FEDERAL MINISTRY OF POWER
MID-TERM ACHIEVEMENTS OF PRESIDENT GOODLUCK JONATHAN, GCFR,
IN THE POWER SECTOR
PRESENTED AT THE 2013 MINISTERIAL PLATFORM
FOR THE PERIOD OF MAY, 2011 – MAY 2013
ON
TUESDAY, JULY 23rd, 2013
BY
PROF. CHINEDU NEBO, OON, NPOM
HONOURABLE MINISTER OF POWER
&
HAJIYA ZAINAB IBRAHIM KUCHI, FICMC
HONOURABLE MINISTER OF STATE FOR POWER
FEDERAL MINISTRY OF POWER
1
FEDERAL MINISTRY OF POWER 2
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 3
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 4
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 5
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 6
AMBASSADOR (DR) GODKNOWS IGALI OON, FNAH
Permanent Secretary, Federal Ministry of Power
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Let me start by acknowledging the high-level political will of His Excellency,
President Dr. Goodluck Ebele Jonathan, GCFR and His Excellency, Vice-President,
Arc. Mohammed Namadi Sambo, GCON, to have launched the process fundamental
to the transformation witnessed in the power sector in recent years. Without this
level of commitment, the achievements recorded from 2011 to date would not
have been realised.
More importantly, the launching of the Power Sector Roadmap by Mr. President in
August, 2010 has accelerated the pace of the reform and the significant
achievements recorded so far in the power sector.
Introduction
7
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
•PTFP
•GenCos
•TCN
•DisCos
•NDPHC
•NBET
•NELMCO
•EMS
•NAPTIN
•REA
•HYPERDEC
• Residential
• Commercial
• Industrial
• NERC• FMoP
Policy Regulation
OperationsCustomers
Introduction…Cont’d.
Power Sector Structure
8
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Introduction…Cont’d.
Focus on Activities of the Power Sector
Power stability, reliability &
sustainability
Diversification of energy mix
(large hydros, renewables &
coal)
Electricity market stabilization
Improving rural access to
electricity
Human capacity development
Improving policy and
regulatory environment for
rapid growth through private
investment
Reducing production cost and
making manufacturing sector
more competitive
Empowering SMEs with more
power supply and creating
employment
9
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Omotosho
304MW
Ibom
190MW
Afam VI
650MW
Shiroro
600MW
Jebba
540MW
Kainji
760MW
Egbin
1,320MW
Delta
900MW
Afam I-V
726MW
Okpai
450MW
Sapele
720MW
Omoku
120MW
N I G E R I A
Power Generation.
Existing Power Stations Connected to Grid
Design
Installed
Capacity (MW)
Kainji 760
Jebba 540
Shiroro 600
Olorunsogo 304
Egbin 1320
Sapele - FGN 720
Delta 900
Afam I-V 726
Afam VI
(Shell) 650
Okpai
Omoku
Omotosho 304
Geregu 414
AES 294
Ibom Power 190lorunsogo
304MW
AES
294MW
Geregu
414MW
450
120
10
FEDERAL MINISTRY OF POWER
Power Generation. Cont’d
Rehabilitation Works
11
• Shiroro: Repair works on Unit 2 which led to recovery of 150MW in 2012
Hydropower Plant.
• Jebba: Hydro Power Station preventive maintenance of 2G2 in 2012 to
ensure availability and sustainability of 96.4MW.
• Egbin: In 2012, several worn parts of the plant were replaced with new
ones. This has improved plant reliability from 60% to more than
70%.
• Kainji: Rehabilitation works on 1G5 & 1G12 Units to recover 220MW
capacity by Dec 2014.
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Power Generation. Cont’d
Rehabilitation Works – Kainji Hydro Power Station
Rehabilitation works on 1G5 & 1G12 Units to recover 220MW capacity by Dec 2014
12
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 13
Mambilla
3050MW
Calabar
563MW
Geregu-2
434MW
Olorusogo-2
675MW
Omotosho-2
451MW
Alaoji
960MW
Egbema
338MW
Omoku
225MW
Ihovbor
450MW
Sapele
450MW
Gbarain
225MW
Kaduna
215MW
Katsina wind
10MW
Zungeru
700MW
Kashimbila
40MW
Gurara
30MW
Installed Capacity
(MW)
Katsina 10
Kaduna 215
Zungeru 700
Gurara I 30
Mambilla 3,050
Olorunsogo -2 675
Omotosho - 2 451
Geregu - 2 434
Kashimbilla 40
Ihovbor 450
Sapele 450
Gbarin 225
Omoku 225
Alaoji 960
Egbema 338
Calabar 563
13
Power Generation. Cont’d
Newly Completed/On-going Power Plants for Increased Generation
FEDERAL MINISTRY OF POWER
Power Generation. Cont’d
Completed Generation Projects in the period under review
14
S/No Power Station Date MW Cumulative MW
1 Olorunsogo Jan-11 112.5 112.5
2 Olorunsogo Feb-11 112.5 225.0
3 Olorunsogo May-11 112.5 337.5
4 Sapele Aug-11 112.5 450.0
5 Olorunsogo Nov-11 112.5 562.5
6 Sapele Feb-12 112.5 675.0
7 Alaoji Apr-12 112.5 787.5
8 Omotosho Apr-12 112.5 900.0
9 Olorunsogo Jul-12 112.5 1,012.5
10 Sapele Aug-12 112.5 1,125.0
11 Omotosho Aug-12 112.5 1,237.5
12 Alaoji Sep-12 112.5 1,350.0
13 Omotosho Oct-12 112.5 1,462.5
14 Sapele Oct-12 112.5 1,575.0
15 Omotosho Dec-12 112.5 1,687.5
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Energy Mix
In order to enhance the security of power supply, government is
assiduously working towards the diversification of the fuel mix. In this
regard, the nation’s vast resources of coal, wind, solar, biomass and
hydropower potentials are being fully exploited.
• Feasibility Studies on the development of coal to power are on-
going in five(5) coal blocks in Enugu axis and three (3) coal blocks in
Benue, Kogi and Gombe axis. Progress of work on the studies is at
25% and is expected to focus on clean coal technology.
• Feasibility Studies on ten (10) dams with small hydropower
potentials which commenced in Y2011 have been completed and
ready for concession.
15
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Hydro Power Development in Nigeria
16
• Zungeru project in Niger State…………………….700MW
• Mambilla project – Taraba State…………………..3,050MW
• Gurara II project – Niger State……………………...360MW
• Gurara I Project Niger State…………………………..30MW
• Itisi project – Kaduna State……………………………40MW
• Kashimbilla project – Taraba State…………………40MW
• Other Small/medium hydropower projects – Nationwide
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Hydro Power Development in Nigeria
Small/Medium Hydropower studies completed by FMP from 2011 to date
S/N DAM STATE CAPACITY (MW)
1 Oyan Ogun 10
2 Ikere Gorge Oyo 6
3 Bakolori Zamfara 3
4 Challawa Kano 7.5
5 Tiga Kano 10
6 Kampe Kogi 3
7 Owena Ondo 0.45
8 Doma Nasarawa 1
9 Zobe Katsina 0.30
10 Jibia Katsina 4
17
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Hydro Power Development in Nigeria
360MW GURARA II Multi-purpose Project
C.A. 2,510
km2
C.A. 2,840
km2
Gurara II
Located
140km
downstream
of Gurara I
and 40km
from Abuja
Design basis:
360MW and
1,130GWhr of
energy per
annum
IRR = 8.9% at
MYTO tariff
Estimated
cost: US$800m
Irrigation
potential:
8,000Ha
18
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Hydropower Development in Nigeria
(Zungeru)
19
The construction of the 700MW Zungeru hydropower project was approved by FEC in
2012 in favour of a consortium of Messrs. Sinohydro/CNEEC in the contract sum of
US$ 1.237 billion and a completion period of 48 months.
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Hydropower Project in Nigeria
Zungeru
20
•Ground breaking ceremony for the project was performed by His Excellency President
Goodluck Jonathan, GCFR on 28th May, 2013
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
River Basins with Large and Small Scale Hydropower Potential
Focus on Renewable Energy Resources Development
Solar Map Hydro Potentials
21
FEDERAL MINISTRY OF POWER
River Basins with Large and Small Scale Hydropower Potential
FEDERAL MINISTRY OF POWER
Focus on Renewable Energy Resources Development
contd.
Wind Map
22
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
The 10 MW Katsina Windfarm Power Project is at 98% completion and will
soon be commissioned
Focus on Renewable Energy Resources Development
contd.
23
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Nigeria’s Transmission Grid
24
• Transmission development activities are mainly carried out by Transmission
Company of Nigerian (TCN) and Niger/Delta Power Holding Company
(NDPHCN) under the National Independent Power Project (NIPP).
• TCN Projects are funded through the statutory budgets from the FGN.
• NIPP projects are funded by the 3-tiers of the government from the excess crude
account.
• For the period under review several transmission projects have been completed
which lead to modest increase in the nation’s transmission capacity as listed in
the following slides.
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
330kV
System
Capacity
(blue line)
6870 MW
5650 KM
Nigeria 330kV Network
25
Nigeria’s Transmission Grid
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Nigeria’s Transmission Grid
Completed Transmission Projects (Substations) - NIPP
26
PROJECT DESCRIPTION MVA
LOT 9-A 330/132/33KV Ganmo SS (New) 300
LOT 9-B 132/33KV Ayede SS (Ext.) 150
LOT 10-A 132/33KV Central Area SS (Ext.) 60
LOT 10-B 330/132KV Katampe SS (Ext.) 150
LOT 10-C 132/33KV Kumbotso SS (Ext.) 60
LOT 10-D 330/132/33KV Mando SS (Ext.) 150
LOT 11-A 132/33KV Agbara SS (Ext.) 60
LOT 11-B 132/33KV Ikeja West SS (Ext.) 150
LOT 11-C 132/33KV Ojo SS (Ext.) 120
LOT 11-D 132/33KV Oworonsoki SS (Ext.) 120
LOT 13-A 330/132KV Aja G.I.S. SS (Ext.) 150
LOT 13-B 132KV Aja G.I.S. SS (Ext.)
LOT 24-1 330/132KV Papalanto SS (New) 450
LOT 26-1 330/132KV Omotosho SS (New) 450
LOT 27A 330KV Sapele SS (Rehab. & Ext.)
LOT 27B 330KV Benin SS (Rehab.)
TOTAL 2,370
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Nigeria’s Transmission Grid
Completed Transmission Projects (Lines) - NIPP
27
PROJECT DESCRIPTION LENGTH (KM)
LOT 9-C 330KV DC Ganmo-(Jebba/Osogbo SC - Turn in/Turn out) 12
LOT 9-D 132KV DC Ganmo-(Ilorin/Oshogbo SC Turn in/Turn out) 2
LOT 19-3A 330KV DC Ihovbor-(Benin Main-Oshogbo) (Line A) 17
LOT22-2 330KV DC Ajaokuta-Lokoja-Gwagwalada 222
LOT 24-2 330KV DC Papalanto-(Ikeja West/Ayede) 16
LOT 26-2 330KV DC Omotosho - Ikeja West 5
TOTAL 274
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 28
Nigeria’s Transmission Grid
Completed Transmission Projects - TCN
Completed Projects from 2011 to Date
S/N Title of Project
Project
Location
Deliverables
1Construction of 150MVA 330/132/33kV T/F and 330kV bays
at Onitsha and Benin.
Edo & Anambra 150MVA increase in transformer capacity at 330kV Voltage
level at Onitsha
2Calabar 2x150MVA, 330/132/33kV Substation and line bay at
Alaoji Substation.
Cross River &
Abia
300MVA Transformer capacity at 330kV level in Calabar,
Cross River State
3Construction of Alaoji-Umuahia 132kV DC line Abia 50km of 132kV Transmission line. Increase wheeling
capacity to Umuahia, Abia State
4Umuahia 2x30/40MVA, 132/33kV Substation Abia 80MVA Transformer capacity at 132kV level in Umuahia,
Abia State
5Gombe-Damaturu-Maiduguri 330kV line. Gombe, Yobe &
Borno
376km of 330kV Transmission line. Increase wheeling
capacity to Yobe and Borno States
6Jos - Kafanchan 132KV D/C Line . Plateau &
Kaduna
80km of 132kV Transmission line. Increase wheeling
capacity to Kafachan & Environs, Kaduna State
72 x 30MVA 132/33KV S/S at Pankshin and Makeri Plateau 60MVA Transformer capacity at 132kV level in Makeri &
Pankshin towns in Plateau State
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 29
Nigeria’s Transmission Grid
Completed Transmission Projects - TCN
Completed Projects from 2011 to Date
S/N Title of Project Project Location Deliverables
83rd Benin - Onitsha 330KV DC Line Edo, Delta & Anambra 131km of 330kV Transmission line. Increase wheeling
capacity to Onitsha & Environs, Anambra States
9Rehabilitation of Sokoto – Talata Mafara 132KV DC line Sokoto & Zamfara Recovery of 125km of 132kV Transmission line
10Transmission & Supply of Substation at Tamburawa Water
Facility
Kano 80MVA Transformer capacity at 132kV level in
Tamburawa
111X30 MVA 132/33 KV SS at Kwanar Dangora Kano 30MVA Transformer capacity at 132kV level in Kwanar
Dangora
12Reinforcement of Birnin Kebbi and Kumbotso Substations
with 1x150MVA, 330/132kV transformer each.
Kebbi and Kano States 150MVA transformer capacity increase at 330kV level
in both Birnin Kebbi and Kano
1Kainji-New Bussa 330kV single-circuit transmission line Kainji to New Bussa in
Niger State
8.6km of 330kV transmission line to link Kainji and
New Bussa
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 30
Nigeria’s Transmission Grid.
On-Going TCN Projects at advanced stages of Implementation
S/
N
Project Description Name of Contractor
Project
Location
Project Total Cost
(Naira)
Project Deliverables
Status of
Implement
ation (%)
Impact of Project
1Arochukwu
2x30/40MVA,
132/33kV substation
Omen International Ltd.Abia State 937,496,022.58 80MVA Transformer
capacity at 132kV level in
Arochukwu, Abia State
86% Improvement of Power supply to
Arochukwu and environs and
enhancement of socio-economic
life of the people.
2Mbalano-Okigwe
132kv SC line
Atlantic Engineering &
Construction
Mbalano
(Abia) to
Okigwe
(Imo)
329,754,483.86 20km of 132kV
Transmission line.
100% Improvement of Power supply to
Okigwe and environs and
enhancement of socio-economic
life of the people.
3Okigwe
2x30/40MVA
132/33kV
Substation
Union Allied
Engineering Ltd.
Imo State 1,839,789,715.03 80MVA Transformer
capacity at 132kV level in
Okigwe, Imo State
60% Improvement of Power supply to
Okigwe and environs and
enhancement of socio-economic
life of the people.
4Umuahia-Ohafia
132kv SC line
Harlesden Engineering
Ltd
Umuahia to
Ohafia in
Abia State
1,257,267,830.78 49.5km of 132kV
Transmission line.
60% Improvement of Power supply to
Ohafia and environs and
enhancement of socio-economic
life of the people.
5Ohafia 2x30/40MVA
132/33kV
substation.
Union Allied
Engineering Ltd.
Abia State 1,972,613,202.90 80MVA Transformer
capacity at 132kV level in
Ohafia, Abia State
60% Improvement of Power supply to
Ohafia and environs and
enhancement of socio-economic
life of the people.
6Mbalano
2x30/40MVA
132/33kV
substation.
Union Allied
Engineering Ltd.
Abia State 1,409,011,316.42 80MVA Transformer
capacity at 132kV level in
Mbalano, Abia State
60% Improvement of Power supply to
Mbalano and environs and
enhancement of socio-economic
life of the people.
FEDERAL MINISTRY OF POWER 31
Nigeria’s Transmission Grid.
On-Going TCN Projects at advanced stages of Implementation
S/N Project Description Name of Contractor
Project
Location
Project Total Cost
(Naira)
Project Deliverables
Status of
Implementation
(%)
Impact of Project
71x150MVA,330/132KV
Transformer at Birnin
Kebbi and Reinforcement
at 330/132KV substation at
Kumbotso
MBH Power Kebbi and
Kano States
3,559,832,144.00 150MVA Transformer capacity at
330KV level in Birnin Kebbi
98% Improvement of Power supply to
Birnin Kebbi, Kumbotso and
envirohancemens and enhance
ment of socio-economic
activities in the areas.
8Kainji - New Bussa 132KV
DC Transmission line &
330KV SC River crossing
Dextron Engineering Ltd Kainji to New
Bussa, Niger
State
308,108,608.00 132kV and 330KV transmission
lines to wheel more power to
Nerw Bussa.
98% Improvement of Power supply to
New Bussa and environs and
enhancement of socio-economic
life of the people.
9Katampe-National Stadium
132kv DC line
ABB Powerlines;
Energo Nigeria Ltd
FCT 2,656,115,130.98 8.4km of 132kV double-circuit
underground cable and 4km of
132kV DC overhead transmission
line.
55% Improvement of Power supply to
the FCT.
10Kainji 1x150MVA,
330/132KV & 2x30/40MVA
substation at New Bussa
MBH Power Niger State 4,599,287,900.00 150MVA Transformer capacity in
kainji, Niger State.
89% Improvement of Power supply to
New Bussa and environs and
enhancement of socio-economic
life of the people.
112x60MVA, 132/33KV
Substation at Odogunyan
and Ayobo with 132KV DC
line Ikeja west - Ayobo.
LAGA CePower Lagos State 3,657,155,630.00 120MVA Transformer capcity at
132kV level at Odogunyan and
Ayobo.
89% Improvement of Power supply to
Odogunyan, Ayobo and environs
and improvement of socio-
economic activities in the areas.
12Ikorodu - Odogunyan -
Shagamu 132KV DC
Transmission line
PPCL/ Westcom JV Ikorodu to
Odogunyan,
Lagos State
3,192,097,186.00 132kV DC transmission line
from Ikorodu to Odogunyan
52% Improvement of Power supply to
Odogunyan, Shagamu and
environs and improvement of
socio-economic activities in the
areas.
13Damaturu 330/132kV
Substation
Parsian High
VoltageDiv./ Cartlark
Int'l Ltd
Yobe State 2,502,960,280.52 150MVA Transformer capacity at
330kV level in Damaturu, Yobe
State
80% Improvement of Power supply to
Damaturu and environs and
improvement of socio-economic
activities in the areas.
FEDERAL MINISTRY OF POWER 32
Nigeria’s Transmission Grid.
On-Going TCN Projects at advanced stages of Implementation
S/N Project Description
Name of
Contractor
Project
Location
Project Total Cost
(Naira)
Project Deliverables
Status of
Implementati
on (%)
Impact of Project
14Nnewi 2x60 MVA 132kV
substation
Valenz Holdings
(Nig) Ltd.
Anambra State 735,801,070.00 120MVA Transformer capacity at
330kV level in Nnewi
65% Improvement of Power supply to
Nnewi and environs and
improvement of socio-economic
activities in the areas.
15Kafanchan 132kv 2 x
60mva Substation
Valenz Holding Ltd Kaduna State 1,407,774,049.57 120MVA Transformer capacity at
132kV level in Kafanchan
80% Improvement of Power supply to
Kafanchan and environs and
improvement of socio-economic
activities in the areas.
16Makeri - Pankshin 132KV
DC Line
Mogabs Nig. Ltd Makeri to
Pankshin,
Plateau State
1,295,611,365.16 Rehabilitation of 122km of
132kV Transmission line.
75% Improvement of Power supply to
Pankshin and environs and
improvement of socio-economic
activities in the areas.
172 x 30MVA 132/33KV S/S
at Pankshin and Makeri
North China/EESE Plateau State 1,783,781,485.32 60MVA Transformer capacity at
132kV level in Makeri &
Pankshin towns in Plateau State
100% Improvement of Power supply to
Makeri, Pankshin and environs
and improvement of socio-
economic activities in the areas.
18Kano- Walalanbe 132KV
Line (Turn in and out of
Dan agundi-Dakata 132KV
single Cct Line) and 2 x
30/40MVA S/S at
Walalambe
GIT Kano Sate 1,783,781,485.32 132kV DC Transmission line &
80MVA Transformer capacity at
132kV level in Walalambe
55% Improvement of Power supply to
Kano and environs and
improvement of socio-economic
activities in the areas.
19Yelwa - Yauri 2 x
30/40MVA S/S and 100KM
of 33KV Line
Valenz/
Electromontaz
Kebbi State 1,242,074,910.89 100km of 33kV line & 80MVA
Transformer capacity at 132kV
level in Yelwa, Kebbi State
60% Improvement of Power supply to
Yelwa, Yauri and environs and
improvement of socio-economic
activities in the areas.
20Umuahia - Mbalano 132KV
Line
Santon Energy L:td Abia State 991,759,726.68 30km of 132kV DC Transmission
line.
67% Improvement of Power supply to
Mbalano and environs and
improvement of socio-economic
activities in the areas.
21Ohafia - Arochukwu 132KV
Line
Mogabs Nig. Ltd Abia State 856,128,363.00 40km of 132kV DC Transmission
line.
45% Improvement of Power supply to
Arochukwu and environs and
improvement of socio-economic
activities in the areas.
FEDERAL MINISTRY OF POWER 33
Nigeria’s Transmission Grid.
On-Going TCN Projects at advanced stages of Implementation
S/N Project Description
Name of
Contractor
Project
Location
Project Total Cost
(Naira)
Project Deliverables
Status of
Implementati
on (%)
Impact of Project
22Kukwaba 2x60MVA,
132/33kV substation
North China Power
Egnineering
FCT 2,568,846,118.51 120MVA Transformer capacity
at 132kV level in Kukwaba, FCT
40% Improvement of Power supply to
the FCT.
232x60MVA, 132KV/33 at
Aboh -Mbaise S/S
Ashtavinayaka/Bran
Engineering
Imo State 1,480,777,014.45 120MVA Transformer capacity at
132kV level in Aboh Mbaise in
Imo State
65% Improvement of Power supply to
Aboh Mbaise and environs and
improvement of socio-economic
activities in the areas.
242x60 MVA, 132/33 kV
substation at Ideato and 2
x132KV Line Bays at
Okigwe
Ashtavinayaka/Bran
Engineering
Imo State 1,739,004,381.00 120MVA Transformer capacity at
132kV level in Ideato in Imo
State
60% Improvement of Power supply
toIdeato and environs and
improvement of socio-economic
activities in the areas.
252x60 MVA, 132/33 kV
substation at Oba and
2 x132KV Line Bays at
Nnewi
Xian/GIT Engineering Anambra State 1,863,432,339.00 120MVA Transformer capacity
at 132kV level in Oba.
45% Improvement of Power supply to
Oba and environs and
improvement of socio-economic
activities in the areas.
26Oshogbo- Ede 132KV DC
Line
Aster Infrast/Aster
Teleservices
Osun State 1,490,085,721.56 15km of 132kV DC transmission
line
53% Improvement of Power supply to
Ede and environs and
improvement of socio-economic
activities in the areas.
27DC 132kV line from Alscon
to Ibom Power and
Switching Station to link
the GIS at Alscon with
associated bay extensions
at Ibom Power - Akwa
Ibom State
KEC International
Limited
Akwa Ibom
State
747,246,322.01 2.5km of 132kV DC Transmission
line and 150km of 132kV DC
underground Cable
45% Improvement of Power supply to
Akwa Ibom State and
improvement of socio-
economiclife of the people.
28Reconductoring of Afam-
Port Harcourt 132kV line
Electrical Solutions Ltd Ricers State 290,000,000.00 Rehabilitation of 37.8km of
132kV Transmission line with
increased wheeling capacity
100% Improvement of Power supply to
Port Harcourt and environs and
improvement of socio-economic
activities in the areas.
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Nigeria’s Transmission Grid
NIPP Completed Transmission Projects
LOT 10-B (Charnel/AkAy 150MVA 330/132kV Katampe SS (Extension) in full service
LOT 11-B (Charnel/AkAy 150MVA 330/132kV Ikeja West SS (Extension) in full service
34
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Distribution Activities
35
To ensure availability of un-interrupted power supply to
the consumers, this administration executed various
distribution projects (maintenance/expansion) across the
country through the eleven (11) Electricity Distribution
Companies (DisCos)
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
NIPP Completed Distribution Projects
36
• Abuja Zone –
- ABUJA - AIRPORT 33KV DC LINE
- APO 1 X 15MVA INJECTION S/S TRANSFORMER
• Benin Zone –
- IHOVBOR 2 X 2.5MVA INJECTION S/S TRANSFORMER
- AKURE Main 1x15mva INJECTION TRANSFORMER
• Eko –
- NEW IDUMAGBO 1 X 15MVA INJECTION S/S TRANSFORMER
- Beckely 1 X 15mva Injection S/S Transformer
- Alagbon 1 X 15mva Injection S/S Transformer
- Fowler 1 X 15mva Injection S/S Transformer
- Apapa Road 1 X 15mva Injection S/S Transformer
- Nitel 1 X 15mva Injection S/S Transformer
- Tincan 1 X 15mva Injection S/S Transformer
- Agbara 1 X 15mva Injection S/S Transformer
- Ajangbadi 1 X 15mva Injection S/S Transformer
• Ibadan Zone
- Akobo 1 X 15mva Injection S/S Transformer
- Awe - Oyo 1 X 7.5mva Injection S/S Transformer
- Samanda 1 X 15mva Injection S/S Transformer
- Apata 1 X 15mva Injection S/S Transformer
- Ikiru Road 1 X 15mva Injection S/S Transformer
-Tinumola 1 X 7.5mva Injection S/S Transformer
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
NIPP Completed Distribution Projects contd.
37
• Ikeja
- IPAKODO 1 X 15MVA INJECTION S/S TRANSFORMER
- IJEDE 1 X 15MVA INJECTION S/S TRANSFORMER
- AGBOWA 1 X 15MVA INJECTION S/S TRANSFORMER
- OWUTU 1 X 15MVA INJECTION S/S TRANSFORMER
- IMOTA 1 X 15MVA INJECTION S/S TRANSFORMER
- MAGODO 1 X 15MVA INJECTION S/S TRANSFORMER
• Kaduna
- ZAMBIAN CRESCENT 1 X 2.5MVA INJECTION S/S TRANSFORMER
- KAGORO 1 X 7.5MVA INJECTION S/S TRANSFORMER
- NARAYI 2 X 2.5MVA INJECTION S/S TRANSFORMER
• Jos
- PANKSHIN 1 X 7.5MVA INJECTION S/S TRANSFORMER
- SHENDAM 1 X 7.5MVA INJECTION S/S TRANSFORMER
- COMPLETED INJECTION S/S = 31
- CAPACITY = 492.5 MVA
- COMPLETED CSP TRANSFORMERS = 2514
- COMPLETED 11KV LINES = 1221KM, 33KV = 230KM
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 38
DisCos Completed Distribution Projects
ENUGU ELECTRICITY DISTRIBUTION COMPANY
PROJECTS COMPLETED FROM 2011 TO DATE
DisCos Installed Transformer Capacity from 2011 to date
S/N Description
Year
2011 2012 2013 (as at 31st May)
1 33/11KV Injection Substation (MVA) 959.75 974.75 1,083.50
2
33/0.415KV Distribution Substation
(MVA)
972.67 1,028.62 1,047.32
3
11/0.415KV Distribution Substation
(MVA)
1,600.99 1,657.84 1,680.74
ENUGU ELECTRICITY DISTRIBUTION COMPANY
PROJECTS COMPLETED FROM 2011 TO DATE
DisCos Installed 33KV and 11KV Overhead Lines from 2011 to date
S/N Description
Year
2011 2012
2013 (as at 31st
May)
1 33KV Overhead lines (Km) 6,596.50 6,651.95 6,924.80
2 11KV Overhead lines (Km) 3,464.80 3,504.00 3,522.90
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
SOME COMPLETED INJECTION SUBSTATION & SWITCH YARD in 2012
39
DisCos Completed Distribution Projects contd.
Ikeja DisCo
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 40
 REA was reactivated in June, 2012, to improve rural access to electricity.
 The Ministry has developed a draft REA Strategy and Implementation Plan
and it is being finalized.
 REA will focus on increased exploitation of renewables and the facilitation
of rural electrification projects.
 The Agency carried out Survey, Design, Procurement and Award of
several rural electrification projects under 2012 capital appropriation.
Rural Electrification Agency (REA)
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
The Reform Process : Progress So Far
The Electric Power Sector Reform (EPSR) Act of 2005 provided the platform for the
reform of deregulating the Nigerian Electricity Supply Industry (NESI) from the
control, ownership and regulation of the sector by the Federal government to a
private sector-driven industry. The launching of the Roadmap by Mr. President in
August 2010 has led to significant progress in the implementation of the structural
reforms outlined in the Act.
The major achievements to date are as follows:
i. Bidding and selection of preferred bidders for the 10 Distribution Companies
and the 5 Generation Companies was concluded in November 2012, contracts
have been signed and bidders have already made initial payments of 25% of the
bid price.
ii. Presidential Power Reform Transaction signing and presentation of certificates
for payments of initial deposits to successful bidders of the DisCos and GenCos
by Mr. President was performed on 22nd April, 2013.
iii. Handing over of TCN to Manitoba Hydro International for management
contract concluded. Schedule of Delegated Authority (SODA) give to Manitoba
41
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
The Reform Process : Progress So Far contd.
iv. The Nigerian Electricity Regulatory Commission (NERC) has been reconstituted, strengthened and
now is fully operational.
v. NERC launched MYTO 2 cost-reflective tariff in June, 2012, which is now operational.
vi. Nigeria Bulk Electricity Trading (NBET) PLC was incorporated in July, 2010 and is now in operation as
a credit-worthy off - taker.
vii. The Nigeria Electricity Liability Management Company (NELMCO) was established in 2010 to assume
and manage the assets, liabilities and other obligations that could not be earlier transferred from
PHCN to any successor company
viii. Resolution of Labour issues is almost completed and payment of severance package to commence
this week.
ix. Investor confidence evidenced by increased investment and signing of MoUs. Most recent being
the MoU signed with Power China Corporation to develop 20,000 MW of Thermal Power Plants
with associated substations and transmission lines up to 10,000 km
x. Sale of Ten (10) power plants built by the Niger Delta Power Holding Company Ltd commenced with
road-shows in Lagos, London, Hong Kong and New York.
42
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
The Reform Process : Progress So Far contd.
43
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
The Reform Process : Progress So Far
iv. T
44
His Excellency, the Vice President , Arc. Namadi Sambo presenting certificates to one of the Core
investors in the on-going privatisation of the Power Sector.
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Reform Process:
Resolution of all labour issues
Seated from the left: The Honourable Minister of State for Finance, Yerima Ngama;
Honourable Minister of State for Power, Hajiya Zainab Ibrahim Kuchi; Honourable Minister
of Labour and Productivity, Emeka Wogu together with Labour Union in the sector.
45
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 46
A robust Nigeria Electricity Supply Industry requires a well-trained work force. Hence,
strategies have been put in place to improve the competences of the existing work force
through skill enhancement and professional development programmes. Part of these
strategies include the establishment of the National Power Training Institute of Nigeria
(NAPTIN) to ensure that the human capital needs of the sector are met. Key achievements
include:
1. Rehabilitated six(6) existing Regional Training Centres (RTC) inherited from PHCN and
building of 2 new ultra-modern training centres in Jos and Kano
2. Commenced intensive training of 1,000 graduate engineers (Graduate Skill Development
Program)
3. Trained 70 engineers across the power sector on renewable energy options (solar, wind
+ hybrid)
4. Commissioned Power System Training Simulator at Ijora RTC in October, 2012
Capacity Building
National Power Training Institute (NAPTIN)
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 47
5. Laid foundation for the development of NAPTIN’s permanent site at Idu Industrial
Layout, Abuja in October 2012
6. Completed rehabilitation of mechanical workshop at Ijora Regional Training Center (RTC),
Lagos.
7. Installed / commissioned NAPTIN’s e-Learning platform in December, 2012
8. Installed / commissioned renewable hybrid solar PV + wind demonstration plants at
Kainji RTC in November 2012
9. Completed Faculty profiling and curriculum development in December, 2012
10.Signed MoU with PNN Nigeria Limited (an indigenous renewable energy company) on
the Training of 1,500 youths on installation and maintenance of solar PVs
11.Developed and commissioned 60 and 36-room executive hostel / guest house for
trainees at Kainji and Akangba RTCs respectively.
12.Trained about 5,340 professionals to date since inception
Capacity Building
National Power Training Institute (NAPTIN)
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Capacity Building
National Power Training Institute (NAPTIN)
Various Projects Completed and Commissioned by NAPTIN in 2012
ENGINEERING LABORATORY ,
KAINJI
Electric Power System Simulator, Ijora
MECHANICAL WORKSHOP,
NAPTIN RTC IJORA
EXECUTIVE HOSTEL AT
AKANGBA RTC
Electric Power System Simulator, Ijora
EXECUTIVE HOSTEL AT
AKANGBA RTC
48
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Capacity Building
National Power Training Institute (NAPTIN)
49
Various Training Courses Organized In 2012 Covering Technical And Administrative Skills
Scheduled Training Undertaken
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 50
Stakeholder Engagements
• Nigeria/Niger Joint Commission Meetings in Abuja & Niamey.
• West African Power Pool Meetings.
• ECREEE meeting at Cape Verde.
• Engagements with Investors from international countries
• Meetings with Development Partners.
• Meetings with Manitoba Hydro International of Canada.
• Meeting with AfDB, World Bank, JICA, EU, GIZ, USAID, USTDA, DFID, UNIDO, NAIF
etc.
• Meeting with BOI on MoU for financial services for Public Private Partnership.
• Bilateral Meetings with Reps of various countries on power sector development
(Sweden, Germany, Italy etc.)
• Engagements with private investors (including FDI’s) in power sector
• MYTO II tariff consultation with stakeholders
• As part of advocacy, the Ministry had working visits and consultations with
traditional rulers.
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Stakeholders Engagements
As part of advocacy visits, HMP on working visit
to the HRH. Emir of Zazzau, Alh. Shehu Idiris.
Tariff consultation with Oba of Lagos in
May 2012
FEDERAL MINISTRY OF POWER
51
FEDERAL MINISTRY OF POWER 52
Stakeholders Engagements
From left: Vice Chairman Senate Committee on Power, Sen. Chris Ngige; Chairman, Sen. Philip Aduda; HMP,
Prof. Chinedu Nebo; HMSP, Hajiya Zainab Ibrahim Kuchi; Permanent Secretary Ministry of Power,
Amb. Godknows Igali, during Senate committee on Power’s visit to the Ministry.
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Summary of Key Output/Achievements
53
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
 Record Peak Generation of 4,517.6MW .
 Record Average Energy Sent Out of 4,028.85MWh/h
Key Output/Achievements.
Generation
54
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 55
8,497
9,9209,097
2012-201320112010
Installed Generation Capacity MW
5,563
6,522
3,700
2010 2011 2012-2013
Available Generation Capacity MW
FEDERAL MINISTRY OF POWER 56
Key Output/Achievements.
Transmission
TCN Installed Transformer Capacity (MVA) at 330 and 132kV Transmission Voltage Levels
0
2000
4000
6000
8000
10000
12000
2007 2008 2009 2010 2011 2012
MVA @330/132kV
MVA @132/33kV
Volt Level 2007 2008 2009 2010 2011 2012 2013
MVA
@330/132kV
6,098 6,398 6848 7,688 8,138 8,686
Being Up-
DatedMVA
@132/33kV
8,244 8,350 8,590 9,130 9,800 10,792
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
3,640
4,527
2,800
2010 2011 2012
Transmission Wheeling Capacity (MW)
Transmission Wheeling Capacity (MW)
FEDERAL MINISTRY OF POWER
NIPP TCN TOTAL
58
Summary of deliverables of completed
Transmission line Projects from 2011 to date
FEDERAL MINISTRY OF POWER
Substation
capacity (MVA)
Transmission
line coverage
(Km.)
850 3,220 MVA
780.6 1,045.6 Km
2,370
274
FEDERAL MINISTRY OF POWER
Power
Distribution
Capacity at
33/11kV
(MVA)
Abuja: 568 633
Benin: 529 625
Eko: 844 1019
Enugu: 668 757
Ibadan: 960 1057
Ikeja: 935 1058
Jos: 397 448
Kaduna: 368 390
Kano: 397 483
P/H: 550 681
Yola: 144 174
Disco YR 2011
Total 6,360 7,325
YR 2012
MVA MVA
59
Key Output/Achievements.
Distribution
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 60
8
16
12
Average no of hours of power availability per day
201220112010
Average No of Hours of Power availability per day
FEDERAL MINISTRY OF POWER
Transmission
Distribution
▪ 5515MW
▪ 12%
▪ 6360 MW
▪ N151 Billion
▪ 6870MW
▪ 12%
▪ 7325 MW
▪ N189 Billion
Generation
▪ 9,097MW
▪ 5,563MW
▪ 4,089 MW
▪ 27,692MWH
▪ 9,920MW
▪ 6,522MW
▪ 4,517 MW
▪ 29,196MWH
▪ Installed Capacity
▪ Available Capacity
▪ Record Peak Generation
▪ Average Energy Delivered
▪ Transmission capacity (nominal)
▪ Technical losses
▪ Distribution capacity (nominal)
▪ Total Revenue Collection from the Market
Sector
Reforms
• All power reform institutions are established and in operation
• FGN/Labour signed agreement and its implementation is at advanced stage
• Privatization of 10 DisCos and 5 GenCos at advanced stage
• TCN management has been handed over to Management Contractors
(Manitoba of Canada) and TCN Board Inaugurated.
Target Metric 2011 May, 2013
61
Key Output/Achievements
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Projection for 2013 and beyond
62
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Going forward, the Ministry will pursue vigorously the following:
• Restructuring of Ministry of Power and its Agencies to cope with the
evolving role in a privatised environment.
• Private Investment - including Foreign Direct Investments (FDI) in
the Power sector (IPPs, distribution, renewable energy & capacity
building)
• Transmission Grid Expansion (Super Grid)
• Develop framework for alternative funding of transmission projects
that will allow recovery of investments.
• Renewable Energy Resource Development .
• Electricity Market Development.
• Effective Monitoring & Evaluation.
Focus in 2013 and beyond
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
• Conclusion of labour-related issues.
• Develop Local Content framework in the power sector.
• Promoting Energy Efficiency and Conservation.
• Collaborate with other agencies to check vandalisation of
power infrastructure.
• Improving rural access to electricity.
• Divestment of NIPP sales now at bidding stage (EoI bid
submission closed July 19, 2013).
• Conclude privatisation process by the end of 2013.
Focus in 2013 and beyond contd.
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Focus in 2013 and beyond contd.
• Development of the major coal fields as this will contribute between 3000 - 4000 MW
power to the National grid towards improving energy mix and security of supply when
implemented.
• Establishment of National Council on Power to harmonize the activities of different
players: Federal Government, State Governments, Local Governments etc. for effective
coordination of efforts in the Power Sector.
• The Ministry will leverage on the abundant Renewable Energy sources in the country
which are environmentally friendly to increase power generation and guarantee security
of supply.
• Graduate Trainee programme aimed at producing personnel equipped with the basic
skills required in the Power Sector.
• The Ministry will consolidate the gains in the previous years performance and improve
availability of power supply between 16 – 24 hours per day for Nigerians.
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Future Plan for Transmission Expansion
(330kV and Super Grid Networks)
ONITSHA
KAINJI
JEBBA/GS
JEBBA/TS
SHIRORO
AJAOKUTA
Abeokuta
Ikeja
Akure
Benin
Asaba
Port
Harcourt
Owerri
Uyo
ALAGBADO
Birnin
Kebbi
Minna
Kaduna
Abuja
Jos
Bauchi
Gombe
Damaturu
MaiduguriKano
IIorin
Ado
Ekiti
Lokoja
Lafia
Makurdi
MAKURDI
Enugu
Akwa
Umuahia
Ibadan
Sokoto
Gusau
Katsina
Hadejia
Jalingo
Yola
Abakaliki
Calabar
JIGAWA
KANO
KATSINA
SOKOTO
ZAMFARA
KEBBI
KWARA
KADUNA
ABUJA
NIGER
NASSARAWA
TARABA
YOBE
PLATEAU
BENUE
EBONYI
CROSS
RIVER
AN AMBRA
OSUN
BAYELSA
KOGI
EDO
ABIA
RIVERSDELTA
ONDO
OYO
ENUGU
IMO
ADAMAWA
BORNO
GOMBE
BAUCHI
EKITI
LAGOS
AKWA
IBOM
ATLANTIC OCEAN
NIGER
REPUBLIC
OF BENIN
REPUBLIC
OF CAMEROON
REPUBLIC
OF
CHAD
TRANSMISSION LINE LEGEND
BULK SUPPLY POINT
HYDROELECTRIC POWER STATION
THERMAL POWER STATIONS
330 kV
H
SAPELE
P/ST.
DELTA
POWER ST.
OGUN
Osogbo
EGBIN
P/ST.
NIGERIA
Potiskum
Niamey
132 kV
2
3
2
3
4
2
2
Aliade
Mambila
Bali
2
AFAM
POWER ST.
2
2
330kV LINES– MULTIPLE CIRCUITS
330kV LINES- EXISTING
2
2
2005 : new
2
2015 : new
2015 : new
2015 : new
2015 :
3rd Circuit
2010 : new
2015 : new
2010: new
2
2
4
2015 : new
SAPELE
P/ST.
Okitipupa
Geregu
2015 : 2nd Circuit
Agip
Zaria
2015 : new
2015 : new
2015 : new
2015 : new
700kV LINES– SUPER GRID
700 / 330kV SUBSTATION
MambilaHydro
66
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
•General Electric
•Siemens AG
•Daewoo E&C
•Electrobras
•EDF/ETDE
•Power China Corp.
Investors from all over the world have shown commitment and keen interest in Nigeria’s
Power sector owing to the clearly defined programme set out by its government
-Asia (China, India, South Korea)
-Europe (Germany, Nordic Countries, UK)
-North America (United States, Canada)
-Africa (South Africa)
-South America (Brazil)
These companies have all signed Memorandum of
Understanding with the Nigerian Government to support
Power Projects with a new approach of providing equity in
the investment
Focus on Partnerships & Investment
Activities in 2013
67
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER 68
Conclusion
The Power Sector has recorded appreciable improvement in power delivery in the period
under review despite daunting challenges. The Ministry will intensify effort in the
implementation of the Roadmap and will ensure completion of key projects/programmes
with renewed vigour in 2013 and beyond. Consequently, we seek continuous support and
understanding from our numerous stakeholders.
The Ministry is committed to ensuring that improved service delivery level is maintained
during and after the transition to private ownership of the GenCos and DisCos.
The Ministry wishes to express its profound gratitude to the Hon. Minister of Petroleum
Resources for working assiduously to provide the thermal plants with adequate gas
We also thank the Hon. Minister of Information for providing the platform to present our
sectoral achievements over the past two years.
The Power Sector revolution will unleash Nigeria into her new season of peace, progress,
prosperity and development.
FEDERAL MINISTRY OF POWER
FEDERAL MINISTRY OF POWER
Lighting up
Nigeria 24/7
Thank You
69
FEDERAL MINISTRY OF POWER

Mais conteúdo relacionado

Mais procurados

Pakistan electricity scenario
Pakistan electricity scenarioPakistan electricity scenario
Pakistan electricity scenarioMansoor Magsi
 
Thesis power theft detection ch 2
Thesis power theft detection ch 2Thesis power theft detection ch 2
Thesis power theft detection ch 2Faraz Ahmed
 
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...RCREEE
 
Punjab energy department
Punjab energy departmentPunjab energy department
Punjab energy departmentLoveit2
 
Electricity.myanmar.2016.by.government
Electricity.myanmar.2016.by.governmentElectricity.myanmar.2016.by.government
Electricity.myanmar.2016.by.governmentZaw Aung
 
Final report
Final reportFinal report
Final report91avijit
 
World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015WEC Italia
 
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentOffshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentGlenn Klith Andersen
 
Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015Frank Mercado
 
Ace acdis jakarta, 9 july 2012
Ace acdis jakarta, 9 july 2012Ace acdis jakarta, 9 july 2012
Ace acdis jakarta, 9 july 2012benisuryadi
 
Sustainable Energy development bangladesh
Sustainable Energy development bangladeshSustainable Energy development bangladesh
Sustainable Energy development bangladeshA.S.M. Abdul Hye
 
דו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראליתדו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראליתTashtiot media
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...IPPAI
 
Electricity.2013.slides
Electricity.2013.slidesElectricity.2013.slides
Electricity.2013.slidesZaw Aung
 

Mais procurados (18)

Is the PH power supply ready for the AEC?
Is the PH power supply ready for the AEC?Is the PH power supply ready for the AEC?
Is the PH power supply ready for the AEC?
 
Fmp
FmpFmp
Fmp
 
report
reportreport
report
 
Pakistan electricity scenario
Pakistan electricity scenarioPakistan electricity scenario
Pakistan electricity scenario
 
Thesis power theft detection ch 2
Thesis power theft detection ch 2Thesis power theft detection ch 2
Thesis power theft detection ch 2
 
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...
 
Punjab energy department
Punjab energy departmentPunjab energy department
Punjab energy department
 
Electricity.myanmar.2016.by.government
Electricity.myanmar.2016.by.governmentElectricity.myanmar.2016.by.government
Electricity.myanmar.2016.by.government
 
BRICS SADC ENERGY
BRICS SADC ENERGYBRICS SADC ENERGY
BRICS SADC ENERGY
 
Final report
Final reportFinal report
Final report
 
World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015
 
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentOffshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For Deployment
 
Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015
 
Ace acdis jakarta, 9 july 2012
Ace acdis jakarta, 9 july 2012Ace acdis jakarta, 9 july 2012
Ace acdis jakarta, 9 july 2012
 
Sustainable Energy development bangladesh
Sustainable Energy development bangladeshSustainable Energy development bangladesh
Sustainable Energy development bangladesh
 
דו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראליתדו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראלית
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
 
Electricity.2013.slides
Electricity.2013.slidesElectricity.2013.slides
Electricity.2013.slides
 

Destaque

Federal Ministry of Education
Federal Ministry of EducationFederal Ministry of Education
Federal Ministry of EducationTransformNG
 
Ministry of National planning
Ministry of National planningMinistry of National planning
Ministry of National planningTransformNG
 
Accessibility of PHC in Egor LGA (Final Year Research)
Accessibility of PHC in Egor LGA (Final Year Research)Accessibility of PHC in Egor LGA (Final Year Research)
Accessibility of PHC in Egor LGA (Final Year Research)Joel Obuge
 
Critical issues that should form the basic road map of the next government in...
Critical issues that should form the basic road map of the next government in...Critical issues that should form the basic road map of the next government in...
Critical issues that should form the basic road map of the next government in...Usman Suleman
 
Human rights in police investigations
Human rights in police investigationsHuman rights in police investigations
Human rights in police investigationsLangrial
 
Human_Rights_Guidance_for_Police_Authorities-Human Rights Guidance - Jan 09
Human_Rights_Guidance_for_Police_Authorities-Human Rights Guidance - Jan 09Human_Rights_Guidance_for_Police_Authorities-Human Rights Guidance - Jan 09
Human_Rights_Guidance_for_Police_Authorities-Human Rights Guidance - Jan 09SAIMA AFZAL MBE
 
6 Secrets of Transformation for a country
6 Secrets of Transformation for a country 6 Secrets of Transformation for a country
6 Secrets of Transformation for a country Voice Malaysia
 
Overview of The Transformation Agenda
Overview of The Transformation AgendaOverview of The Transformation Agenda
Overview of The Transformation AgendaTransformNG
 
Ministry of Police Affairs
Ministry of Police AffairsMinistry of Police Affairs
Ministry of Police AffairsTransformNG
 
Ministry of justice
Ministry of justiceMinistry of justice
Ministry of justiceTransformNG
 
Presidential Mid-Term Report- Summaries of Policies and Strategies for Delive...
Presidential Mid-Term Report- Summaries of Policies and Strategies for Delive...Presidential Mid-Term Report- Summaries of Policies and Strategies for Delive...
Presidential Mid-Term Report- Summaries of Policies and Strategies for Delive...TransformNG
 
Ministry of culture, tourism and national orientation
Ministry of culture, tourism and national orientationMinistry of culture, tourism and national orientation
Ministry of culture, tourism and national orientationTransformNG
 
Nigerian govt ministries, depts, and agencies
Nigerian govt ministries, depts, and agenciesNigerian govt ministries, depts, and agencies
Nigerian govt ministries, depts, and agenciesstatisense
 
Ministry of Petroleum Resources
Ministry of Petroleum ResourcesMinistry of Petroleum Resources
Ministry of Petroleum ResourcesTransformNG
 
2017 proposed budget analysis - sectoral allocations
2017 proposed budget analysis - sectoral allocations2017 proposed budget analysis - sectoral allocations
2017 proposed budget analysis - sectoral allocationsstatisense
 
Final Report of the Committee on the Review of the Structures of MDAs
Final Report of the Committee on the Review of the Structures of MDAsFinal Report of the Committee on the Review of the Structures of MDAs
Final Report of the Committee on the Review of the Structures of MDAsOgilegwu Ajah Caffodil
 
70+ Digital Transformation Statistics
70+ Digital Transformation Statistics 70+ Digital Transformation Statistics
70+ Digital Transformation Statistics SantokuPartners
 

Destaque (20)

Federal Ministry of Education
Federal Ministry of EducationFederal Ministry of Education
Federal Ministry of Education
 
Ministry of National planning
Ministry of National planningMinistry of National planning
Ministry of National planning
 
Accessibility of PHC in Egor LGA (Final Year Research)
Accessibility of PHC in Egor LGA (Final Year Research)Accessibility of PHC in Egor LGA (Final Year Research)
Accessibility of PHC in Egor LGA (Final Year Research)
 
Critical issues that should form the basic road map of the next government in...
Critical issues that should form the basic road map of the next government in...Critical issues that should form the basic road map of the next government in...
Critical issues that should form the basic road map of the next government in...
 
Human rights in police investigations
Human rights in police investigationsHuman rights in police investigations
Human rights in police investigations
 
Human_Rights_Guidance_for_Police_Authorities-Human Rights Guidance - Jan 09
Human_Rights_Guidance_for_Police_Authorities-Human Rights Guidance - Jan 09Human_Rights_Guidance_for_Police_Authorities-Human Rights Guidance - Jan 09
Human_Rights_Guidance_for_Police_Authorities-Human Rights Guidance - Jan 09
 
6 Secrets of Transformation for a country
6 Secrets of Transformation for a country 6 Secrets of Transformation for a country
6 Secrets of Transformation for a country
 
0771182 The Nigeria I Know
0771182 The Nigeria I Know0771182 The Nigeria I Know
0771182 The Nigeria I Know
 
Overview of The Transformation Agenda
Overview of The Transformation AgendaOverview of The Transformation Agenda
Overview of The Transformation Agenda
 
Ministry of Police Affairs
Ministry of Police AffairsMinistry of Police Affairs
Ministry of Police Affairs
 
Ministry of justice
Ministry of justiceMinistry of justice
Ministry of justice
 
Presidential Mid-Term Report- Summaries of Policies and Strategies for Delive...
Presidential Mid-Term Report- Summaries of Policies and Strategies for Delive...Presidential Mid-Term Report- Summaries of Policies and Strategies for Delive...
Presidential Mid-Term Report- Summaries of Policies and Strategies for Delive...
 
Ministry of culture, tourism and national orientation
Ministry of culture, tourism and national orientationMinistry of culture, tourism and national orientation
Ministry of culture, tourism and national orientation
 
Nigerian govt ministries, depts, and agencies
Nigerian govt ministries, depts, and agenciesNigerian govt ministries, depts, and agencies
Nigerian govt ministries, depts, and agencies
 
Ministry of Petroleum Resources
Ministry of Petroleum ResourcesMinistry of Petroleum Resources
Ministry of Petroleum Resources
 
2017 proposed budget analysis - sectoral allocations
2017 proposed budget analysis - sectoral allocations2017 proposed budget analysis - sectoral allocations
2017 proposed budget analysis - sectoral allocations
 
Pnppgs
PnppgsPnppgs
Pnppgs
 
Eight to one: Scottish police reform programme:
Eight to one: Scottish police reform programme:Eight to one: Scottish police reform programme:
Eight to one: Scottish police reform programme:
 
Final Report of the Committee on the Review of the Structures of MDAs
Final Report of the Committee on the Review of the Structures of MDAsFinal Report of the Committee on the Review of the Structures of MDAs
Final Report of the Committee on the Review of the Structures of MDAs
 
70+ Digital Transformation Statistics
70+ Digital Transformation Statistics 70+ Digital Transformation Statistics
70+ Digital Transformation Statistics
 

Semelhante a Federal Ministry of Power Achievements 2011-2013

Off-grid small hydropower for rural development in Nigeria
Off-grid small hydropower for rural development in NigeriaOff-grid small hydropower for rural development in Nigeria
Off-grid small hydropower for rural development in NigeriaIJSRED
 
GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014Dinno Kurniawan
 
Integration of coal based fuel into the energy mix & expansion of hydro...
Integration of coal based fuel into the energy mix &   expansion of hydro...Integration of coal based fuel into the energy mix &   expansion of hydro...
Integration of coal based fuel into the energy mix & expansion of hydro...FRANKLIN AJAEGBU
 
E N E R G Y M A N A G E M E N T
E N E R G Y  M A N A G E M E N TE N E R G Y  M A N A G E M E N T
E N E R G Y M A N A G E M E N Tsajid ghafoor
 
Gha Science association 29 biennial conf GSA 29BC wisdom
Gha Science association 29 biennial conf GSA 29BC wisdomGha Science association 29 biennial conf GSA 29BC wisdom
Gha Science association 29 biennial conf GSA 29BC wisdomRobert Bright Mawuko Sogbadji
 
Present energy situation in Bangladesh
Present energy situation in BangladeshPresent energy situation in Bangladesh
Present energy situation in BangladeshKhairul Bashar
 
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...IJERA Editor
 
RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID O...
RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID O...RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID O...
RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID O...Najeem Olawale Adelakun
 
Hydropower Potential of Nigeria
Hydropower Potential of NigeriaHydropower Potential of Nigeria
Hydropower Potential of NigeriaIJMERJOURNAL
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Kachinga-Wankunda Phiri
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...IPPAI
 
Indonesia's coal based power market
Indonesia's coal based power marketIndonesia's coal based power market
Indonesia's coal based power marketSuparn Kuer
 
Comparative Study of Electricity Production Cost of Energy Mix of Burkina Faso
Comparative Study of Electricity Production Cost of Energy Mix of Burkina FasoComparative Study of Electricity Production Cost of Energy Mix of Burkina Faso
Comparative Study of Electricity Production Cost of Energy Mix of Burkina Fasoijtsrd
 
Nyngan solar director-general's assessment report.pdf
Nyngan solar   director-general's assessment report.pdfNyngan solar   director-general's assessment report.pdf
Nyngan solar director-general's assessment report.pdfTurlough Guerin GAICD FGIA
 
Gencos Rehabilitation 27.03.2013
Gencos Rehabilitation 27.03.2013Gencos Rehabilitation 27.03.2013
Gencos Rehabilitation 27.03.2013SULTAN ZAFAR
 
Gencos rehabilitation 27.03.2013
Gencos rehabilitation 27.03.2013Gencos rehabilitation 27.03.2013
Gencos rehabilitation 27.03.2013SULTAN ZAFAR
 

Semelhante a Federal Ministry of Power Achievements 2011-2013 (20)

Off-grid small hydropower for rural development in Nigeria
Off-grid small hydropower for rural development in NigeriaOff-grid small hydropower for rural development in Nigeria
Off-grid small hydropower for rural development in Nigeria
 
GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014
 
Integration of coal based fuel into the energy mix & expansion of hydro...
Integration of coal based fuel into the energy mix &   expansion of hydro...Integration of coal based fuel into the energy mix &   expansion of hydro...
Integration of coal based fuel into the energy mix & expansion of hydro...
 
E N E R G Y M A N A G E M E N T
E N E R G Y  M A N A G E M E N TE N E R G Y  M A N A G E M E N T
E N E R G Y M A N A G E M E N T
 
NELSAP NEWS APRIL 2021.pdf
NELSAP NEWS APRIL 2021.pdfNELSAP NEWS APRIL 2021.pdf
NELSAP NEWS APRIL 2021.pdf
 
Gha Science association 29 biennial conf GSA 29BC wisdom
Gha Science association 29 biennial conf GSA 29BC wisdomGha Science association 29 biennial conf GSA 29BC wisdom
Gha Science association 29 biennial conf GSA 29BC wisdom
 
Present energy situation in Bangladesh
Present energy situation in BangladeshPresent energy situation in Bangladesh
Present energy situation in Bangladesh
 
F0513644
F0513644F0513644
F0513644
 
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...
 
RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID O...
RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID O...RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID O...
RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID O...
 
Volume 2 issue 5
Volume 2 issue 5Volume 2 issue 5
Volume 2 issue 5
 
Hydropower Potential of Nigeria
Hydropower Potential of NigeriaHydropower Potential of Nigeria
Hydropower Potential of Nigeria
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
 
Indonesia's coal based power market
Indonesia's coal based power marketIndonesia's coal based power market
Indonesia's coal based power market
 
Comparative Study of Electricity Production Cost of Energy Mix of Burkina Faso
Comparative Study of Electricity Production Cost of Energy Mix of Burkina FasoComparative Study of Electricity Production Cost of Energy Mix of Burkina Faso
Comparative Study of Electricity Production Cost of Energy Mix of Burkina Faso
 
Nyngan solar director-general's assessment report.pdf
Nyngan solar   director-general's assessment report.pdfNyngan solar   director-general's assessment report.pdf
Nyngan solar director-general's assessment report.pdf
 
Gencos Rehabilitation 27.03.2013
Gencos Rehabilitation 27.03.2013Gencos Rehabilitation 27.03.2013
Gencos Rehabilitation 27.03.2013
 
Gencos rehabilitation 27.03.2013
Gencos rehabilitation 27.03.2013Gencos rehabilitation 27.03.2013
Gencos rehabilitation 27.03.2013
 

Mais de TransformNG

Ministry of Defence
Ministry of DefenceMinistry of Defence
Ministry of DefenceTransformNG
 
Ministry of Aviation
Ministry of AviationMinistry of Aviation
Ministry of AviationTransformNG
 
Ministry of Women Affairs
Ministry of Women AffairsMinistry of Women Affairs
Ministry of Women AffairsTransformNG
 
Ministry of Youth Development
Ministry of Youth DevelopmentMinistry of Youth Development
Ministry of Youth DevelopmentTransformNG
 
Ministry of Foreign Affairs
Ministry of Foreign AffairsMinistry of Foreign Affairs
Ministry of Foreign AffairsTransformNG
 
Ministry of Housing and Urban Development
Ministry of Housing and Urban DevelopmentMinistry of Housing and Urban Development
Ministry of Housing and Urban DevelopmentTransformNG
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory AdministrationTransformNG
 
Ministry of Interior
Ministry of InteriorMinistry of Interior
Ministry of InteriorTransformNG
 
Ministry of Intergovernmental Affairs
Ministry of Intergovernmental AffairsMinistry of Intergovernmental Affairs
Ministry of Intergovernmental AffairsTransformNG
 
Ministry of Communication and Technology
Ministry of Communication and TechnologyMinistry of Communication and Technology
Ministry of Communication and TechnologyTransformNG
 
Ministry of Science and Technology
Ministry of Science and TechnologyMinistry of Science and Technology
Ministry of Science and TechnologyTransformNG
 
The Complete Mid-term Report of the Transformation Agenda
The Complete Mid-term Report of the Transformation Agenda The Complete Mid-term Report of the Transformation Agenda
The Complete Mid-term Report of the Transformation Agenda TransformNG
 
Federal Ministry of Water Resources
Federal Ministry of Water ResourcesFederal Ministry of Water Resources
Federal Ministry of Water ResourcesTransformNG
 
Federal Ministry of Agriculture and Rural Development
Federal Ministry of Agriculture and Rural DevelopmentFederal Ministry of Agriculture and Rural Development
Federal Ministry of Agriculture and Rural DevelopmentTransformNG
 
Federal Ministry Of Health Presentation
Federal Ministry Of Health PresentationFederal Ministry Of Health Presentation
Federal Ministry Of Health PresentationTransformNG
 
Ministry of-sports-and-the-transformation-agenda
Ministry of-sports-and-the-transformation-agendaMinistry of-sports-and-the-transformation-agenda
Ministry of-sports-and-the-transformation-agendaTransformNG
 
Ministry of Transport Report
Ministry of Transport ReportMinistry of Transport Report
Ministry of Transport ReportTransformNG
 
2013 presidential-mid-term-report
2013 presidential-mid-term-report2013 presidential-mid-term-report
2013 presidential-mid-term-reportTransformNG
 
Ministry of works mid term performance report
Ministry of works mid term performance reportMinistry of works mid term performance report
Ministry of works mid term performance reportTransformNG
 
Sure & Steady Transformation Progress Report of President Goodluck Ebele Jona...
Sure & Steady Transformation Progress Report of President Goodluck Ebele Jona...Sure & Steady Transformation Progress Report of President Goodluck Ebele Jona...
Sure & Steady Transformation Progress Report of President Goodluck Ebele Jona...TransformNG
 

Mais de TransformNG (20)

Ministry of Defence
Ministry of DefenceMinistry of Defence
Ministry of Defence
 
Ministry of Aviation
Ministry of AviationMinistry of Aviation
Ministry of Aviation
 
Ministry of Women Affairs
Ministry of Women AffairsMinistry of Women Affairs
Ministry of Women Affairs
 
Ministry of Youth Development
Ministry of Youth DevelopmentMinistry of Youth Development
Ministry of Youth Development
 
Ministry of Foreign Affairs
Ministry of Foreign AffairsMinistry of Foreign Affairs
Ministry of Foreign Affairs
 
Ministry of Housing and Urban Development
Ministry of Housing and Urban DevelopmentMinistry of Housing and Urban Development
Ministry of Housing and Urban Development
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory Administration
 
Ministry of Interior
Ministry of InteriorMinistry of Interior
Ministry of Interior
 
Ministry of Intergovernmental Affairs
Ministry of Intergovernmental AffairsMinistry of Intergovernmental Affairs
Ministry of Intergovernmental Affairs
 
Ministry of Communication and Technology
Ministry of Communication and TechnologyMinistry of Communication and Technology
Ministry of Communication and Technology
 
Ministry of Science and Technology
Ministry of Science and TechnologyMinistry of Science and Technology
Ministry of Science and Technology
 
The Complete Mid-term Report of the Transformation Agenda
The Complete Mid-term Report of the Transformation Agenda The Complete Mid-term Report of the Transformation Agenda
The Complete Mid-term Report of the Transformation Agenda
 
Federal Ministry of Water Resources
Federal Ministry of Water ResourcesFederal Ministry of Water Resources
Federal Ministry of Water Resources
 
Federal Ministry of Agriculture and Rural Development
Federal Ministry of Agriculture and Rural DevelopmentFederal Ministry of Agriculture and Rural Development
Federal Ministry of Agriculture and Rural Development
 
Federal Ministry Of Health Presentation
Federal Ministry Of Health PresentationFederal Ministry Of Health Presentation
Federal Ministry Of Health Presentation
 
Ministry of-sports-and-the-transformation-agenda
Ministry of-sports-and-the-transformation-agendaMinistry of-sports-and-the-transformation-agenda
Ministry of-sports-and-the-transformation-agenda
 
Ministry of Transport Report
Ministry of Transport ReportMinistry of Transport Report
Ministry of Transport Report
 
2013 presidential-mid-term-report
2013 presidential-mid-term-report2013 presidential-mid-term-report
2013 presidential-mid-term-report
 
Ministry of works mid term performance report
Ministry of works mid term performance reportMinistry of works mid term performance report
Ministry of works mid term performance report
 
Sure & Steady Transformation Progress Report of President Goodluck Ebele Jona...
Sure & Steady Transformation Progress Report of President Goodluck Ebele Jona...Sure & Steady Transformation Progress Report of President Goodluck Ebele Jona...
Sure & Steady Transformation Progress Report of President Goodluck Ebele Jona...
 

Último

30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Pooja Nehwal
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsVashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsPooja Nehwal
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Axel Bruns
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Muhammad Shamsaddin Megalommatis
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Ismail Fahmi
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...Axel Bruns
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfLorenzo Lemes
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxAwaiskhalid96
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docxkfjstone13
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Krish109503
 

Último (20)

30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsVashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf
 
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdf
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptx
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!
 

Federal Ministry of Power Achievements 2011-2013

  • 1. FEDERAL MINISTRY OF POWER MID-TERM ACHIEVEMENTS OF PRESIDENT GOODLUCK JONATHAN, GCFR, IN THE POWER SECTOR PRESENTED AT THE 2013 MINISTERIAL PLATFORM FOR THE PERIOD OF MAY, 2011 – MAY 2013 ON TUESDAY, JULY 23rd, 2013 BY PROF. CHINEDU NEBO, OON, NPOM HONOURABLE MINISTER OF POWER & HAJIYA ZAINAB IBRAHIM KUCHI, FICMC HONOURABLE MINISTER OF STATE FOR POWER FEDERAL MINISTRY OF POWER 1
  • 2. FEDERAL MINISTRY OF POWER 2 FEDERAL MINISTRY OF POWER
  • 3. FEDERAL MINISTRY OF POWER 3 FEDERAL MINISTRY OF POWER
  • 4. FEDERAL MINISTRY OF POWER 4 FEDERAL MINISTRY OF POWER
  • 5. FEDERAL MINISTRY OF POWER 5 FEDERAL MINISTRY OF POWER
  • 6. FEDERAL MINISTRY OF POWER 6 AMBASSADOR (DR) GODKNOWS IGALI OON, FNAH Permanent Secretary, Federal Ministry of Power FEDERAL MINISTRY OF POWER
  • 7. FEDERAL MINISTRY OF POWER Let me start by acknowledging the high-level political will of His Excellency, President Dr. Goodluck Ebele Jonathan, GCFR and His Excellency, Vice-President, Arc. Mohammed Namadi Sambo, GCON, to have launched the process fundamental to the transformation witnessed in the power sector in recent years. Without this level of commitment, the achievements recorded from 2011 to date would not have been realised. More importantly, the launching of the Power Sector Roadmap by Mr. President in August, 2010 has accelerated the pace of the reform and the significant achievements recorded so far in the power sector. Introduction 7 FEDERAL MINISTRY OF POWER
  • 8. FEDERAL MINISTRY OF POWER •PTFP •GenCos •TCN •DisCos •NDPHC •NBET •NELMCO •EMS •NAPTIN •REA •HYPERDEC • Residential • Commercial • Industrial • NERC• FMoP Policy Regulation OperationsCustomers Introduction…Cont’d. Power Sector Structure 8 FEDERAL MINISTRY OF POWER
  • 9. FEDERAL MINISTRY OF POWER Introduction…Cont’d. Focus on Activities of the Power Sector Power stability, reliability & sustainability Diversification of energy mix (large hydros, renewables & coal) Electricity market stabilization Improving rural access to electricity Human capacity development Improving policy and regulatory environment for rapid growth through private investment Reducing production cost and making manufacturing sector more competitive Empowering SMEs with more power supply and creating employment 9 FEDERAL MINISTRY OF POWER
  • 10. FEDERAL MINISTRY OF POWER FEDERAL MINISTRY OF POWER Omotosho 304MW Ibom 190MW Afam VI 650MW Shiroro 600MW Jebba 540MW Kainji 760MW Egbin 1,320MW Delta 900MW Afam I-V 726MW Okpai 450MW Sapele 720MW Omoku 120MW N I G E R I A Power Generation. Existing Power Stations Connected to Grid Design Installed Capacity (MW) Kainji 760 Jebba 540 Shiroro 600 Olorunsogo 304 Egbin 1320 Sapele - FGN 720 Delta 900 Afam I-V 726 Afam VI (Shell) 650 Okpai Omoku Omotosho 304 Geregu 414 AES 294 Ibom Power 190lorunsogo 304MW AES 294MW Geregu 414MW 450 120 10
  • 11. FEDERAL MINISTRY OF POWER Power Generation. Cont’d Rehabilitation Works 11 • Shiroro: Repair works on Unit 2 which led to recovery of 150MW in 2012 Hydropower Plant. • Jebba: Hydro Power Station preventive maintenance of 2G2 in 2012 to ensure availability and sustainability of 96.4MW. • Egbin: In 2012, several worn parts of the plant were replaced with new ones. This has improved plant reliability from 60% to more than 70%. • Kainji: Rehabilitation works on 1G5 & 1G12 Units to recover 220MW capacity by Dec 2014. FEDERAL MINISTRY OF POWER
  • 12. FEDERAL MINISTRY OF POWER Power Generation. Cont’d Rehabilitation Works – Kainji Hydro Power Station Rehabilitation works on 1G5 & 1G12 Units to recover 220MW capacity by Dec 2014 12 FEDERAL MINISTRY OF POWER
  • 13. FEDERAL MINISTRY OF POWER FEDERAL MINISTRY OF POWER 13 Mambilla 3050MW Calabar 563MW Geregu-2 434MW Olorusogo-2 675MW Omotosho-2 451MW Alaoji 960MW Egbema 338MW Omoku 225MW Ihovbor 450MW Sapele 450MW Gbarain 225MW Kaduna 215MW Katsina wind 10MW Zungeru 700MW Kashimbila 40MW Gurara 30MW Installed Capacity (MW) Katsina 10 Kaduna 215 Zungeru 700 Gurara I 30 Mambilla 3,050 Olorunsogo -2 675 Omotosho - 2 451 Geregu - 2 434 Kashimbilla 40 Ihovbor 450 Sapele 450 Gbarin 225 Omoku 225 Alaoji 960 Egbema 338 Calabar 563 13 Power Generation. Cont’d Newly Completed/On-going Power Plants for Increased Generation
  • 14. FEDERAL MINISTRY OF POWER Power Generation. Cont’d Completed Generation Projects in the period under review 14 S/No Power Station Date MW Cumulative MW 1 Olorunsogo Jan-11 112.5 112.5 2 Olorunsogo Feb-11 112.5 225.0 3 Olorunsogo May-11 112.5 337.5 4 Sapele Aug-11 112.5 450.0 5 Olorunsogo Nov-11 112.5 562.5 6 Sapele Feb-12 112.5 675.0 7 Alaoji Apr-12 112.5 787.5 8 Omotosho Apr-12 112.5 900.0 9 Olorunsogo Jul-12 112.5 1,012.5 10 Sapele Aug-12 112.5 1,125.0 11 Omotosho Aug-12 112.5 1,237.5 12 Alaoji Sep-12 112.5 1,350.0 13 Omotosho Oct-12 112.5 1,462.5 14 Sapele Oct-12 112.5 1,575.0 15 Omotosho Dec-12 112.5 1,687.5 FEDERAL MINISTRY OF POWER
  • 15. FEDERAL MINISTRY OF POWER Energy Mix In order to enhance the security of power supply, government is assiduously working towards the diversification of the fuel mix. In this regard, the nation’s vast resources of coal, wind, solar, biomass and hydropower potentials are being fully exploited. • Feasibility Studies on the development of coal to power are on- going in five(5) coal blocks in Enugu axis and three (3) coal blocks in Benue, Kogi and Gombe axis. Progress of work on the studies is at 25% and is expected to focus on clean coal technology. • Feasibility Studies on ten (10) dams with small hydropower potentials which commenced in Y2011 have been completed and ready for concession. 15 FEDERAL MINISTRY OF POWER
  • 16. FEDERAL MINISTRY OF POWER Hydro Power Development in Nigeria 16 • Zungeru project in Niger State…………………….700MW • Mambilla project – Taraba State…………………..3,050MW • Gurara II project – Niger State……………………...360MW • Gurara I Project Niger State…………………………..30MW • Itisi project – Kaduna State……………………………40MW • Kashimbilla project – Taraba State…………………40MW • Other Small/medium hydropower projects – Nationwide FEDERAL MINISTRY OF POWER
  • 17. FEDERAL MINISTRY OF POWER Hydro Power Development in Nigeria Small/Medium Hydropower studies completed by FMP from 2011 to date S/N DAM STATE CAPACITY (MW) 1 Oyan Ogun 10 2 Ikere Gorge Oyo 6 3 Bakolori Zamfara 3 4 Challawa Kano 7.5 5 Tiga Kano 10 6 Kampe Kogi 3 7 Owena Ondo 0.45 8 Doma Nasarawa 1 9 Zobe Katsina 0.30 10 Jibia Katsina 4 17 FEDERAL MINISTRY OF POWER
  • 18. FEDERAL MINISTRY OF POWER Hydro Power Development in Nigeria 360MW GURARA II Multi-purpose Project C.A. 2,510 km2 C.A. 2,840 km2 Gurara II Located 140km downstream of Gurara I and 40km from Abuja Design basis: 360MW and 1,130GWhr of energy per annum IRR = 8.9% at MYTO tariff Estimated cost: US$800m Irrigation potential: 8,000Ha 18 FEDERAL MINISTRY OF POWER
  • 19. FEDERAL MINISTRY OF POWER Hydropower Development in Nigeria (Zungeru) 19 The construction of the 700MW Zungeru hydropower project was approved by FEC in 2012 in favour of a consortium of Messrs. Sinohydro/CNEEC in the contract sum of US$ 1.237 billion and a completion period of 48 months. FEDERAL MINISTRY OF POWER
  • 20. FEDERAL MINISTRY OF POWER Hydropower Project in Nigeria Zungeru 20 •Ground breaking ceremony for the project was performed by His Excellency President Goodluck Jonathan, GCFR on 28th May, 2013 FEDERAL MINISTRY OF POWER
  • 21. FEDERAL MINISTRY OF POWER River Basins with Large and Small Scale Hydropower Potential Focus on Renewable Energy Resources Development Solar Map Hydro Potentials 21 FEDERAL MINISTRY OF POWER River Basins with Large and Small Scale Hydropower Potential
  • 22. FEDERAL MINISTRY OF POWER Focus on Renewable Energy Resources Development contd. Wind Map 22 FEDERAL MINISTRY OF POWER
  • 23. FEDERAL MINISTRY OF POWER The 10 MW Katsina Windfarm Power Project is at 98% completion and will soon be commissioned Focus on Renewable Energy Resources Development contd. 23 FEDERAL MINISTRY OF POWER
  • 24. FEDERAL MINISTRY OF POWER Nigeria’s Transmission Grid 24 • Transmission development activities are mainly carried out by Transmission Company of Nigerian (TCN) and Niger/Delta Power Holding Company (NDPHCN) under the National Independent Power Project (NIPP). • TCN Projects are funded through the statutory budgets from the FGN. • NIPP projects are funded by the 3-tiers of the government from the excess crude account. • For the period under review several transmission projects have been completed which lead to modest increase in the nation’s transmission capacity as listed in the following slides. FEDERAL MINISTRY OF POWER
  • 25. FEDERAL MINISTRY OF POWER 330kV System Capacity (blue line) 6870 MW 5650 KM Nigeria 330kV Network 25 Nigeria’s Transmission Grid FEDERAL MINISTRY OF POWER
  • 26. FEDERAL MINISTRY OF POWER Nigeria’s Transmission Grid Completed Transmission Projects (Substations) - NIPP 26 PROJECT DESCRIPTION MVA LOT 9-A 330/132/33KV Ganmo SS (New) 300 LOT 9-B 132/33KV Ayede SS (Ext.) 150 LOT 10-A 132/33KV Central Area SS (Ext.) 60 LOT 10-B 330/132KV Katampe SS (Ext.) 150 LOT 10-C 132/33KV Kumbotso SS (Ext.) 60 LOT 10-D 330/132/33KV Mando SS (Ext.) 150 LOT 11-A 132/33KV Agbara SS (Ext.) 60 LOT 11-B 132/33KV Ikeja West SS (Ext.) 150 LOT 11-C 132/33KV Ojo SS (Ext.) 120 LOT 11-D 132/33KV Oworonsoki SS (Ext.) 120 LOT 13-A 330/132KV Aja G.I.S. SS (Ext.) 150 LOT 13-B 132KV Aja G.I.S. SS (Ext.) LOT 24-1 330/132KV Papalanto SS (New) 450 LOT 26-1 330/132KV Omotosho SS (New) 450 LOT 27A 330KV Sapele SS (Rehab. & Ext.) LOT 27B 330KV Benin SS (Rehab.) TOTAL 2,370 FEDERAL MINISTRY OF POWER
  • 27. FEDERAL MINISTRY OF POWER Nigeria’s Transmission Grid Completed Transmission Projects (Lines) - NIPP 27 PROJECT DESCRIPTION LENGTH (KM) LOT 9-C 330KV DC Ganmo-(Jebba/Osogbo SC - Turn in/Turn out) 12 LOT 9-D 132KV DC Ganmo-(Ilorin/Oshogbo SC Turn in/Turn out) 2 LOT 19-3A 330KV DC Ihovbor-(Benin Main-Oshogbo) (Line A) 17 LOT22-2 330KV DC Ajaokuta-Lokoja-Gwagwalada 222 LOT 24-2 330KV DC Papalanto-(Ikeja West/Ayede) 16 LOT 26-2 330KV DC Omotosho - Ikeja West 5 TOTAL 274 FEDERAL MINISTRY OF POWER
  • 28. FEDERAL MINISTRY OF POWER 28 Nigeria’s Transmission Grid Completed Transmission Projects - TCN Completed Projects from 2011 to Date S/N Title of Project Project Location Deliverables 1Construction of 150MVA 330/132/33kV T/F and 330kV bays at Onitsha and Benin. Edo & Anambra 150MVA increase in transformer capacity at 330kV Voltage level at Onitsha 2Calabar 2x150MVA, 330/132/33kV Substation and line bay at Alaoji Substation. Cross River & Abia 300MVA Transformer capacity at 330kV level in Calabar, Cross River State 3Construction of Alaoji-Umuahia 132kV DC line Abia 50km of 132kV Transmission line. Increase wheeling capacity to Umuahia, Abia State 4Umuahia 2x30/40MVA, 132/33kV Substation Abia 80MVA Transformer capacity at 132kV level in Umuahia, Abia State 5Gombe-Damaturu-Maiduguri 330kV line. Gombe, Yobe & Borno 376km of 330kV Transmission line. Increase wheeling capacity to Yobe and Borno States 6Jos - Kafanchan 132KV D/C Line . Plateau & Kaduna 80km of 132kV Transmission line. Increase wheeling capacity to Kafachan & Environs, Kaduna State 72 x 30MVA 132/33KV S/S at Pankshin and Makeri Plateau 60MVA Transformer capacity at 132kV level in Makeri & Pankshin towns in Plateau State FEDERAL MINISTRY OF POWER
  • 29. FEDERAL MINISTRY OF POWER 29 Nigeria’s Transmission Grid Completed Transmission Projects - TCN Completed Projects from 2011 to Date S/N Title of Project Project Location Deliverables 83rd Benin - Onitsha 330KV DC Line Edo, Delta & Anambra 131km of 330kV Transmission line. Increase wheeling capacity to Onitsha & Environs, Anambra States 9Rehabilitation of Sokoto – Talata Mafara 132KV DC line Sokoto & Zamfara Recovery of 125km of 132kV Transmission line 10Transmission & Supply of Substation at Tamburawa Water Facility Kano 80MVA Transformer capacity at 132kV level in Tamburawa 111X30 MVA 132/33 KV SS at Kwanar Dangora Kano 30MVA Transformer capacity at 132kV level in Kwanar Dangora 12Reinforcement of Birnin Kebbi and Kumbotso Substations with 1x150MVA, 330/132kV transformer each. Kebbi and Kano States 150MVA transformer capacity increase at 330kV level in both Birnin Kebbi and Kano 1Kainji-New Bussa 330kV single-circuit transmission line Kainji to New Bussa in Niger State 8.6km of 330kV transmission line to link Kainji and New Bussa FEDERAL MINISTRY OF POWER
  • 30. FEDERAL MINISTRY OF POWER 30 Nigeria’s Transmission Grid. On-Going TCN Projects at advanced stages of Implementation S/ N Project Description Name of Contractor Project Location Project Total Cost (Naira) Project Deliverables Status of Implement ation (%) Impact of Project 1Arochukwu 2x30/40MVA, 132/33kV substation Omen International Ltd.Abia State 937,496,022.58 80MVA Transformer capacity at 132kV level in Arochukwu, Abia State 86% Improvement of Power supply to Arochukwu and environs and enhancement of socio-economic life of the people. 2Mbalano-Okigwe 132kv SC line Atlantic Engineering & Construction Mbalano (Abia) to Okigwe (Imo) 329,754,483.86 20km of 132kV Transmission line. 100% Improvement of Power supply to Okigwe and environs and enhancement of socio-economic life of the people. 3Okigwe 2x30/40MVA 132/33kV Substation Union Allied Engineering Ltd. Imo State 1,839,789,715.03 80MVA Transformer capacity at 132kV level in Okigwe, Imo State 60% Improvement of Power supply to Okigwe and environs and enhancement of socio-economic life of the people. 4Umuahia-Ohafia 132kv SC line Harlesden Engineering Ltd Umuahia to Ohafia in Abia State 1,257,267,830.78 49.5km of 132kV Transmission line. 60% Improvement of Power supply to Ohafia and environs and enhancement of socio-economic life of the people. 5Ohafia 2x30/40MVA 132/33kV substation. Union Allied Engineering Ltd. Abia State 1,972,613,202.90 80MVA Transformer capacity at 132kV level in Ohafia, Abia State 60% Improvement of Power supply to Ohafia and environs and enhancement of socio-economic life of the people. 6Mbalano 2x30/40MVA 132/33kV substation. Union Allied Engineering Ltd. Abia State 1,409,011,316.42 80MVA Transformer capacity at 132kV level in Mbalano, Abia State 60% Improvement of Power supply to Mbalano and environs and enhancement of socio-economic life of the people.
  • 31. FEDERAL MINISTRY OF POWER 31 Nigeria’s Transmission Grid. On-Going TCN Projects at advanced stages of Implementation S/N Project Description Name of Contractor Project Location Project Total Cost (Naira) Project Deliverables Status of Implementation (%) Impact of Project 71x150MVA,330/132KV Transformer at Birnin Kebbi and Reinforcement at 330/132KV substation at Kumbotso MBH Power Kebbi and Kano States 3,559,832,144.00 150MVA Transformer capacity at 330KV level in Birnin Kebbi 98% Improvement of Power supply to Birnin Kebbi, Kumbotso and envirohancemens and enhance ment of socio-economic activities in the areas. 8Kainji - New Bussa 132KV DC Transmission line & 330KV SC River crossing Dextron Engineering Ltd Kainji to New Bussa, Niger State 308,108,608.00 132kV and 330KV transmission lines to wheel more power to Nerw Bussa. 98% Improvement of Power supply to New Bussa and environs and enhancement of socio-economic life of the people. 9Katampe-National Stadium 132kv DC line ABB Powerlines; Energo Nigeria Ltd FCT 2,656,115,130.98 8.4km of 132kV double-circuit underground cable and 4km of 132kV DC overhead transmission line. 55% Improvement of Power supply to the FCT. 10Kainji 1x150MVA, 330/132KV & 2x30/40MVA substation at New Bussa MBH Power Niger State 4,599,287,900.00 150MVA Transformer capacity in kainji, Niger State. 89% Improvement of Power supply to New Bussa and environs and enhancement of socio-economic life of the people. 112x60MVA, 132/33KV Substation at Odogunyan and Ayobo with 132KV DC line Ikeja west - Ayobo. LAGA CePower Lagos State 3,657,155,630.00 120MVA Transformer capcity at 132kV level at Odogunyan and Ayobo. 89% Improvement of Power supply to Odogunyan, Ayobo and environs and improvement of socio- economic activities in the areas. 12Ikorodu - Odogunyan - Shagamu 132KV DC Transmission line PPCL/ Westcom JV Ikorodu to Odogunyan, Lagos State 3,192,097,186.00 132kV DC transmission line from Ikorodu to Odogunyan 52% Improvement of Power supply to Odogunyan, Shagamu and environs and improvement of socio-economic activities in the areas. 13Damaturu 330/132kV Substation Parsian High VoltageDiv./ Cartlark Int'l Ltd Yobe State 2,502,960,280.52 150MVA Transformer capacity at 330kV level in Damaturu, Yobe State 80% Improvement of Power supply to Damaturu and environs and improvement of socio-economic activities in the areas.
  • 32. FEDERAL MINISTRY OF POWER 32 Nigeria’s Transmission Grid. On-Going TCN Projects at advanced stages of Implementation S/N Project Description Name of Contractor Project Location Project Total Cost (Naira) Project Deliverables Status of Implementati on (%) Impact of Project 14Nnewi 2x60 MVA 132kV substation Valenz Holdings (Nig) Ltd. Anambra State 735,801,070.00 120MVA Transformer capacity at 330kV level in Nnewi 65% Improvement of Power supply to Nnewi and environs and improvement of socio-economic activities in the areas. 15Kafanchan 132kv 2 x 60mva Substation Valenz Holding Ltd Kaduna State 1,407,774,049.57 120MVA Transformer capacity at 132kV level in Kafanchan 80% Improvement of Power supply to Kafanchan and environs and improvement of socio-economic activities in the areas. 16Makeri - Pankshin 132KV DC Line Mogabs Nig. Ltd Makeri to Pankshin, Plateau State 1,295,611,365.16 Rehabilitation of 122km of 132kV Transmission line. 75% Improvement of Power supply to Pankshin and environs and improvement of socio-economic activities in the areas. 172 x 30MVA 132/33KV S/S at Pankshin and Makeri North China/EESE Plateau State 1,783,781,485.32 60MVA Transformer capacity at 132kV level in Makeri & Pankshin towns in Plateau State 100% Improvement of Power supply to Makeri, Pankshin and environs and improvement of socio- economic activities in the areas. 18Kano- Walalanbe 132KV Line (Turn in and out of Dan agundi-Dakata 132KV single Cct Line) and 2 x 30/40MVA S/S at Walalambe GIT Kano Sate 1,783,781,485.32 132kV DC Transmission line & 80MVA Transformer capacity at 132kV level in Walalambe 55% Improvement of Power supply to Kano and environs and improvement of socio-economic activities in the areas. 19Yelwa - Yauri 2 x 30/40MVA S/S and 100KM of 33KV Line Valenz/ Electromontaz Kebbi State 1,242,074,910.89 100km of 33kV line & 80MVA Transformer capacity at 132kV level in Yelwa, Kebbi State 60% Improvement of Power supply to Yelwa, Yauri and environs and improvement of socio-economic activities in the areas. 20Umuahia - Mbalano 132KV Line Santon Energy L:td Abia State 991,759,726.68 30km of 132kV DC Transmission line. 67% Improvement of Power supply to Mbalano and environs and improvement of socio-economic activities in the areas. 21Ohafia - Arochukwu 132KV Line Mogabs Nig. Ltd Abia State 856,128,363.00 40km of 132kV DC Transmission line. 45% Improvement of Power supply to Arochukwu and environs and improvement of socio-economic activities in the areas.
  • 33. FEDERAL MINISTRY OF POWER 33 Nigeria’s Transmission Grid. On-Going TCN Projects at advanced stages of Implementation S/N Project Description Name of Contractor Project Location Project Total Cost (Naira) Project Deliverables Status of Implementati on (%) Impact of Project 22Kukwaba 2x60MVA, 132/33kV substation North China Power Egnineering FCT 2,568,846,118.51 120MVA Transformer capacity at 132kV level in Kukwaba, FCT 40% Improvement of Power supply to the FCT. 232x60MVA, 132KV/33 at Aboh -Mbaise S/S Ashtavinayaka/Bran Engineering Imo State 1,480,777,014.45 120MVA Transformer capacity at 132kV level in Aboh Mbaise in Imo State 65% Improvement of Power supply to Aboh Mbaise and environs and improvement of socio-economic activities in the areas. 242x60 MVA, 132/33 kV substation at Ideato and 2 x132KV Line Bays at Okigwe Ashtavinayaka/Bran Engineering Imo State 1,739,004,381.00 120MVA Transformer capacity at 132kV level in Ideato in Imo State 60% Improvement of Power supply toIdeato and environs and improvement of socio-economic activities in the areas. 252x60 MVA, 132/33 kV substation at Oba and 2 x132KV Line Bays at Nnewi Xian/GIT Engineering Anambra State 1,863,432,339.00 120MVA Transformer capacity at 132kV level in Oba. 45% Improvement of Power supply to Oba and environs and improvement of socio-economic activities in the areas. 26Oshogbo- Ede 132KV DC Line Aster Infrast/Aster Teleservices Osun State 1,490,085,721.56 15km of 132kV DC transmission line 53% Improvement of Power supply to Ede and environs and improvement of socio-economic activities in the areas. 27DC 132kV line from Alscon to Ibom Power and Switching Station to link the GIS at Alscon with associated bay extensions at Ibom Power - Akwa Ibom State KEC International Limited Akwa Ibom State 747,246,322.01 2.5km of 132kV DC Transmission line and 150km of 132kV DC underground Cable 45% Improvement of Power supply to Akwa Ibom State and improvement of socio- economiclife of the people. 28Reconductoring of Afam- Port Harcourt 132kV line Electrical Solutions Ltd Ricers State 290,000,000.00 Rehabilitation of 37.8km of 132kV Transmission line with increased wheeling capacity 100% Improvement of Power supply to Port Harcourt and environs and improvement of socio-economic activities in the areas. FEDERAL MINISTRY OF POWER
  • 34. FEDERAL MINISTRY OF POWER Nigeria’s Transmission Grid NIPP Completed Transmission Projects LOT 10-B (Charnel/AkAy 150MVA 330/132kV Katampe SS (Extension) in full service LOT 11-B (Charnel/AkAy 150MVA 330/132kV Ikeja West SS (Extension) in full service 34 FEDERAL MINISTRY OF POWER
  • 35. FEDERAL MINISTRY OF POWER Distribution Activities 35 To ensure availability of un-interrupted power supply to the consumers, this administration executed various distribution projects (maintenance/expansion) across the country through the eleven (11) Electricity Distribution Companies (DisCos) FEDERAL MINISTRY OF POWER
  • 36. FEDERAL MINISTRY OF POWER NIPP Completed Distribution Projects 36 • Abuja Zone – - ABUJA - AIRPORT 33KV DC LINE - APO 1 X 15MVA INJECTION S/S TRANSFORMER • Benin Zone – - IHOVBOR 2 X 2.5MVA INJECTION S/S TRANSFORMER - AKURE Main 1x15mva INJECTION TRANSFORMER • Eko – - NEW IDUMAGBO 1 X 15MVA INJECTION S/S TRANSFORMER - Beckely 1 X 15mva Injection S/S Transformer - Alagbon 1 X 15mva Injection S/S Transformer - Fowler 1 X 15mva Injection S/S Transformer - Apapa Road 1 X 15mva Injection S/S Transformer - Nitel 1 X 15mva Injection S/S Transformer - Tincan 1 X 15mva Injection S/S Transformer - Agbara 1 X 15mva Injection S/S Transformer - Ajangbadi 1 X 15mva Injection S/S Transformer • Ibadan Zone - Akobo 1 X 15mva Injection S/S Transformer - Awe - Oyo 1 X 7.5mva Injection S/S Transformer - Samanda 1 X 15mva Injection S/S Transformer - Apata 1 X 15mva Injection S/S Transformer - Ikiru Road 1 X 15mva Injection S/S Transformer -Tinumola 1 X 7.5mva Injection S/S Transformer FEDERAL MINISTRY OF POWER
  • 37. FEDERAL MINISTRY OF POWER NIPP Completed Distribution Projects contd. 37 • Ikeja - IPAKODO 1 X 15MVA INJECTION S/S TRANSFORMER - IJEDE 1 X 15MVA INJECTION S/S TRANSFORMER - AGBOWA 1 X 15MVA INJECTION S/S TRANSFORMER - OWUTU 1 X 15MVA INJECTION S/S TRANSFORMER - IMOTA 1 X 15MVA INJECTION S/S TRANSFORMER - MAGODO 1 X 15MVA INJECTION S/S TRANSFORMER • Kaduna - ZAMBIAN CRESCENT 1 X 2.5MVA INJECTION S/S TRANSFORMER - KAGORO 1 X 7.5MVA INJECTION S/S TRANSFORMER - NARAYI 2 X 2.5MVA INJECTION S/S TRANSFORMER • Jos - PANKSHIN 1 X 7.5MVA INJECTION S/S TRANSFORMER - SHENDAM 1 X 7.5MVA INJECTION S/S TRANSFORMER - COMPLETED INJECTION S/S = 31 - CAPACITY = 492.5 MVA - COMPLETED CSP TRANSFORMERS = 2514 - COMPLETED 11KV LINES = 1221KM, 33KV = 230KM FEDERAL MINISTRY OF POWER
  • 38. FEDERAL MINISTRY OF POWER 38 DisCos Completed Distribution Projects ENUGU ELECTRICITY DISTRIBUTION COMPANY PROJECTS COMPLETED FROM 2011 TO DATE DisCos Installed Transformer Capacity from 2011 to date S/N Description Year 2011 2012 2013 (as at 31st May) 1 33/11KV Injection Substation (MVA) 959.75 974.75 1,083.50 2 33/0.415KV Distribution Substation (MVA) 972.67 1,028.62 1,047.32 3 11/0.415KV Distribution Substation (MVA) 1,600.99 1,657.84 1,680.74 ENUGU ELECTRICITY DISTRIBUTION COMPANY PROJECTS COMPLETED FROM 2011 TO DATE DisCos Installed 33KV and 11KV Overhead Lines from 2011 to date S/N Description Year 2011 2012 2013 (as at 31st May) 1 33KV Overhead lines (Km) 6,596.50 6,651.95 6,924.80 2 11KV Overhead lines (Km) 3,464.80 3,504.00 3,522.90 FEDERAL MINISTRY OF POWER
  • 39. FEDERAL MINISTRY OF POWER SOME COMPLETED INJECTION SUBSTATION & SWITCH YARD in 2012 39 DisCos Completed Distribution Projects contd. Ikeja DisCo FEDERAL MINISTRY OF POWER
  • 40. FEDERAL MINISTRY OF POWER 40  REA was reactivated in June, 2012, to improve rural access to electricity.  The Ministry has developed a draft REA Strategy and Implementation Plan and it is being finalized.  REA will focus on increased exploitation of renewables and the facilitation of rural electrification projects.  The Agency carried out Survey, Design, Procurement and Award of several rural electrification projects under 2012 capital appropriation. Rural Electrification Agency (REA) FEDERAL MINISTRY OF POWER
  • 41. FEDERAL MINISTRY OF POWER The Reform Process : Progress So Far The Electric Power Sector Reform (EPSR) Act of 2005 provided the platform for the reform of deregulating the Nigerian Electricity Supply Industry (NESI) from the control, ownership and regulation of the sector by the Federal government to a private sector-driven industry. The launching of the Roadmap by Mr. President in August 2010 has led to significant progress in the implementation of the structural reforms outlined in the Act. The major achievements to date are as follows: i. Bidding and selection of preferred bidders for the 10 Distribution Companies and the 5 Generation Companies was concluded in November 2012, contracts have been signed and bidders have already made initial payments of 25% of the bid price. ii. Presidential Power Reform Transaction signing and presentation of certificates for payments of initial deposits to successful bidders of the DisCos and GenCos by Mr. President was performed on 22nd April, 2013. iii. Handing over of TCN to Manitoba Hydro International for management contract concluded. Schedule of Delegated Authority (SODA) give to Manitoba 41 FEDERAL MINISTRY OF POWER
  • 42. FEDERAL MINISTRY OF POWER The Reform Process : Progress So Far contd. iv. The Nigerian Electricity Regulatory Commission (NERC) has been reconstituted, strengthened and now is fully operational. v. NERC launched MYTO 2 cost-reflective tariff in June, 2012, which is now operational. vi. Nigeria Bulk Electricity Trading (NBET) PLC was incorporated in July, 2010 and is now in operation as a credit-worthy off - taker. vii. The Nigeria Electricity Liability Management Company (NELMCO) was established in 2010 to assume and manage the assets, liabilities and other obligations that could not be earlier transferred from PHCN to any successor company viii. Resolution of Labour issues is almost completed and payment of severance package to commence this week. ix. Investor confidence evidenced by increased investment and signing of MoUs. Most recent being the MoU signed with Power China Corporation to develop 20,000 MW of Thermal Power Plants with associated substations and transmission lines up to 10,000 km x. Sale of Ten (10) power plants built by the Niger Delta Power Holding Company Ltd commenced with road-shows in Lagos, London, Hong Kong and New York. 42 FEDERAL MINISTRY OF POWER
  • 43. FEDERAL MINISTRY OF POWER The Reform Process : Progress So Far contd. 43 FEDERAL MINISTRY OF POWER
  • 44. FEDERAL MINISTRY OF POWER The Reform Process : Progress So Far iv. T 44 His Excellency, the Vice President , Arc. Namadi Sambo presenting certificates to one of the Core investors in the on-going privatisation of the Power Sector. FEDERAL MINISTRY OF POWER
  • 45. FEDERAL MINISTRY OF POWER Reform Process: Resolution of all labour issues Seated from the left: The Honourable Minister of State for Finance, Yerima Ngama; Honourable Minister of State for Power, Hajiya Zainab Ibrahim Kuchi; Honourable Minister of Labour and Productivity, Emeka Wogu together with Labour Union in the sector. 45 FEDERAL MINISTRY OF POWER
  • 46. FEDERAL MINISTRY OF POWER 46 A robust Nigeria Electricity Supply Industry requires a well-trained work force. Hence, strategies have been put in place to improve the competences of the existing work force through skill enhancement and professional development programmes. Part of these strategies include the establishment of the National Power Training Institute of Nigeria (NAPTIN) to ensure that the human capital needs of the sector are met. Key achievements include: 1. Rehabilitated six(6) existing Regional Training Centres (RTC) inherited from PHCN and building of 2 new ultra-modern training centres in Jos and Kano 2. Commenced intensive training of 1,000 graduate engineers (Graduate Skill Development Program) 3. Trained 70 engineers across the power sector on renewable energy options (solar, wind + hybrid) 4. Commissioned Power System Training Simulator at Ijora RTC in October, 2012 Capacity Building National Power Training Institute (NAPTIN) FEDERAL MINISTRY OF POWER
  • 47. FEDERAL MINISTRY OF POWER 47 5. Laid foundation for the development of NAPTIN’s permanent site at Idu Industrial Layout, Abuja in October 2012 6. Completed rehabilitation of mechanical workshop at Ijora Regional Training Center (RTC), Lagos. 7. Installed / commissioned NAPTIN’s e-Learning platform in December, 2012 8. Installed / commissioned renewable hybrid solar PV + wind demonstration plants at Kainji RTC in November 2012 9. Completed Faculty profiling and curriculum development in December, 2012 10.Signed MoU with PNN Nigeria Limited (an indigenous renewable energy company) on the Training of 1,500 youths on installation and maintenance of solar PVs 11.Developed and commissioned 60 and 36-room executive hostel / guest house for trainees at Kainji and Akangba RTCs respectively. 12.Trained about 5,340 professionals to date since inception Capacity Building National Power Training Institute (NAPTIN) FEDERAL MINISTRY OF POWER
  • 48. FEDERAL MINISTRY OF POWER Capacity Building National Power Training Institute (NAPTIN) Various Projects Completed and Commissioned by NAPTIN in 2012 ENGINEERING LABORATORY , KAINJI Electric Power System Simulator, Ijora MECHANICAL WORKSHOP, NAPTIN RTC IJORA EXECUTIVE HOSTEL AT AKANGBA RTC Electric Power System Simulator, Ijora EXECUTIVE HOSTEL AT AKANGBA RTC 48 FEDERAL MINISTRY OF POWER
  • 49. FEDERAL MINISTRY OF POWER Capacity Building National Power Training Institute (NAPTIN) 49 Various Training Courses Organized In 2012 Covering Technical And Administrative Skills Scheduled Training Undertaken FEDERAL MINISTRY OF POWER
  • 50. FEDERAL MINISTRY OF POWER 50 Stakeholder Engagements • Nigeria/Niger Joint Commission Meetings in Abuja & Niamey. • West African Power Pool Meetings. • ECREEE meeting at Cape Verde. • Engagements with Investors from international countries • Meetings with Development Partners. • Meetings with Manitoba Hydro International of Canada. • Meeting with AfDB, World Bank, JICA, EU, GIZ, USAID, USTDA, DFID, UNIDO, NAIF etc. • Meeting with BOI on MoU for financial services for Public Private Partnership. • Bilateral Meetings with Reps of various countries on power sector development (Sweden, Germany, Italy etc.) • Engagements with private investors (including FDI’s) in power sector • MYTO II tariff consultation with stakeholders • As part of advocacy, the Ministry had working visits and consultations with traditional rulers. FEDERAL MINISTRY OF POWER
  • 51. FEDERAL MINISTRY OF POWER Stakeholders Engagements As part of advocacy visits, HMP on working visit to the HRH. Emir of Zazzau, Alh. Shehu Idiris. Tariff consultation with Oba of Lagos in May 2012 FEDERAL MINISTRY OF POWER 51
  • 52. FEDERAL MINISTRY OF POWER 52 Stakeholders Engagements From left: Vice Chairman Senate Committee on Power, Sen. Chris Ngige; Chairman, Sen. Philip Aduda; HMP, Prof. Chinedu Nebo; HMSP, Hajiya Zainab Ibrahim Kuchi; Permanent Secretary Ministry of Power, Amb. Godknows Igali, during Senate committee on Power’s visit to the Ministry. FEDERAL MINISTRY OF POWER
  • 53. FEDERAL MINISTRY OF POWER Summary of Key Output/Achievements 53 FEDERAL MINISTRY OF POWER
  • 54. FEDERAL MINISTRY OF POWER  Record Peak Generation of 4,517.6MW .  Record Average Energy Sent Out of 4,028.85MWh/h Key Output/Achievements. Generation 54 FEDERAL MINISTRY OF POWER
  • 55. FEDERAL MINISTRY OF POWER 55 8,497 9,9209,097 2012-201320112010 Installed Generation Capacity MW 5,563 6,522 3,700 2010 2011 2012-2013 Available Generation Capacity MW
  • 56. FEDERAL MINISTRY OF POWER 56 Key Output/Achievements. Transmission TCN Installed Transformer Capacity (MVA) at 330 and 132kV Transmission Voltage Levels 0 2000 4000 6000 8000 10000 12000 2007 2008 2009 2010 2011 2012 MVA @330/132kV MVA @132/33kV Volt Level 2007 2008 2009 2010 2011 2012 2013 MVA @330/132kV 6,098 6,398 6848 7,688 8,138 8,686 Being Up- DatedMVA @132/33kV 8,244 8,350 8,590 9,130 9,800 10,792 FEDERAL MINISTRY OF POWER
  • 57. FEDERAL MINISTRY OF POWER 3,640 4,527 2,800 2010 2011 2012 Transmission Wheeling Capacity (MW) Transmission Wheeling Capacity (MW)
  • 58. FEDERAL MINISTRY OF POWER NIPP TCN TOTAL 58 Summary of deliverables of completed Transmission line Projects from 2011 to date FEDERAL MINISTRY OF POWER Substation capacity (MVA) Transmission line coverage (Km.) 850 3,220 MVA 780.6 1,045.6 Km 2,370 274
  • 59. FEDERAL MINISTRY OF POWER Power Distribution Capacity at 33/11kV (MVA) Abuja: 568 633 Benin: 529 625 Eko: 844 1019 Enugu: 668 757 Ibadan: 960 1057 Ikeja: 935 1058 Jos: 397 448 Kaduna: 368 390 Kano: 397 483 P/H: 550 681 Yola: 144 174 Disco YR 2011 Total 6,360 7,325 YR 2012 MVA MVA 59 Key Output/Achievements. Distribution FEDERAL MINISTRY OF POWER
  • 60. FEDERAL MINISTRY OF POWER 60 8 16 12 Average no of hours of power availability per day 201220112010 Average No of Hours of Power availability per day
  • 61. FEDERAL MINISTRY OF POWER Transmission Distribution ▪ 5515MW ▪ 12% ▪ 6360 MW ▪ N151 Billion ▪ 6870MW ▪ 12% ▪ 7325 MW ▪ N189 Billion Generation ▪ 9,097MW ▪ 5,563MW ▪ 4,089 MW ▪ 27,692MWH ▪ 9,920MW ▪ 6,522MW ▪ 4,517 MW ▪ 29,196MWH ▪ Installed Capacity ▪ Available Capacity ▪ Record Peak Generation ▪ Average Energy Delivered ▪ Transmission capacity (nominal) ▪ Technical losses ▪ Distribution capacity (nominal) ▪ Total Revenue Collection from the Market Sector Reforms • All power reform institutions are established and in operation • FGN/Labour signed agreement and its implementation is at advanced stage • Privatization of 10 DisCos and 5 GenCos at advanced stage • TCN management has been handed over to Management Contractors (Manitoba of Canada) and TCN Board Inaugurated. Target Metric 2011 May, 2013 61 Key Output/Achievements FEDERAL MINISTRY OF POWER
  • 62. FEDERAL MINISTRY OF POWER Projection for 2013 and beyond 62 FEDERAL MINISTRY OF POWER
  • 63. FEDERAL MINISTRY OF POWER Going forward, the Ministry will pursue vigorously the following: • Restructuring of Ministry of Power and its Agencies to cope with the evolving role in a privatised environment. • Private Investment - including Foreign Direct Investments (FDI) in the Power sector (IPPs, distribution, renewable energy & capacity building) • Transmission Grid Expansion (Super Grid) • Develop framework for alternative funding of transmission projects that will allow recovery of investments. • Renewable Energy Resource Development . • Electricity Market Development. • Effective Monitoring & Evaluation. Focus in 2013 and beyond FEDERAL MINISTRY OF POWER
  • 64. FEDERAL MINISTRY OF POWER • Conclusion of labour-related issues. • Develop Local Content framework in the power sector. • Promoting Energy Efficiency and Conservation. • Collaborate with other agencies to check vandalisation of power infrastructure. • Improving rural access to electricity. • Divestment of NIPP sales now at bidding stage (EoI bid submission closed July 19, 2013). • Conclude privatisation process by the end of 2013. Focus in 2013 and beyond contd. FEDERAL MINISTRY OF POWER
  • 65. FEDERAL MINISTRY OF POWER Focus in 2013 and beyond contd. • Development of the major coal fields as this will contribute between 3000 - 4000 MW power to the National grid towards improving energy mix and security of supply when implemented. • Establishment of National Council on Power to harmonize the activities of different players: Federal Government, State Governments, Local Governments etc. for effective coordination of efforts in the Power Sector. • The Ministry will leverage on the abundant Renewable Energy sources in the country which are environmentally friendly to increase power generation and guarantee security of supply. • Graduate Trainee programme aimed at producing personnel equipped with the basic skills required in the Power Sector. • The Ministry will consolidate the gains in the previous years performance and improve availability of power supply between 16 – 24 hours per day for Nigerians. FEDERAL MINISTRY OF POWER
  • 66. FEDERAL MINISTRY OF POWER Future Plan for Transmission Expansion (330kV and Super Grid Networks) ONITSHA KAINJI JEBBA/GS JEBBA/TS SHIRORO AJAOKUTA Abeokuta Ikeja Akure Benin Asaba Port Harcourt Owerri Uyo ALAGBADO Birnin Kebbi Minna Kaduna Abuja Jos Bauchi Gombe Damaturu MaiduguriKano IIorin Ado Ekiti Lokoja Lafia Makurdi MAKURDI Enugu Akwa Umuahia Ibadan Sokoto Gusau Katsina Hadejia Jalingo Yola Abakaliki Calabar JIGAWA KANO KATSINA SOKOTO ZAMFARA KEBBI KWARA KADUNA ABUJA NIGER NASSARAWA TARABA YOBE PLATEAU BENUE EBONYI CROSS RIVER AN AMBRA OSUN BAYELSA KOGI EDO ABIA RIVERSDELTA ONDO OYO ENUGU IMO ADAMAWA BORNO GOMBE BAUCHI EKITI LAGOS AKWA IBOM ATLANTIC OCEAN NIGER REPUBLIC OF BENIN REPUBLIC OF CAMEROON REPUBLIC OF CHAD TRANSMISSION LINE LEGEND BULK SUPPLY POINT HYDROELECTRIC POWER STATION THERMAL POWER STATIONS 330 kV H SAPELE P/ST. DELTA POWER ST. OGUN Osogbo EGBIN P/ST. NIGERIA Potiskum Niamey 132 kV 2 3 2 3 4 2 2 Aliade Mambila Bali 2 AFAM POWER ST. 2 2 330kV LINES– MULTIPLE CIRCUITS 330kV LINES- EXISTING 2 2 2005 : new 2 2015 : new 2015 : new 2015 : new 2015 : 3rd Circuit 2010 : new 2015 : new 2010: new 2 2 4 2015 : new SAPELE P/ST. Okitipupa Geregu 2015 : 2nd Circuit Agip Zaria 2015 : new 2015 : new 2015 : new 2015 : new 700kV LINES– SUPER GRID 700 / 330kV SUBSTATION MambilaHydro 66 FEDERAL MINISTRY OF POWER
  • 67. FEDERAL MINISTRY OF POWER •General Electric •Siemens AG •Daewoo E&C •Electrobras •EDF/ETDE •Power China Corp. Investors from all over the world have shown commitment and keen interest in Nigeria’s Power sector owing to the clearly defined programme set out by its government -Asia (China, India, South Korea) -Europe (Germany, Nordic Countries, UK) -North America (United States, Canada) -Africa (South Africa) -South America (Brazil) These companies have all signed Memorandum of Understanding with the Nigerian Government to support Power Projects with a new approach of providing equity in the investment Focus on Partnerships & Investment Activities in 2013 67 FEDERAL MINISTRY OF POWER
  • 68. FEDERAL MINISTRY OF POWER 68 Conclusion The Power Sector has recorded appreciable improvement in power delivery in the period under review despite daunting challenges. The Ministry will intensify effort in the implementation of the Roadmap and will ensure completion of key projects/programmes with renewed vigour in 2013 and beyond. Consequently, we seek continuous support and understanding from our numerous stakeholders. The Ministry is committed to ensuring that improved service delivery level is maintained during and after the transition to private ownership of the GenCos and DisCos. The Ministry wishes to express its profound gratitude to the Hon. Minister of Petroleum Resources for working assiduously to provide the thermal plants with adequate gas We also thank the Hon. Minister of Information for providing the platform to present our sectoral achievements over the past two years. The Power Sector revolution will unleash Nigeria into her new season of peace, progress, prosperity and development. FEDERAL MINISTRY OF POWER
  • 69. FEDERAL MINISTRY OF POWER Lighting up Nigeria 24/7 Thank You 69 FEDERAL MINISTRY OF POWER