7. “A work measurement technique consisting of careful time measurement of the
task with a time measuring instrument, adjusted for any observed variance
variance from normal effort or pace and to allow adequate time for such
such items as foreign elements, unavoidable or machine delays, rest to
to overcome fatigue, and personal needs. Learning or progress effects may
may also be considered. If the task is of sufficient length, it is normally
normally broken down into short, relatively homogenous work elements,
elements, each of which is treated separately as well as in combination with
combination with the rest.”
โดย Institute of Industrial Engineers แห่งสหรัฐอเมริกา
อ.ธีทัต ตรีศิริโชติ 7
12. • Motion Time Analysis (MTA)
• Body Member Movements
• Motion-Time Data for Assembly Work
• The Work-Factor System
• Elemental Time Standard for Basic Manual Work
• Methods-Time Measurement (MTM)
• Basic Motion-Time Study (BMT)
• Dimensional Motion Time (DMT)
• Master Standard Data (MSD)
อ.ธีทัต ตรีศิริโชติ 12
ได้จากการวิเคราะห์ Micromotion แล้ว
รวบรวมไว้เป็นข้อมูลมาตรฐาน
เหมาะกับงานที่ใช้มือกระทา ซ้า ๆกัน
กาหนดเวลามาตรฐานก่อนผลิตจริงได้