SlideShare uma empresa Scribd logo
1 de 14
Baixar para ler offline
Overview 01
Part Number Reference 02
Class 150 Floating Ball Valves 2”- 6“ 03
Class 150 Floating Ball Valves 8”- 10” 04
Class 300 Floating Ball Valves 05
Class 600 Floating Ball Valves 06
Class 600 Trunnion Ball Valves 6“ - 8” 07
Class 600 Trunnion Ball Valves 10”- 12” 08
Class 1500 Trunnion Ball Valves 09
Class 600 Check Valves 10
Terms and Conditions 11
Table of Contents
Overview
Apache pipeline valves are Manufactured
according to API Q1 standards. All Valves
are designed according to API standards
and are supplied with full material traciblity
and pressure test reports conforming to
API 598 and API 6D test requirements.
For ease of purchasing please consult the
part number reference chart on the following
page.
OVERVIEW
PART NUMBER REFERENCE
BALL VALVES
CHECK, GATE, GLOBE VALVES
1. PRICING - Products and services provided will be invoiced at the price shown and agreed upon at the time of
service, invoice, or, as printed on any and/or all Apache Pressure Products sales/information material including
purchase orders, letters, or emails. Printed prices do not include freight or any applicable taxes. Taxes and other fees
such as shipping will be quoted and or billed as per order, or as required.
2. TREMS OF PAYMENT – Payment is due upon receipt or as agreed to by contract. Any unpaid past due balance
will accrue interest and penalties at the rate of 12% APR, or the max allowed by state law, for the period that the past
due balance remains unpaid, and shall not be less than twenty dollars ($20.00). Further customers agree to pay all
attorney and/or collection fees and waives notice of such should subsequent litigation become required to effect
collection or to assert our interest for unpaid balances.
3. QUOTATIONS - All quotations and sales are F.O.B. our plant in Manvel, Texas. Net prices and discounts are
subject to change without notice. Prices in effect at the time of receipt of order whether higher or lower, will prevail. All
sales tax, use tax, or other excise taxes which may be required by law to be paid in connection with any sale will be
added to the gross sales price.
4. DELIVERY/FREIGHT - All shipments are F.O.B. Manvel, Texas unless otherwise stated. All promises of shipments
are as closely estimated as possible. We will make every effort to ship within the time promised, but do not guarantee
to do so, or assume further or implied liability with respect to delivery dates or timelines. Our responsibility ceases
upon delivery to any common carrier or other agent furnished or specified by the customer and we do not, unless
previously instructed, insure shipments beyond the point of delivery to such carriers. Full freight allowance will be
covered on individual orders of $3000.00-$5000.00 based upon the state to which the shipment will be delivered to.
The Freight carrier will be chosen by the seller unless otherwise instructed or agreed upon in advance by both parties.
Individual orders that do not meet the required amount will not receive freight allowance.
5. SHORTAGES AND DAMAGES IN TRANSIT - All claims for shortages or damaged products must be made within
five days after receipt of shipment. All lost or damaged materials in transit become the responsibility.
6. WARRANTY - This warranty is in lieu of all other warranties, expressed or implied, including any implied
warranty or merchantability or fitness for any use or purpose. All of Apache Pressure Products INC. products are
warranted to be free from manufacturing defects and workmanship for a period of one (1) year from the date of
shipment, and if found to be defective within that period the product will be replaced at no charge to the customer.
However, the product being returned must have been used in accordance with the intended or published purpose, and
approved installation and operating practices. There must be a properly filled out return authorization (RA) before
credit or replacement will be offered.
7. CANCELLATIONS/CHANGES - Cancellations or instructions to change work or delivery must be submitted in
writing to the seller. If any order is canceled the buyer will be responsible for the payment of work already performed
and any material already in use.
GENERAL TERMS AND CONDITIONS
Apache Pipeline Valve Catalog

Mais conteúdo relacionado

Mais procurados

Cheap pit bikes for sale
Cheap pit bikes for saleCheap pit bikes for sale
Cheap pit bikes for salepowerrideoutlet
 
Zayyan Group Invoice Format
Zayyan Group Invoice FormatZayyan Group Invoice Format
Zayyan Group Invoice FormatMajid Hashmi
 
brochure-govcon
brochure-govconbrochure-govcon
brochure-govconTSimonsVA
 
Section 146 Notice Letter
Section 146 Notice LetterSection 146 Notice Letter
Section 146 Notice Letterhotukdeal
 
Chevron
ChevronChevron
Chevronkckozf
 

Mais procurados (6)

IPSWICH 2
IPSWICH 2IPSWICH 2
IPSWICH 2
 
Cheap pit bikes for sale
Cheap pit bikes for saleCheap pit bikes for sale
Cheap pit bikes for sale
 
Zayyan Group Invoice Format
Zayyan Group Invoice FormatZayyan Group Invoice Format
Zayyan Group Invoice Format
 
brochure-govcon
brochure-govconbrochure-govcon
brochure-govcon
 
Section 146 Notice Letter
Section 146 Notice LetterSection 146 Notice Letter
Section 146 Notice Letter
 
Chevron
ChevronChevron
Chevron
 

Destaque

Innochem General PT
Innochem General PTInnochem General PT
Innochem General PTjustinart
 
دسته بندی اسکنرهای لیزری و کاربرد آنها در صنعت Laser Scanners classification ...
دسته بندی اسکنرهای لیزری و کاربرد آنها در صنعت Laser Scanners classification ...دسته بندی اسکنرهای لیزری و کاربرد آنها در صنعت Laser Scanners classification ...
دسته بندی اسکنرهای لیزری و کاربرد آنها در صنعت Laser Scanners classification ...Mozaffar Etezadi Far
 
Complete - Non Shielding Coatings Presentation
Complete - Non Shielding Coatings PresentationComplete - Non Shielding Coatings Presentation
Complete - Non Shielding Coatings PresentationDanilo Caparida
 
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...Marcellus Drilling News
 
آموزش جامع اسکنر های لیزری How Laser Scanners Work?
آموزش جامع اسکنر های لیزری How Laser Scanners Work?آموزش جامع اسکنر های لیزری How Laser Scanners Work?
آموزش جامع اسکنر های لیزری How Laser Scanners Work?Mozaffar Etezadi Far
 
Edf R&D Xemard Coupling Between Transmission Underground Cables And Pipelines
Edf R&D Xemard Coupling Between Transmission Underground Cables And PipelinesEdf R&D Xemard Coupling Between Transmission Underground Cables And Pipelines
Edf R&D Xemard Coupling Between Transmission Underground Cables And Pipelinescorinne rocherieux
 
آموزش جامع انکودرها How Encoders Work?
آموزش جامع انکودرها How Encoders Work?آموزش جامع انکودرها How Encoders Work?
آموزش جامع انکودرها How Encoders Work?Mozaffar Etezadi Far
 
آموزش جامع فاصله یاب های لیزری How Laser Distance Meters Work?
آموزش جامع فاصله یاب های لیزری How Laser Distance Meters Work?آموزش جامع فاصله یاب های لیزری How Laser Distance Meters Work?
آموزش جامع فاصله یاب های لیزری How Laser Distance Meters Work?Mozaffar Etezadi Far
 
Pipeline and instrumentation diagram for lpg tank farm project
Pipeline and instrumentation diagram for lpg tank farm project Pipeline and instrumentation diagram for lpg tank farm project
Pipeline and instrumentation diagram for lpg tank farm project lpgbnhgastank
 
Williams Transco Atlantic Sunrise Project Map
Williams Transco Atlantic Sunrise Project MapWilliams Transco Atlantic Sunrise Project Map
Williams Transco Atlantic Sunrise Project MapMarcellus Drilling News
 
Surface protective coatings
Surface protective coatingsSurface protective coatings
Surface protective coatingsit-monarch
 
Corrosion In Soils
Corrosion In SoilsCorrosion In Soils
Corrosion In SoilsRay Mignogna
 
Zinfra protective coating statement
Zinfra protective coating statement Zinfra protective coating statement
Zinfra protective coating statement Zinfra Group
 

Destaque (20)

Innochem General PT
Innochem General PTInnochem General PT
Innochem General PT
 
دسته بندی اسکنرهای لیزری و کاربرد آنها در صنعت Laser Scanners classification ...
دسته بندی اسکنرهای لیزری و کاربرد آنها در صنعت Laser Scanners classification ...دسته بندی اسکنرهای لیزری و کاربرد آنها در صنعت Laser Scanners classification ...
دسته بندی اسکنرهای لیزری و کاربرد آنها در صنعت Laser Scanners classification ...
 
06_WP-JTN_1306_LR
06_WP-JTN_1306_LR06_WP-JTN_1306_LR
06_WP-JTN_1306_LR
 
Complete - Non Shielding Coatings Presentation
Complete - Non Shielding Coatings PresentationComplete - Non Shielding Coatings Presentation
Complete - Non Shielding Coatings Presentation
 
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...
NTSB Final Report on Columbia Gas Transmission Pipeline Explosion Near Sisson...
 
آموزش جامع اسکنر های لیزری How Laser Scanners Work?
آموزش جامع اسکنر های لیزری How Laser Scanners Work?آموزش جامع اسکنر های لیزری How Laser Scanners Work?
آموزش جامع اسکنر های لیزری How Laser Scanners Work?
 
GE O&G overview 2013
GE O&G overview 2013GE O&G overview 2013
GE O&G overview 2013
 
Edf R&D Xemard Coupling Between Transmission Underground Cables And Pipelines
Edf R&D Xemard Coupling Between Transmission Underground Cables And PipelinesEdf R&D Xemard Coupling Between Transmission Underground Cables And Pipelines
Edf R&D Xemard Coupling Between Transmission Underground Cables And Pipelines
 
آموزش جامع انکودرها How Encoders Work?
آموزش جامع انکودرها How Encoders Work?آموزش جامع انکودرها How Encoders Work?
آموزش جامع انکودرها How Encoders Work?
 
آموزش جامع فاصله یاب های لیزری How Laser Distance Meters Work?
آموزش جامع فاصله یاب های لیزری How Laser Distance Meters Work?آموزش جامع فاصله یاب های لیزری How Laser Distance Meters Work?
آموزش جامع فاصله یاب های لیزری How Laser Distance Meters Work?
 
Pipeline and instrumentation diagram for lpg tank farm project
Pipeline and instrumentation diagram for lpg tank farm project Pipeline and instrumentation diagram for lpg tank farm project
Pipeline and instrumentation diagram for lpg tank farm project
 
scada systems
scada systemsscada systems
scada systems
 
Williams Transco Atlantic Sunrise Project Map
Williams Transco Atlantic Sunrise Project MapWilliams Transco Atlantic Sunrise Project Map
Williams Transco Atlantic Sunrise Project Map
 
Delivering Cost-Effective Natural Gas to Your Remote Facility – New Innovatio...
Delivering Cost-Effective Natural Gas to Your Remote Facility – New Innovatio...Delivering Cost-Effective Natural Gas to Your Remote Facility – New Innovatio...
Delivering Cost-Effective Natural Gas to Your Remote Facility – New Innovatio...
 
Surface protective coatings
Surface protective coatingsSurface protective coatings
Surface protective coatings
 
CTM PROVING
CTM PROVINGCTM PROVING
CTM PROVING
 
Corrosion In Soils
Corrosion In SoilsCorrosion In Soils
Corrosion In Soils
 
Protective coating
Protective coatingProtective coating
Protective coating
 
Zinfra protective coating statement
Zinfra protective coating statement Zinfra protective coating statement
Zinfra protective coating statement
 
Scada
ScadaScada
Scada
 

Semelhante a Apache Pipeline Valve Catalog

TUBE FITTING.PDF
TUBE FITTING.PDFTUBE FITTING.PDF
TUBE FITTING.PDFTony Vila
 
Chief2009-2010 Full Line Product Catalog
Chief2009-2010 Full Line Product CatalogChief2009-2010 Full Line Product Catalog
Chief2009-2010 Full Line Product Catalogchiefmfg
 
Standard Ordering Terms and Conditions | Noblex Sport Optics | Optics Trade
Standard Ordering Terms and Conditions | Noblex Sport Optics | Optics TradeStandard Ordering Terms and Conditions | Noblex Sport Optics | Optics Trade
Standard Ordering Terms and Conditions | Noblex Sport Optics | Optics TradeOptics-Trade
 
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docxRAJU852744
 
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docxaulasnilda
 
ArmacellProductRangeEN
ArmacellProductRangeENArmacellProductRangeEN
ArmacellProductRangeENautranphilong
 
Catalog Example - Install Supplies
Catalog Example - Install SuppliesCatalog Example - Install Supplies
Catalog Example - Install SuppliesMike Reeves
 
Receiving stocks
Receiving stocksReceiving stocks
Receiving stocksFoods1975
 
Warranty KOWA | Optics Trade
Warranty KOWA | Optics TradeWarranty KOWA | Optics Trade
Warranty KOWA | Optics TradeOptics-Trade
 
Abreviated Project Slides
Abreviated Project SlidesAbreviated Project Slides
Abreviated Project SlidesJacob Sims
 
Tracking of returns
Tracking of returnsTracking of returns
Tracking of returnsPaytm
 
General Air Shipment Procedures_Nov2015_Ver 004
General Air Shipment Procedures_Nov2015_Ver 004General Air Shipment Procedures_Nov2015_Ver 004
General Air Shipment Procedures_Nov2015_Ver 004Reynir Gislason
 

Semelhante a Apache Pipeline Valve Catalog (20)

TUBE FITTING.PDF
TUBE FITTING.PDFTUBE FITTING.PDF
TUBE FITTING.PDF
 
Chief2009-2010 Full Line Product Catalog
Chief2009-2010 Full Line Product CatalogChief2009-2010 Full Line Product Catalog
Chief2009-2010 Full Line Product Catalog
 
2016 Product Catalog
2016 Product Catalog2016 Product Catalog
2016 Product Catalog
 
Standard Ordering Terms and Conditions | Noblex Sport Optics | Optics Trade
Standard Ordering Terms and Conditions | Noblex Sport Optics | Optics TradeStandard Ordering Terms and Conditions | Noblex Sport Optics | Optics Trade
Standard Ordering Terms and Conditions | Noblex Sport Optics | Optics Trade
 
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx
 
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx
111CORPORATE AWARD PROGRAMMEASSIGNMENT FRONT S.docx
 
Emin sg hubbell anclaje
Emin sg hubbell anclajeEmin sg hubbell anclaje
Emin sg hubbell anclaje
 
ArmacellProductRangeEN
ArmacellProductRangeENArmacellProductRangeEN
ArmacellProductRangeEN
 
Catalog Example - Install Supplies
Catalog Example - Install SuppliesCatalog Example - Install Supplies
Catalog Example - Install Supplies
 
1 p40y9135
1 p40y91351 p40y9135
1 p40y9135
 
Steel Storage Equipment
Steel Storage EquipmentSteel Storage Equipment
Steel Storage Equipment
 
Receiving stocks
Receiving stocksReceiving stocks
Receiving stocks
 
Engagement brochure penders
Engagement brochure pendersEngagement brochure penders
Engagement brochure penders
 
PO FOR NEEV TECH_Al Nosing
PO FOR NEEV TECH_Al NosingPO FOR NEEV TECH_Al Nosing
PO FOR NEEV TECH_Al Nosing
 
2017 API Catalog
2017 API Catalog2017 API Catalog
2017 API Catalog
 
Warranty KOWA | Optics Trade
Warranty KOWA | Optics TradeWarranty KOWA | Optics Trade
Warranty KOWA | Optics Trade
 
Abreviated Project Slides
Abreviated Project SlidesAbreviated Project Slides
Abreviated Project Slides
 
Tracking of returns
Tracking of returnsTracking of returns
Tracking of returns
 
General Air Shipment Procedures_Nov2015_Ver 004
General Air Shipment Procedures_Nov2015_Ver 004General Air Shipment Procedures_Nov2015_Ver 004
General Air Shipment Procedures_Nov2015_Ver 004
 
Warranty Policy
Warranty PolicyWarranty Policy
Warranty Policy
 

Apache Pipeline Valve Catalog

  • 1.
  • 2. Overview 01 Part Number Reference 02 Class 150 Floating Ball Valves 2”- 6“ 03 Class 150 Floating Ball Valves 8”- 10” 04 Class 300 Floating Ball Valves 05 Class 600 Floating Ball Valves 06 Class 600 Trunnion Ball Valves 6“ - 8” 07 Class 600 Trunnion Ball Valves 10”- 12” 08 Class 1500 Trunnion Ball Valves 09 Class 600 Check Valves 10 Terms and Conditions 11 Table of Contents
  • 3. Overview Apache pipeline valves are Manufactured according to API Q1 standards. All Valves are designed according to API standards and are supplied with full material traciblity and pressure test reports conforming to API 598 and API 6D test requirements. For ease of purchasing please consult the part number reference chart on the following page. OVERVIEW
  • 4. PART NUMBER REFERENCE BALL VALVES CHECK, GATE, GLOBE VALVES
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. 1. PRICING - Products and services provided will be invoiced at the price shown and agreed upon at the time of service, invoice, or, as printed on any and/or all Apache Pressure Products sales/information material including purchase orders, letters, or emails. Printed prices do not include freight or any applicable taxes. Taxes and other fees such as shipping will be quoted and or billed as per order, or as required. 2. TREMS OF PAYMENT – Payment is due upon receipt or as agreed to by contract. Any unpaid past due balance will accrue interest and penalties at the rate of 12% APR, or the max allowed by state law, for the period that the past due balance remains unpaid, and shall not be less than twenty dollars ($20.00). Further customers agree to pay all attorney and/or collection fees and waives notice of such should subsequent litigation become required to effect collection or to assert our interest for unpaid balances. 3. QUOTATIONS - All quotations and sales are F.O.B. our plant in Manvel, Texas. Net prices and discounts are subject to change without notice. Prices in effect at the time of receipt of order whether higher or lower, will prevail. All sales tax, use tax, or other excise taxes which may be required by law to be paid in connection with any sale will be added to the gross sales price. 4. DELIVERY/FREIGHT - All shipments are F.O.B. Manvel, Texas unless otherwise stated. All promises of shipments are as closely estimated as possible. We will make every effort to ship within the time promised, but do not guarantee to do so, or assume further or implied liability with respect to delivery dates or timelines. Our responsibility ceases upon delivery to any common carrier or other agent furnished or specified by the customer and we do not, unless previously instructed, insure shipments beyond the point of delivery to such carriers. Full freight allowance will be covered on individual orders of $3000.00-$5000.00 based upon the state to which the shipment will be delivered to. The Freight carrier will be chosen by the seller unless otherwise instructed or agreed upon in advance by both parties. Individual orders that do not meet the required amount will not receive freight allowance. 5. SHORTAGES AND DAMAGES IN TRANSIT - All claims for shortages or damaged products must be made within five days after receipt of shipment. All lost or damaged materials in transit become the responsibility. 6. WARRANTY - This warranty is in lieu of all other warranties, expressed or implied, including any implied warranty or merchantability or fitness for any use or purpose. All of Apache Pressure Products INC. products are warranted to be free from manufacturing defects and workmanship for a period of one (1) year from the date of shipment, and if found to be defective within that period the product will be replaced at no charge to the customer. However, the product being returned must have been used in accordance with the intended or published purpose, and approved installation and operating practices. There must be a properly filled out return authorization (RA) before credit or replacement will be offered. 7. CANCELLATIONS/CHANGES - Cancellations or instructions to change work or delivery must be submitted in writing to the seller. If any order is canceled the buyer will be responsible for the payment of work already performed and any material already in use. GENERAL TERMS AND CONDITIONS