SlideShare uma empresa Scribd logo
1 de 37
Baixar para ler offline
Qualification _Documentation for
HZD1500 PART1:General Part
Installation Qualification (GP- IQ )
Equipment:HZD1500 Bin Blender
Machine Serial No.: 140205
HZD1500 Bin Blender
Installation Qualification
Prospective Validation
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
Writer’s signature
Your signature indicates that the preparation of this file (Edit/Revision) complies with the validation
project of the equipment, installation requirements of GMP and GEP for bin blender. It also fully
reflects the necessary tasks that shall be completed during the validation procedure, and it can
implement the Installation Validation of the HZD1500 Bin Blender.
Name Title Name Date Unit
Checker’s signature
Your signature indicates you have carefully read this document and have confirmed its exactness and
this document fully reflects the validation tasks, and it can implement the Installation Validation of the
HZD1500 Bin Blender
.
Name Title Name Date Unit
Approver’s signature
Your signature indicates that this document complies with the general plan of enterprise validation, the
technical production standards and all the including files and information are sufficient and can be
directly applied. After the approval, any modification or correction to the aim of this document or to the
validation standard must be done in improving this document, and before the execution of the
modified/corrected document, it must be approved.
Name Title Name Date Unit
0
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
Table of contents
TABLE OF CONTENTS.................................................................................................................................................2
1 PURPOSE.............................................................................................................................................................4
2 VALIDATION SCOPE............................................................................................................................................. 4
3 PROTOCOL CHECKING.........................................................................................................................................4
4 ORGANIZATION AND RESPONSIBILITIES............................................................................................................. 4
SYSTEM DESCRIPTION
6 VALIDATION PROCEDURES AND RECORDS.........................................................................................................7
6.1 DOCUMENTS QUALIFICATION................................................................................................................................7
6.2 QUALIFICATION OF THE KEY MATERIAL................................................................................................................8
6.3 (N/A)QUALIFICATION OF CALIBRATION OF INSTRUMENTS AND METERS (N/A)............................................8
6.4 QUALIFICATION OF SYSTEM LUBRICATION...........................................................................................................9
6.5 QUALIFICATION OF EQUIPMENT INSTALLATION POSITION AND ROOM.............................................................. 9
6.6 QUALIFICATION OF THE INSTALLATION OF UTILITY SERVICES......................................................................... 10
6.7 QUALIFICATION OF THE CORRECT CONNECTION FOR POWER TRANSMISSION AND SIGNAL TRANSMISSION10
6.8 QUALIFICATION OF TESTS OF THE PLC I/O......................................................................................................11
6.9 INSTALLATION QUALIFICATION OF THE SOFTWARE...........................................................................................11
6.10 QUALIFICATION OF THE MAIN COMPONENTS OF THE BLENDER....................................................................11
6.11 SAFETY MEASURES........................................................................................................................................... 12
6.12 QUALIFICATION OF THE EQUIPMENT APPEARANCE....................................................................................... 12
6.13 ATTACHED PAGE OF THE RECORD...................................................................................................................13
7 DEVIATIONS....................................................................................................................................................... 13
7.1 DEVIATIONS LIST............................................................................................................................................13
7.2 DEVIATIONS REPORT..................................................................................................................................... 13
8 ATTACHMENTS LIST............................................................................................................................................13
9 REPORT....................................................................................................................................................................13
10 CHECKING AND APPROVAL.............................................................................................................................14
11 ALTERATION CONTROL.................................................................................................................................... 14
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
RECOURD:
DOCUMENTS QUALIFICATION........................................................................................................................................15
QUALIFICATION OF KEY MATERIAL............................................................................................................................... 17
QUALIFICATION OF CALIBRATION OF INSTRUMENTS AND METERS............................................................................18
QUALIFICATION OF SYSTEM LUBRICATION...................................................................................................................19
QUALIFICATION OF THE INSTALLATION POSITION AND ROOM OF THE EQUIPMENT.................................................20
QUALIFICATION OF THE INSTALLATION OF UTILITY ENGINEERING.............................................................................21
QUALIFICATION OF CORRECT CONNECTIONS OF POWER AND SIGNAL TRANSMISSION......................................... 22
QUALIFICATION OF THE TESTS OF THE PLC INPUT/OUTPUT (I/O)..........................................................................23
INSTALLATION QUALIFICATION OF THE SOFTWARE....................................................................................................24
QUALIFICATION OF THE MAIN COMPONENTS OF THE BLENDER................................................................................25
QUALIFICATION OF THE SAFETY MEASURES...............................................................................................................26
QUALIFICATION OF EQUIPMENT APPEARANCE............................................................................................................27
ATTACHED PAGE OF THE RECORD..............................................................................................................................28
DEVIATIONS LIST............................................................................................................................................................29
DEVIATIONS REPORT.................................................................................................................................................... 30
ATTACHMENTS LIST........................................................................................................................................................31
CHECKING AND APPROVAL OF THE EXECUTION.................................................................................................... 32
APPENDIX:
APPENDIX I:INSTALLATION QUALIFICATION REPORT.......................................................................................... 33
APPENDIX Ⅱ:ABBREVIATIONS............................................................................................................................ 36
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
1 Purpose
The purpose of this protocol is to provide guiding and technical standards to the installation of the
HZD1500 Bin Blender.
This is to establish the validation protocol in order to obtain a document certifying that the HZD1500
Bin Blender has been installed according to GMP and GEP requirements.
The acquisition of this document proves that the installation of the HZD1500 Bin Blender has been
implemented according to the approved protocol.
This protocol is the second part of the validation protocol of the HZD1500 Bin Blender: Installation
Qualification (IQ).
2 Validation Scope
Validation scope covers ① the hardware, ② utility system installation (electric power), ③ training
and ④ others of the Bin Blender manufactured by SAINTY that is installed in Room ______________,
ID No.______________
Validation does not include separated validation of history data.
3 Protocol Checking
 At the following times, please check and ensure the suitability of this protocol:
 When the principal part of the validation has been modified
 When the validation scope has been modified
 When the design has been modified
 Prior to the execution of the IQ
 During the review after the IQ has been completed.
4 Organization and Responsibilities
Define roles and responsibilities properly, according to their concrete division of labor.
All the personal participating to the execution of this protocol must provide their sample of signature.
Name Title Department Function
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
5 System description
5.1 Nameplate
NAME: Blender
MODEL: HZD1500
POWER SUPPLY: 440V/60Hz
SPEED: 3~15r/min
RATED CAPACITY:1500L
POWER: 10.5 kW
WEIGHT:
DATE :
NO.:
5.2 Main functions and technical use
When the bin has been loaded in the blending frame, the blender can complete lifting of the bin, and
processes the rotation of the frame according to the expected technical parameters, thus it achieves
the blending of the materials inside the bin. It is mainly used in pharmaceutical industries for blending
materials in the solid dosage production procedure.
5.3 Characteristic of the configuration
The blender mainly consists of the following parts:
 Supporting frame, Body of the frame, Cover board
 Lifting structure, Lifting reducer, Lifting screw-nut pairs, Casing (Cover)
 Rotary system, Rotary reducer, Power and signal transmission devices of the rotary part,
Rotary frame
 Electrical control system, Electrical control box, Operation terminal, Sensors
 Safety measures, Photoelectrical isolation of the Blending area, Warning labels
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
5.4 Main technical parameters , see Table B3-01
Table B3-01 Main Technical Parameters
Model HZD1500
Adaptive bin type LDZ
150
0
LDZ1000-1500 LDZ500-1500
Capacity L 150
0
1000 500
Working load kg 750
Working speed r/min 3~15
Mixing time min 1~60
Mixing motor power kW 7.5
Lifting motor power kW 3
5.5 Manufacturer
SaintyCo International Group : 402#, Tower-1, Pearl Mansion, Block-3, Rui’an city, Zhejiang Province, China
Website:www.saintyco.com
Email:sainty@saintyco.com
Tel:(86)0577-66612826
5.6 Tests procedure
5.6.1 Every validation results shall be truly and integrally filled in the Installation Qualification Report
IQR, this manual has provided a template of IQR.
5.6.2 Inspector and checker will decide whether the validation results are up to scratch, IQR shall
clearly indicate whether the validation has been passed. Inspector and checker shall sign and record
the date on the related chapters and sections; putting a tick as signature is forbidden. On places that
are not suitable to the system, please use N/A for indicating and write the reason the suitable place.
5.6.3 The inspection file shall be kept as part of the inspection records, all the main accidents should
be recorded on the inspection file, such as system damages or failures causing the stop of the
inspection.
5.6.4 A group (or a day) of validation accomplished, validation group shall summarize briefly the
formed results or datum and shall conclude it (including inspection datum which are not up to
standard).
5.6.5 All deviations appeared during validation shall be recorded in the Deviation Report (DR).
5.6.6 After analyzing inconsistent items and deviations, they shall be validated again; this validation
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
can used actual protocol or change for another mode of qualification.
5.6.7 Every validation finished, results or records shall be analyzed again to form the Installation
Qualification Report. The Report should explicitly mention whether this validation has been passed or
not.
5.6.8 All the records, IQR, DR and the lastly formed Installation Qualification Report shall be arranged,
filled in a document for archiving and should be kept and saved as part of the equipment dossier.
6 Validation procedures and records
6.1 Documents Qualification
Purpose
Qualify the documents pursuant to installations of the blender system and its utility services are
fully valid.
Procedure
Check carefully the following documents and qualify their integrality and validity:
Packing list
Certificate of conformity/Production inspection report and others.
Material certificates of Key components (Components in direct contact with medicine)
Product manual and manual of key outsourcing components
List of attachments (Spare parts of the machine)
List of engineering drawings, including: installation foundation drawing, outline dimension drawing
and electrical principal drawing, etc…
Qualification standard
The above suitable documents have all been provided and approved.
Record
Record the validation result in IQR01;
Record deviation appeared during the qualification process in the deviation report.
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
6.2 Qualification of SOP feasibility
Purpose
Qualify the SOP of the blender system have been checked and approved.
Procedure
Check SOP version and approval status.
Qualification standard
Qualify the SOP of the blender system have been checked and approved.
Record
Record the validation result in IQR02;
Record deviation appeared during the qualification process in the deviation report.
6.3 Qualification of the key material
Purpose
Qualify the materials of the blender system which can influence quality of product and safety of utility
system accord with design requirements.
Procedure
Check the manufacturing materials certificates of the following parts of the system; they shall comply
with GMP requirements:
 Bin body
 Bin lid
 Lid seal
 Butterfly valve seal
 Control box
 Machine housing
Qualification standard
Material of the bin complies with designed URS requirements.
Record
Record the validation result in IQR03;
Record deviation appeared during the qualification process in the deviation report.
6.4 Qualification of calibration of instruments and meters (N/A)
Purpose
Qualify the instruments and meters used by the blender system have been calibrated.
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
Procedure
 According to the instruments and meters list of the blender system, check the calibration
certificates or certificates of conformity;
 Qualify the key meters have been calibrated, and their calibration is in their period of validity;
 Process the calibration of the instruments and meters under user’s responsibilities.
Acceptable standard
The instruments and meters used by the blender system have been calibrated.
Record
Record the validation result in IQR04;
Record deviation appeared during the qualification process in the deviation report.
6.5 Qualification of system lubrication
Purpose
Qualify the lubrication positions and points of the system and the used lubrication complies with GMP
requirements.
Procedure
 Check drawings of lubrication positions of the system, list of lubrication points(IQR04),
qualify the lubrication of the system complies with the design requirements;
 Check the lubrication certificates of the key lubrication points, qualify they comply with GMP
requirements.
Acceptable standard
The lubrication positions and points of the system and the used lubrication complies with GMP
requirements.
Record
Record the validation result in IQR05;
Record deviation appeared during the qualification process in the deviation report.
6.6 Qualification of equipment installation position and room
Purpose
Qualify the installation position and room of the equipment comply with requirements of the layout
drawing; qualify whether they can satisfy the requirements for production and system service.
Procedure
According to layout drawing or installation position drawing and completion drawing; on site, observe
the installation position and room shall comply with the drawing.
Acceptable standard
The installation position and room of the equipment comply with requirements of the layout drawing.
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
Record
Record the validation result in IQR06;
Record deviation appeared during the qualification process in the deviation report.
6.7 Qualification of the installation of utility services
Purpose
Qualify power of the blender system and installation of the utility services comply with equipment
requirements and management requirements of the utility engineering.
Procedure
Check carefully and qualify voltage of the power loop, power, line No., cable model as well as model
and No. of the switch cabinet fulfill the requirements of engineering design of the system, operation
conditions of the equipment and system management for electric power.
Acceptable standard
Power of the blender system and installation of the utility services comply with equipment
requirements and management requirements of the utility engineering.
Record
Record the validation result in IQR07;
Record deviation appeared during the qualification process in the deviation report.
6.8 Qualification of the correct connection for power transmission and signal transmission
Purpose
Qualify power of the blender system and installation of the utility services comply with equipment
requirements and management requirements of the utility engineering.
Procedure
According to product manual, qualify the status of power transmission and signal transmission comply
with design requirement.
 Rotary motor
 Lifting motor
 PLC
 Touch screen
 Printer
 Sensor
 Electric components of control part.
Acceptable standard
Equipment power transmission and signal transmission comply with design requirement.
Record
Record the validation result in IQR08;
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
Record deviation appeared during the qualification process in the deviation report.
6.9 PLC Qualification of tests of the PLC I/O
Purpose
Check the I/O of the system, inspect whether the connection of PLC card is correctly connected.
Procedure
According to the electrical principal drawing, test the I/O points.
Acceptable standard
Qualify there isn’t any error connections of the I/O.
Record
Record the validation result in IQR09;
Record deviation appeared during the qualification process in the deviation report.
6.10 Installation Qualification of the software
Purpose
Qualify the installed software editions of the blender are exact and have no error.
Procedure
Qualify all the needed software editions comply with the software criterion of the manufacturer,
including the following applications software:
 Qualify the edition No. of the operation system
 Qualify the edition No. of the HMI
 Qualify the edition No. of the software
 Qualify the disk No. of the backup
Acceptable standard
All needed software editions for the system have been installed.
Record
Record the validation result in IQR10;
Record deviation appeared during the qualification process in the deviation report.
6.11 Qualification of the main components of the blender
Purpose
Qualify the installation of the main components of the blender system complies with URS/FAT
requirements.
Procedure
According to URS /FAT, qualify the following items:
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
 Frame body
 Rotary reducer
 Lifting reducer
 Collector ring device
 Electric control system
 Operation terminal
 Sensors
Acceptable standard
The installation of the main components of the blender system complies with URS/FAT requirements.
Record
Record the validation result in IQR10;
Record deviation appeared during the qualification process in the deviation report.
6.12 Safety measures
Purpose
Qualify the installation of the hardware system of the blender complies with requirements for safety
production.
Procedure
Qualify the following items:
 Electrical safety
 Operation safety
Acceptable standard
The installation of the hardware system of the blender complies with requirements for safety
production.
Record
Record the validation result in IQR12;
Record deviation appeared during the qualification process in the deviation report.
6.13 Qualification of the equipment appearance
Purpose
Qualify the appearance of the blender system has not been damaged or injured during the installation
process.
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
Procedure
Check the following items:
 Nameplate
 Cover
 Rotary frame
 Bin
 Electrical control box
Acceptable standard
The appearance of the blender system has not been damaged or injured.
Record
Record the validation result in IQR13;
Record deviation appeared during the qualification process in the deviation report.
6.14 Attached page of the record
If the main record pages are not enough, the record like IQR14 can be used, then give a clear
indication of the title of the number and Qualification record reference.
7 Deviations
7.1 Deviations list
Collect all the deviations appeared during the IQ activities to form the deviations list and indicate date
of solution.
7.2 Deviations report
Record all the deviations and their management occurred during the protocol execution process and
analyze their effects on Validation conclusion.
Record the records contents, cause analysis, improved situations and effects on Validation conclusion
in the deviations report.
8 Attachments list
Collect all related documents, records, videos. CDs, use them as attachments for the validation report.
Compile the attachment list, specify the pages and use conditions.
9 Report
Collect all records and reports of chapters 6, 7 and 8. Validation group uses procedures below to form
the final validation report:
Installation Qualification Protocol for HZD1500 Bin Blender
JN/JS/IQ-HZD1500
version:V01
SAINTYCO INTERNATIONAL GROUP
 Check the review of the IQ process
 Check and analyze the records
 Check and analyze the deviations report DR
 Draft out report
 Discuss and approve the report
 Form the formal Installation Qualification Report
10 Checking and Approval
Report is checked and approved by authorized person.
Validation Report and its attachments shall be arranged, filled in a document for archiving and should
be kept and saved as part of the equipment dossier.
Appendix I has provided an example of Installation Validation Report.
11 Modification control
Any change of the equipment must be checked and approved by both parts, and then changed
files should be archived.
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:01 Manufacturer Saintyco
Record/Date Check/Date
name: Documents Qualification
Document Name (PASS) (FAIL) (N/A)
Packing list
Certificate of conformity
FAT protocol
Materials certificate
Product manual
Inverter manual
Installation foundation Dwg
Outline dimension Dwg
Electrical principal Dwg
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:02 Manufacturer Saintyco
Record/Date Check/Date
name:SOP Qualification of SOP feasibility
Item Description Result
SOP
Operation SOP
Has been checked and approved by authorized
personnel
□Yes □NoAll revisions have been checked and approved
It is the current effective version
SOP
Washing SOP
Has been checked and approved by authorized
personnel
□Yes □NoAll revisions have been checked and approved
It is the current effective version
SOP
Maintenance SOP
Has been checked and approved by authorized
personnel
□Yes □NoAll revisions have been checked and approved
It is the current effective version
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checked Checked Checked
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:03 Manufacturer Saintyco
Record/Date Check/Date
name:Qualification of key material
Part name Required Material Real material Material report No.
Bin body 316L
Bin lid 316L
Lid seal Silicone
Butterfly valve seal Silicone
Control box 304
Machine housing 304
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:04 Manufacturer Saintyco
Record/Date Check/Date
name:Qualification of calibration of instruments and meters(N/A)
Instruments and meters Calibration
No. Name Manufacturer Model
Range/
Precision
Critical?
Y/ N
Calibration
date
Expiry Date
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:05 Manufacturer Saintyco
Record/Date Check/Date
name:Qualification of system lubrication
NO. Lubrication point Distance to product (materials)
Lubrication
period
Lubrication medium
1 Left/right gearbox
Far from product (medicine), it doesn’t
influence product safety directly
3 months High-quality lubricant
2 Lifting screw-nut pair
Far from product (medicine), it doesn’t
influence product safety directly
2 months High-quality lubricant
3
Bottom guide rod of
the lifting mechanism
Far from product (medicine), it doesn’t
influence product safety directly
2 months High-quality lubricant
4
Left/right bearings of
the rotating body
Far from product (medicine), it doesn’t
influence product safety directly
1 year High-quality lubricant
5 Lifting reducer
Far from product (medicine), it doesn’t
influence product safety directly
Refer to motor
manual
Refer to motor manual
6 Rotary reducer
Far from product (medicine), it doesn’t
influence product safety directly
Refer to motor
manual
Refer to motor manual
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:06 Manufacturer Saintyco
Record/Date Check/Date
name:Qualification of the installation position and room of the equipment
Item
Result
Yes No
Room accords with technical layout □Yes □No
Room accords with completion drawing or elevation drawing □Yes □No
Site temperature18℃~45℃ □Yes □No
site humidity level 25%~85% □Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:07 Manufacturer Saintyco
Record/Date Check/Date
name:Qualification of the installation of utility engineering
Item Description
Electric power
Power supply:440 V/60Hz/3P
Power:Rotary power:7.5 kW
Lifting power:3 kW
Wire section:4.0 mm²; 2.5 mm²; 1.0 mm²; 0.5 mm²
Cable type: VVRP RVV
System earthing Protection earthing:Resistance≤4Ω
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:08 Manufacturer Saintyco
Record/Date Check/Date
name:Qualification of correct connections of power and signal transmission
Item Description
Result
Yes No
Mixing motor 3x4mm²+1x2.5 mm² □Yes □No
Lifting motor 3x2.5mm²+1x1.5 mm² □Yes □No
PLC
24V
Power supply 24V, actions of I/O are agile and reliable
□Yes □No
Touch panel
DC24V
Power supply 24V, displays data and picture
□Yes □No
Printer 220V Power supply 220V □Yes □No
Various sensors
Sensitive actions of proximity switches/photoelectric
switches/limit switches
□Yes □No
Strong electricity
electric elements of the
control part
Reliable actions of inverters, contactors and relays □Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:09 Manufacturer Saintyco
Record/Date Check/Date
name:PLC Qualification of the tests of the PLC Input/Output (I/O)
Item Description
Result
Yes No
Input
Sensors for bin
in position
Mandatory input position, bin in position, signal
light 0.3 of the PLC illuminates
□Yes □No
upper limit
Mandatory input position, bin clamped in position,
signal light 0.4 of the PLC illuminates
□Yes □No
Lower limit
Mandatory input position, bin fallen to ground
position, signal light 0.5 of the PLC illuminates
□Yes □No
Safety barrier
Mandatory input position, bin fallen to ground
position, signal light 0.6 of the PLC illuminates
□Yes □No
Emergency
stop
Mandatory input position, bin fallen to ground
position, signal light 0.7 of the PLC illuminates
□Yes □No
Output
Lifting sensors
Mandatory output position, bin is lifting, signal light
0.1 of the PLC illuminates
□Yes □No
Falling sensors
Mandatory output position, bin is falling, signal light
0.1 of the PLC illuminates
□Yes □No
Contracting
brake
Mandatory output position, system is braking,
signal light 0.1 of the PLC illuminates
□Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:109 Manufacturer Saintyco
Record/Date Check/Date
name:Installation Qualification of the Software
Item Description Conformance
Yes No
Operation interface Qualify the edition No. of PLC program □Yes □No
HMI Qualify edition No. of HMI program □Yes □No
System Siemens S7 200
Qualify the OS of the system is Siemens S7 200
□Yes □No
Backup Set with backup, backup disk No. is □Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:11 Manufacturer Saintyco
Record/Date Check/Date
name:Qualification of the main components of the blender
Item
Description
Conformance
Yes No
Frame body
Installation foundation complies with requirements of user’s
manual
The anchor bolts are reliably locked and loosing prevention
measures are implemented.
The frame body has not been hit during its installation and
the anti-rust layer is kept intact.
□Yes □No
Rotary reducer
Model:DK107-YBEJ7.5KW-4P-96.15-B3B
Power:7.5 kW
□Yes □No
Lifting reducer
Model:YBEJ100L2-4P-3KW-B3+DFAFS67-17.4-B5Ⅱ
Power:3 kW
□Yes □No
Top lid of pharma
bin
No seal leakage of top lid of pharma bin, locked reliable,no
material leakage.
□Yes □No
Electric control
system
Components shall comply with electric parts list
Devices arrangement shall be consistent with lines No. and
electric diagram
No wires loosening
□Yes □No
Operation
terminal
Touch panel has a clear display, it has no distinctness
scratch or spot
□Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:12 Manufacturer Saintyco
Record/Date Check/Date
name: Qualification of the safety measures
Item Description
Conformance
Yes No
Electric
safety
Labels
Driving Power connection has “Electricity Danger” label
Protective Earthing label
□Yes □No
Earthing resistance Correct earthing, resistance ≤4Ω □Yes □No
Shell (control box
body)
Only use key or tool to open it □Yes □No
Motor overloading
protection
Designed with motor overloading protection,
when overloaded, system emits overload alarm
signal
□Yes □No
Insulation failure
protection
Designed with system insulation failure
protection (Air switch)
□Yes □No
Operati
on
safety
Designed with obvious alarm labels warning any misoperation □Yes □Yes
The blending rotary area has been reliably isolated □Yes □Yes
The emergency stop switch is set to operator’s most convenient
position(control panel/machine column)
□Yes □Yes
System is designed with optic and acoustic alarm devices alarming
any system failures or malfunctions
□Yes □Yes
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:13 Manufacturer Saintyco
Record/Date Check/Date
name:Qualification of equipment appearance
Item Description
Conformance
Yes No
Labels Without any nick; with clear characters and pattern □Yes □No
External
housing
Flat and smooth surface without obvious concave convex
surface, spot or nick
□Yes □No
Rotate frame
Flat and smooth surface without obvious concave convex
surface, spot or nick
□Yes □No
Pharma Bin
Flat and smooth surface without obvious concave convex
surface, spot or nick
□Yes □No
Electric control
cabinet
Flat and smooth surface without obvious concave convex
surface, spot or nick
Sheet metal parts have not obvious distortion
Door lock is well kept
Operation panel has no nick; with clear characters and pattern.
Devices on the panel are well kept and are not distorted
□Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:14 Manufacturer Saintyco
Record/Date Check/Date
name:Attached page of the Record
Record No. IQR Record name Pages
Total pages:
Page No.:
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:15 Manufacturer Saintyco
Record/Date Check/Date
name:Deviations list
Deviation No.
Qualification
record No.
Description Date of solution
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:16 Manufacturer Saintyco
Record/Date Check/Date
name:Deviations Report
Deviation No. Record No.
Deviation Description:
Signature Date
Reason analysis:
Signature Date
Improvement measure: Improvement result:
Signature/Date Signature/Date
Improvement results have positive effects on
installation validation
Yes No
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:17 Manufacturer Saintyco
Record/Date Check/Date
name: Attachments list
Attachment
No.
Attachment name Page
Application validation record
No./Name
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
IQR of HZD1500 Bin Blender
Record No. IQR:18 Manufacturer Saintyco
Record/Date Check/Date
name: Checking and Approval of the execution
Check the IQ results and original data, then form the ultimate conclusion of the IQ:
PASS FAIL
If there’s still unsolved deviations, please fill down the following content:
Qualify if these unsolved deviations may influence the ultimate conclusion of the IQ.
YES NO
Note:
Executed by
Signature Date
Checked by
Signature Date
Checked by
Signature Date
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
Appendix I: Installation Qualification Report
(Installation Qualification Report)
1 Purpose
This is to set the validation report of the HZD1500 Bin Blender, and to conclude if the activities of IQ
meet equipment requirements, and if the Equipment qualification can be concluded.
2 Scope
 Installation Qualification of the HZD1500 Bin Blender manufactured by SAINTY that is installed
in Room , ID No.
 The making of the IQ tests is to ensure that the complete functions of the installation fully
comply with the design specifications.
 The contents of this validation document refer to the equipment, testing steps, specifications,
documentation. This information will be used to ensure that the blender has been installed,
operated and run according to the user’s design specifications and company’s requirements.
 This document is compiled by SAINTY INTERNATIONAL GROUP, and then the related
approval signature, supporting documents and other documentation will be included. Any
supporting datum and documentation shall be attached to the inspection report.
3 Responsibilities
Validation team is responsible for this report.
4 Summary
The validation of this equipment activities have been done according to the procedure requirements
of the Company (Management regulations of equipment validation), the validation group proceeds
according to the validation protocol of the HZD1500 Bin Blender. The protocol should have the entire
IQ validated and results of the checking listed. By the validation process, the checking and auditing
of the reports and deviations reports, qualify that the protocol, during the implementation process,
has no modification, is real and complete and accords with requirements of the protocol.
The validation group, after has discussed, approves the Installation Qualification (IQ) of the Bin
Blender.
5 Confirmed Record Summary
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
No. Item Evaluation and analysis
1 IQR1: PASS□ FAIL□ N/A□
2 IQR2: PASS□ FAIL□ N/A□
3 IQR3: PASS□ FAIL□ N/A□
4 IQR4: PASS□ FAIL□ N/A□
5 IQR5: PASS□ FAIL□ N/A□
6 IQR6: PASS□ FAIL□ N/A□
7 IQR7: PASS□ FAIL□ N/A□
8 IQR8: PASS□ FAIL□ N/A□
9 IQR9: PASS□ FAIL□ N/A□
10 IQR10: PASS□ FAIL□ N/A□
11 IQR11: PASS□ FAIL□ N/A□
12 IQR12: PASS□ FAIL□ N/A□
13 IQR13: PASS□ FAIL□ N/A□
14 IQR14: PASS□ FAIL□ N/A□
15 IQR15: PASS□ FAIL□ N/A□
16 IQR16: PASS□ FAIL□ N/A□
17 IQR17: PASS□ FAIL□ N/A□
Conclusion
Activities of the Installation Qualification accord with the requirements of the protocol,
installation of the Bin Blender accords with standards of the equipment and design,
industrial manufacturing and GMP requirements. And can go to the next step activities
and equipment validation or equipment trial operation.
6 Validation conclusion
The group, after has checked the content report of the equipment validation and has discussed,
approves that the Installation Qualification (IQ) of the equipment accords with the requirements of
the protocol, thus Operational Qualification (OQ) and Performance Qualification (PQ) of the
equipment can be performed.
By the validation process, the checking and auditing of the reports and deviations reports, qualify
that contents related to the IQ of the protocol, during the implementation process, have not been
modified, records are real and complete. The members of the validation group, after have discussed,
declares unanimously that activities of the Installation Qualification accord with the requirements of
the protocol, installation of the Bin Blender accords with standards of the equipment and design,
blender system accords with industrial manufacturing and GMP requirements. And can go to the
next step activities and equipment validation or equipment trial operation.
7 List of signatures of validation group members (Brief)
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
8 Signature
Executed by
Signature
Date
(dd/mm/yyyy)
Checked by
Signature
Date
(dd/mm/yyyy)
Checked by
Signature
Date
(dd/mm/yyyy)
JN/JS/IQ-HZD1500
Installation Qualification Protocol for HZD1500 Bin Blender version:V01
SAINTYCO INTERNATIONAL GROUP
Appendix Ⅱ: Abbreviations
AC Alternating current
A Ampere
V Volt
Hz Hertz
PLC Programmable Logic Controller
ºC Degrees Celsius
DQ Design Qualification
IQ Installation Qualification
OQ Operational Qualification
PQ Performance Qualification
FAT Factory Acceptance Test
SAT Site Acceptance Test
DQR Design Qualification Report
IQR Installation Qualification Record
OQR Operational Qualification Record
PQR Performance Qualification Record
DR Deviation Report
N/A Not Applicable
SOP Standard Operating Procedure
RSD Relative Standard Deviation

Mais conteúdo relacionado

Mais procurados

An approach on pharmaceuticals qualification
An approach on pharmaceuticals qualificationAn approach on pharmaceuticals qualification
An approach on pharmaceuticals qualificationDewan Sumsuzzman
 
FDA Form 483 (Inspectional Observations) - Top Violations 2013
FDA Form 483 (Inspectional Observations) - Top Violations 2013FDA Form 483 (Inspectional Observations) - Top Violations 2013
FDA Form 483 (Inspectional Observations) - Top Violations 2013Marc Sanchez
 
1 - Introduction to Computerized Systems Validation - for review.pptx
1 - Introduction to Computerized Systems Validation - for review.pptx1 - Introduction to Computerized Systems Validation - for review.pptx
1 - Introduction to Computerized Systems Validation - for review.pptxpatemalabanan
 
Analytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revisionAnalytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revisionpi
 
Equipment qualification & validation of autoclave, dry heat sterilization and...
Equipment qualification & validation of autoclave, dry heat sterilization and...Equipment qualification & validation of autoclave, dry heat sterilization and...
Equipment qualification & validation of autoclave, dry heat sterilization and...Malla Reddy College of Pharmacy
 
Iso 13485:2016
Iso 13485:2016Iso 13485:2016
Iso 13485:2016Suhas R
 
Advanced sterile product manufacturing technology
Advanced sterile product manufacturing technologyAdvanced sterile product manufacturing technology
Advanced sterile product manufacturing technologySantosh kumar
 
Validation of dry_powder_mixer_ .
Validation of dry_powder_mixer_ .Validation of dry_powder_mixer_ .
Validation of dry_powder_mixer_ .Aditi Roy
 
Basics of EBR: What Are Electronic Batch Records?
Basics of EBR: What Are Electronic Batch Records?Basics of EBR: What Are Electronic Batch Records?
Basics of EBR: What Are Electronic Batch Records?Laura Olson
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSANKUSH JADHAV
 
Qualification Of Bag Sealer.Finalpdf.
Qualification Of Bag Sealer.Finalpdf.Qualification Of Bag Sealer.Finalpdf.
Qualification Of Bag Sealer.Finalpdf.nenalandim
 
Regulation of medical device in japan
Regulation of medical device in japanRegulation of medical device in japan
Regulation of medical device in japanKrushnaAgnihotri
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation Ankush Sule
 

Mais procurados (20)

An approach on pharmaceuticals qualification
An approach on pharmaceuticals qualificationAn approach on pharmaceuticals qualification
An approach on pharmaceuticals qualification
 
FDA Form 483 (Inspectional Observations) - Top Violations 2013
FDA Form 483 (Inspectional Observations) - Top Violations 2013FDA Form 483 (Inspectional Observations) - Top Violations 2013
FDA Form 483 (Inspectional Observations) - Top Violations 2013
 
1 - Introduction to Computerized Systems Validation - for review.pptx
1 - Introduction to Computerized Systems Validation - for review.pptx1 - Introduction to Computerized Systems Validation - for review.pptx
1 - Introduction to Computerized Systems Validation - for review.pptx
 
Analytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revisionAnalytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revision
 
Qualification of Weights and Measures
Qualification of Weights and MeasuresQualification of Weights and Measures
Qualification of Weights and Measures
 
Equipment qualification & validation of autoclave, dry heat sterilization and...
Equipment qualification & validation of autoclave, dry heat sterilization and...Equipment qualification & validation of autoclave, dry heat sterilization and...
Equipment qualification & validation of autoclave, dry heat sterilization and...
 
Iso13485 ppt
Iso13485 pptIso13485 ppt
Iso13485 ppt
 
Iso 13485:2016
Iso 13485:2016Iso 13485:2016
Iso 13485:2016
 
Advanced sterile product manufacturing technology
Advanced sterile product manufacturing technologyAdvanced sterile product manufacturing technology
Advanced sterile product manufacturing technology
 
Validation of dry_powder_mixer_ .
Validation of dry_powder_mixer_ .Validation of dry_powder_mixer_ .
Validation of dry_powder_mixer_ .
 
Basics of EBR: What Are Electronic Batch Records?
Basics of EBR: What Are Electronic Batch Records?Basics of EBR: What Are Electronic Batch Records?
Basics of EBR: What Are Electronic Batch Records?
 
Questions FDA will ask during Inspection of Sterile Drug Manufacturing.
Questions FDA will ask during Inspection of Sterile Drug Manufacturing.Questions FDA will ask during Inspection of Sterile Drug Manufacturing.
Questions FDA will ask during Inspection of Sterile Drug Manufacturing.
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTS
 
Qualification Of Bag Sealer.Finalpdf.
Qualification Of Bag Sealer.Finalpdf.Qualification Of Bag Sealer.Finalpdf.
Qualification Of Bag Sealer.Finalpdf.
 
Regulation of medical device in japan
Regulation of medical device in japanRegulation of medical device in japan
Regulation of medical device in japan
 
FDA 21 CFR Part 11 and Related Regulations and Guidances
FDA 21 CFR Part 11 and Related Regulations and GuidancesFDA 21 CFR Part 11 and Related Regulations and Guidances
FDA 21 CFR Part 11 and Related Regulations and Guidances
 
Who trs 961
Who   trs 961Who   trs 961
Who trs 961
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation
 
FDA 483 observations in the lab
FDA 483 observations in the labFDA 483 observations in the lab
FDA 483 observations in the lab
 
ISO 13485.pptx
ISO 13485.pptxISO 13485.pptx
ISO 13485.pptx
 

Semelhante a HZD 1500 IBC Bin Blender IQ Documents -SaintyCo

Approve standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversApprove standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversWiroj Kaewkan
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptxGargiVaghela
 
Basic and-further-onshore-emergency-response boer and foer
Basic and-further-onshore-emergency-response  boer and foerBasic and-further-onshore-emergency-response  boer and foer
Basic and-further-onshore-emergency-response boer and foerPISTA Offshore Pondicherry
 
Guidelines For The Issuance And Management Of EV Code Signing Certificate
Guidelines For The Issuance And Management Of EV Code Signing CertificateGuidelines For The Issuance And Management Of EV Code Signing Certificate
Guidelines For The Issuance And Management Of EV Code Signing CertificateCodeSigningStore
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.KhushbooKunkulol
 
0859 - Update White Paper Choosing Linux for Medical Devices_NO_cover
0859 - Update White Paper Choosing Linux for Medical Devices_NO_cover 0859 - Update White Paper Choosing Linux for Medical Devices_NO_cover
0859 - Update White Paper Choosing Linux for Medical Devices_NO_cover Ken Herold
 
GBSS15.0 Basic Feature Description.pdf
GBSS15.0 Basic Feature Description.pdfGBSS15.0 Basic Feature Description.pdf
GBSS15.0 Basic Feature Description.pdfSokrates5
 

Semelhante a HZD 1500 IBC Bin Blender IQ Documents -SaintyCo (20)

Approve standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversApprove standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump drivers
 
Kế hoạch thẩm định gốc – thẩm định vệ sinh (e)
Kế hoạch thẩm định gốc – thẩm định vệ sinh (e)Kế hoạch thẩm định gốc – thẩm định vệ sinh (e)
Kế hoạch thẩm định gốc – thẩm định vệ sinh (e)
 
Kế hoạch thẩm định gốc và thẩm định vệ sinh
Kế hoạch thẩm định gốc và thẩm định vệ sinhKế hoạch thẩm định gốc và thẩm định vệ sinh
Kế hoạch thẩm định gốc và thẩm định vệ sinh
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptx
 
Nfpa 1046
Nfpa 1046Nfpa 1046
Nfpa 1046
 
Basic and-further-onshore-emergency-response boer and foer
Basic and-further-onshore-emergency-response  boer and foerBasic and-further-onshore-emergency-response  boer and foer
Basic and-further-onshore-emergency-response boer and foer
 
Football
Football Football
Football
 
Nes 362
Nes 362Nes 362
Nes 362
 
Validation
ValidationValidation
Validation
 
Guidelines For The Issuance And Management Of EV Code Signing Certificate
Guidelines For The Issuance And Management Of EV Code Signing CertificateGuidelines For The Issuance And Management Of EV Code Signing Certificate
Guidelines For The Issuance And Management Of EV Code Signing Certificate
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.
 
ISO 9001_2008 Awareness Training
ISO 9001_2008 Awareness TrainingISO 9001_2008 Awareness Training
ISO 9001_2008 Awareness Training
 
IAASB-2020-Handbook-Volume 2
IAASB-2020-Handbook-Volume 2 IAASB-2020-Handbook-Volume 2
IAASB-2020-Handbook-Volume 2
 
Qualification for validation
Qualification for validationQualification for validation
Qualification for validation
 
Validation ksd
Validation ksdValidation ksd
Validation ksd
 
Validation_Tutorial.ppt
Validation_Tutorial.pptValidation_Tutorial.ppt
Validation_Tutorial.ppt
 
0859 - Update White Paper Choosing Linux for Medical Devices_NO_cover
0859 - Update White Paper Choosing Linux for Medical Devices_NO_cover 0859 - Update White Paper Choosing Linux for Medical Devices_NO_cover
0859 - Update White Paper Choosing Linux for Medical Devices_NO_cover
 
GBSS15.0 Basic Feature Description.pdf
GBSS15.0 Basic Feature Description.pdfGBSS15.0 Basic Feature Description.pdf
GBSS15.0 Basic Feature Description.pdf
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
 
Nfpa 1210
Nfpa 1210Nfpa 1210
Nfpa 1210
 

Último

Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Siliguri Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Nagpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Lucknow Call girls - 8800925952 - 24x7 service with hotel room
Lucknow Call girls - 8800925952 - 24x7 service with hotel roomLucknow Call girls - 8800925952 - 24x7 service with hotel room
Lucknow Call girls - 8800925952 - 24x7 service with hotel roomdiscovermytutordmt
 
Chandrapur Call girls 8617370543 Provides all area service COD available
Chandrapur Call girls 8617370543 Provides all area service COD availableChandrapur Call girls 8617370543 Provides all area service COD available
Chandrapur Call girls 8617370543 Provides all area service COD availableDipal Arora
 
VIP Russian Call Girls in Varanasi Samaira 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Varanasi Samaira 8250192130 Independent Escort Serv...VIP Russian Call Girls in Varanasi Samaira 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Varanasi Samaira 8250192130 Independent Escort Serv...Neha Kaur
 
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls JaipurCall Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipurparulsinha
 
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Service
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort ServicePremium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Service
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Servicevidya singh
 
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...narwatsonia7
 
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...narwatsonia7
 
Russian Escorts Girls Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls Delhi
Russian Escorts Girls  Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls DelhiRussian Escorts Girls  Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls Delhi
Russian Escorts Girls Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls DelhiAlinaDevecerski
 
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Bareilly Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...Taniya Sharma
 
VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...
VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...
VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...jageshsingh5554
 
Bangalore Call Girl Whatsapp Number 100% Complete Your Sexual Needs
Bangalore Call Girl Whatsapp Number 100% Complete Your Sexual NeedsBangalore Call Girl Whatsapp Number 100% Complete Your Sexual Needs
Bangalore Call Girl Whatsapp Number 100% Complete Your Sexual NeedsGfnyt
 
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...astropune
 
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...Garima Khatri
 
Top Rated Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
Top Rated  Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...Top Rated  Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
Top Rated Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...chandars293
 
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...chandars293
 

Último (20)

Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Siliguri Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Nagpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service Available
 
Lucknow Call girls - 8800925952 - 24x7 service with hotel room
Lucknow Call girls - 8800925952 - 24x7 service with hotel roomLucknow Call girls - 8800925952 - 24x7 service with hotel room
Lucknow Call girls - 8800925952 - 24x7 service with hotel room
 
Chandrapur Call girls 8617370543 Provides all area service COD available
Chandrapur Call girls 8617370543 Provides all area service COD availableChandrapur Call girls 8617370543 Provides all area service COD available
Chandrapur Call girls 8617370543 Provides all area service COD available
 
VIP Russian Call Girls in Varanasi Samaira 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Varanasi Samaira 8250192130 Independent Escort Serv...VIP Russian Call Girls in Varanasi Samaira 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Varanasi Samaira 8250192130 Independent Escort Serv...
 
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls JaipurCall Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
 
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
 
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Service
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort ServicePremium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Service
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Service
 
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...
 
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...
 
Russian Escorts Girls Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls Delhi
Russian Escorts Girls  Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls DelhiRussian Escorts Girls  Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls Delhi
Russian Escorts Girls Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls Delhi
 
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Bareilly Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service Available
 
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
 
VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...
VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...
VIP Service Call Girls Sindhi Colony 📳 7877925207 For 18+ VIP Call Girl At Th...
 
Bangalore Call Girl Whatsapp Number 100% Complete Your Sexual Needs
Bangalore Call Girl Whatsapp Number 100% Complete Your Sexual NeedsBangalore Call Girl Whatsapp Number 100% Complete Your Sexual Needs
Bangalore Call Girl Whatsapp Number 100% Complete Your Sexual Needs
 
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
 
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...
 
Top Rated Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
Top Rated  Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...Top Rated  Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
Top Rated Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
 
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
 
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...
 

HZD 1500 IBC Bin Blender IQ Documents -SaintyCo

  • 1. Qualification _Documentation for HZD1500 PART1:General Part Installation Qualification (GP- IQ ) Equipment:HZD1500 Bin Blender Machine Serial No.: 140205 HZD1500 Bin Blender Installation Qualification Prospective Validation
  • 2. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP Writer’s signature Your signature indicates that the preparation of this file (Edit/Revision) complies with the validation project of the equipment, installation requirements of GMP and GEP for bin blender. It also fully reflects the necessary tasks that shall be completed during the validation procedure, and it can implement the Installation Validation of the HZD1500 Bin Blender. Name Title Name Date Unit Checker’s signature Your signature indicates you have carefully read this document and have confirmed its exactness and this document fully reflects the validation tasks, and it can implement the Installation Validation of the HZD1500 Bin Blender . Name Title Name Date Unit Approver’s signature Your signature indicates that this document complies with the general plan of enterprise validation, the technical production standards and all the including files and information are sufficient and can be directly applied. After the approval, any modification or correction to the aim of this document or to the validation standard must be done in improving this document, and before the execution of the modified/corrected document, it must be approved. Name Title Name Date Unit 0
  • 3. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP Table of contents TABLE OF CONTENTS.................................................................................................................................................2 1 PURPOSE.............................................................................................................................................................4 2 VALIDATION SCOPE............................................................................................................................................. 4 3 PROTOCOL CHECKING.........................................................................................................................................4 4 ORGANIZATION AND RESPONSIBILITIES............................................................................................................. 4 SYSTEM DESCRIPTION 6 VALIDATION PROCEDURES AND RECORDS.........................................................................................................7 6.1 DOCUMENTS QUALIFICATION................................................................................................................................7 6.2 QUALIFICATION OF THE KEY MATERIAL................................................................................................................8 6.3 (N/A)QUALIFICATION OF CALIBRATION OF INSTRUMENTS AND METERS (N/A)............................................8 6.4 QUALIFICATION OF SYSTEM LUBRICATION...........................................................................................................9 6.5 QUALIFICATION OF EQUIPMENT INSTALLATION POSITION AND ROOM.............................................................. 9 6.6 QUALIFICATION OF THE INSTALLATION OF UTILITY SERVICES......................................................................... 10 6.7 QUALIFICATION OF THE CORRECT CONNECTION FOR POWER TRANSMISSION AND SIGNAL TRANSMISSION10 6.8 QUALIFICATION OF TESTS OF THE PLC I/O......................................................................................................11 6.9 INSTALLATION QUALIFICATION OF THE SOFTWARE...........................................................................................11 6.10 QUALIFICATION OF THE MAIN COMPONENTS OF THE BLENDER....................................................................11 6.11 SAFETY MEASURES........................................................................................................................................... 12 6.12 QUALIFICATION OF THE EQUIPMENT APPEARANCE....................................................................................... 12 6.13 ATTACHED PAGE OF THE RECORD...................................................................................................................13 7 DEVIATIONS....................................................................................................................................................... 13 7.1 DEVIATIONS LIST............................................................................................................................................13 7.2 DEVIATIONS REPORT..................................................................................................................................... 13 8 ATTACHMENTS LIST............................................................................................................................................13 9 REPORT....................................................................................................................................................................13 10 CHECKING AND APPROVAL.............................................................................................................................14 11 ALTERATION CONTROL.................................................................................................................................... 14
  • 4. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP RECOURD: DOCUMENTS QUALIFICATION........................................................................................................................................15 QUALIFICATION OF KEY MATERIAL............................................................................................................................... 17 QUALIFICATION OF CALIBRATION OF INSTRUMENTS AND METERS............................................................................18 QUALIFICATION OF SYSTEM LUBRICATION...................................................................................................................19 QUALIFICATION OF THE INSTALLATION POSITION AND ROOM OF THE EQUIPMENT.................................................20 QUALIFICATION OF THE INSTALLATION OF UTILITY ENGINEERING.............................................................................21 QUALIFICATION OF CORRECT CONNECTIONS OF POWER AND SIGNAL TRANSMISSION......................................... 22 QUALIFICATION OF THE TESTS OF THE PLC INPUT/OUTPUT (I/O)..........................................................................23 INSTALLATION QUALIFICATION OF THE SOFTWARE....................................................................................................24 QUALIFICATION OF THE MAIN COMPONENTS OF THE BLENDER................................................................................25 QUALIFICATION OF THE SAFETY MEASURES...............................................................................................................26 QUALIFICATION OF EQUIPMENT APPEARANCE............................................................................................................27 ATTACHED PAGE OF THE RECORD..............................................................................................................................28 DEVIATIONS LIST............................................................................................................................................................29 DEVIATIONS REPORT.................................................................................................................................................... 30 ATTACHMENTS LIST........................................................................................................................................................31 CHECKING AND APPROVAL OF THE EXECUTION.................................................................................................... 32 APPENDIX: APPENDIX I:INSTALLATION QUALIFICATION REPORT.......................................................................................... 33 APPENDIX Ⅱ:ABBREVIATIONS............................................................................................................................ 36
  • 5. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP 1 Purpose The purpose of this protocol is to provide guiding and technical standards to the installation of the HZD1500 Bin Blender. This is to establish the validation protocol in order to obtain a document certifying that the HZD1500 Bin Blender has been installed according to GMP and GEP requirements. The acquisition of this document proves that the installation of the HZD1500 Bin Blender has been implemented according to the approved protocol. This protocol is the second part of the validation protocol of the HZD1500 Bin Blender: Installation Qualification (IQ). 2 Validation Scope Validation scope covers ① the hardware, ② utility system installation (electric power), ③ training and ④ others of the Bin Blender manufactured by SAINTY that is installed in Room ______________, ID No.______________ Validation does not include separated validation of history data. 3 Protocol Checking  At the following times, please check and ensure the suitability of this protocol:  When the principal part of the validation has been modified  When the validation scope has been modified  When the design has been modified  Prior to the execution of the IQ  During the review after the IQ has been completed. 4 Organization and Responsibilities Define roles and responsibilities properly, according to their concrete division of labor. All the personal participating to the execution of this protocol must provide their sample of signature. Name Title Department Function
  • 6. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP 5 System description 5.1 Nameplate NAME: Blender MODEL: HZD1500 POWER SUPPLY: 440V/60Hz SPEED: 3~15r/min RATED CAPACITY:1500L POWER: 10.5 kW WEIGHT: DATE : NO.: 5.2 Main functions and technical use When the bin has been loaded in the blending frame, the blender can complete lifting of the bin, and processes the rotation of the frame according to the expected technical parameters, thus it achieves the blending of the materials inside the bin. It is mainly used in pharmaceutical industries for blending materials in the solid dosage production procedure. 5.3 Characteristic of the configuration The blender mainly consists of the following parts:  Supporting frame, Body of the frame, Cover board  Lifting structure, Lifting reducer, Lifting screw-nut pairs, Casing (Cover)  Rotary system, Rotary reducer, Power and signal transmission devices of the rotary part, Rotary frame  Electrical control system, Electrical control box, Operation terminal, Sensors  Safety measures, Photoelectrical isolation of the Blending area, Warning labels
  • 7. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP 5.4 Main technical parameters , see Table B3-01 Table B3-01 Main Technical Parameters Model HZD1500 Adaptive bin type LDZ 150 0 LDZ1000-1500 LDZ500-1500 Capacity L 150 0 1000 500 Working load kg 750 Working speed r/min 3~15 Mixing time min 1~60 Mixing motor power kW 7.5 Lifting motor power kW 3 5.5 Manufacturer SaintyCo International Group : 402#, Tower-1, Pearl Mansion, Block-3, Rui’an city, Zhejiang Province, China Website:www.saintyco.com Email:sainty@saintyco.com Tel:(86)0577-66612826 5.6 Tests procedure 5.6.1 Every validation results shall be truly and integrally filled in the Installation Qualification Report IQR, this manual has provided a template of IQR. 5.6.2 Inspector and checker will decide whether the validation results are up to scratch, IQR shall clearly indicate whether the validation has been passed. Inspector and checker shall sign and record the date on the related chapters and sections; putting a tick as signature is forbidden. On places that are not suitable to the system, please use N/A for indicating and write the reason the suitable place. 5.6.3 The inspection file shall be kept as part of the inspection records, all the main accidents should be recorded on the inspection file, such as system damages or failures causing the stop of the inspection. 5.6.4 A group (or a day) of validation accomplished, validation group shall summarize briefly the formed results or datum and shall conclude it (including inspection datum which are not up to standard). 5.6.5 All deviations appeared during validation shall be recorded in the Deviation Report (DR). 5.6.6 After analyzing inconsistent items and deviations, they shall be validated again; this validation
  • 8. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP can used actual protocol or change for another mode of qualification. 5.6.7 Every validation finished, results or records shall be analyzed again to form the Installation Qualification Report. The Report should explicitly mention whether this validation has been passed or not. 5.6.8 All the records, IQR, DR and the lastly formed Installation Qualification Report shall be arranged, filled in a document for archiving and should be kept and saved as part of the equipment dossier. 6 Validation procedures and records 6.1 Documents Qualification Purpose Qualify the documents pursuant to installations of the blender system and its utility services are fully valid. Procedure Check carefully the following documents and qualify their integrality and validity: Packing list Certificate of conformity/Production inspection report and others. Material certificates of Key components (Components in direct contact with medicine) Product manual and manual of key outsourcing components List of attachments (Spare parts of the machine) List of engineering drawings, including: installation foundation drawing, outline dimension drawing and electrical principal drawing, etc… Qualification standard The above suitable documents have all been provided and approved. Record Record the validation result in IQR01; Record deviation appeared during the qualification process in the deviation report.
  • 9. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP 6.2 Qualification of SOP feasibility Purpose Qualify the SOP of the blender system have been checked and approved. Procedure Check SOP version and approval status. Qualification standard Qualify the SOP of the blender system have been checked and approved. Record Record the validation result in IQR02; Record deviation appeared during the qualification process in the deviation report. 6.3 Qualification of the key material Purpose Qualify the materials of the blender system which can influence quality of product and safety of utility system accord with design requirements. Procedure Check the manufacturing materials certificates of the following parts of the system; they shall comply with GMP requirements:  Bin body  Bin lid  Lid seal  Butterfly valve seal  Control box  Machine housing Qualification standard Material of the bin complies with designed URS requirements. Record Record the validation result in IQR03; Record deviation appeared during the qualification process in the deviation report. 6.4 Qualification of calibration of instruments and meters (N/A) Purpose Qualify the instruments and meters used by the blender system have been calibrated.
  • 10. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP Procedure  According to the instruments and meters list of the blender system, check the calibration certificates or certificates of conformity;  Qualify the key meters have been calibrated, and their calibration is in their period of validity;  Process the calibration of the instruments and meters under user’s responsibilities. Acceptable standard The instruments and meters used by the blender system have been calibrated. Record Record the validation result in IQR04; Record deviation appeared during the qualification process in the deviation report. 6.5 Qualification of system lubrication Purpose Qualify the lubrication positions and points of the system and the used lubrication complies with GMP requirements. Procedure  Check drawings of lubrication positions of the system, list of lubrication points(IQR04), qualify the lubrication of the system complies with the design requirements;  Check the lubrication certificates of the key lubrication points, qualify they comply with GMP requirements. Acceptable standard The lubrication positions and points of the system and the used lubrication complies with GMP requirements. Record Record the validation result in IQR05; Record deviation appeared during the qualification process in the deviation report. 6.6 Qualification of equipment installation position and room Purpose Qualify the installation position and room of the equipment comply with requirements of the layout drawing; qualify whether they can satisfy the requirements for production and system service. Procedure According to layout drawing or installation position drawing and completion drawing; on site, observe the installation position and room shall comply with the drawing. Acceptable standard The installation position and room of the equipment comply with requirements of the layout drawing.
  • 11. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP Record Record the validation result in IQR06; Record deviation appeared during the qualification process in the deviation report. 6.7 Qualification of the installation of utility services Purpose Qualify power of the blender system and installation of the utility services comply with equipment requirements and management requirements of the utility engineering. Procedure Check carefully and qualify voltage of the power loop, power, line No., cable model as well as model and No. of the switch cabinet fulfill the requirements of engineering design of the system, operation conditions of the equipment and system management for electric power. Acceptable standard Power of the blender system and installation of the utility services comply with equipment requirements and management requirements of the utility engineering. Record Record the validation result in IQR07; Record deviation appeared during the qualification process in the deviation report. 6.8 Qualification of the correct connection for power transmission and signal transmission Purpose Qualify power of the blender system and installation of the utility services comply with equipment requirements and management requirements of the utility engineering. Procedure According to product manual, qualify the status of power transmission and signal transmission comply with design requirement.  Rotary motor  Lifting motor  PLC  Touch screen  Printer  Sensor  Electric components of control part. Acceptable standard Equipment power transmission and signal transmission comply with design requirement. Record Record the validation result in IQR08;
  • 12. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP Record deviation appeared during the qualification process in the deviation report. 6.9 PLC Qualification of tests of the PLC I/O Purpose Check the I/O of the system, inspect whether the connection of PLC card is correctly connected. Procedure According to the electrical principal drawing, test the I/O points. Acceptable standard Qualify there isn’t any error connections of the I/O. Record Record the validation result in IQR09; Record deviation appeared during the qualification process in the deviation report. 6.10 Installation Qualification of the software Purpose Qualify the installed software editions of the blender are exact and have no error. Procedure Qualify all the needed software editions comply with the software criterion of the manufacturer, including the following applications software:  Qualify the edition No. of the operation system  Qualify the edition No. of the HMI  Qualify the edition No. of the software  Qualify the disk No. of the backup Acceptable standard All needed software editions for the system have been installed. Record Record the validation result in IQR10; Record deviation appeared during the qualification process in the deviation report. 6.11 Qualification of the main components of the blender Purpose Qualify the installation of the main components of the blender system complies with URS/FAT requirements. Procedure According to URS /FAT, qualify the following items:
  • 13. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP  Frame body  Rotary reducer  Lifting reducer  Collector ring device  Electric control system  Operation terminal  Sensors Acceptable standard The installation of the main components of the blender system complies with URS/FAT requirements. Record Record the validation result in IQR10; Record deviation appeared during the qualification process in the deviation report. 6.12 Safety measures Purpose Qualify the installation of the hardware system of the blender complies with requirements for safety production. Procedure Qualify the following items:  Electrical safety  Operation safety Acceptable standard The installation of the hardware system of the blender complies with requirements for safety production. Record Record the validation result in IQR12; Record deviation appeared during the qualification process in the deviation report. 6.13 Qualification of the equipment appearance Purpose Qualify the appearance of the blender system has not been damaged or injured during the installation process.
  • 14. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP Procedure Check the following items:  Nameplate  Cover  Rotary frame  Bin  Electrical control box Acceptable standard The appearance of the blender system has not been damaged or injured. Record Record the validation result in IQR13; Record deviation appeared during the qualification process in the deviation report. 6.14 Attached page of the record If the main record pages are not enough, the record like IQR14 can be used, then give a clear indication of the title of the number and Qualification record reference. 7 Deviations 7.1 Deviations list Collect all the deviations appeared during the IQ activities to form the deviations list and indicate date of solution. 7.2 Deviations report Record all the deviations and their management occurred during the protocol execution process and analyze their effects on Validation conclusion. Record the records contents, cause analysis, improved situations and effects on Validation conclusion in the deviations report. 8 Attachments list Collect all related documents, records, videos. CDs, use them as attachments for the validation report. Compile the attachment list, specify the pages and use conditions. 9 Report Collect all records and reports of chapters 6, 7 and 8. Validation group uses procedures below to form the final validation report:
  • 15. Installation Qualification Protocol for HZD1500 Bin Blender JN/JS/IQ-HZD1500 version:V01 SAINTYCO INTERNATIONAL GROUP  Check the review of the IQ process  Check and analyze the records  Check and analyze the deviations report DR  Draft out report  Discuss and approve the report  Form the formal Installation Qualification Report 10 Checking and Approval Report is checked and approved by authorized person. Validation Report and its attachments shall be arranged, filled in a document for archiving and should be kept and saved as part of the equipment dossier. Appendix I has provided an example of Installation Validation Report. 11 Modification control Any change of the equipment must be checked and approved by both parts, and then changed files should be archived.
  • 16. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:01 Manufacturer Saintyco Record/Date Check/Date name: Documents Qualification Document Name (PASS) (FAIL) (N/A) Packing list Certificate of conformity FAT protocol Materials certificate Product manual Inverter manual Installation foundation Dwg Outline dimension Dwg Electrical principal Dwg Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 17. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:02 Manufacturer Saintyco Record/Date Check/Date name:SOP Qualification of SOP feasibility Item Description Result SOP Operation SOP Has been checked and approved by authorized personnel □Yes □NoAll revisions have been checked and approved It is the current effective version SOP Washing SOP Has been checked and approved by authorized personnel □Yes □NoAll revisions have been checked and approved It is the current effective version SOP Maintenance SOP Has been checked and approved by authorized personnel □Yes □NoAll revisions have been checked and approved It is the current effective version Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checked Checked Checked Signature Date
  • 18. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:03 Manufacturer Saintyco Record/Date Check/Date name:Qualification of key material Part name Required Material Real material Material report No. Bin body 316L Bin lid 316L Lid seal Silicone Butterfly valve seal Silicone Control box 304 Machine housing 304 Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 19. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:04 Manufacturer Saintyco Record/Date Check/Date name:Qualification of calibration of instruments and meters(N/A) Instruments and meters Calibration No. Name Manufacturer Model Range/ Precision Critical? Y/ N Calibration date Expiry Date Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 20. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:05 Manufacturer Saintyco Record/Date Check/Date name:Qualification of system lubrication NO. Lubrication point Distance to product (materials) Lubrication period Lubrication medium 1 Left/right gearbox Far from product (medicine), it doesn’t influence product safety directly 3 months High-quality lubricant 2 Lifting screw-nut pair Far from product (medicine), it doesn’t influence product safety directly 2 months High-quality lubricant 3 Bottom guide rod of the lifting mechanism Far from product (medicine), it doesn’t influence product safety directly 2 months High-quality lubricant 4 Left/right bearings of the rotating body Far from product (medicine), it doesn’t influence product safety directly 1 year High-quality lubricant 5 Lifting reducer Far from product (medicine), it doesn’t influence product safety directly Refer to motor manual Refer to motor manual 6 Rotary reducer Far from product (medicine), it doesn’t influence product safety directly Refer to motor manual Refer to motor manual Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 21. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:06 Manufacturer Saintyco Record/Date Check/Date name:Qualification of the installation position and room of the equipment Item Result Yes No Room accords with technical layout □Yes □No Room accords with completion drawing or elevation drawing □Yes □No Site temperature18℃~45℃ □Yes □No site humidity level 25%~85% □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 22. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:07 Manufacturer Saintyco Record/Date Check/Date name:Qualification of the installation of utility engineering Item Description Electric power Power supply:440 V/60Hz/3P Power:Rotary power:7.5 kW Lifting power:3 kW Wire section:4.0 mm²; 2.5 mm²; 1.0 mm²; 0.5 mm² Cable type: VVRP RVV System earthing Protection earthing:Resistance≤4Ω Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 23. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:08 Manufacturer Saintyco Record/Date Check/Date name:Qualification of correct connections of power and signal transmission Item Description Result Yes No Mixing motor 3x4mm²+1x2.5 mm² □Yes □No Lifting motor 3x2.5mm²+1x1.5 mm² □Yes □No PLC 24V Power supply 24V, actions of I/O are agile and reliable □Yes □No Touch panel DC24V Power supply 24V, displays data and picture □Yes □No Printer 220V Power supply 220V □Yes □No Various sensors Sensitive actions of proximity switches/photoelectric switches/limit switches □Yes □No Strong electricity electric elements of the control part Reliable actions of inverters, contactors and relays □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 24. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:09 Manufacturer Saintyco Record/Date Check/Date name:PLC Qualification of the tests of the PLC Input/Output (I/O) Item Description Result Yes No Input Sensors for bin in position Mandatory input position, bin in position, signal light 0.3 of the PLC illuminates □Yes □No upper limit Mandatory input position, bin clamped in position, signal light 0.4 of the PLC illuminates □Yes □No Lower limit Mandatory input position, bin fallen to ground position, signal light 0.5 of the PLC illuminates □Yes □No Safety barrier Mandatory input position, bin fallen to ground position, signal light 0.6 of the PLC illuminates □Yes □No Emergency stop Mandatory input position, bin fallen to ground position, signal light 0.7 of the PLC illuminates □Yes □No Output Lifting sensors Mandatory output position, bin is lifting, signal light 0.1 of the PLC illuminates □Yes □No Falling sensors Mandatory output position, bin is falling, signal light 0.1 of the PLC illuminates □Yes □No Contracting brake Mandatory output position, system is braking, signal light 0.1 of the PLC illuminates □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 25. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:109 Manufacturer Saintyco Record/Date Check/Date name:Installation Qualification of the Software Item Description Conformance Yes No Operation interface Qualify the edition No. of PLC program □Yes □No HMI Qualify edition No. of HMI program □Yes □No System Siemens S7 200 Qualify the OS of the system is Siemens S7 200 □Yes □No Backup Set with backup, backup disk No. is □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 26. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:11 Manufacturer Saintyco Record/Date Check/Date name:Qualification of the main components of the blender Item Description Conformance Yes No Frame body Installation foundation complies with requirements of user’s manual The anchor bolts are reliably locked and loosing prevention measures are implemented. The frame body has not been hit during its installation and the anti-rust layer is kept intact. □Yes □No Rotary reducer Model:DK107-YBEJ7.5KW-4P-96.15-B3B Power:7.5 kW □Yes □No Lifting reducer Model:YBEJ100L2-4P-3KW-B3+DFAFS67-17.4-B5Ⅱ Power:3 kW □Yes □No Top lid of pharma bin No seal leakage of top lid of pharma bin, locked reliable,no material leakage. □Yes □No Electric control system Components shall comply with electric parts list Devices arrangement shall be consistent with lines No. and electric diagram No wires loosening □Yes □No Operation terminal Touch panel has a clear display, it has no distinctness scratch or spot □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 27. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:12 Manufacturer Saintyco Record/Date Check/Date name: Qualification of the safety measures Item Description Conformance Yes No Electric safety Labels Driving Power connection has “Electricity Danger” label Protective Earthing label □Yes □No Earthing resistance Correct earthing, resistance ≤4Ω □Yes □No Shell (control box body) Only use key or tool to open it □Yes □No Motor overloading protection Designed with motor overloading protection, when overloaded, system emits overload alarm signal □Yes □No Insulation failure protection Designed with system insulation failure protection (Air switch) □Yes □No Operati on safety Designed with obvious alarm labels warning any misoperation □Yes □Yes The blending rotary area has been reliably isolated □Yes □Yes The emergency stop switch is set to operator’s most convenient position(control panel/machine column) □Yes □Yes System is designed with optic and acoustic alarm devices alarming any system failures or malfunctions □Yes □Yes Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 28. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:13 Manufacturer Saintyco Record/Date Check/Date name:Qualification of equipment appearance Item Description Conformance Yes No Labels Without any nick; with clear characters and pattern □Yes □No External housing Flat and smooth surface without obvious concave convex surface, spot or nick □Yes □No Rotate frame Flat and smooth surface without obvious concave convex surface, spot or nick □Yes □No Pharma Bin Flat and smooth surface without obvious concave convex surface, spot or nick □Yes □No Electric control cabinet Flat and smooth surface without obvious concave convex surface, spot or nick Sheet metal parts have not obvious distortion Door lock is well kept Operation panel has no nick; with clear characters and pattern. Devices on the panel are well kept and are not distorted □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 29. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:14 Manufacturer Saintyco Record/Date Check/Date name:Attached page of the Record Record No. IQR Record name Pages Total pages: Page No.:
  • 30. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:15 Manufacturer Saintyco Record/Date Check/Date name:Deviations list Deviation No. Qualification record No. Description Date of solution
  • 31. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:16 Manufacturer Saintyco Record/Date Check/Date name:Deviations Report Deviation No. Record No. Deviation Description: Signature Date Reason analysis: Signature Date Improvement measure: Improvement result: Signature/Date Signature/Date Improvement results have positive effects on installation validation Yes No
  • 32. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:17 Manufacturer Saintyco Record/Date Check/Date name: Attachments list Attachment No. Attachment name Page Application validation record No./Name
  • 33. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP IQR of HZD1500 Bin Blender Record No. IQR:18 Manufacturer Saintyco Record/Date Check/Date name: Checking and Approval of the execution Check the IQ results and original data, then form the ultimate conclusion of the IQ: PASS FAIL If there’s still unsolved deviations, please fill down the following content: Qualify if these unsolved deviations may influence the ultimate conclusion of the IQ. YES NO Note: Executed by Signature Date Checked by Signature Date Checked by Signature Date
  • 34. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP Appendix I: Installation Qualification Report (Installation Qualification Report) 1 Purpose This is to set the validation report of the HZD1500 Bin Blender, and to conclude if the activities of IQ meet equipment requirements, and if the Equipment qualification can be concluded. 2 Scope  Installation Qualification of the HZD1500 Bin Blender manufactured by SAINTY that is installed in Room , ID No.  The making of the IQ tests is to ensure that the complete functions of the installation fully comply with the design specifications.  The contents of this validation document refer to the equipment, testing steps, specifications, documentation. This information will be used to ensure that the blender has been installed, operated and run according to the user’s design specifications and company’s requirements.  This document is compiled by SAINTY INTERNATIONAL GROUP, and then the related approval signature, supporting documents and other documentation will be included. Any supporting datum and documentation shall be attached to the inspection report. 3 Responsibilities Validation team is responsible for this report. 4 Summary The validation of this equipment activities have been done according to the procedure requirements of the Company (Management regulations of equipment validation), the validation group proceeds according to the validation protocol of the HZD1500 Bin Blender. The protocol should have the entire IQ validated and results of the checking listed. By the validation process, the checking and auditing of the reports and deviations reports, qualify that the protocol, during the implementation process, has no modification, is real and complete and accords with requirements of the protocol. The validation group, after has discussed, approves the Installation Qualification (IQ) of the Bin Blender. 5 Confirmed Record Summary
  • 35. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP No. Item Evaluation and analysis 1 IQR1: PASS□ FAIL□ N/A□ 2 IQR2: PASS□ FAIL□ N/A□ 3 IQR3: PASS□ FAIL□ N/A□ 4 IQR4: PASS□ FAIL□ N/A□ 5 IQR5: PASS□ FAIL□ N/A□ 6 IQR6: PASS□ FAIL□ N/A□ 7 IQR7: PASS□ FAIL□ N/A□ 8 IQR8: PASS□ FAIL□ N/A□ 9 IQR9: PASS□ FAIL□ N/A□ 10 IQR10: PASS□ FAIL□ N/A□ 11 IQR11: PASS□ FAIL□ N/A□ 12 IQR12: PASS□ FAIL□ N/A□ 13 IQR13: PASS□ FAIL□ N/A□ 14 IQR14: PASS□ FAIL□ N/A□ 15 IQR15: PASS□ FAIL□ N/A□ 16 IQR16: PASS□ FAIL□ N/A□ 17 IQR17: PASS□ FAIL□ N/A□ Conclusion Activities of the Installation Qualification accord with the requirements of the protocol, installation of the Bin Blender accords with standards of the equipment and design, industrial manufacturing and GMP requirements. And can go to the next step activities and equipment validation or equipment trial operation. 6 Validation conclusion The group, after has checked the content report of the equipment validation and has discussed, approves that the Installation Qualification (IQ) of the equipment accords with the requirements of the protocol, thus Operational Qualification (OQ) and Performance Qualification (PQ) of the equipment can be performed. By the validation process, the checking and auditing of the reports and deviations reports, qualify that contents related to the IQ of the protocol, during the implementation process, have not been modified, records are real and complete. The members of the validation group, after have discussed, declares unanimously that activities of the Installation Qualification accord with the requirements of the protocol, installation of the Bin Blender accords with standards of the equipment and design, blender system accords with industrial manufacturing and GMP requirements. And can go to the next step activities and equipment validation or equipment trial operation. 7 List of signatures of validation group members (Brief)
  • 36. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP 8 Signature Executed by Signature Date (dd/mm/yyyy) Checked by Signature Date (dd/mm/yyyy) Checked by Signature Date (dd/mm/yyyy)
  • 37. JN/JS/IQ-HZD1500 Installation Qualification Protocol for HZD1500 Bin Blender version:V01 SAINTYCO INTERNATIONAL GROUP Appendix Ⅱ: Abbreviations AC Alternating current A Ampere V Volt Hz Hertz PLC Programmable Logic Controller ºC Degrees Celsius DQ Design Qualification IQ Installation Qualification OQ Operational Qualification PQ Performance Qualification FAT Factory Acceptance Test SAT Site Acceptance Test DQR Design Qualification Report IQR Installation Qualification Record OQR Operational Qualification Record PQR Performance Qualification Record DR Deviation Report N/A Not Applicable SOP Standard Operating Procedure RSD Relative Standard Deviation