER ALL DISCHARGE WATER. NO DEWATERING DISCHARGE SHALL BE ALLOWED TO FLOW UNFILTERED FROM THE CONSTRUCTION SITE. ALL STRUCTURES SHALL BE ASSEMBLED ON VEGETATED SURFACES. 16. AT THE CONTRACTOR'S DISCRETION, TEMPORARY DITCHES MAY BE CONSTRUCTED ACROSS AREAS OF THE SITE TO IMPROVE SITE DRAINAGE FOLLOWING RAIN EVENTS AND PERIODIC FLOODING. IN ALL CASES, STONE FILTERS SHALL BE INSTALLED AT ALL OUTLETS ALONG THE LIMITS OF CONSTRUCTION AND SILT FENCE SHALL BE KEYED INTO THE SIDES OF THE FILTER TO CREATE A CONTINUOUS BARRIER. STONE FILTERS SHALL ALSO INCLUDE A 5'L X3'W 2'D SUMP EXCAVATED IMMEDIATELY UPSTREAM FROM THE FILTER. INSTALL STONE FILTERS AND SUMPS 150 FEET APART WITHIN EACH TEMPORARY DITCH. 17. ANY MATERIAL STOCKPILES LEFT OVERNIGHT OUTSIDE A PROTECTED AREA SHALL BE SURROUNDED BY A SILT FENCE. IMMEDIATELY PRIOR TO MIAMI UNIVERSITY TAKING RESPONSIBILITY OF THE SITE, THE CONTRACTOR SHALL 18. IMMEDIATELY PRIOR TO MIAMI UNIVERSITY TAKING RESPONSIBILITY OF THE SITE, THE CONTRACTOR SHALL CLEAN CATCH BASINS AFFECTED BY THE CONSTRUCTION, BOTH WITHIN THE CONTRACT LIMITS AND IN ALL SURROUNDING ROADS AND LAWN AREAS WHERE SOIL MAY HAVE SPREAD DUE TO CONSTRUCTION ACTIVITIES. 19. IF EROSION OR SEDIMENTATION OCCURS DUE TO NON-COMPLIANCE WITH THESE REQUIREMENTS, IMMEDIATELY REMOVE DEPOSITED SEDIMENT OR RESTORE ERODED AREAS AT NO COST TO THE OWNER. OWNER WILL DEDUCT PAYMENT TO CONTRACTOR EQUIVALENT TO ANY FINES RESULTING FROM NON-COMPLIANCE WITH APPLICABLE REGULATIONS. 20. IN ADDITION TO THE EROSION CONTROL MEASURES IDENTIFIED ON THE SWP3, ANY SUPPLEMENTAL MEASURES REQUIRED FOR SITE SPECIFIC REMEDIES SHALL BE CONSTRUCTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL REFERENCE OHC000004 PART III.G.2.d AND e IN ITS ENTIRETY. 21. ANY PARTY (TYPICALLY THE GENERAL CONTRACTOR) WHO HAS DAY-TO-DAY OPERATIONAL CONTROL OF ACTIVITIES AT THIS PROJECT, WHICH ARE NECESSARY TO ENSURE COMPLIANCE WITH THE SWP3 FOR THE SITE OR OTHER CONDITIONS SET FORTH IN THE PERMIT, MUST FILE A CO-PERMITTEE NOI WITH THE OHIO EPA. THIS IS THE SOLE RESPONSIBILITY OF THE CO-PERMITTEE AND SHALL BE DONE IN 21 DAYS BEFORE GROUND IS BROKEN. EROSION EEL GENERAL NOTES: 1. EROSION EELS™ USED IN PERIMETER CONTROL APPLICATIONS SHALL HAVE A SPECIFICATION MIXTURE 1.1 OR 1.2. a. MIXTURE SPECIFICATION 1.1. A FILTER MIXTURE COMPRISED OF 50% SHREDDED RUBBER AND 50% WOOD CHIP PARTICLES BY VOLUME. THE SHREDDED RUBBER SHALL BE WASHED AND PROCESSED TO REMOVE MOST, IF NOT ALL, METAL COMPONENTS. THE RUBBER SHALL BE DERIVED FROM RECYCLED TIRES AND SHALL BE SHREDDED TO PRODUCE A MAXIMUM PARTICLE SIZE OF +/- 3/4 INCH. THE WOOD CHIPS SHALL BE PRODUCED FROM HARDWOOD TREES AND SHALL CONFIRM TO AASHTO CERTIFICATION SPECIFICATION MP 9-03. b. MIXTURE SPECIFICATION 1.2. A FILTER MIXTURE COMPRISED OF 1/3 SHREDDED RUBBER, 1/3 WOOD CHIPS, AND 1/3 RECYCLED SYNTHETIC FIBERS. THE SHREDDED RUBBER SHALL BE WASHED AND PROCESSED TO REMOVE MOST, IF NOT ALL, METAL COMPONENTS. THE RUBBER SHALL BE DERIVED FROM RECYCLED TIRES AND SHALL BE SHREDDED TO PRODUCE A MAXIMUM PARTICLE SIZE OF +/- 3/4 INCH. THE WOOD CHIPS SHALL BE PRODUCED FROM HARDWOOD TREES AND SHALL CONFIRM TO AASHTO CERTIFICATION SPECIFICATION MP 9-03. THE SYNTHETIC FIBERS SHALL BE PRODUCED FROM RECYCLED, MANUFACTURED MATERIALS, SUCH AS, BUT NOT LIMITED TO, PRE-CONSUMER SCRAP CARPET, TIRE CHORD, AND TIRE FIBER MATERIALS. 2. EROSION EELS™ SHALL BE MANUFACTURED FROM A WOVEN GEOTEXTILE COVERING WITH INTERIOR FILTER MATERIALS SUCH AS 100% SHREDDED RUBBER (MIXTURE SPECIFICATION 1.0, 50% SHREDDED RUBBER/50% AASHTO-CERTIFIED WOOD CHIPS (MIXTURE SPECIFICATION 1.1). 3. LENGTHS OF EROSION EELS™ SHALL BE EITHER A NOMINAL +/-10 FT. OR +/- 4.5 FT. NOMINAL DIAMETER SHALL BE +/-9.5 INCHES. 4. EROSION EELS™ CAN BE PLACED AT THE TOP, ON THE FACE, OR AT THE TOE OF SLOPES TO INTERCEPT RUNOFF, REDUCE FLOW VELOCITY, RELEASE THE RUNOFF AS SHEET FLOW AND PROVIDE REMOVAL OF SEDIMENT FROM THE RUNOFF. 5. EROSION EELS™ SHALL BE INSTALLED ALONG THE GROUND CONTOUR, AT THE TOE OF SLOPES, AT AN ANGLE TO THE CONTOUR TO DIRECT FLOW AS A DIVERSION BERM, AROUND INLET STRUCTURES, IN A DITCH AS A CHECK DAM TO HELP REDUCE SUSPENDED SOLIDS LOADING AND RETAIN SEDIMENT, OR AS A GENERAL FILTER FOR ANY DISTURBED SOIL AREA. 6. NO TRENCHING IS REQUIRED FOR INSTALLATION OF EROSION EELS™ 7. PREPARE BED FOR EEL INSTALLATION BY REMOVING ANY LARGE DEBRIS INCLUDING ROCKS, SOIL CLODS, AND WOODY VEGETATION. EROSION EELS™ CAN ALSO BE PLACED OVER PAVED SURFACES INCLUDING CONCRETE AND ASPHALT WITH NO SURFACE PREPARATION REQUIRED. 8. RAKE BED AREA WITH A HAND RAKE OR BY DRAG HARROW. 9. DO NOT PLACE EEL DIRECTLY OVER RILL AND GULLIES UNTIL AREA HAS BEEN HAND-EXCAVATED AND RAKED TO PROVIDE A LEVEL BEDDING SURFACE. ALL SURFACES SHALL BE UNIFORMLY COMPACTED FOR MAXIMUM SEATING OF EELS™ IN PLACE. 10. FOR LOCATIONS WHERE EELS™ WILL BE PLACED IN CONCENTRATED FLOWS (SUCH AS CHECK DAMS, INLET PROTECTION) AND FOR PERIMETER CONTROLS AT PRIMARY DISCHARGE LOCATIONS, BED THE EELS™ IN A FLOCMAT CRADLE PER THE DETAILED DRAWINGS. 11. FOR DITCH APPLICATIONS, THE MAXIMUM DRAINAGE AREA SHALL BE 10 ACRES. 12. IF MORE THAN ONE EROSION EEL IS PLACED IN A ROW, THE EELS™ SHALL BE OVERLAPPED A MINIMUM OF 12 INCHES TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT. COMPRESS THE TWO EELS™ OF THE OVERLAP TIGHTLY TOGETHER EITHER BY HAND OR MANUFACTURER-APPROVED MECHANIZED MEANS. 13. WHEN USED IN DITCHES AS A CHECK DAM, EROSION EELS™ SHALL BE INSTALLED PER MANUFACTURER'S DETAILS. 14. FOR CHECK DAM APPLICATIONS, EROSION EELS™ SHALL BE PLACED PERPENDICULAR TO THE FLOW OF THE WATER. EROSION EELS™ SHALL CONTINUE UP THE SIDES SLOPES A MINIMUM OF 3 FEET ABOVE THE DESIGN FLOW DEPTH. 15. EROSION EELS™ SHALL REMAIN IN PLACE UNTIL FULLY ESTABLISHED VEGETATION HAS COMPLETELY DEVELOPED OR UNTIL THE STORAGE CAPACITY/FUNCTIONAL LIFE OF THE EEL HAS BEEN EXHAUSTED (REQUIRING REPLACEMENT WITH NEW EELS™). 16. ANCHORING POSTS FOR CHECK DAM APPLICATIONS SHALL HAVE A MINIMUM WEIGHT OF 1.25 LBS/FT STEEL T-POSTS (5 TO 7 FT. LENGTHS) ROLLED FROM HIGH CARBON STEEL. POSTS SHOULD BE HOT-DIP GALVANIZED OR COATED WITH A WEATHER-RESISTANT PAINT FOR STEEL APPLICATION. POSTS SHOULD BE EQUIPPED WITH A METAL ANCHOR PLATE. INSTALL PER DETAILS ON THIS SHEET. 17. PLACE T-POSTS THROUGH HANDLE OF BAGS. DO NOT DRIVE POSTS THROUGH EROSION EELS™ . T-POSTS ARE TO BE EMBEDDED A MINIMUM OF 2 FT INTO GROUND. (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: PARKING LOT SWPPP NOTES NO SCALE C-1.1
  • 5. 10'-0" MAX 18"MIN ELEVATION 6" 6" 18"MIN FABRIC ANCHOR DETAIL DIRECTION OF FLOW NOTES: 1. TEMPORARY SILT FENCE SHALL BE INSTALLED PRIOR TO ANY GRADING WORK IN THE AREA TO BE PROTECTED. THEY SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD AND REMOVED IN CONJUNCTION WITH THE FINAL GRADING AND SITE STABILIZATION. 2. FENCE POSTS SHALL BE WOOD POSTS WITH A MINIMUM CROSS-SECTIONAL AREA OF 3.0 SQ. IN. STEP 1 STEP 2 STEP 3 FILTER FABRIC POSTS FASTENER-MIN. NO. 16 GAUGE WIRE, 4 PER POST REQUIRED (EVENLY SPACED), TYP. UNDISTURBED SUBGRADE COMPACTED BACKFILL EXTENDED FILTER FABRIC TO 6" BELOW GRADE ATTACHMENT STEPS: 1. PLACE THE END POST OF THE SECOND FENCE INSIDE THE END POST OF THE FIRST FENCE. 2. ROTATE BOTH POSTS AT LEAST 180 DEGREES IN A CLOCKWISE DIRECTION TO CREATE A TIGHT SEAL WITH THE FABRIC MATERIAL. 3. DRIVE BOTH POSTS A MINIMUM OF 18 INCHES INTO THE GROUND AND BURY THE FLAP. 1'-8"MIN EXISTING GRADE 2"-3" CRUSHED ROCK (8" DEPTH) NON-WOVEN GEOTEXTILE FABRIC EXISTING PAVEMENT 50' MINIMUM LENGTH LENGTH OF STABILIZED ROAD 50' MINIMUM LENGTH LENGTH OF STABILIZED ROAD 1 2 3 4 4 1 2 3 2 PLAN VIEW ELEVATION 25' WIDTH MIN. RECTANGLE INLET FILTERSROUND INLET FILTER GENERAL NOTES: 1. INLET PROTECTION SHALL BE NON-BLACK IN COLOR AND SHALL HAVE THE NAME OF THE CONTRACTOR WRITTEN OR ATTACHED TO IT. 2. TEMPORARY INLET SEDIMENT FILTER TO BE INSTALLED ON ALL CATCH BASINS AND STORM INLETS NOTED ON DRAWINGS. CLEAN FILTER AS NEEDED. 3. INLET FILTERS TO BE FLEXSTORM INLET FILTERS AS MANUFACTURED BY ADVANCED DRAINAGE SYSTEMS, INC. (800-821-6710) OR SIMILAR PRODUCT. GALVANIZED STEEL FRAME LIFT HANDLES STAINLESS STEEL LOCKING BAND OVERFLOW FEATURE GEOTEXTILE FILTER BAG WITH REINFORCED POLYESTER OUTER MESH REAR CURB GUARD FLAP INCLUDED FOR CURB BOX INLET FILTERS EROSION EEL™ SHEET FLOW BUTT JOINT ENLARGEMENT PLAN VIEW BUTT ENDS OF EEL TOGETHER AND JOIN TIGHTLY WITH JUNCTION WRAP (PER BUTT JOINT ENLARGEMENT THIS SHEET) ANCHOR LOOP TYP. (4 PER 10 FT. BAG) EROSION EEL™ TIE-STRING END OF EELSEWN SEAM EDGE TO FORM BUTT JOINT, PRESS TIED END OF EEL AGAINST SEWN EDGE OF ADJACENT EEL CONSTRUCTION FENCE EROSION EEL™ FLOCMAT CRADLE UNDER EROSION EEL™ PER MANUFACTURER'S REQUIREMENTS SECTION VIEW PLAN 10 MIL. PLASTIC LINING STRAW BALE STAKE TYP. TYP. 10' MIN. 8' (TYPE "ABOVE GRADE" WITH STRAW BALES) STAPLE DETAIL 4" 2" 1/8" DIA. STEEL WIRE10 MIL. PLASTIC LINING STRAW BALE FINISH GRADE STAPLES (2 PER BALE) BINDING WIRE NATIVE MATERIAL (OPTIONAL) SECTION B-B CONCRETE WASHOUT 3' 3' PLYWOOD 48" X 24" PAINTED WHITE BLACK LETTERS - 6" HEIGHT 0.5" LAG SCREWS WOOD POST 3" X 3" X 8' CONCRETE WASHOUT SIGN DETAIL NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE NOTES: 1. ACTUAL LAYOUT DETERMINED IN THE FIELD. 2. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30 FT. OF THE TEMPORARY CONCRETE WASHOUT FACILITY. (OR EQUIVALENT) (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: NTS. SILT FENCE S1 1" = 1' CONSTRUCTION ACCESS ROAD S2 NTS. EROSION EELS S4 NTS. STORM SEWER INLET SILT SACK S3 NTS. CONSTRUCTION WASTE MANAGEMENT S5 PARKING LOT SWPPP DETAILS AS NOTED C-1.2
  • 6. LIMITS OF CONSTRUCTION FULL DEPTH PAVEMENT REMOVAL FULL DEPTH CONCRETE REMOVAL TOPSOIL STRIPPING UTILITY REMOVAL STRUCTURE REMOVAL TREE PROTECTION FENCE INLET PROTECTION CURB REMOVAL CONSTRUCTION FENCE (PER MIAMI UNIVERSITY STANDARD) SHEET NOTES KEYED NOTES 1. COORDINATE AREA TO STOCKPILE TOPSOIL WITH OWNER. 2. COORDINATE STAGING AREA WITH OWNER. 3. ACCESS TO AND FROM THE EXISTING PARKING GARAGE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. TEMPORARY CLOSURES WILL ONLY BE ALLOWED AS COORDINATED WITH, AND APPROVED BY OWNER. 4. SALVAGE EXISTING LIGHT POLES,LUMINARIES, AND EXISTING SIGNAGE TO OWNER. 5. SAWCUT PAVEMENT AT NEAREST EXISTING JOINT. ALL SAWCUT SECTIONS ARE TO PENETRATE THE STREET 2'. 6. SALVAGE ATM AND RETURN TO OWNER. 7. ACCESS TO AND FROM THE EXISTING PARKING GARAGE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. TEMPORARY CLOSURES WILL ONLY BE ALLOWED AS COORDINATED WITH, AND APPROVED BY OWNER. 8. SITE SIGNAGE SHALL CONFORM TO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES,(MUTCD) LATEST EDITION. REMOVE LIGHT POLE, TYP. (SEE NOTE 4) STRIP TOPSOIL FULL DEPTH CONCRETE SIDEWALK REMOVAL REMOVE TELEPHONE UTILITY LINE SALVAGE EXISTING HANDICAPPED SIGN TO OWNER (SEE NOTE 4) REMOVE LIGHT POLE, TYP. (SEE NOTE 4) EXISTING CURB TO REMAIN, TYP. REMOVE LIGHT POLE,TYP. (SEE NOTE 4) FULL DEPTH ASPHALT PAVEMENT REMOVAL STRIP TOPSOIL EXISTING FIRE HYDRANT TO REMAIN PROTECT EXISTING AREAWAY STRIP TOPSOIL REMOVE ATM AND CONCRETE PAD (SEE NOTE 6) SALVAGE EXISTING ELECTRONIC SIGN TO OWNER (SEE NOTE 4) INLET PROTECTION REMOVE LIGHT POLE, TYP. (SEE NOTE 4) INLET PROTECTION SALVAGE EXISTING SIGN TO OWNER (SEE NOTE 4) FULL DEPTH CONCRETE SIDEWALK REMOVAL SAWCUT, TYP. (SEE NOTE 5) SAWCUT, TYP. (SEE NOTE 5) SAWCUT, TYP. (SEE NOTE 5) SALVAGE EXISTING PARKING LOT SIGN TO OWNER (SEE NOTE 4) REMOVE EXISTING CURB, TYP. EXISTING CURB TO REMAIN, TYP. SAWCUT AND REMOVE CURB (SEE NOTE 5) SAWCUT AND REMOVE CURB (SEE NOTE 5) E. WITHROW ST. N. CAMPUS PARKING GARAGE 2.00' 49.55' 6.28' 6.42' LIMITS OF CONSTRUCTION 38.23' 39.82' STORM SEWER REMOVAL ABANDONED STORM SEWER REMOVAL 6' HIGH CONSTRUCTION FENCE (PER MIAMI UNIVERSITY STANDARD) 2 X 6" HIGH BY 10' WIDE CONSTRUCTION SWING GATES (PER MIAMI UNIVERSITY STANDARD) 6' HIGH CONSTRUCTION FENCE (PER MIAMI UNIVERSITY STANDARD) (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: PARKING LOT DEMOLITION PLAN PROJECT NORTH 1" = 20' C-2.0 Feet 0 20 40
  • 7. CONCRETE CURB W/O GUTTER, TYP. CONCRETE PAVEMENT, TYP. SEEDED LAWN ASPHALT PAVEMENT STANDARD DUTY STONE MULCH BLUE PAVEMENT MARKING FOR ADA MARKINGS, TYP. CONCRETE PAVEMENT, TYP. CONCRETE CURB W/O GUTTER, TYP. ASPHALT PAVEMENT STANDARD DUTY CONCRETE CURB W/ GUTTER, TYP. SEEDED LAWN STONE MULCH PROTECT EXISTING AREAWAY BUTT JOINT, TYP. CONCRETE CURB W/ GUTTER, TYP. CONCRETE PAVEMENT, TYP. BUTT JOINT (TYP.) BUTT JOINT (TYP.) SIGN TYPE B, TYP. LIMITS OF CONSTRUCTION WHITE PAVEMENT MARKING 4" WIDE, TYP. EXISTING CURB TO REMAIN MEET EXISTING WALK, TYP. MEET EXISTING WALK, TYP. LIGHTPOLE, TYP. (SEE ELECTRICAL SITE PLAN) 8.99' 9.00' (TYP.) 18.00'(TYP.) R4.50' R2.00' 24.00' (TYP.) 18.00' 25.00' 8.00' 24.00' (TYP.) 136.00' 18.00'24.00'18.00'18.00'24.00'18.00'18.00'24.00'18.00' 9.00'12.00'12.00' R5.00' R39.00' R15.00' R2.00' 9.00'11.29' 22.00' (TYP.) 9.00'(TYP.) 5.00' (TYP.) 18.00'(TYP.) BARRIER FREE PAVEMENT MARKING, TYP. SIGN TYPE A, TYP. (SEE NOTE 2) R3.00' 24.00'8.50' 43.98' R4.00' CONCRETE PAVEMENT, TYP. ASPHALT PAVEMENT HEAVY DUTY SIGN TYPE C, TYP. (DIRECTING TRAFFIC NORTH)SIGN TYPE B, TYP. EXISTING CURB TO REMAIN 45°0'' 45°0'' 4 C-6.0 4 C-6.0 4 C-6.0 SOUTHWEST LAYOUT ENLARGEMENT PLAN NORTHWEST LAYOUT ENLARGEMENT PLAN SOUTHEAST ENLARGEMENT PLAN E. WITHROW ST. N. CAMPUS PARKING GARAGE LIGHTPOLE, TYP. (SEE ELECTRICAL SITE PLAN) 6.83' ALIGN JOINTS W/ ADJACENT SIDEWALK, V.I.F. SEEDED LAWN 6.41' R15.00' R39.00' CONCRETE CURB W/O GUTTER, TYP. CONCRETE CURB W/O GUTTER, TYP. 3 C-3.1 1 C-3.1 17.00' 9.00' 2 C-3.1 ASPHALT PAVEMENT STANDARD DUTY FLUSH CURB LIMITS OF CONSTRUCTION ASPHALT PAVEMENT STANDARD DUTY CONCRETE PAVEMENT ASPHALT PAVEMENT HEAVY DUTY SEEDED LAWN STONE MULCH ODOT TYPE 2 STANDARD CURB W/ GUTTER ODOT TYPE 7 STANDARD CURB W/O GUTTER FLUSH CURB CURB TRANSITION BARRIERFREE PAVEMENT MARKING SIGNAGE (SEE NOTE 2) SIGN TYPE A = BARRIER FREE SIGN TYPE B = "DO NOT ENTER" SIGN TYPE C = "ONE-WAY" LIGHTPOLE, TYP. (SEE ELECTRICAL PLANS) TURNING PAVEMENT MARKINGS (WHITE) VERIFY IN FIELD SHEET NOTES KEYED NOTES 1. ACCESS TO AND FROM THE EXISTING PARKING GARAGE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. TEMPORARY CLOSURES WILL ONLY BE ALLOWED AS COORDINATED WITH, AND APPROVED BY OWNER. 2. SITE SIGNAGE SHALL CONFORM TO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES,(MUTCD) LATEST EDITION. 3. ALL PAVEMENT MARKINGS RELATED TO BARRIERFREE PARKING STALLS SHALL BE BLUE. ALL OTHER PAVEMENT MARKINGS SHALL BE WHITE. 4. ALL DIMENSIONS ARE TO FACE OF CURB. 5. RESTORE PARKING GARAGE EXIT/ENTRY DRIVE PAVEMENT SECTIONS AS NEEDED FOR INSTALLATION OF ELECTRICAL WIRING FOR NEW SITE LIGHTING. 2 C-6.0 PARKING SUMMARY 58 EXISTING PARKING SPACES 128 PROPOSED PARKING SPACES -5 BARRIERFREE SPACES INCLUDING 1 VAN ACCESSABLE SPACE 1 2 TYPICAL PARKING SPACE: 18' LONG AND 9' WIDE TYPICAL PARALLEL PARKING SPACE: 22' LONG AND 9' WIDE TYPICAL PARKING DRIVE AISLE: 24' WIDE 5 C-6.0 3 C-6.0 1 C-6.0 7 C-6.0 6 C-6.0 8 C-6.0 9 C-6.0 11 C-6.1 10 C-6.1 V.I.F. (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: PARKING LOT MATERIALS LAYOUT PLAN PROJECT NORTH 1" = 20' C-3.0 Feet 0 20 40
  • 8. CONCRETE PAVEMENT CONCRETE CURB W/O GUTTER, TYP. CONCRETE CURB W/ GUTTER, TYP. HEAVY DUTY ASPHALT CONCRETE CURB W/ GUTTER, TYP. STONE MULCH BUTT JOINT EXISTING CURB TO REMAIN SIGN TYPE B, TYP. STANDARD DUTY ASPHALT R15.00' TO F/C R39.00'TOF/C 24.90'TOF/C(MIN.) MEET EXISTING CURB TO REMAIN MEET EXISTING CURB TO REMAIN 1 C-6.0 END CONCRETE CURB W/O GUTTER BEGIN CONCRETE CURB W/ GUTTER END CONCRETE CURB W/O GUTTER BEGIN CONCRETE CURB W/ GUTTER N. CAMPUS PARKING GARAGE CONCRETE CURB W/O GUTTER, TYP. SIGN TYPE B, TYP. ASPHALT PAVEMENT STANDARD DUTY CONCRETE CURB W/O GUTTER ASPHALT PAVEMENT HEAVY DUTY CONCRETE CURB W/ GUTTER STONE MULCH BUTT JOINT MEET EXISTING CURB TO REMAIN R4.50' R15.00' R39.00'TOF/C 12.00'TOF/C12.00'TOF/C PAVEMENT MARKING SIGN TYPE B, TYP. MEET EXISTING CURB TO REMAIN SIGN TYPE B, TYP. 1 C-6.0 END CONCRETE CURB W/O GUTTER BEGIN CONCRETE CURB W/ GUTTER PARKING GARAGE EXIT DRIVE SIGN TYPE C, TYP. N. CAMPUS PARKING GARAGE LIGHT POLE, TYP. (SEE ELECTRICAL PLAN) CONCRETE CURB W/O GUTTER CONCRETE CURB W/ GUTTER CONCRETE PAVEMENT SIGN TYPE A, TYP. CONCRETE PAVEMENT CONCRETE CURB W/O GUTTER, TYP. SEEDED LAWNEXISTING CURB TO REMAIN CONCRETE CURB W/O GUTTER, TYP. SEALED EXPANSION JOINT LINE STRIPING (WHITE) EXISTING WALK LINE STRIPING (BLUE) DETECTABLE WARNING 9.00' 9.00'5.00'9.00'9.00'8.00'9.00' LIGHT POLE, TYP. (SEE ELECTRICAL PLAN) 5.00' 18.18' FLUSH CURB, TYP. 5.00' CURB TRANSITION CURB TRANSITION MEET EXISTING CURB TO REMAIN TOOLED CONTROL JOINT, TYP. SEALED EXPANSION JOINT 9 C-6.0 SIGN TYPE A-1, TYP. 5.00'9.00' PARKING GARAGE ENTRY DRIVE CONCRETE CURB W/O GUTTER, TYP. E. WITHROW ST. (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: SCALE: 1"= 10' NORTHWEST LAYOUT ENLARGEMENT PLAN 1 SCALE: 1"= 10' SOUTHWEST LAYOUT ENLARGEMENT PLAN 2 SCALE: 1"= 10' SOUTHEAST LAYOUT ENLARGEMENT PLAN 3 PARKING LOT MATERIAL LAYOUT ENLARGEMENTS PROJECT NORTH 1" = 10' C-3.1 Feet 0 10 20
  • 9. LIMITS OF CONSTRUCTION SURFACE SLOPE, TYP. SURFACE ELEVATION, TYP. STORM DRAIN INLET EXISTING STORM STRUCTURE STORM SEWER PIPE GRADING BREAKLINE PROPOSED INDEX CONTOUR, TYP. PROPOSED CONTOUR, TYP. EXISTING CONTOUR, TYP. SHEET NOTES KEYED NOTES 1. EXISTING RIM ELEVATION SHALL BE FIELD VERIFIED 2. EXISTING INVERT OF EXISTING STRUCTURE SHALL BE FIELD VERIFIED 3. PROPOSED FIELD INVERT MAY VARY, BASED ON PREVIOUS FILED VERIFICATIONS OF EXISTING INVERTS AND RIM ELEVATIONS 4. REMOVE EXISTING PIPE; PATCH HOLE AND CORE NEW HOLE FOR PROPOSED PIPE. 5. EXISTING STORM SEWER STRUCTURES SHALL BE FIELD VERIFIED AS TO NOT HAVE THEM INTERFERE WITH THE PROPOSED ASPHALT PAVING. ADJUST STRUCTURES AS NECESSARY TO MEET PROPOSED ELEVATIONS. 6. ACCESS TO AND FROM THE EXISTING PARKING GARAGE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. TEMPORARY CLOSURES WILL ONLY BE ALLOWED AS COORDINATED WITH, AND APPROVED BY OWNER. 7. SITE SIGNAGE SHALL CONFORM TO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES,(MUTCD) LATEST EDITION. 1 C1.0 D 870 870 870 876 876 877 878 876 875 875 875 TC 876.75 M.E. TC 877.35 M.E. TC 878.00 M.E. TC 878.32 M.E. TC 878.14 M.E. TC 877.39 M.E. TC 876.99 M.E. TC 876.63 M.E. TC 876.24 M.E. TC 875.78 M.E. TC 875.31 M.E. TC 875.28 M.E. TC 875.24 M.E. TC 876.13 M.E. TC 876.51 M.E. TC 876.39 M.E. TC 875.82 M.E. TC 875.43 M.E. TC 875.13 M.E. 875.58 875.43 875.43 875.16 875.28 875.64 874.75 875.64 875.31 875.65 875.65 875.37 876.11 875.34 875.53 875.63 876.22877.94 878.12 878.65 877.59 876.65 T/C 875.93 T/C 875.93 T/C 876.31 T/C 877.15 T/C ??? T/C 876.72 T/C 876.13 T/C 876.03 T/C 875.84 T/C 876.61 T/C 875.87 T/C 876.15 T/C 876.15 T/C 875.81 T/C 876.14 T/C 875.25 T/C 876.14 T/C 875.66 876 876 876 876 876 876 877 876.13 876.13 875.97 875.80 876.13 875.81 T/C 875.78 -2.1% -1.7% -1.6% -0.8% -2.4% -1.2% -2.4% -1.7% -0.6% EX CB PR RIM 874.84 (SEE NOTE 5) EX RIM 875.11 (SEE NOTE 1) EX CB PR RIM 874.10 (SEE NOTE 5) EX RIM 873.49 (SEE NOTE 1) 12" IE 871.39 N (SEE NOTE 2) PR CB - 1 RIM 875.30 12" IE 870.33 NE (SEE NOTE 3) 12" IE 870.23 SW PR CB - 2 RIM 874.96 12" IE 870.96 SW (SEE NOTE 3) PR CB - 3 RIM 875.40 12" IE 871.40 S (SEE NOTE 3) 127 LF 12" RCP STORM SEWER @ 0.5% 25 LF 12" RCP STORM SEWER @ 0.5% MIN EXISTING STORM STRUCTURE SOUTHEAST GRADING ENLARGEMENT PLAN NORTHWEST GRADING ENLARGEMENT PLAN SOUTHWEST GRADING ENLARGEMENT PLAN EX CB PR RIM 875.10 (SEE NOTE 5) EX RIM 875.02 (SEE NOTE 1) 12" IE 871.30 E (SEE NOTE 2) 18" IE 864.12 NW 12" IE 871.30 N 74 LF 12" RCP STORM SEWER @ 0.5% (SEE NOTE 4) EX CB PR RIM 875.25 (SEE NOTE 5) EX RIM 875.47 (SEE NOTE 1) 12" IE 869.86 NE (SEE NOTE 2) 24" IE 862.43 NW 18" IE 862.67 SE 24" IE 868.25 SW 15" IE 863.33 S 3 C-4.1 1 C-4.1 2 C-4.1 LIMITS OF CONSTRUCTION (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: PARKING LOT GRADING AND DRAINAGE PLAN PROJECT NORTH 1" = 20' C-4.0 Feet 0 20 40
  • 10. 877 878 TC 877.39 M.E. TC 877.52 M.E. TC 877.84 M.E. TC 878.04 M.E. TC 878.14 M.E. TC 878.32 M.E. TC 878.52 M.E. T/C 878.65 TC 878.56 M.E. TC 878.58 M.E. TC 878.46 M.E. TC 878.28 M.E. TC 878.10 M.E. TC 877.90 M.E. T/C 878.66 T/C 878.68 T/C 878.56 T/C 878.38 T/C ??? T/C 878.00 878.15 878.18 877.50 T/C 877.94 877.96 878.07 T/C 878.04 877.62 877.94 TC 877.23 M.E. TC 877.09 M.E. TC 877.00 M.E. 877.95 878.19 878.08 875 T/C 876.08 875.58 875.43 875.43 T/C 875.93 875.81 T/C 876.31 TC 875.91 M.E. T/C 876.41 TC 875.97 M.E. TC 875.75 M.E. TC 876.45 M.E. T/C 875.53 875.16 875.20 T/C 875.70 875.28 TC 875.78 M.E. TC 875.40 M.E. T/C 875.66 875.64 T/C 876.14 875.99 876.21 876 T/C 875.93 875.64 T/C 876.14 T/C 875.81 875.31 875.14 T/C 875.64 874.92 TC 875.42 M.E. 875.65 T/C 876.15 875.35 T/C 875.85 875.65 T/C 876.15 875.37 T/C 875.87 T/C 875.95 875.45 TC 875.81 M.E. TC 875.91 M.E. TC 876.10 M.E. T/C 876.12 875.62 TC 875.15 M.E. TC 875.23 M.E. 876 876 876 (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: 1" = 10' NORTHWEST GRADING ENLARGEMENT PLAN 1 1" = 10' SOUTHWEST GRADING ENLARGEMENT PLAN 2 1" = 10' SOUTHEAST GRADING ENLARGEMENT PLAN 3 GRADING ENLARGEMENTS PROJECT NORTH 1" = 10' C-4.1 Feet 0 10 20
  • 11. REMOVE EXISTING LINE STRIPING REMOVE TIMBER RETAINING WALL (109 LF) FULL DEPTH TREE REMOVAL REMOVE LAWN AND TOPSOIL TILL 12" BELOW EXISTING PAVEMENT AND 18" OF ADJACENT WEARING COURSE FOR BUTT JOINT (885 SF) REMOVE TIMBER RETAINING WALL (109 LF) FULL DEPTH TREE REMOVAL REMOVE LIGHT POLE (SALVAGE TO OWNER) REMOVE TIMBER RETAINING WALL (109 LF) FULL DEPTH TREE REMOVAL REMOVE LAWN AND TOPSOIL TILL 12" BELOW EXISTING PAVEMENT AND 18" OF ADJACENT WEARING COURSE FOR BUTT JOINT (434 SF) REMOVE LAWN AND TOPSOIL TILL 12" BELOW EXISTING PAVEMENT AND 18" OF ADJACENT WEARING COURSE FOR BUTT JOINT (435 SF) STANDARD DUTY ASPHALT PAVEMENT BF BF NEW PARKING STALL LINE STRIPING (9' W X 18' L, TYP.) 2 C-6.0 ASPHALT BUTT JOINT 4 C-6.0 STANDARD DUTY ASPHALT PAVEMENT 2 C-6.0 ASPHALT BUTT JOINT 4 C-6.0 STANDARD DUTY ASPHALT PAVEMENT 2 C-6.0 ASPHALT BUTT JOINT 4 C-6.0 12EQUALSPACES@9'WIDE (108.00')V.I.F. TOPSOIL STRIPPING PAVEMENT LINE STRIPING REMOVAL UTILITY REMOVAL STRUCTURE REMOVAL FULL DEPTH TREE REMOVAL EDGE OF BUTT JOINT NEW PARKING SPACE LINE STRIPING STANDARD DUTY ASPHALT PAVEMENT LEGEND (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: MIAMI INN PARKING LOT IMPROVEMENTS PROJECT NORTH 1" = 20' C-5.0 Feet 0 20 40 SCALE: 1" = 20' SITE REMOVAL PLAN 1 SCALE: 1" = 20' LAYOUT AND MATERIALS PLAN 2 NOTE: 1. EXISTING TOPOGRAPHIC SURVEY NOT AVAILABLE FOR MIAMI INN PARKING LOT AREA. FIELD VERIFY EXISTING CONDITIONS. 2. SLOPE ALL NEW PAVEMENT TO DRAIN FOLLOWING THE EXISTING ADJACENT PAVEMENT SLOPES.
  • 12. 4" 2" EXPANSION OR CONTROL JOINT, TYP. BROOMING TO BE PERPENDICULAR TO PEDESTRIAN TRAFFIC. TROWEL CONCRETE BORDER AT ALL EDGES AND JOINTS. LIGHT BROOM FINISH NOTE: THIS DETAIL APPLIES TO ALL CONCRETE PAVEMENT, INCLUDING 6 IN. CONCRETE PAVEMENT. 6"MIN SUBGRADE 3" - 5" NATURAL LIMESTONE RIP RAP GEOTEXTILE FABRIC PARKING GARAGE SLOPE SUBGRADE @ 1 4" / FOOT AWAY FROM BUILDING 2"8"2" ASPHALT TOP COURSE ASPHALT LEVELING COURSE COMPACTED AGGREGATE BASE COMPACTED SUBGRADE 3"8"2" ASPHALT TOP COURSE ASPHALT LEVELING COURSE COMPACTED AGGREGATE BASE COMPACTED SUBGRADE 1'-6" OVERLAP ASPHALT LEVELING COURSE OF EXISTING PAVEMENT WITH ASPHALT TOP COURSE OF NEW PAVEMENT SAWCUT EXISTING ASPHALT PAVEMENT TO FULL DEPTH SAWCUT AND REMOVE 1-1 2" ASPHALT SURFACE COURSE OF EXISTING PAVEMENT. FIELD VERIFY DEPTH EXISTING ASPHALT SURFACE COURSE EXISTING AGGREGATE BASE COURSE EXISTING PAVEMENT NEW PAVEMENT EXISTING ASPHALT LEVELING COURSE 6"6" 2" WIDTH VARIES, SEE PLANS MATCH EXISTING 3:1 MAX GRADE SLOPE VARIES 3:1 MAX GRADE MATCH EXISTING CONCRETE WALK 6x6 6/6 42# /100 S.F. WELDED WIRE FABRIC COMPACTED AGGREGATE BASE COMPACTED SUBGRADENOTES: 1. CONSTRUCTION JOINTS: SURFACE OF WALKS TO BE DIVIDED INTO EQUALLY SPACED BLOCKS @ SIDEWALKS' WIDTHS INTERVALS. 2. FINISH: BROOM FINISH WITH TOOLED EDGE AND JOINTS. 3. STRENGTH: 4000 PSI 5% - 7% ENTRAINED NOTES: 1. AT 90° ANGLE POINTS IN THE CURB LINE, PLACE EXPANSION JOINTS IN THE "LONG LEG" 18" FROM THE BACK OF CURB OF THE "SHORT LEG" 2. ALL REINFORCING #4 REBAR, CONTINUOUS BETWEEN EXPANSION JOINTS 9" 7 8 " 1'-2" 9" 4" 1'-6" 4" 5" 51 2" 13 4" R2" R2" T/C (TOP OF CURB) ELEVATION GIVEN ON PLANS 1"/FT SLOPE 2"2"8" ASPHALT LEVELING COURSE ASPHALT SURFACE COURSE COMPACTED AGGREGATE BASE SUBGRADE 1" RADIUS5" 1" 1'-6" 1 2" 6" 6"6" 2" CONCRETE WALK 6x6 6/6 42# /100 S.F. WELDED WIRE FABRIC COMPACTED AGGREGATE BASE COMPACTED SUBGRADE 2"2"8" COMPACTED AGGREGATE BASE ASPHALT LEVELING COURSE ASPHALT SURFACE COURSE 1'-6" NOTES: 1. CONSTRUCTION JOINTS: SURFACE OF WALKS TO BE DIVIDED INTO EQUALLY SPACED BLOCKS @ SIDEWALKS' WIDTHS INTERVALS. 2. FINISH: BROOM FINISH WITH TOOLED EDGE AND JOINTS. 3. STRENGTH: 4000 PSI 5% - 7% ENTRAINED 6" (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: SCALE: 1"=1' STONE MULCH 1 SCALE: 1" = 1' ASPHALT PAVEMENT STANDARD DUTY 2 SCALE: 1" = 1' ASPHALT PAVEMENT HEAVY DUTY 3 SCALE: 1"=1' ASPHALT BUTT JOINT 4 SCALE: 1"=1' 6 IN CONCRETE PAVEMENT 5 SCALE: 1"=1' CONCRETE TROWEL & BROOM FINISH 6 SCALE: 1"=1' CURB AND GUTTER 7 SCALE: 1"=1' CURB WITHOUT GUTTER 8 SCALE: 1"=1' FLUSH CURB 9 SITE DETAILS AS NOTED C-6.0
  • 13. JOINT SEALANT TOP OF PAVEMENT NOTE: BACKER ROD AND SEALANT PER MANUFACTURER'S RECOMMENDATIONS FOAM BACKER ROD EXPANSION JOINT MATERIAL 1/4" CONTROL JOINT TO 1/4 DEPTH OF PAVEMENT COMPACTED SUBGRADE COMPACTED AGGREGATE BASE CONCRETE PAVEMENT FINISH GRADE PER PLAN AND PROFILES FINAL BACKFILL (GRANULAR FILL UNDER PAVED AREAS, GENERAL SITE FILL UNDER NON-PAVED AREAS) SLOPE PER OSHA SAFETY STANDARDS INITIAL BACKFILL (GRANULAR BACKFILL) PIPE MATERIAL AND SIZE PER PLAN AND PROFILE BEDDING COURSE (GRANULAR BEDDING) UNDISTURBED SUBGRADE KEYED NOTES O.D. ≤ 12", W = 30" O.D. = 15" - 24", W = O.D.+18" O.D. = 30" - 36", W = O.D.+24" DETAIL NOTES W = MAX. TRENCH WIDTH 1'-0" MIN. 4" MIN. O.D. (614) 766-4896 Dublin, OH, 43016 6130 Wilcox RD. Site Lighting and Electrical Prater Engineering Associates, Inc. SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER North Campus Garage and Miami Inn Surface Parking Lot Renovations MIAMI UNIVERSITY OXFORD, OHIO Owner: DATEREVISSUED FOR 201 DEPOT STREET SECOND FLOOR ANN ARBOR, MI 48104 734.662.4457 www.smithgroupjjr.com ELECTRICAL ENGINEERING: CIVIL ENGINEERING: SCALE: 1"=1' SEALED EXPANSION JOINT 10 SCALE: 1"=1' CONTROL JOINT 11 SITE DETAILS AS NOTED C-6.1 NTS. UTILITY TRENCH 13 NTS. CATCH BASIN 14