A few key aspects of an outsourcing contract typically drive its projected savings
and return on investment (ROI). You must carefully consider all of these areas to
avoid mixed financial results on your outsourcing project. Strategizing the following
five areas can help you develop a successful outsourcing contract:
•	 Contract components
•	 Unit pricing
•	 Resource volume
•	 Dead bands
•	 Renegotiation bands
Introduction
3 ©2015 WGroup. ThinkWGroup.com
Contract components
The first step in developing an outsourcing
contract is to define its scope of service. The
scope typically describes the responsibilities
and rights of all parties to the contract, but it
also should define the contract’s requirements.
You can begin this process by attaching the
request for proposal (RFP) and corresponding
vendor’s response to the contract. These
documents should provide an accurate
description of the contract’s requirements
and how the vendor plans to meet those
requirements, provided the procurement
process has been performed properly.
RFPs should provide an
accurate description
of the contract’s
requirements – and how
the vendor plans to meet
those requirements.
A large outsourcing contract typically contains many components.
This section provides an overview of the contract components that
are most important in developing a successful contract.
Scope of service
The incorporation of sales language into
the contract usually troubles outsourcing
service providers, since the RFP often
describes a scope of service that’s different
from the final scope that’s priced in the
contract. The RFP also contains much
more information than is useful for the
contract. It’s therefore important to use
the RFP as just a guideline for writing
the contract’s requirements section.

4 ©2015 WGroup. ThinkWGroup.com
Service level agreements
Service level agreements (SLAs) are typically attached to the contract or treated as exhibits.
These formal documents describe the service levels required by the contract, as indicated by
key metrics. SLAs often determine the success of an outsourcing contract and their use has
become more widespread in recent years. Clients have traditionally used SLAs to request service
guarantees from vendors such as outsourcers. However, enterprises also use SLAs to obtain
service guarantees from their own business units and IT departments. A significant majority
of enterprises use both internal and external SLAs, and only a small minority have no SLAs in
place at all. The extensive use of both types of SLAs can be effective in motivating enterprises
to deliver the same level of service to their internal clients as they receive from their vendors.
The key to creating SLAs for effective outsourcing contracts is to tie the SLAs to business outcomes
rather than just technical or transactional measures. Vendors’ key performance indicators and
day-to-day operations should be aligned directly with the organization’s own business metrics. For
example, while measures of system availability have been common for decades, what actually
matters to the business is “end user perceived availability”, i.e. the availability of applications
and data to the people who actually use them in their work. And while service desk SLAs have
included such conventional measures as response time and time-to-answer, the measures that
mean the most to the business itself are things like customer satisfaction (end users’ surveyed
opinions on their satisfaction with service desk performance) and first call resolution percentage.
The collection of baseline data is a key step in the development of SLAs, since it
allows you to set appropriate performance standards. The majority of enterprises are
able to collect baseline data for the SLA, although a small minority may be unable to
collect this data due to inadequate capabilities or insufficient time. These limitations
place an enterprise in the position of creating SLAs without knowing their baseline
performance, which is a clear path to undesirable results in an outsourcing contract.
A poorly structured SLA also can lead to unintended consequences in a contract.
Many enterprises create too many SLAs in effort to guarantee service levels for
all services described in the contract. However, this practice can be a mistake,
since it reduces the value of the critical services that have the greatest impact
on business. A better practice is to focus on just a few critical services and align
those measures directly with business outcomes. Focus and business alignment are two
ways to avoid “seeing green but feeling red” when reviewing outsourcing performance.

5 ©2015 WGroup. ThinkWGroup.com
Critical service levels drive the business and generally have financial implications when these
service levels are missed. These service levels must be under the complete control of the service
provider to qualify as a critical service levels under the term of the outsourcing contract.
Key service levels are less important than critical service levels, since they have
no financial implications for the client as described in the SLAs. However, these
service levels are still important to the client and may be designated as critical
services under specific conditions. The service provider also must have full control
over key service levels since they can become critical service levels.
Metrics are service levels that the service provider can measure, although they don’t have full
control over them. Metrics, therefore, can’t become critical service levels or key service levels.
The service levels described in an outsourcing contract fall into three
categories: critical service levels, key service levels, and metrics.
6 ©2015 WGroup. ThinkWGroup.com
Pricing
The pricing section of an outsourcing
contract describes the fees for services.
It’s essential for this section to include the
costs for development, implementation, and
conversion. All parties to the contract must
clearly understand these terms for the contract
to succeed. The pricing section may also
describe the cost of de-conversion, which
may occur when the contract is terminated.
This section should define the conditions
under which costs may change, including
inflation and changes in activity levels. This
section also should place limits on price
increases in the event the prices are variable.
Obtaining the best price requires the
contract to contain fixed and variable pricing
components. The resource volumes should
provide a set of volumes that ultimately charge
for services on a monthly basis for the lifetime
of the contract. The most cost-effective pricing
solution on an outsourcing contract is typically
a fixed monthly charge for the projected
baseline of the resource volume. This strategy
allows the contract to reduce the pricing risk to
the vendor and increase the client’s leverage.
It also creates a close correlation between
cost and revenue, as well as simplifying
invoicing for most contract services.
The fixed-price portion of the contract should
retain sufficient visibility to adequately
describe its major service components.
Assume for this example that the purpose
of the contract is to provide IT infrastructure.
The fixed-price portion of this contract should
include major hardware, such as mainframes,
networks and servers. Components of this
hardware may require fixed pricing to identify
the resources that are driving your service
prices. Additional reasons
for using fixed prices include
the ability to compare
contract services with similar
services in the marketplace.
The variable-price portion of
the contract allows the client
to adjust the fixed portion
in response to unexpected
volume changes. No
one can accurately predict the changes in
economy and business environment that can
drive the demand for enterprise’s goods and
services. These changes in demand also
impact the IT resources that an enterprise
requires, which must be managed effectively.
Finally, the organization should expect
continual price reduction to be built into the
contract. With a number of factors - Moores’
Law, dropping costs of disk storage, cheaper
bandwidth, and new automation -- conspiring
to continually reduce costs of computing
and networking, the vendor’s cost to deliver
service in Year 3 will be less than in Year
1. The outsourcing contract should reflect
this and allow both the vendor and the
company to share in those cost reductions.
7 ©2015 WGroup. ThinkWGroup.com
Ownership
The ownership section of an outsourcing contract specifies the ownership of physical property,
including tools and equipment as well as intellectual property such as data, trademarks and
work output. It’s crucial for the client to retain ownership of existing intellectual property, although
equipment ownership depends on the relationship between client and service provider. Either
party may retain ownership of intellectual property created as a result of the contract, which
primarily includes software in the case of an IT outsourcing contract. The client generally will
retain ownership of created software when the client defines the specifications, and the software
is an extension of existing systems owned by the client. However, the client and service provider
may share ownership of software when it customizes or extends a service provider’s product.
The security and controls portion of the contract specifies the safe
handling and confidentiality of the client’s data, in addition to the
vendor practices needed to meet those requirements. These
practices may include the controls that determine how vendor
staff member will access physical areas of the client’s facility
or data. Access controls typically require vendors to have
non-disclosure agreements (NDAs) with staff members and
report security breaches. Some contracts may define additional
controls, such as approval of assigned personnel, notification
of personnel changes, insurance requirements, and maintenance
timeframes. Some clients may need to include compliance regulations in
the security and controls section, especially in certain industries like healthcare and finance.
Security and controls
8 ©2015 WGroup. ThinkWGroup.com
An outsourcing contract may contain a dispute resolution section that defines the process
for escalating and resolving conflicts. This section typically specifies the escalation time
frame for both the client and service provider, in addition to the use of arbitration as a means
of resolution instead of civil litigation. An indemnification clause generally requires the
service provider to take responsibility for its negligent actions. A limitation of liability clause
places limits on the service provider’s liability, which is typically equal to the fees paid. The
termination clause specifies the conditions under which the contract may be terminated
before its normal expiration and usually includes any termination notices and fees.
Dispute resolution
An outsourcing contract may contain an audit
section for various audit types, including internal
control, financial, and security. This section specifies
the audit frequency, the party that pays for the
audits, and the types of reporting available. It also
may define the documentation and timeframes
of audit deficiencies and their resolutions.
Audit
The performance standards section of the contract defines the SLAs,
including the minimum service-level requirements. It also describes the
remedies and penalties for failure to meet those standards.
Performance standards
9 ©2015 WGroup. ThinkWGroup.com
Unit pricing
Unit pricing in a contract includes additional resource charges (ARCs) and reduced
resource charges (RRCs). These pricing vehicles apply to each type of resource
identified in the baseline volumes and allow both the customer and service provider
to adjust the charges of the contract. ARCs and RRCs should represent the variable
component of unit pricing, which is the cost of delivering additional services. Fixed
charges recover the costs of infrastructure, management and tools, so they should offer
enough bandwidth to accommodate reasonable fluctuations in resource usage.
Different variations from the baseline resources may incur different unit pricing, provided the dead
bands are broad enough to adequately represent the benefit and risk to the contract. ARC or RRC
unit prices generally remain constant, although broader dead bands provide greater justification
for cost variations. IT costs decrease as volume increases, provided the additional volume doesn’t
require more investment in infrastructure. These costs increase when volume decreases to the
point that it eats into fixed costs. ARC and RRC pricing comes into play when the service volumes
fall outside the dead band specified in the contract on a particular month. These unit rates allow the
service provider to recover the additional costs incurred in providing the supplemental services.
Assume for this example that the baseline volume for help desk calls is 10,000 calls per month,
and the contract specifies a +/- 5 percent dead band. The help desk receives 11,000 calls
in a particular month, meaning that 500 calls fall above the dead band. The service provider
would invoice the client for an additional 500
calls, based on the assumption that the existing
infrastructure does not support these calls. These
500 additional calls would therefore be covered
under the variable-price portion of the contract.
Conversely, the client would receive a credit for 500 calls in a month where the help
desk only received 9,000 calls. In this case, the call volume fell 500 calls below the dead
band minimum of 9,500 calls. The rationale for this credit is that the service provider’s
variable cost is less due to the lower number of calls that were supported.
The client should ensure that the unit prices specified in the contract have the desired impact
on business behavior. Assume, for example, that the client had an initiative to migrate from
paper processing to electronic processing. A misalignment in the prices specified in the
outsourcing contract could remove any financial incentive to change this business process.
10 ©2015 WGroup. ThinkWGroup.com
Resource volume
The client should strive to ensure that the contract specifies base volumes that will remain as
accurate as possible for the life of the contract. This strategy will minimize the pricing adjustments
that must be made due to changes in service volume. It’s important to anticipate future changes
that could affect resource volume, which is often the most important factor in driving variances
in financial planning. An outsourcing client therefore needs to take enough time during the pre-
RFP stage to get the resource volumes right. In particular, the initial resource volumes need
to accurately reflect the service levels currently supported in the business environment.
It’s also important to consider how those resource volumes will change over the life of the contract.
The baseline resource volumes will form the basis for pricing in the contract,
which should also represent future volume changes. These baselines
need to reflect future growth, so that your enterprise doesn’t have
to renegotiate the contract to avoid continually paying ARCs.
The most common method of establishing a baseline
resource volume is to measure it over the course of a year
to account for any seasonal fluctuations in business. Divide
this annual volume by 12 to establish the average monthly
volume. This methodology works well for most businesses,
although a longer time period may be needed for businesses with large
changes in annual service volume. Some businesses may use average quarterly volumes
to minimize potential credits and debits due to large differences in monthly volume.
The unit of measure is another key aspect of resource volumes. You need to
structure your resource units so that you can assess an equitable charge back of
services to the end users. The correct units of measure for resource followings
will minimize the cost to the end users for services they didn’t consume.
11 ©2015 WGroup. ThinkWGroup.com
The structuring of resource units becomes somewhat more complex in cases involving different
types of servers, since each category must have its own set of resource units. For example, a
contract may have servers made by different manufacturers, or with different levels of complexity.
Resource unit structures also become more challenging to develop when your business strategy
changes the mix and volumes of services. Common reasons for this occurrence include migrating
from physical servers to virtual servers or moving from paper to electronic processing.
It’s especially important in these cases to ensure that the service volume specified in the contract
reflect these anticipated changes in resource volume. Failure to account for these volume changes
can result in extra charges when they reach the limits of the dead bands and renegotiation bands.
12 ©2015 WGroup. ThinkWGroup.com
Dead bands
Outsourcing contracts nearly always contain
a large amount of hidden scope. Common
reasons for this problem include employees
who are unclear about what they’re doing,
as well as work that’s budgeted or performed
outside the process area. These situations
often result in disagreements over who
should perform the work or bear the cost.
Major service providers like Pricewaterhouse
Coopers address the issue of hidden scope
by including a “dead band” in the contract.
This section identifies the baseline of
services in addition to a small number of
other services that the vendor will provide
without incremental charges. A contract
with a dead band should be written so that
the customer can add additional services
with rates that are easily understood.
Dead bands require
the customer to have a
clear understanding of
baseline service levels.
Otherwise, the service
provider may have difficulty in anticipating
the customer’s needs, even when the
provider attempts to perform due diligence.
Uncertainty over baseline standards can
thus lead to the customer’s disappointment
over the vendor’s service levels, which may
require renegotiation of that portion of the
contract. No customer can precisely predict
the baseline resources that it will require
each month, so a dead band minimizes
billing complexities due to minor variances
in consumed resources. A contract typically
expresses a dead band as a variance
percentage from the baseline volume.
Assume for this example that you’re trying to
outsource IT services. Your baseline volume
for help desk calls is 10,000 calls per month,
but the help desk receives 10,500 calls in one
particular month. A dead band of +/- 5 percent
will prevent you from paying an additional fee.
By the same token, you wouldn’t pay less if
the help desk only received 9,500 calls. The
rationale behind a dead band in this case
is that the service provider’s costs aren’t
directly tied to call volume. Furthermore, the
dead band provides the
help desk with some
flexibility on capacity.
A dead band should
generally be as close to the baseline volume
as possible, while still being greater than
the typical fluctuation in resource usage.
The service provider will incorporate the
additional costs into the fixed or variable
prices if the dead band becomes too wide.
Uncertainty over baseline
standards can lead to
customer dissapointment.
13 ©2015 WGroup. ThinkWGroup.com
Renegotiation bands
Resource volumes may still fluctuate beyond the limits indicated by the dead band, despite all
efforts to prevent this occurrence. This change in resource volume can cause service charges
to change so much that it impacts the original purpose of the contract, resulting in a need to
re-price the contract. Renegotiation is especially desirable when the change in service volume
is likely to become the normal service level. This situation is most likely to occur when the
variable and fixed prices in the contract are based on specific resource volumes. A renegotiation
band describes the minimum change in service volume needed to trigger a renegotiation.
Both parties in an outsourcing contract typically become interested in renegotiating prices when
the service volume changes by at least 25 percent from the baseline level, and renegotiation is
almost always necessary before the fluctuation exceeds 50 percent. The current pricing model
begins to fall apart when the volume
change reaches this level because the
increasing use of RRCs makes the costs
in the fixed portion of the contract less
likely to be recovered. A 25 percent
increase in resource volume also means
that ARCs may no longer represent the
incremental service costs, since the
growth in service volume generates
greater leverage to reduce unit costs.
The specific type of service being provided may cause some exceptions to this general
rule. For example, some services require additional infrastructure and may not be
completely utilized until the service volume increases further. Service volume growth
may actually increase unit prices in these cases, rather than reducing them.
14 ©2015 WGroup. ThinkWGroup.com
Renegotiation bands should be wide enough to accommodate corporate strategy. This process
generally involves running scenarios with the proposed fixed and variable prices to reflect
possible changes in service volume. These scenarios often explore possibilities such as using
past purchase types or divesting parts of the business. Businesses that are expecting significant
changes may require wider renegotiation bands to accommodate multiple rates for ARCs and
RRCs. For example, a renegotiation band could specify an ARC rate of $10 for each helpdesk call
up to a 25 percent change in volume from the baseline level. This renegotiation band could also
specify a second rate of eight dollars per call for volume changes between 25 and 50 percent.
An accurate baseline volume is especially critical when developing renegotiation bands. Consider
a contract that involves 1,000 servers, including 300 Intel servers and 700 UNIX servers. UNIX
servers are generally more expensive than Intel servers, so a business may have an IT strategy that
involves shifting from UNIX servers to Intel
servers over the life of the contract. A failure
to account for this anticipated change in
resource volume could result in a scenario in
which one of these resource units reaches the
renegotiation point before the other one.
Assume for this example that the renegotiation band is +/- 25 percent and 150 Unix servers
are replaced by Intel servers over the life of the contract. The volume change for the Unix
servers is only 150/700, or about 21 percent. This change falls below the renegotiation
band, so the RRC rates can adjust the fixed price of the contract for the Unix servers.
However, the volume change for the Intel servers is 150/300, or 50 percent. This volume
change falls outside the renegotiation band, which forces a contract renegotiation.
A renegotiation in this scenario provides the client with limited leverage in obtaining a more
favorable price. The client is already locked into a multiyear contract with liabilities for
early termination, placing the service provider in control of the renegotiation. This example
An accurate baseline is
especially critical when
developing renegotiation bands.
15 ©2015 WGroup. ThinkWGroup.com
further illustrates the importance of analyzing resource volumes carefully to ensure that the
baseline volume in the contract will adequately represent current and future service volumes.
Another key concern when developing renegotiation bands is the need for a methodology
that will predict the effect of changes in business environment upon service volumes.
A renegotiation band must clearly state the actions that will occur when service volumes
fall outside the indicated range. The RRC adjustment may represent a greater cost than
that needed to support the resource volumes if the service provider adjusts the fixed rate.
On the other hand, the service provider may not be able to recover sufficient costs to
be profitable if the service provider continues to charge the fixed rate plus ARCs.
It’s therefore essential that provisions continue to use the existing ARC/RRC rates for
volume changes outside the renegotiation band until the renegotiation adjusts the contract
prices. The new rates can then be reconciled with the existing rate after renegotiation is
complete. The renegotiation band also should describe a period of time during which prices
can be adjusted. For example, the renegotiation band could specify that prices can be
renegotiated when the resource volume has remained stable for at least three months.
The potential for renegotiating the contract emphasizes the requirement for flexibility in the original
contract. The frequency of change in modern business operations is the primary reason that contracts
with major service providers often describe two levels of change. The first level is for clients that
are growing at a predictable rate, typically less than 15 percent per year. The other level is for
clients that change dramatically, usually as the result of an unexpected acquisition or divesture.
An outsourcing contract must be properly structured and provide accurate resource
volumes to minimize the probability of invoking the renegotiation band. The primary
driver for success is ensuring the resource volumes account for volume changes over the
life of the contract. The variable pricing portion of the contract also must be accurate to
ensure that price changes align with volume changes. These actions will help to ensure
the contract is properly managed to provide the expected benefits for both parties.
16 ©2015 WGroup. ThinkWGroup.com
An outsourcing contract’s projected savings
and ROI are typically driven by a few
key features. The development of these
features requires careful thought to avoid
compromising the expected benefits of
the contract. One of the most important
considerations is ensuring that the baseline
service volume in the contract accurately
reflects the current resource volumes and
anticipates future volume fluctuations due
to changes in the business environment.
An accurate estimation of
resource volumes
ensures a fair
price for the
services
the client
consumes
each month
throughout
the life of the
contract. The
ARCs and RRCs in
the contract are composed of unit prices
that allow both client and service provider
to adjust charges in the contract.
Outsourcing contracts should always include
fixed and variable pricing components to
obtain the best overall prices for the client.
A cost-effective pricing solution generally
requires the service provider to include a
Summary
fixed monthly charge to cover the baseline
resource volume. The variable pricing
component of the contract allows a client to
adjust the fixed component to account for
volume changes that are unaccounted for
by the baseline levels. Proper structuring
of the variable component requires price
changes to reflect volume changes.
A dead band minimizes billing complexities
due to relatively minor fluctuations in resource
volume. The rationale behind including a
dead band in the contract is that the service
provider’s costs usually aren’t significantly
affected by modest changes in service
volume. A properly structured dead band
also builds some capacity and flexibility
into the contract for the service provider.
A renegotiation band should describe the
point at which a deviation from the baseline
resource volume has become large enough
to impact the contract’s original purpose. A
properly structured contract and accurate
baseline volumes are especially important
for developing renegotiation bands, since
the client is often at a disadvantage in a
renegotiation. These features are also
essential for the effective management
and business approval of the contract.
Drive Your Business
Founded in 1995, WGroup is a boutique management consulting firm that provides Strategy,
Management and Execution Services to optimize business performance, minimize cost and create
value. Our consultants have years of experience both as industry executives and trusted advisors
to help clients think through complicated and pressing challenges to drive their business forward.
WGroup’s Sourcing Advisory Services include:
•	 Sourcing Strategy Development
•	 Shared Services Strategy and Transformation
•	 IT Outsourcing (ITO) Advisory
•	 Business Process Outsourcing (BPO) Advisory
•	 First Time Projects and Contract Renewals
•	 RFP Lifecycle Management
•	 Vendor Selection
•	 Contract Development and Negotiation
•	 Transition Planning and Management
•	 Contract Analysis
301 Lindenwood Drive, Suite 301
Malvern, PA 19355
610-854-2700
ThinkWGroup.com

Mais conteúdo relacionado

Destaque

Outsourcing Contract Negotiations - Structure, Process & Tools
Outsourcing Contract Negotiations - Structure, Process & ToolsOutsourcing Contract Negotiations - Structure, Process & Tools
Outsourcing Contract Negotiations - Structure, Process & Toolsknowlan
 
11 things IT leaders need to know about the internet of things
11 things IT leaders need to know about the internet of things 11 things IT leaders need to know about the internet of things
11 things IT leaders need to know about the internet of things WGroup
 
Clound computing
Clound computingClound computing
Clound computingWGroup
 
State of Cloud 2016 - WGroup Industry Report
State of Cloud 2016 - WGroup Industry ReportState of Cloud 2016 - WGroup Industry Report
State of Cloud 2016 - WGroup Industry ReportWGroup
 
Your business and the internet of things
Your business and the internet of thingsYour business and the internet of things
Your business and the internet of thingsWGroup
 
Management model for exploratory investment in IT
Management model for exploratory investment in IT Management model for exploratory investment in IT
Management model for exploratory investment in IT WGroup
 
Governance and relationship management
Governance and relationship management Governance and relationship management
Governance and relationship management WGroup
 
Starting small with big data
Starting small with big data Starting small with big data
Starting small with big data WGroup
 
Negotiating Better Solutions with IT Partners
Negotiating Better Solutions with IT PartnersNegotiating Better Solutions with IT Partners
Negotiating Better Solutions with IT PartnersWGroup
 
Increasing project success rates using project behavioral coaching
Increasing project success rates using project behavioral coachingIncreasing project success rates using project behavioral coaching
Increasing project success rates using project behavioral coachingWGroup
 
Understanding Automation and Autonomics
Understanding Automation and AutonomicsUnderstanding Automation and Autonomics
Understanding Automation and AutonomicsWGroup
 
Rethink IT strategy
Rethink IT strategyRethink IT strategy
Rethink IT strategyWGroup
 
IT Strategic Sourcing Can Relieve the Squeeze on Healthcare
IT Strategic Sourcing Can Relieve the Squeeze on HealthcareIT Strategic Sourcing Can Relieve the Squeeze on Healthcare
IT Strategic Sourcing Can Relieve the Squeeze on HealthcareWGroup
 
Common pitfalls in portfolia management
Common pitfalls in portfolia managementCommon pitfalls in portfolia management
Common pitfalls in portfolia managementWGroup
 
15 attributes of leaders in IT outsourcing
15 attributes of leaders in IT outsourcing15 attributes of leaders in IT outsourcing
15 attributes of leaders in IT outsourcingWGroup
 
ReThink IT - IT Must Transform
ReThink IT - IT Must TransformReThink IT - IT Must Transform
ReThink IT - IT Must TransformWGroup
 

Destaque (16)

Outsourcing Contract Negotiations - Structure, Process & Tools
Outsourcing Contract Negotiations - Structure, Process & ToolsOutsourcing Contract Negotiations - Structure, Process & Tools
Outsourcing Contract Negotiations - Structure, Process & Tools
 
11 things IT leaders need to know about the internet of things
11 things IT leaders need to know about the internet of things 11 things IT leaders need to know about the internet of things
11 things IT leaders need to know about the internet of things
 
Clound computing
Clound computingClound computing
Clound computing
 
State of Cloud 2016 - WGroup Industry Report
State of Cloud 2016 - WGroup Industry ReportState of Cloud 2016 - WGroup Industry Report
State of Cloud 2016 - WGroup Industry Report
 
Your business and the internet of things
Your business and the internet of thingsYour business and the internet of things
Your business and the internet of things
 
Management model for exploratory investment in IT
Management model for exploratory investment in IT Management model for exploratory investment in IT
Management model for exploratory investment in IT
 
Governance and relationship management
Governance and relationship management Governance and relationship management
Governance and relationship management
 
Starting small with big data
Starting small with big data Starting small with big data
Starting small with big data
 
Negotiating Better Solutions with IT Partners
Negotiating Better Solutions with IT PartnersNegotiating Better Solutions with IT Partners
Negotiating Better Solutions with IT Partners
 
Increasing project success rates using project behavioral coaching
Increasing project success rates using project behavioral coachingIncreasing project success rates using project behavioral coaching
Increasing project success rates using project behavioral coaching
 
Understanding Automation and Autonomics
Understanding Automation and AutonomicsUnderstanding Automation and Autonomics
Understanding Automation and Autonomics
 
Rethink IT strategy
Rethink IT strategyRethink IT strategy
Rethink IT strategy
 
IT Strategic Sourcing Can Relieve the Squeeze on Healthcare
IT Strategic Sourcing Can Relieve the Squeeze on HealthcareIT Strategic Sourcing Can Relieve the Squeeze on Healthcare
IT Strategic Sourcing Can Relieve the Squeeze on Healthcare
 
Common pitfalls in portfolia management
Common pitfalls in portfolia managementCommon pitfalls in portfolia management
Common pitfalls in portfolia management
 
15 attributes of leaders in IT outsourcing
15 attributes of leaders in IT outsourcing15 attributes of leaders in IT outsourcing
15 attributes of leaders in IT outsourcing
 
ReThink IT - IT Must Transform
ReThink IT - IT Must TransformReThink IT - IT Must Transform
ReThink IT - IT Must Transform
 

Semelhante a Five ways to develop a successful outsourcing contract

Service level agreement presentation
Service level agreement presentationService level agreement presentation
Service level agreement presentationAshimolowo Tomi
 
Contract Management
Contract ManagementContract Management
Contract Managementadvsharma
 
Multi-supplier governance
Multi-supplier governance Multi-supplier governance
Multi-supplier governance WGroup
 
Determine Maintenance Strategy LO21.pptx
Determine Maintenance Strategy LO21.pptxDetermine Maintenance Strategy LO21.pptx
Determine Maintenance Strategy LO21.pptxaytenewbelay1
 
A model for winning in OS market
A model for winning in OS marketA model for winning in OS market
A model for winning in OS marketSunil Nair
 
Topic The top 5 details that should be included in your cloud SLA..docx
Topic The top 5 details that should be included in your cloud SLA..docxTopic The top 5 details that should be included in your cloud SLA..docx
Topic The top 5 details that should be included in your cloud SLA..docxjuliennehar
 
White Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing VendorWhite Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing VendorISHIR
 
Kinetic Data White Paper, Divide And Conquer To Accelerate Client Transitions
Kinetic Data White Paper, Divide And Conquer To Accelerate Client TransitionsKinetic Data White Paper, Divide And Conquer To Accelerate Client Transitions
Kinetic Data White Paper, Divide And Conquer To Accelerate Client Transitionsbrettnorgaard
 
The Importance of an SLA in RPO
The Importance of an SLA in RPOThe Importance of an SLA in RPO
The Importance of an SLA in RPORavi Subramanian
 
Px Webinars Provider Agreements 2010
Px Webinars Provider Agreements 2010Px Webinars Provider Agreements 2010
Px Webinars Provider Agreements 2010Praxiom
 
Drive Business Excellence with Outcomes-Based Contracting: The OBC Toolkit
Drive Business Excellence with Outcomes-Based Contracting: The OBC ToolkitDrive Business Excellence with Outcomes-Based Contracting: The OBC Toolkit
Drive Business Excellence with Outcomes-Based Contracting: The OBC ToolkitCAST
 
Beyond Contract Renegotiation: Keys to Managing the Sourcing Continuum
Beyond Contract Renegotiation: Keys to Managing the Sourcing ContinuumBeyond Contract Renegotiation: Keys to Managing the Sourcing Continuum
Beyond Contract Renegotiation: Keys to Managing the Sourcing ContinuumInformation Services Group (ISG)
 
3PL Service Provider Management for LinkedIn
3PL Service Provider Management for LinkedIn3PL Service Provider Management for LinkedIn
3PL Service Provider Management for LinkedInScott Leydin
 
Aavenir.com mastering it contracts management tips to optimize it vendor mana...
Aavenir.com mastering it contracts management tips to optimize it vendor mana...Aavenir.com mastering it contracts management tips to optimize it vendor mana...
Aavenir.com mastering it contracts management tips to optimize it vendor mana...Aavenir
 
Contract Management Benchmarking and the Role of Technology Executive Brief
Contract Management Benchmarking and the Role of Technology Executive BriefContract Management Benchmarking and the Role of Technology Executive Brief
Contract Management Benchmarking and the Role of Technology Executive Briefsealsoftwaredept
 
A model for winning in os market
A model for winning in os marketA model for winning in os market
A model for winning in os marketSathyam Jayathe
 

Semelhante a Five ways to develop a successful outsourcing contract (20)

Service level agreement presentation
Service level agreement presentationService level agreement presentation
Service level agreement presentation
 
A guide to sl as
A guide to sl asA guide to sl as
A guide to sl as
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Multi-supplier governance
Multi-supplier governance Multi-supplier governance
Multi-supplier governance
 
Determine Maintenance Strategy LO21.pptx
Determine Maintenance Strategy LO21.pptxDetermine Maintenance Strategy LO21.pptx
Determine Maintenance Strategy LO21.pptx
 
A model for winning in OS market
A model for winning in OS marketA model for winning in OS market
A model for winning in OS market
 
Topic The top 5 details that should be included in your cloud SLA..docx
Topic The top 5 details that should be included in your cloud SLA..docxTopic The top 5 details that should be included in your cloud SLA..docx
Topic The top 5 details that should be included in your cloud SLA..docx
 
White Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing VendorWhite Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing Vendor
 
Kinetic Data White Paper, Divide And Conquer To Accelerate Client Transitions
Kinetic Data White Paper, Divide And Conquer To Accelerate Client TransitionsKinetic Data White Paper, Divide And Conquer To Accelerate Client Transitions
Kinetic Data White Paper, Divide And Conquer To Accelerate Client Transitions
 
Sla
SlaSla
Sla
 
The Importance of an SLA in RPO
The Importance of an SLA in RPOThe Importance of an SLA in RPO
The Importance of an SLA in RPO
 
Px Webinars Provider Agreements 2010
Px Webinars Provider Agreements 2010Px Webinars Provider Agreements 2010
Px Webinars Provider Agreements 2010
 
Drive Business Excellence with Outcomes-Based Contracting: The OBC Toolkit
Drive Business Excellence with Outcomes-Based Contracting: The OBC ToolkitDrive Business Excellence with Outcomes-Based Contracting: The OBC Toolkit
Drive Business Excellence with Outcomes-Based Contracting: The OBC Toolkit
 
WP 012_CLM Analytics
WP 012_CLM AnalyticsWP 012_CLM Analytics
WP 012_CLM Analytics
 
Beyond Contract Renegotiation: Keys to Managing the Sourcing Continuum
Beyond Contract Renegotiation: Keys to Managing the Sourcing ContinuumBeyond Contract Renegotiation: Keys to Managing the Sourcing Continuum
Beyond Contract Renegotiation: Keys to Managing the Sourcing Continuum
 
3PL Service Provider Management for LinkedIn
3PL Service Provider Management for LinkedIn3PL Service Provider Management for LinkedIn
3PL Service Provider Management for LinkedIn
 
Bkozlowski wpa
Bkozlowski wpaBkozlowski wpa
Bkozlowski wpa
 
Aavenir.com mastering it contracts management tips to optimize it vendor mana...
Aavenir.com mastering it contracts management tips to optimize it vendor mana...Aavenir.com mastering it contracts management tips to optimize it vendor mana...
Aavenir.com mastering it contracts management tips to optimize it vendor mana...
 
Contract Management Benchmarking and the Role of Technology Executive Brief
Contract Management Benchmarking and the Role of Technology Executive BriefContract Management Benchmarking and the Role of Technology Executive Brief
Contract Management Benchmarking and the Role of Technology Executive Brief
 
A model for winning in os market
A model for winning in os marketA model for winning in os market
A model for winning in os market
 

Mais de WGroup

The M&A Playbook for IT
The M&A Playbook for ITThe M&A Playbook for IT
The M&A Playbook for ITWGroup
 
Strategies to Address Regulation in Sourcing
Strategies to Address Regulation in SourcingStrategies to Address Regulation in Sourcing
Strategies to Address Regulation in SourcingWGroup
 
IAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining Applications
IAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining ApplicationsIAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining Applications
IAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining ApplicationsWGroup
 
The data ecosystem
The data ecosystemThe data ecosystem
The data ecosystemWGroup
 
Why sourcing speed is critical
Why sourcing speed is criticalWhy sourcing speed is critical
Why sourcing speed is criticalWGroup
 
Agile based project management
Agile based project managementAgile based project management
Agile based project managementWGroup
 
A prescription for saving money case study
A prescription for saving money   case studyA prescription for saving money   case study
A prescription for saving money case studyWGroup
 
Next generation IT outsourcing and the global enterprise model (GEM)
Next generation IT outsourcing and the global enterprise model (GEM)Next generation IT outsourcing and the global enterprise model (GEM)
Next generation IT outsourcing and the global enterprise model (GEM)WGroup
 
Indirect procurement
Indirect procurementIndirect procurement
Indirect procurementWGroup
 
Best-in-class vendor management office
Best-in-class vendor management office Best-in-class vendor management office
Best-in-class vendor management office WGroup
 
Five principles for improving your cyber security
Five principles for improving your cyber securityFive principles for improving your cyber security
Five principles for improving your cyber securityWGroup
 
How to select the right sourcing advisor
How to select the right sourcing advisorHow to select the right sourcing advisor
How to select the right sourcing advisorWGroup
 
IT outsourcing is not about cost savings
IT outsourcing is not about cost savingsIT outsourcing is not about cost savings
IT outsourcing is not about cost savingsWGroup
 
Innovative sourcing transformation provides ongoing value through strategic p...
Innovative sourcing transformation provides ongoing value through strategic p...Innovative sourcing transformation provides ongoing value through strategic p...
Innovative sourcing transformation provides ongoing value through strategic p...WGroup
 
Pharmacy systems analysis
Pharmacy systems analysis Pharmacy systems analysis
Pharmacy systems analysis WGroup
 
IT due diligence for private equity firm
IT due diligence for private equity firmIT due diligence for private equity firm
IT due diligence for private equity firmWGroup
 
IT spend & cost modeling
IT spend & cost modeling IT spend & cost modeling
IT spend & cost modeling WGroup
 
IT outsourcing transformation
IT outsourcing transformation IT outsourcing transformation
IT outsourcing transformation WGroup
 

Mais de WGroup (18)

The M&A Playbook for IT
The M&A Playbook for ITThe M&A Playbook for IT
The M&A Playbook for IT
 
Strategies to Address Regulation in Sourcing
Strategies to Address Regulation in SourcingStrategies to Address Regulation in Sourcing
Strategies to Address Regulation in Sourcing
 
IAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining Applications
IAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining ApplicationsIAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining Applications
IAOP OWS 17 Leveraging Outsourcing to Modernize While Maintaining Applications
 
The data ecosystem
The data ecosystemThe data ecosystem
The data ecosystem
 
Why sourcing speed is critical
Why sourcing speed is criticalWhy sourcing speed is critical
Why sourcing speed is critical
 
Agile based project management
Agile based project managementAgile based project management
Agile based project management
 
A prescription for saving money case study
A prescription for saving money   case studyA prescription for saving money   case study
A prescription for saving money case study
 
Next generation IT outsourcing and the global enterprise model (GEM)
Next generation IT outsourcing and the global enterprise model (GEM)Next generation IT outsourcing and the global enterprise model (GEM)
Next generation IT outsourcing and the global enterprise model (GEM)
 
Indirect procurement
Indirect procurementIndirect procurement
Indirect procurement
 
Best-in-class vendor management office
Best-in-class vendor management office Best-in-class vendor management office
Best-in-class vendor management office
 
Five principles for improving your cyber security
Five principles for improving your cyber securityFive principles for improving your cyber security
Five principles for improving your cyber security
 
How to select the right sourcing advisor
How to select the right sourcing advisorHow to select the right sourcing advisor
How to select the right sourcing advisor
 
IT outsourcing is not about cost savings
IT outsourcing is not about cost savingsIT outsourcing is not about cost savings
IT outsourcing is not about cost savings
 
Innovative sourcing transformation provides ongoing value through strategic p...
Innovative sourcing transformation provides ongoing value through strategic p...Innovative sourcing transformation provides ongoing value through strategic p...
Innovative sourcing transformation provides ongoing value through strategic p...
 
Pharmacy systems analysis
Pharmacy systems analysis Pharmacy systems analysis
Pharmacy systems analysis
 
IT due diligence for private equity firm
IT due diligence for private equity firmIT due diligence for private equity firm
IT due diligence for private equity firm
 
IT spend & cost modeling
IT spend & cost modeling IT spend & cost modeling
IT spend & cost modeling
 
IT outsourcing transformation
IT outsourcing transformation IT outsourcing transformation
IT outsourcing transformation
 

Último

[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 

Último (20)

[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 

Five ways to develop a successful outsourcing contract

  • 1. Drive Your Business Five Ways to Develop a Successful Outsourcing Contract
  • 2. 2 ©2015 WGroup. ThinkWGroup.com A few key aspects of an outsourcing contract typically drive its projected savings and return on investment (ROI). You must carefully consider all of these areas to avoid mixed financial results on your outsourcing project. Strategizing the following five areas can help you develop a successful outsourcing contract: • Contract components • Unit pricing • Resource volume • Dead bands • Renegotiation bands Introduction
  • 3. 3 ©2015 WGroup. ThinkWGroup.com Contract components The first step in developing an outsourcing contract is to define its scope of service. The scope typically describes the responsibilities and rights of all parties to the contract, but it also should define the contract’s requirements. You can begin this process by attaching the request for proposal (RFP) and corresponding vendor’s response to the contract. These documents should provide an accurate description of the contract’s requirements and how the vendor plans to meet those requirements, provided the procurement process has been performed properly. RFPs should provide an accurate description of the contract’s requirements – and how the vendor plans to meet those requirements. A large outsourcing contract typically contains many components. This section provides an overview of the contract components that are most important in developing a successful contract. Scope of service The incorporation of sales language into the contract usually troubles outsourcing service providers, since the RFP often describes a scope of service that’s different from the final scope that’s priced in the contract. The RFP also contains much more information than is useful for the contract. It’s therefore important to use the RFP as just a guideline for writing the contract’s requirements section. 
  • 4. 4 ©2015 WGroup. ThinkWGroup.com Service level agreements Service level agreements (SLAs) are typically attached to the contract or treated as exhibits. These formal documents describe the service levels required by the contract, as indicated by key metrics. SLAs often determine the success of an outsourcing contract and their use has become more widespread in recent years. Clients have traditionally used SLAs to request service guarantees from vendors such as outsourcers. However, enterprises also use SLAs to obtain service guarantees from their own business units and IT departments. A significant majority of enterprises use both internal and external SLAs, and only a small minority have no SLAs in place at all. The extensive use of both types of SLAs can be effective in motivating enterprises to deliver the same level of service to their internal clients as they receive from their vendors. The key to creating SLAs for effective outsourcing contracts is to tie the SLAs to business outcomes rather than just technical or transactional measures. Vendors’ key performance indicators and day-to-day operations should be aligned directly with the organization’s own business metrics. For example, while measures of system availability have been common for decades, what actually matters to the business is “end user perceived availability”, i.e. the availability of applications and data to the people who actually use them in their work. And while service desk SLAs have included such conventional measures as response time and time-to-answer, the measures that mean the most to the business itself are things like customer satisfaction (end users’ surveyed opinions on their satisfaction with service desk performance) and first call resolution percentage. The collection of baseline data is a key step in the development of SLAs, since it allows you to set appropriate performance standards. The majority of enterprises are able to collect baseline data for the SLA, although a small minority may be unable to collect this data due to inadequate capabilities or insufficient time. These limitations place an enterprise in the position of creating SLAs without knowing their baseline performance, which is a clear path to undesirable results in an outsourcing contract. A poorly structured SLA also can lead to unintended consequences in a contract. Many enterprises create too many SLAs in effort to guarantee service levels for all services described in the contract. However, this practice can be a mistake, since it reduces the value of the critical services that have the greatest impact on business. A better practice is to focus on just a few critical services and align those measures directly with business outcomes. Focus and business alignment are two ways to avoid “seeing green but feeling red” when reviewing outsourcing performance. 
  • 5. 5 ©2015 WGroup. ThinkWGroup.com Critical service levels drive the business and generally have financial implications when these service levels are missed. These service levels must be under the complete control of the service provider to qualify as a critical service levels under the term of the outsourcing contract. Key service levels are less important than critical service levels, since they have no financial implications for the client as described in the SLAs. However, these service levels are still important to the client and may be designated as critical services under specific conditions. The service provider also must have full control over key service levels since they can become critical service levels. Metrics are service levels that the service provider can measure, although they don’t have full control over them. Metrics, therefore, can’t become critical service levels or key service levels. The service levels described in an outsourcing contract fall into three categories: critical service levels, key service levels, and metrics.
  • 6. 6 ©2015 WGroup. ThinkWGroup.com Pricing The pricing section of an outsourcing contract describes the fees for services. It’s essential for this section to include the costs for development, implementation, and conversion. All parties to the contract must clearly understand these terms for the contract to succeed. The pricing section may also describe the cost of de-conversion, which may occur when the contract is terminated. This section should define the conditions under which costs may change, including inflation and changes in activity levels. This section also should place limits on price increases in the event the prices are variable. Obtaining the best price requires the contract to contain fixed and variable pricing components. The resource volumes should provide a set of volumes that ultimately charge for services on a monthly basis for the lifetime of the contract. The most cost-effective pricing solution on an outsourcing contract is typically a fixed monthly charge for the projected baseline of the resource volume. This strategy allows the contract to reduce the pricing risk to the vendor and increase the client’s leverage. It also creates a close correlation between cost and revenue, as well as simplifying invoicing for most contract services. The fixed-price portion of the contract should retain sufficient visibility to adequately describe its major service components. Assume for this example that the purpose of the contract is to provide IT infrastructure. The fixed-price portion of this contract should include major hardware, such as mainframes, networks and servers. Components of this hardware may require fixed pricing to identify the resources that are driving your service prices. Additional reasons for using fixed prices include the ability to compare contract services with similar services in the marketplace. The variable-price portion of the contract allows the client to adjust the fixed portion in response to unexpected volume changes. No one can accurately predict the changes in economy and business environment that can drive the demand for enterprise’s goods and services. These changes in demand also impact the IT resources that an enterprise requires, which must be managed effectively. Finally, the organization should expect continual price reduction to be built into the contract. With a number of factors - Moores’ Law, dropping costs of disk storage, cheaper bandwidth, and new automation -- conspiring to continually reduce costs of computing and networking, the vendor’s cost to deliver service in Year 3 will be less than in Year 1. The outsourcing contract should reflect this and allow both the vendor and the company to share in those cost reductions.
  • 7. 7 ©2015 WGroup. ThinkWGroup.com Ownership The ownership section of an outsourcing contract specifies the ownership of physical property, including tools and equipment as well as intellectual property such as data, trademarks and work output. It’s crucial for the client to retain ownership of existing intellectual property, although equipment ownership depends on the relationship between client and service provider. Either party may retain ownership of intellectual property created as a result of the contract, which primarily includes software in the case of an IT outsourcing contract. The client generally will retain ownership of created software when the client defines the specifications, and the software is an extension of existing systems owned by the client. However, the client and service provider may share ownership of software when it customizes or extends a service provider’s product. The security and controls portion of the contract specifies the safe handling and confidentiality of the client’s data, in addition to the vendor practices needed to meet those requirements. These practices may include the controls that determine how vendor staff member will access physical areas of the client’s facility or data. Access controls typically require vendors to have non-disclosure agreements (NDAs) with staff members and report security breaches. Some contracts may define additional controls, such as approval of assigned personnel, notification of personnel changes, insurance requirements, and maintenance timeframes. Some clients may need to include compliance regulations in the security and controls section, especially in certain industries like healthcare and finance. Security and controls
  • 8. 8 ©2015 WGroup. ThinkWGroup.com An outsourcing contract may contain a dispute resolution section that defines the process for escalating and resolving conflicts. This section typically specifies the escalation time frame for both the client and service provider, in addition to the use of arbitration as a means of resolution instead of civil litigation. An indemnification clause generally requires the service provider to take responsibility for its negligent actions. A limitation of liability clause places limits on the service provider’s liability, which is typically equal to the fees paid. The termination clause specifies the conditions under which the contract may be terminated before its normal expiration and usually includes any termination notices and fees. Dispute resolution An outsourcing contract may contain an audit section for various audit types, including internal control, financial, and security. This section specifies the audit frequency, the party that pays for the audits, and the types of reporting available. It also may define the documentation and timeframes of audit deficiencies and their resolutions. Audit The performance standards section of the contract defines the SLAs, including the minimum service-level requirements. It also describes the remedies and penalties for failure to meet those standards. Performance standards
  • 9. 9 ©2015 WGroup. ThinkWGroup.com Unit pricing Unit pricing in a contract includes additional resource charges (ARCs) and reduced resource charges (RRCs). These pricing vehicles apply to each type of resource identified in the baseline volumes and allow both the customer and service provider to adjust the charges of the contract. ARCs and RRCs should represent the variable component of unit pricing, which is the cost of delivering additional services. Fixed charges recover the costs of infrastructure, management and tools, so they should offer enough bandwidth to accommodate reasonable fluctuations in resource usage. Different variations from the baseline resources may incur different unit pricing, provided the dead bands are broad enough to adequately represent the benefit and risk to the contract. ARC or RRC unit prices generally remain constant, although broader dead bands provide greater justification for cost variations. IT costs decrease as volume increases, provided the additional volume doesn’t require more investment in infrastructure. These costs increase when volume decreases to the point that it eats into fixed costs. ARC and RRC pricing comes into play when the service volumes fall outside the dead band specified in the contract on a particular month. These unit rates allow the service provider to recover the additional costs incurred in providing the supplemental services. Assume for this example that the baseline volume for help desk calls is 10,000 calls per month, and the contract specifies a +/- 5 percent dead band. The help desk receives 11,000 calls in a particular month, meaning that 500 calls fall above the dead band. The service provider would invoice the client for an additional 500 calls, based on the assumption that the existing infrastructure does not support these calls. These 500 additional calls would therefore be covered under the variable-price portion of the contract. Conversely, the client would receive a credit for 500 calls in a month where the help desk only received 9,000 calls. In this case, the call volume fell 500 calls below the dead band minimum of 9,500 calls. The rationale for this credit is that the service provider’s variable cost is less due to the lower number of calls that were supported. The client should ensure that the unit prices specified in the contract have the desired impact on business behavior. Assume, for example, that the client had an initiative to migrate from paper processing to electronic processing. A misalignment in the prices specified in the outsourcing contract could remove any financial incentive to change this business process.
  • 10. 10 ©2015 WGroup. ThinkWGroup.com Resource volume The client should strive to ensure that the contract specifies base volumes that will remain as accurate as possible for the life of the contract. This strategy will minimize the pricing adjustments that must be made due to changes in service volume. It’s important to anticipate future changes that could affect resource volume, which is often the most important factor in driving variances in financial planning. An outsourcing client therefore needs to take enough time during the pre- RFP stage to get the resource volumes right. In particular, the initial resource volumes need to accurately reflect the service levels currently supported in the business environment. It’s also important to consider how those resource volumes will change over the life of the contract. The baseline resource volumes will form the basis for pricing in the contract, which should also represent future volume changes. These baselines need to reflect future growth, so that your enterprise doesn’t have to renegotiate the contract to avoid continually paying ARCs. The most common method of establishing a baseline resource volume is to measure it over the course of a year to account for any seasonal fluctuations in business. Divide this annual volume by 12 to establish the average monthly volume. This methodology works well for most businesses, although a longer time period may be needed for businesses with large changes in annual service volume. Some businesses may use average quarterly volumes to minimize potential credits and debits due to large differences in monthly volume. The unit of measure is another key aspect of resource volumes. You need to structure your resource units so that you can assess an equitable charge back of services to the end users. The correct units of measure for resource followings will minimize the cost to the end users for services they didn’t consume.
  • 11. 11 ©2015 WGroup. ThinkWGroup.com The structuring of resource units becomes somewhat more complex in cases involving different types of servers, since each category must have its own set of resource units. For example, a contract may have servers made by different manufacturers, or with different levels of complexity. Resource unit structures also become more challenging to develop when your business strategy changes the mix and volumes of services. Common reasons for this occurrence include migrating from physical servers to virtual servers or moving from paper to electronic processing. It’s especially important in these cases to ensure that the service volume specified in the contract reflect these anticipated changes in resource volume. Failure to account for these volume changes can result in extra charges when they reach the limits of the dead bands and renegotiation bands.
  • 12. 12 ©2015 WGroup. ThinkWGroup.com Dead bands Outsourcing contracts nearly always contain a large amount of hidden scope. Common reasons for this problem include employees who are unclear about what they’re doing, as well as work that’s budgeted or performed outside the process area. These situations often result in disagreements over who should perform the work or bear the cost. Major service providers like Pricewaterhouse Coopers address the issue of hidden scope by including a “dead band” in the contract. This section identifies the baseline of services in addition to a small number of other services that the vendor will provide without incremental charges. A contract with a dead band should be written so that the customer can add additional services with rates that are easily understood. Dead bands require the customer to have a clear understanding of baseline service levels. Otherwise, the service provider may have difficulty in anticipating the customer’s needs, even when the provider attempts to perform due diligence. Uncertainty over baseline standards can thus lead to the customer’s disappointment over the vendor’s service levels, which may require renegotiation of that portion of the contract. No customer can precisely predict the baseline resources that it will require each month, so a dead band minimizes billing complexities due to minor variances in consumed resources. A contract typically expresses a dead band as a variance percentage from the baseline volume. Assume for this example that you’re trying to outsource IT services. Your baseline volume for help desk calls is 10,000 calls per month, but the help desk receives 10,500 calls in one particular month. A dead band of +/- 5 percent will prevent you from paying an additional fee. By the same token, you wouldn’t pay less if the help desk only received 9,500 calls. The rationale behind a dead band in this case is that the service provider’s costs aren’t directly tied to call volume. Furthermore, the dead band provides the help desk with some flexibility on capacity. A dead band should generally be as close to the baseline volume as possible, while still being greater than the typical fluctuation in resource usage. The service provider will incorporate the additional costs into the fixed or variable prices if the dead band becomes too wide. Uncertainty over baseline standards can lead to customer dissapointment.
  • 13. 13 ©2015 WGroup. ThinkWGroup.com Renegotiation bands Resource volumes may still fluctuate beyond the limits indicated by the dead band, despite all efforts to prevent this occurrence. This change in resource volume can cause service charges to change so much that it impacts the original purpose of the contract, resulting in a need to re-price the contract. Renegotiation is especially desirable when the change in service volume is likely to become the normal service level. This situation is most likely to occur when the variable and fixed prices in the contract are based on specific resource volumes. A renegotiation band describes the minimum change in service volume needed to trigger a renegotiation. Both parties in an outsourcing contract typically become interested in renegotiating prices when the service volume changes by at least 25 percent from the baseline level, and renegotiation is almost always necessary before the fluctuation exceeds 50 percent. The current pricing model begins to fall apart when the volume change reaches this level because the increasing use of RRCs makes the costs in the fixed portion of the contract less likely to be recovered. A 25 percent increase in resource volume also means that ARCs may no longer represent the incremental service costs, since the growth in service volume generates greater leverage to reduce unit costs. The specific type of service being provided may cause some exceptions to this general rule. For example, some services require additional infrastructure and may not be completely utilized until the service volume increases further. Service volume growth may actually increase unit prices in these cases, rather than reducing them.
  • 14. 14 ©2015 WGroup. ThinkWGroup.com Renegotiation bands should be wide enough to accommodate corporate strategy. This process generally involves running scenarios with the proposed fixed and variable prices to reflect possible changes in service volume. These scenarios often explore possibilities such as using past purchase types or divesting parts of the business. Businesses that are expecting significant changes may require wider renegotiation bands to accommodate multiple rates for ARCs and RRCs. For example, a renegotiation band could specify an ARC rate of $10 for each helpdesk call up to a 25 percent change in volume from the baseline level. This renegotiation band could also specify a second rate of eight dollars per call for volume changes between 25 and 50 percent. An accurate baseline volume is especially critical when developing renegotiation bands. Consider a contract that involves 1,000 servers, including 300 Intel servers and 700 UNIX servers. UNIX servers are generally more expensive than Intel servers, so a business may have an IT strategy that involves shifting from UNIX servers to Intel servers over the life of the contract. A failure to account for this anticipated change in resource volume could result in a scenario in which one of these resource units reaches the renegotiation point before the other one. Assume for this example that the renegotiation band is +/- 25 percent and 150 Unix servers are replaced by Intel servers over the life of the contract. The volume change for the Unix servers is only 150/700, or about 21 percent. This change falls below the renegotiation band, so the RRC rates can adjust the fixed price of the contract for the Unix servers. However, the volume change for the Intel servers is 150/300, or 50 percent. This volume change falls outside the renegotiation band, which forces a contract renegotiation. A renegotiation in this scenario provides the client with limited leverage in obtaining a more favorable price. The client is already locked into a multiyear contract with liabilities for early termination, placing the service provider in control of the renegotiation. This example An accurate baseline is especially critical when developing renegotiation bands.
  • 15. 15 ©2015 WGroup. ThinkWGroup.com further illustrates the importance of analyzing resource volumes carefully to ensure that the baseline volume in the contract will adequately represent current and future service volumes. Another key concern when developing renegotiation bands is the need for a methodology that will predict the effect of changes in business environment upon service volumes. A renegotiation band must clearly state the actions that will occur when service volumes fall outside the indicated range. The RRC adjustment may represent a greater cost than that needed to support the resource volumes if the service provider adjusts the fixed rate. On the other hand, the service provider may not be able to recover sufficient costs to be profitable if the service provider continues to charge the fixed rate plus ARCs. It’s therefore essential that provisions continue to use the existing ARC/RRC rates for volume changes outside the renegotiation band until the renegotiation adjusts the contract prices. The new rates can then be reconciled with the existing rate after renegotiation is complete. The renegotiation band also should describe a period of time during which prices can be adjusted. For example, the renegotiation band could specify that prices can be renegotiated when the resource volume has remained stable for at least three months. The potential for renegotiating the contract emphasizes the requirement for flexibility in the original contract. The frequency of change in modern business operations is the primary reason that contracts with major service providers often describe two levels of change. The first level is for clients that are growing at a predictable rate, typically less than 15 percent per year. The other level is for clients that change dramatically, usually as the result of an unexpected acquisition or divesture. An outsourcing contract must be properly structured and provide accurate resource volumes to minimize the probability of invoking the renegotiation band. The primary driver for success is ensuring the resource volumes account for volume changes over the life of the contract. The variable pricing portion of the contract also must be accurate to ensure that price changes align with volume changes. These actions will help to ensure the contract is properly managed to provide the expected benefits for both parties.
  • 16. 16 ©2015 WGroup. ThinkWGroup.com An outsourcing contract’s projected savings and ROI are typically driven by a few key features. The development of these features requires careful thought to avoid compromising the expected benefits of the contract. One of the most important considerations is ensuring that the baseline service volume in the contract accurately reflects the current resource volumes and anticipates future volume fluctuations due to changes in the business environment. An accurate estimation of resource volumes ensures a fair price for the services the client consumes each month throughout the life of the contract. The ARCs and RRCs in the contract are composed of unit prices that allow both client and service provider to adjust charges in the contract. Outsourcing contracts should always include fixed and variable pricing components to obtain the best overall prices for the client. A cost-effective pricing solution generally requires the service provider to include a Summary fixed monthly charge to cover the baseline resource volume. The variable pricing component of the contract allows a client to adjust the fixed component to account for volume changes that are unaccounted for by the baseline levels. Proper structuring of the variable component requires price changes to reflect volume changes. A dead band minimizes billing complexities due to relatively minor fluctuations in resource volume. The rationale behind including a dead band in the contract is that the service provider’s costs usually aren’t significantly affected by modest changes in service volume. A properly structured dead band also builds some capacity and flexibility into the contract for the service provider. A renegotiation band should describe the point at which a deviation from the baseline resource volume has become large enough to impact the contract’s original purpose. A properly structured contract and accurate baseline volumes are especially important for developing renegotiation bands, since the client is often at a disadvantage in a renegotiation. These features are also essential for the effective management and business approval of the contract.
  • 17. Drive Your Business Founded in 1995, WGroup is a boutique management consulting firm that provides Strategy, Management and Execution Services to optimize business performance, minimize cost and create value. Our consultants have years of experience both as industry executives and trusted advisors to help clients think through complicated and pressing challenges to drive their business forward. WGroup’s Sourcing Advisory Services include: • Sourcing Strategy Development • Shared Services Strategy and Transformation • IT Outsourcing (ITO) Advisory • Business Process Outsourcing (BPO) Advisory • First Time Projects and Contract Renewals • RFP Lifecycle Management • Vendor Selection • Contract Development and Negotiation • Transition Planning and Management • Contract Analysis 301 Lindenwood Drive, Suite 301 Malvern, PA 19355 610-854-2700 ThinkWGroup.com