SmartTrack
Eglinton Corridor
Feasibility Review
Welcome
Please sign in
SmartTrack Eglinton Corridor Feasibility Review
STUDY BACKGROUND
December 11, 2014 - City Council directed staff to
work with the Toronto Transit Commission (TTC) and
Metrolinx to develop an accelerated work plan for a
review of the SmartTrack and RER plans and consider
the infrastructure requirements, planning, social,
economic development considerations, and incremental
costs of implementing the SmartTrack plan.
 
February 10, 2015 - City Council approved the overall
accelerated work plan for the SmartTrack/RER study
and further directed staff to work with the TTC and
Metrolinx to undertake a feasibility review of three main
SmartTrack options to connect Mount Dennis station to the
Mississauga Airport Corporate Centre. The feasibility
review includes:
 
	 •	At least 3 stations;
	 •	Integration with the Kitchener GO corridor/
RER plan;
	 •	Public consultation to inform the review;
	 •	 Consultation with City of Mississauga; and
	 •	Preparing the feasibility review as a background
study for the Transit Project Assessment Process
(TPAP), subject to further Council direction.
SmartTrack Eglinton Corridor Feasibility Review
STUDY BACKGROUND
•	Findings from the feasibility review will be used by
the City, TTC and Metrolinx in the comprehensive
review of SmartTrack and Regional Express Rail (RER).
•	City staff will report to Council in Fall 2015 on
the results of the feasibility review, along with
other elements of the SmartTrack work plan.
SmartTrack Eglinton Corridor Feasibility Review
TIMING
This review will be carried out in 3 phases which include:
Phase 1: June 2015 Public Consultation Round 1
•	 Confirm approach to the project
•	 Identify conceptual alignments
•	 Develop broad screening criteria
•	 Seek public input on all of the above
Phase 2: September 2015 Public Consultation Round 2
•	 Evaluate feasibility of conceptual alignments/solutions
•	Rank draft short list of feasible conceptual alignments/
solutions based on “Feeling Congested?” criteria
•	Seek input from the public and the City of Mississauga
on all of the above
Phase 3: November 2015 Report to Council
•	 Refine results of Phase 2 based on public input
•	Report to Council on feasible solution at the same
time as reporting on SmartTrack/RER
Future Work (if required)
•	Further analysis and final project review (Transit
Project Assessment Process) in 2016
SmartTrack Eglinton Corridor Feasibility Review
ANALYSIS OVERVIEW (PHASE 2)
Phase 2:	 The draft conceptual alignments will be
refined and the feasibility of each will be
evaluated from the following perspectives:
Technical Analysis
•	How could the alignments be constructed?
•	Could they connect to other existing and planned
transit lines?
•	What would the operational constraints be?
Service Concept Analysis
•	What additional infrastructure would be required
for SmartTrack to operate on the alignments?
•	What would be the implication for other services
(GO, VIA, UP Express) if additional infrastructure
is not added?
•	What would be the impacts on regional connectivity?
Regulatory and Legislative
•	What federal and provincial approvals would be
required to construct the alignments?
SmartTrack Eglinton Corridor Feasibility Review
Land-use Analysis
•	Would the alignments be compatible with surrounding
land uses?
•	What is the development potential around potential
stations?
•	What impacts could there be on sensitive features?
•	Is heavy rail appropriate for serving the anticipated
ridership considering the surrounding land uses?
Financial Analysis
•	What are the estimated costs for constructing,
maintaining and operating each of the alignments?
ANALYSIS OVERVIEW (PHASE 2)
SmartTrack Eglinton Corridor Feasibility Review
ANALYSIS OVERVIEW (PHASE 2)
As part of “Feeling Congested?” the transportation
component of the Official Plan Review process, a set of
City-Building principles and criteria were developed by
which transportation projects could be evaluated. The
feasible conceptual alignments will undergo technical
analysis and will be ranked based on these principles in
order to inform the resulting recommendation to Council.
Serving
People
Supporting
Prosperity
Strengthening
Places
SmartTrack Eglinton Corridor Feasibility Review
POTENTIAL CORRIDORS AND
CONCEPTUAL ALIGNMENTS
Three corridor options will be evaluated for feasibility:
1.	 Continuous Connection - Eglinton
•	A continuous heavy rail
spur connection from the
Kitchener GO corridor
connection by way of
Eglinton Avenue West
•	 2 potential alignments
2.	 Continuous Connection - Airport
•	A continuous heavy rail
spur connection diverging
from the existing GO
corridor near Highway 27
into the airport and south
to the Mississauga Airport
Corporate Centre
•	 3 potential alignments
3.	 Separate Service - Eglinton
•	A separate heavy rail corridor
along Eglinton Avenue West
with a transfer at Mt Dennis
•	 1 potential alignment
The western portion of the Eglinton Crosstown LRT will be taken as
the base reference case against which other options are evaluated.
SmartTrack Eglinton Corridor Feasibility Review
www.toronto.ca/smarttrack
TransitTO@toronto.ca
tel. 416-338-2848
GET INVOLVED
Plan to be involved with
this important study. 
 Join the project mailing
list to stay informed of
project milestones and
opportunities to participate.

Mais conteúdo relacionado

Mais de Toronto Public Consultation Unit

Mais de Toronto Public Consultation Unit (20)

General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
 
Downsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study MapsDownsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study Maps
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
 
King-Liberty Pedestrian / Cycling Bridge
King-Liberty Pedestrian / Cycling Bridge King-Liberty Pedestrian / Cycling Bridge
King-Liberty Pedestrian / Cycling Bridge
 

Último

VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 

Último (20)

Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 

SmartTrack Eglinton Corridor Feasibility Review Display Boards

  • 2. SmartTrack Eglinton Corridor Feasibility Review STUDY BACKGROUND December 11, 2014 - City Council directed staff to work with the Toronto Transit Commission (TTC) and Metrolinx to develop an accelerated work plan for a review of the SmartTrack and RER plans and consider the infrastructure requirements, planning, social, economic development considerations, and incremental costs of implementing the SmartTrack plan.   February 10, 2015 - City Council approved the overall accelerated work plan for the SmartTrack/RER study and further directed staff to work with the TTC and Metrolinx to undertake a feasibility review of three main SmartTrack options to connect Mount Dennis station to the Mississauga Airport Corporate Centre. The feasibility review includes:   • At least 3 stations; • Integration with the Kitchener GO corridor/ RER plan; • Public consultation to inform the review; • Consultation with City of Mississauga; and • Preparing the feasibility review as a background study for the Transit Project Assessment Process (TPAP), subject to further Council direction.
  • 3. SmartTrack Eglinton Corridor Feasibility Review STUDY BACKGROUND • Findings from the feasibility review will be used by the City, TTC and Metrolinx in the comprehensive review of SmartTrack and Regional Express Rail (RER). • City staff will report to Council in Fall 2015 on the results of the feasibility review, along with other elements of the SmartTrack work plan.
  • 4. SmartTrack Eglinton Corridor Feasibility Review TIMING This review will be carried out in 3 phases which include: Phase 1: June 2015 Public Consultation Round 1 • Confirm approach to the project • Identify conceptual alignments • Develop broad screening criteria • Seek public input on all of the above Phase 2: September 2015 Public Consultation Round 2 • Evaluate feasibility of conceptual alignments/solutions • Rank draft short list of feasible conceptual alignments/ solutions based on “Feeling Congested?” criteria • Seek input from the public and the City of Mississauga on all of the above Phase 3: November 2015 Report to Council • Refine results of Phase 2 based on public input • Report to Council on feasible solution at the same time as reporting on SmartTrack/RER Future Work (if required) • Further analysis and final project review (Transit Project Assessment Process) in 2016
  • 5. SmartTrack Eglinton Corridor Feasibility Review ANALYSIS OVERVIEW (PHASE 2) Phase 2: The draft conceptual alignments will be refined and the feasibility of each will be evaluated from the following perspectives: Technical Analysis • How could the alignments be constructed? • Could they connect to other existing and planned transit lines? • What would the operational constraints be? Service Concept Analysis • What additional infrastructure would be required for SmartTrack to operate on the alignments? • What would be the implication for other services (GO, VIA, UP Express) if additional infrastructure is not added? • What would be the impacts on regional connectivity? Regulatory and Legislative • What federal and provincial approvals would be required to construct the alignments?
  • 6. SmartTrack Eglinton Corridor Feasibility Review Land-use Analysis • Would the alignments be compatible with surrounding land uses? • What is the development potential around potential stations? • What impacts could there be on sensitive features? • Is heavy rail appropriate for serving the anticipated ridership considering the surrounding land uses? Financial Analysis • What are the estimated costs for constructing, maintaining and operating each of the alignments? ANALYSIS OVERVIEW (PHASE 2)
  • 7. SmartTrack Eglinton Corridor Feasibility Review ANALYSIS OVERVIEW (PHASE 2) As part of “Feeling Congested?” the transportation component of the Official Plan Review process, a set of City-Building principles and criteria were developed by which transportation projects could be evaluated. The feasible conceptual alignments will undergo technical analysis and will be ranked based on these principles in order to inform the resulting recommendation to Council. Serving People Supporting Prosperity Strengthening Places
  • 8. SmartTrack Eglinton Corridor Feasibility Review POTENTIAL CORRIDORS AND CONCEPTUAL ALIGNMENTS Three corridor options will be evaluated for feasibility: 1. Continuous Connection - Eglinton • A continuous heavy rail spur connection from the Kitchener GO corridor connection by way of Eglinton Avenue West • 2 potential alignments 2. Continuous Connection - Airport • A continuous heavy rail spur connection diverging from the existing GO corridor near Highway 27 into the airport and south to the Mississauga Airport Corporate Centre • 3 potential alignments 3. Separate Service - Eglinton • A separate heavy rail corridor along Eglinton Avenue West with a transfer at Mt Dennis • 1 potential alignment The western portion of the Eglinton Crosstown LRT will be taken as the base reference case against which other options are evaluated.
  • 9. SmartTrack Eglinton Corridor Feasibility Review www.toronto.ca/smarttrack TransitTO@toronto.ca tel. 416-338-2848 GET INVOLVED Plan to be involved with this important study.  Join the project mailing list to stay informed of project milestones and opportunities to participate.