TATA POWER DELHI DISTRIBUTION LIMITED
Powering Delhi….
NON-STOP
TATA POWER DELHI DISTRIBUTION LIMITED
“To be the most trusted
and admired provider of
reliable, competitive
power and services, and
be the company of choice
for all stakeholders” 51:49 Joint Venture
of The Tata Power Company Limited
(Tata Power)
and
the Government of Delhi
Formed on 1st July 2002
in
TATA POWER DELHI DISTRIBUTION LIMITED
we believe in ……..
MAKING A DIFFERENCE
TATA POWER – DDL IS CERTIFIED WITH
ISO
9001:2008
ISO
14001:2004
OHSAS
18001:2007
ISO
27001:2005
SA
8000 : 2008
Parameter Unit Jul ‘02 Dec‘15 % change
OPERATIONAL PERFORMANCE
AT&C Losses % 53.1 9.31 82%
System Reliability – ASAI -Availability Index % 70 99.9 42%
Transformer Failure Rate % 11 0.76 93%
Peak Load MW 930 1704 83%
Length of Network Ckt. Km 6750 12313 82%
Street Light Functionality % 40 99.18 148%
CONSUMER RELATED PERFORMANCE
New Connection Energization Time Days 51.8 5 90%
Meter Replacement Time Days 25 4 84%
Provisional Billing % 15 1.34 91%
Defective Bills % 6 0.14 97%
Bill Complaint Resolution Days 45 4 91%
Mean Time to Repair Faults Hours 11 1.53 86%
Call Center Performance - Service Level % - 92
Payment Collection Avenues Nos. 20 6725 33525%
Consumer Satisfaction Index % - 84
OTHERS
Consumers Million 0.7 1.50 114%
Employees Nos. 5600 3530 (37%)
One of the Most Successful Private Power
Distribution Utility
License Area: North and North West Delhi (510 sq. km)
License Period : 25 years
Annual Turnover: 1.11 Billion US Dollar (FY’14-15)
8726 MW of power of
which 7367 MW is from
Thermal Power plant
2340 KM of
Transmission Network
Over 2 million
consumers (Pan-India)
The Company’s growth
plans include steady
capacity addition year-
on-year, taking its
current installed
capacity to 26000MW
by 2020
16,106 KM of
Distribution Network
TATA POWER : Our Promoter
Lighting Up……..
LIVES
One of the Largest Private Power Generation Company with Installed Capacity of 9100 MW
A COMPANY BELONGING TO THE WORLD-RENOWNED TATA
GROUP, IS INDIA’S LARGEST PRIVATE POWER UTILITY
TATA POWER – DDL : Turnaround Story Of Delhi Power Sector
47.6
45.35
40.85
35.35
31.1
22
20.35
18.68
17
13
12.5 11.5
11
47.79
44.86
33.79
26.52 23.73
18.56
16.74 15.16 13.75 11.49 10.78 10.5 9.78
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15
Tata Power - DDL Loss Reduction Trajectory from
2002-03 to 2014-15
DERC Target Actual
Consistently Exceeding Targets
• Saved over USD 1.8 billion for the Government, Facilitated development of
other infrastructure, lower taxes;
• Repaid USD 100 million load to the Government;
• Paid dividends to Government and Tata power for Four years (FY 2005-06 to
FY 2008-09);
• Highest availability and reliability indices;
• 1:2 Bonus shares Issued in FY’09
AT & C Loss
>50%
------------------------------
No Concept of
Consumer service and
IT Interface
------------------------------
Electricity supply
system on the verge
of collapse
------------------------------
Lack of performance
orientation
THEN (2002) NOW
AT & C Loss
< 10%
------------------------------------
One stop Solution : State-
of-the-art Call Centers and
consumer care centers
-----------------------------------
Remarkable improvement
in system reliability : DT
Losses <1%
------------------------------------
Performance orientation
through change
management and Balanced
scorecard approach
Performance…
EXCELLENCE
Initial Challenges- 2002
6Nothing moved unless long hours were spent standing in queues
Regular Power Cuts, Black Outs & Brown Outs of 4-6 hours
20,000 applications pending for New Connections
- even Attribute change (Name, Load etc.) requests were pending for years
1,00,000 Billing Complaints
- 15% of the customer base complaints pending in files
Erroneous Customer Database
– 50% of customers had some form of an error
Absence of Customer Relationship approaches
– virtually no emphasis on customer comfort
No Digitization
- Limited Computerization / Absence of CRM for tracking and monitoring of Customer
Complaints
• AT&C/Theft losses range between 53% to 60%
of Input
• Govt. Subsidies approx. USD 240 Mn. per
annum to bridge Revenue Gap
• Condition of Network pathetic
• Billing Receivables close to 1 year outstanding
Perceptible Change
7
Then
Manual Communication during Outages
Longer Power Cuts
PerceptibleChange
8Sixty Seven (67) 66/11 KV & 33/11 KV Unmanned Automated Grid Substations catering to TPDDL Peak Demand of 1700 MW
8
Now
Fully Automated
Unmanned Grids
Remote Monitoring & Control24x7 Power Supply
PerceptibleChange
9Tedious Processes with complex documentation and accounting
9
Then
Manual Processes Erroneous Bills
Pending New
Connections
Stakeholders& theirExpectations
10Integrated Web Services for Desktops & Handheld Devices
10
Now
Instant Service at Doorstep
Stakeholders& theirExpectations
11
11
Then
Long Queues Frequent ManhandlingUnhappy Customers
PerceptibleChange
12Integrated GIS-OMS-SCADA-CRM
Now
OMS
Information
of an
Outage
SCADAGIS
Details of the
customer &
Customer Count
SAP - CRM
Details like repair history,
Crew comments, ETR also
visible at SAP-CRM
Outage status updated on
TPDDL website with estimated
time of restoration
Interactive Voice
Response(IVR) system
TATA POWER – DDL : Technical Expertise Our Leverage….
Information Technology (IT)
Operation Technology (OT)
Supervisory Control and Data Acquisition (SCADA)
Outage Management System (OMS)
Demand Side Management (DSM)
Geographic Information System (GIS)
Automatic Meter Reading (AMR)
SAP's Industry Specific Solution for Utilities Industry (SAP-ISU)
24*7*365 Centralized Call Center
Automated Demand Response (ADR)
Solar Rooftop PV Projects
Project Management Consultancy
Capacity Building
TATA POWER – DDL : Presence In India
GOA
No. of Contracts : 2
Project Value : USD 6,707,692
Period of Engagement: 36 months
Client : GOA Electricity Board
(Part A, Part B)
CHHATTISGARH
No. of Contracts : 1
Project Value : USD 1,615,000
Period of Engagement: 24 months
Client : CSPDCL
KARNATAKA
No. of Contracts : 5
Project Value : USD 2,740,000
Period of Engagement: 24 months
Client : HESCOM, GESCOM,
CESCOM, MESCOM, BESCOM
UTTAR PRADESH
No. of Contracts : 2
Project Value : USD 4,289,571
Period of Engagement: 36 months, 18 months
Client : PVVNL, MVVNL - DVVNL
MADHYA PRADESH
No. of Contracts : 1
Project Value : USD 933,334
Period of Engagement: 33 months
Client : MPMKVVCL
WEST BENGAL
No. of Contracts : 1
Project Value : USD 5,166,667
Period of Engagement: 33 months
Client : WBSEDCL
HARYANA
No. of Contracts : 2
Project Value : USD 3,209,734
Period of Engagement: 18 months, 33 months
Client : UHBVN, DHBVN
TATA POWER – DDL : A brief of projects
Project Name Client Name
Location
City/State Country
IT Consultancy for Part A of R-APDRP CED Chandigarh India
Induction Training & Capacity Building PSPCL Punjab India
SCADA / DMS Consultant SEBs Uttar Pradesh India
SCADA / DMS Consultant SEBs Madhya Pradesh India
Consultancy for DSM & Renewal Energy through Open Access ICF International New Delhi India
SCADA / DMS Consultant PSPCL Punjab India
Capacity Building & Business Process Re-engineering ASEB Assam India
Reduction of Distribution Losses ERA Kampala Uganda
SCADA / DMS Consultant PDD Jammu & Kashmir India
Capacity Building Programme JSEB Jharkhand India
Transaction Advisory Services VIGEO Consortium Benin Nigeria
Training on Best Distribution Practices BPC Thimpu Bhutan
Capacity Building & Training for Engineers Chhattisgarh Chhattisgarh India
Technical & Management Strategy Service Provider WPGL / TPIPL Lagos Nigeria
Technical & Management Strategy Service Provider Vigeo Benin Nigeria
Project Management & Consultancy for R-APDRP Part-B SEBs Uttar Pradesh India
Preparation of DPR for System Improvement under NEF DHBVN, UHBVN Haryana India
TATA POWER – DDL : A brief of projects
Project Name Client Name
Location
City/State Country
Consultancy for Distribution and Retail Supply Business DHBVN Haryana India
Meter Reading, Billing and Data Analysis PVVNL Uttar Pradesh India
Consultancy for DPR Preparation for Solar Rooftop Plant DCRUSTM Haryana India
Development of Call Centre and Consumer Care Centre PVVNL Uttar Pradesh India
Restructuring of the transmission & distribution function CEB Curepipe Mauritius
Corporate Restructuring of Nigeria Electricity Power Authority NEPA - Nigeria
Review of RFP for SAP implementation Gujarat Gas Gujarat India
Consultancy Services for Loss Reduction subcomponent PEC Sanaa Yemen
IT Consultancy for Part A of R-APDRP DHBVN Haryana India
Implementation of GIS Tata Power Mumbai India
Advisory Services for Business Process Reengineering CSEB Chhattisgarh India
IT Consultancy for Part A of R-APDRP CSEB Chhattisgarh India
PMC Services for Puri Nabakalebar Project OPTCL Odisha India
RE Capacity Building RREC Rajasthan India
Training of delegates on Power distribution DABS - Afghanistan
Training of delegates from Central Asia on power distribution World Bank Delhi India
Functional Advisory on Commercial & Operation Processes DVVNL Uttar Pradesh India
TATA POWER – DDL : International Footprint
BANGLADESH
GHANA
NIGERIA
Project Value : USD 140,890
Period of Engagement: 6 months, 8 months
Client : VIPL Global Services,
NEPA
UGANDA
Project Value : USD 18,000
Period of Engagement: 12 months
Client : Electricity Regulatory
Authority
MAURITIUS
Project Value : USD 17,780
Period of Engagement: 12 months
Client : Central Electricity Board
YEMEN
Project Value : USD 87,608
Period of Engagement: 6 months
Client : PEC
WORLD BANK – CENTRAL ASIA
Project Value : USD 13, 854
Period of Engagement: 5 days
Client : Delegates from Central
Asia
AFGHANISTAN
Project Value : USD 38,500
Period of Engagement: 11 days
Client : DABS
CENTRAL ASIA
Upcoming opportunity
Executed Projects
TATA POWER – DDL : CSR Joy of Giving…
223 JJ Clusters across North and North-West Delhi
TATA POWER – DDL : Rewards & Recognitions A few of the many…
THINK US FOR – BUSINESS PROPOSITION
1
2
3
4
TECHNOLOGY
ADOPTION
• State-of- the-
Technology
Implementation in
Power Distribution
• Seamless Integration
of Various
Technologies
CREATING BUSINESS VALUES
• Managing Power Distribution
services
• Transaction Advisory Services
• Consultancy services on -Loss
Reduction / Process Re-
engineering / Functional
Consultancy
• Project Management &
Managing Capital Investment
CAPITALIZING BUSINESS IDEAS
• Setting up Green Field
Distribution Project
• Distribution Privatization &
other business transformation
model
• Managing electrical
infrastructure in SEZ /
Townships
PREPARING FOR FUTURE
• Capacity Building Service
• Preparation of Business
Plan
• Technology Roadmap
Preparation for
Information & Operation
Technology
Let’s make a difference
Smart Green Life
For further information, if any
Tarun Katiyar
Addl. GM – Business Development
TATA Power Delhi Distribution Limited
Head Office :- NDPL House, Hudson Lane,
Kingsway Camp, New Delhi-110009, India
Tel. No : +91-11-66112246
Mobile No : +91- 9818100744
Email: tarun.katiyar@tatapower-ddl.com
Website : www.tatapower-ddl.com
21

Mais conteúdo relacionado

Mais procurados

Ambuja cement project report
Ambuja cement project reportAmbuja cement project report
Ambuja cement project reportKrishna Makhesana
 
Internship report main
Internship report mainInternship report main
Internship report mainAJAL A J
 
A Industrial Training Report On ADANI POWER LIMITED
A Industrial Training Report On  ADANI POWER LIMITEDA Industrial Training Report On  ADANI POWER LIMITED
A Industrial Training Report On ADANI POWER LIMITEDSaikat Bhandari
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC Shivam Singh
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 
Internship report of NTPC kawas ,summer internship report of ntpc
Internship report of  NTPC kawas ,summer internship report of ntpcInternship report of  NTPC kawas ,summer internship report of ntpc
Internship report of NTPC kawas ,summer internship report of ntpcLalitGoyal27
 
Aditya birla ultratech cement
Aditya birla ultratech cement Aditya birla ultratech cement
Aditya birla ultratech cement Shinigami_1
 
Power Sector - India - Sample
Power Sector - India - SamplePower Sector - India - Sample
Power Sector - India - SampleNetscribes, Inc.
 
BHEL summer internship report
BHEL summer internship reportBHEL summer internship report
BHEL summer internship reportShivam Teotia
 
A project report on adani power ltd.
A project report on adani power ltd.A project report on adani power ltd.
A project report on adani power ltd.Nipranch Shah
 
Havells India Ltd
Havells India LtdHavells India Ltd
Havells India LtdShray Jali
 
An Organisation study at ADITYA BIRLA ULTRATECH LTD
 An Organisation study at ADITYA BIRLA ULTRATECH  LTD An Organisation study at ADITYA BIRLA ULTRATECH  LTD
An Organisation study at ADITYA BIRLA ULTRATECH LTDRahul G
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVCLinkon Khan
 
Presentation on V-guard Industries Ltd.
Presentation on V-guard Industries Ltd.Presentation on V-guard Industries Ltd.
Presentation on V-guard Industries Ltd.Dony Jose
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...Sagar Mehta
 

Mais procurados (20)

Ambuja cement project report
Ambuja cement project reportAmbuja cement project report
Ambuja cement project report
 
Tata power
Tata powerTata power
Tata power
 
Dgvcl rerport
Dgvcl rerportDgvcl rerport
Dgvcl rerport
 
Internship report main
Internship report mainInternship report main
Internship report main
 
A Industrial Training Report On ADANI POWER LIMITED
A Industrial Training Report On  ADANI POWER LIMITEDA Industrial Training Report On  ADANI POWER LIMITED
A Industrial Training Report On ADANI POWER LIMITED
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
Case study on bhel
Case study on bhelCase study on bhel
Case study on bhel
 
Internship report of NTPC kawas ,summer internship report of ntpc
Internship report of  NTPC kawas ,summer internship report of ntpcInternship report of  NTPC kawas ,summer internship report of ntpc
Internship report of NTPC kawas ,summer internship report of ntpc
 
Indian Power Sector
Indian Power SectorIndian Power Sector
Indian Power Sector
 
Aditya birla ultratech cement
Aditya birla ultratech cement Aditya birla ultratech cement
Aditya birla ultratech cement
 
Power Sector - India - Sample
Power Sector - India - SamplePower Sector - India - Sample
Power Sector - India - Sample
 
TATA MOTORS, JAMSHEDPUR.
TATA  MOTORS, JAMSHEDPUR.TATA  MOTORS, JAMSHEDPUR.
TATA MOTORS, JAMSHEDPUR.
 
BHEL summer internship report
BHEL summer internship reportBHEL summer internship report
BHEL summer internship report
 
A project report on adani power ltd.
A project report on adani power ltd.A project report on adani power ltd.
A project report on adani power ltd.
 
Havells India Ltd
Havells India LtdHavells India Ltd
Havells India Ltd
 
An Organisation study at ADITYA BIRLA ULTRATECH LTD
 An Organisation study at ADITYA BIRLA ULTRATECH  LTD An Organisation study at ADITYA BIRLA ULTRATECH  LTD
An Organisation study at ADITYA BIRLA ULTRATECH LTD
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVC
 
Presentation on V-guard Industries Ltd.
Presentation on V-guard Industries Ltd.Presentation on V-guard Industries Ltd.
Presentation on V-guard Industries Ltd.
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
 

Semelhante a Tata Power Delhi Distribution - Turnaround Story of Delhi Power Sector

Power Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; BuyPower Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; BuyIndiaNotes.com
 
Utility Distribution Franchisee Business in India
Utility Distribution Franchisee Business in IndiaUtility Distribution Franchisee Business in India
Utility Distribution Franchisee Business in IndiaAbhisek Bhattacharya
 
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptxENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptxOmbabu Saxena
 
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridIncreasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridTata Power Delhi Distribution Limited
 
Wind Force Newsletter January, Edition, 2012
Wind Force Newsletter   January, Edition, 2012Wind Force Newsletter   January, Edition, 2012
Wind Force Newsletter January, Edition, 2012rupeshsingh_1
 
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in Delhi
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in DelhiFAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in Delhi
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in DelhiTata Power Delhi Distribution Limited
 
Power Distribution Overview
Power Distribution OverviewPower Distribution Overview
Power Distribution OverviewHIMADRI BANERJI
 
Anirban Roy Choudhury 2022 @Resume.pdf
Anirban Roy Choudhury 2022 @Resume.pdfAnirban Roy Choudhury 2022 @Resume.pdf
Anirban Roy Choudhury 2022 @Resume.pdfAnirban Roy Choudhury
 
Electricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forwardElectricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forwardIPPAI
 
Nepal_Presentation_Final.pptx
Nepal_Presentation_Final.pptxNepal_Presentation_Final.pptx
Nepal_Presentation_Final.pptxssuserfbc60b
 
Performance-management-system-at-ntpc
 Performance-management-system-at-ntpc Performance-management-system-at-ntpc
Performance-management-system-at-ntpcAmrita Singh
 
Energy Audit in WASAs of Punjab
Energy Audit in WASAs of Punjab Energy Audit in WASAs of Punjab
Energy Audit in WASAs of Punjab Abid Hussainy
 

Semelhante a Tata Power Delhi Distribution - Turnaround Story of Delhi Power Sector (20)

Power Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; BuyPower Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; Buy
 
Utility Distribution Franchisee Business in India
Utility Distribution Franchisee Business in IndiaUtility Distribution Franchisee Business in India
Utility Distribution Franchisee Business in India
 
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptxENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
 
Tata Power-DDL Transforming Lives !
Tata Power-DDL Transforming Lives !Tata Power-DDL Transforming Lives !
Tata Power-DDL Transforming Lives !
 
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridIncreasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
 
Wind Force Newsletter January, Edition, 2012
Wind Force Newsletter   January, Edition, 2012Wind Force Newsletter   January, Edition, 2012
Wind Force Newsletter January, Edition, 2012
 
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in Delhi
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in DelhiFAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in Delhi
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in Delhi
 
Power Distribution Overview
Power Distribution OverviewPower Distribution Overview
Power Distribution Overview
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
Energy audit tata power solar
Energy audit   tata power solarEnergy audit   tata power solar
Energy audit tata power solar
 
Anirban Roy Choudhury 2022 @Resume.pdf
Anirban Roy Choudhury 2022 @Resume.pdfAnirban Roy Choudhury 2022 @Resume.pdf
Anirban Roy Choudhury 2022 @Resume.pdf
 
Electricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forwardElectricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forward
 
TATA Power-DDL Utility Connect (Issue 03)
TATA Power-DDL Utility Connect (Issue 03)TATA Power-DDL Utility Connect (Issue 03)
TATA Power-DDL Utility Connect (Issue 03)
 
TPDDL Smart Grid Journey
TPDDL Smart Grid JourneyTPDDL Smart Grid Journey
TPDDL Smart Grid Journey
 
Nepal_Presentation_Final.pptx
Nepal_Presentation_Final.pptxNepal_Presentation_Final.pptx
Nepal_Presentation_Final.pptx
 
Performance-management-system-at-ntpc
 Performance-management-system-at-ntpc Performance-management-system-at-ntpc
Performance-management-system-at-ntpc
 
Ajay Uikey
Ajay UikeyAjay Uikey
Ajay Uikey
 
VINEETA MBA PROJECT.docx
VINEETA MBA PROJECT.docxVINEETA MBA PROJECT.docx
VINEETA MBA PROJECT.docx
 
Energy Audit in WASAs of Punjab
Energy Audit in WASAs of Punjab Energy Audit in WASAs of Punjab
Energy Audit in WASAs of Punjab
 

Mais de Tata Power Delhi Distribution Limited

Read the Exclusive Stories by Bloomberg Featuring Mr. Sanjay Banga, CEO, TATA...
Read the Exclusive Stories by Bloomberg Featuring Mr. Sanjay Banga, CEO, TATA...Read the Exclusive Stories by Bloomberg Featuring Mr. Sanjay Banga, CEO, TATA...
Read the Exclusive Stories by Bloomberg Featuring Mr. Sanjay Banga, CEO, TATA...Tata Power Delhi Distribution Limited
 

Mais de Tata Power Delhi Distribution Limited (20)

Protection, Control and Substation Automation
Protection, Control and Substation AutomationProtection, Control and Substation Automation
Protection, Control and Substation Automation
 
Project Management
Project ManagementProject Management
Project Management
 
Home Automation
Home AutomationHome Automation
Home Automation
 
Energy Auditing
Energy AuditingEnergy Auditing
Energy Auditing
 
Emerging Technologies in Power Distribution
Emerging Technologies in Power DistributionEmerging Technologies in Power Distribution
Emerging Technologies in Power Distribution
 
Distribution, Protection and Equipment Testing
Distribution, Protection and Equipment TestingDistribution, Protection and Equipment Testing
Distribution, Protection and Equipment Testing
 
Demand Side Management and Energy Efficiency
Demand Side Management and Energy EfficiencyDemand Side Management and Energy Efficiency
Demand Side Management and Energy Efficiency
 
Data Analytics
Data AnalyticsData Analytics
Data Analytics
 
Cyber Security
Cyber SecurityCyber Security
Cyber Security
 
Battery Energy Storage System
Battery Energy Storage SystemBattery Energy Storage System
Battery Energy Storage System
 
Distribution Utility Meet (DUM) 2019 Details
Distribution Utility Meet (DUM) 2019 DetailsDistribution Utility Meet (DUM) 2019 Details
Distribution Utility Meet (DUM) 2019 Details
 
TATA Power-DDL Utility Connect (Issue 05)
TATA Power-DDL Utility Connect (Issue 05)TATA Power-DDL Utility Connect (Issue 05)
TATA Power-DDL Utility Connect (Issue 05)
 
Read the Exclusive Stories by Bloomberg Featuring Mr. Sanjay Banga, CEO, TATA...
Read the Exclusive Stories by Bloomberg Featuring Mr. Sanjay Banga, CEO, TATA...Read the Exclusive Stories by Bloomberg Featuring Mr. Sanjay Banga, CEO, TATA...
Read the Exclusive Stories by Bloomberg Featuring Mr. Sanjay Banga, CEO, TATA...
 
Electrical India- Procurement Strategies for Utilities
Electrical India- Procurement Strategies for UtilitiesElectrical India- Procurement Strategies for Utilities
Electrical India- Procurement Strategies for Utilities
 
PowerLine Magazine- Interview of Chief Commercial, TATA Power-DDL
PowerLine Magazine- Interview of Chief Commercial, TATA Power-DDLPowerLine Magazine- Interview of Chief Commercial, TATA Power-DDL
PowerLine Magazine- Interview of Chief Commercial, TATA Power-DDL
 
TATA Power-DDL Utility Connect (Issue 01)
TATA Power-DDL Utility Connect (Issue 01)TATA Power-DDL Utility Connect (Issue 01)
TATA Power-DDL Utility Connect (Issue 01)
 
TATA Power-DDL Utility Connect (Issue 02)
TATA Power-DDL Utility Connect (Issue 02)TATA Power-DDL Utility Connect (Issue 02)
TATA Power-DDL Utility Connect (Issue 02)
 
TATA Power-DDL Utility Connect (Issue 04)
TATA Power-DDL Utility Connect (Issue 04)TATA Power-DDL Utility Connect (Issue 04)
TATA Power-DDL Utility Connect (Issue 04)
 
Power Distribution Sector Needs Skill Development And Soon
Power Distribution Sector Needs Skill Development And SoonPower Distribution Sector Needs Skill Development And Soon
Power Distribution Sector Needs Skill Development And Soon
 
Financial Express: 24×7 power for all Indians - Sanjay Banga
Financial Express: 24×7 power for all Indians - Sanjay BangaFinancial Express: 24×7 power for all Indians - Sanjay Banga
Financial Express: 24×7 power for all Indians - Sanjay Banga
 

Último

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 

Último (20)

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

Tata Power Delhi Distribution - Turnaround Story of Delhi Power Sector

  • 1. TATA POWER DELHI DISTRIBUTION LIMITED Powering Delhi…. NON-STOP
  • 2. TATA POWER DELHI DISTRIBUTION LIMITED “To be the most trusted and admired provider of reliable, competitive power and services, and be the company of choice for all stakeholders” 51:49 Joint Venture of The Tata Power Company Limited (Tata Power) and the Government of Delhi Formed on 1st July 2002 in
  • 3. TATA POWER DELHI DISTRIBUTION LIMITED we believe in …….. MAKING A DIFFERENCE TATA POWER – DDL IS CERTIFIED WITH ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 ISO 27001:2005 SA 8000 : 2008 Parameter Unit Jul ‘02 Dec‘15 % change OPERATIONAL PERFORMANCE AT&C Losses % 53.1 9.31 82% System Reliability – ASAI -Availability Index % 70 99.9 42% Transformer Failure Rate % 11 0.76 93% Peak Load MW 930 1704 83% Length of Network Ckt. Km 6750 12313 82% Street Light Functionality % 40 99.18 148% CONSUMER RELATED PERFORMANCE New Connection Energization Time Days 51.8 5 90% Meter Replacement Time Days 25 4 84% Provisional Billing % 15 1.34 91% Defective Bills % 6 0.14 97% Bill Complaint Resolution Days 45 4 91% Mean Time to Repair Faults Hours 11 1.53 86% Call Center Performance - Service Level % - 92 Payment Collection Avenues Nos. 20 6725 33525% Consumer Satisfaction Index % - 84 OTHERS Consumers Million 0.7 1.50 114% Employees Nos. 5600 3530 (37%) One of the Most Successful Private Power Distribution Utility License Area: North and North West Delhi (510 sq. km) License Period : 25 years Annual Turnover: 1.11 Billion US Dollar (FY’14-15)
  • 4. 8726 MW of power of which 7367 MW is from Thermal Power plant 2340 KM of Transmission Network Over 2 million consumers (Pan-India) The Company’s growth plans include steady capacity addition year- on-year, taking its current installed capacity to 26000MW by 2020 16,106 KM of Distribution Network TATA POWER : Our Promoter Lighting Up…….. LIVES One of the Largest Private Power Generation Company with Installed Capacity of 9100 MW A COMPANY BELONGING TO THE WORLD-RENOWNED TATA GROUP, IS INDIA’S LARGEST PRIVATE POWER UTILITY
  • 5. TATA POWER – DDL : Turnaround Story Of Delhi Power Sector 47.6 45.35 40.85 35.35 31.1 22 20.35 18.68 17 13 12.5 11.5 11 47.79 44.86 33.79 26.52 23.73 18.56 16.74 15.16 13.75 11.49 10.78 10.5 9.78 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 Tata Power - DDL Loss Reduction Trajectory from 2002-03 to 2014-15 DERC Target Actual Consistently Exceeding Targets • Saved over USD 1.8 billion for the Government, Facilitated development of other infrastructure, lower taxes; • Repaid USD 100 million load to the Government; • Paid dividends to Government and Tata power for Four years (FY 2005-06 to FY 2008-09); • Highest availability and reliability indices; • 1:2 Bonus shares Issued in FY’09 AT & C Loss >50% ------------------------------ No Concept of Consumer service and IT Interface ------------------------------ Electricity supply system on the verge of collapse ------------------------------ Lack of performance orientation THEN (2002) NOW AT & C Loss < 10% ------------------------------------ One stop Solution : State- of-the-art Call Centers and consumer care centers ----------------------------------- Remarkable improvement in system reliability : DT Losses <1% ------------------------------------ Performance orientation through change management and Balanced scorecard approach Performance… EXCELLENCE
  • 6. Initial Challenges- 2002 6Nothing moved unless long hours were spent standing in queues Regular Power Cuts, Black Outs & Brown Outs of 4-6 hours 20,000 applications pending for New Connections - even Attribute change (Name, Load etc.) requests were pending for years 1,00,000 Billing Complaints - 15% of the customer base complaints pending in files Erroneous Customer Database – 50% of customers had some form of an error Absence of Customer Relationship approaches – virtually no emphasis on customer comfort No Digitization - Limited Computerization / Absence of CRM for tracking and monitoring of Customer Complaints • AT&C/Theft losses range between 53% to 60% of Input • Govt. Subsidies approx. USD 240 Mn. per annum to bridge Revenue Gap • Condition of Network pathetic • Billing Receivables close to 1 year outstanding
  • 7. Perceptible Change 7 Then Manual Communication during Outages Longer Power Cuts
  • 8. PerceptibleChange 8Sixty Seven (67) 66/11 KV & 33/11 KV Unmanned Automated Grid Substations catering to TPDDL Peak Demand of 1700 MW 8 Now Fully Automated Unmanned Grids Remote Monitoring & Control24x7 Power Supply
  • 9. PerceptibleChange 9Tedious Processes with complex documentation and accounting 9 Then Manual Processes Erroneous Bills Pending New Connections
  • 10. Stakeholders& theirExpectations 10Integrated Web Services for Desktops & Handheld Devices 10 Now Instant Service at Doorstep
  • 11. Stakeholders& theirExpectations 11 11 Then Long Queues Frequent ManhandlingUnhappy Customers
  • 12. PerceptibleChange 12Integrated GIS-OMS-SCADA-CRM Now OMS Information of an Outage SCADAGIS Details of the customer & Customer Count SAP - CRM Details like repair history, Crew comments, ETR also visible at SAP-CRM Outage status updated on TPDDL website with estimated time of restoration Interactive Voice Response(IVR) system
  • 13. TATA POWER – DDL : Technical Expertise Our Leverage…. Information Technology (IT) Operation Technology (OT) Supervisory Control and Data Acquisition (SCADA) Outage Management System (OMS) Demand Side Management (DSM) Geographic Information System (GIS) Automatic Meter Reading (AMR) SAP's Industry Specific Solution for Utilities Industry (SAP-ISU) 24*7*365 Centralized Call Center Automated Demand Response (ADR) Solar Rooftop PV Projects Project Management Consultancy Capacity Building
  • 14. TATA POWER – DDL : Presence In India GOA No. of Contracts : 2 Project Value : USD 6,707,692 Period of Engagement: 36 months Client : GOA Electricity Board (Part A, Part B) CHHATTISGARH No. of Contracts : 1 Project Value : USD 1,615,000 Period of Engagement: 24 months Client : CSPDCL KARNATAKA No. of Contracts : 5 Project Value : USD 2,740,000 Period of Engagement: 24 months Client : HESCOM, GESCOM, CESCOM, MESCOM, BESCOM UTTAR PRADESH No. of Contracts : 2 Project Value : USD 4,289,571 Period of Engagement: 36 months, 18 months Client : PVVNL, MVVNL - DVVNL MADHYA PRADESH No. of Contracts : 1 Project Value : USD 933,334 Period of Engagement: 33 months Client : MPMKVVCL WEST BENGAL No. of Contracts : 1 Project Value : USD 5,166,667 Period of Engagement: 33 months Client : WBSEDCL HARYANA No. of Contracts : 2 Project Value : USD 3,209,734 Period of Engagement: 18 months, 33 months Client : UHBVN, DHBVN
  • 15. TATA POWER – DDL : A brief of projects Project Name Client Name Location City/State Country IT Consultancy for Part A of R-APDRP CED Chandigarh India Induction Training & Capacity Building PSPCL Punjab India SCADA / DMS Consultant SEBs Uttar Pradesh India SCADA / DMS Consultant SEBs Madhya Pradesh India Consultancy for DSM & Renewal Energy through Open Access ICF International New Delhi India SCADA / DMS Consultant PSPCL Punjab India Capacity Building & Business Process Re-engineering ASEB Assam India Reduction of Distribution Losses ERA Kampala Uganda SCADA / DMS Consultant PDD Jammu & Kashmir India Capacity Building Programme JSEB Jharkhand India Transaction Advisory Services VIGEO Consortium Benin Nigeria Training on Best Distribution Practices BPC Thimpu Bhutan Capacity Building & Training for Engineers Chhattisgarh Chhattisgarh India Technical & Management Strategy Service Provider WPGL / TPIPL Lagos Nigeria Technical & Management Strategy Service Provider Vigeo Benin Nigeria Project Management & Consultancy for R-APDRP Part-B SEBs Uttar Pradesh India Preparation of DPR for System Improvement under NEF DHBVN, UHBVN Haryana India
  • 16. TATA POWER – DDL : A brief of projects Project Name Client Name Location City/State Country Consultancy for Distribution and Retail Supply Business DHBVN Haryana India Meter Reading, Billing and Data Analysis PVVNL Uttar Pradesh India Consultancy for DPR Preparation for Solar Rooftop Plant DCRUSTM Haryana India Development of Call Centre and Consumer Care Centre PVVNL Uttar Pradesh India Restructuring of the transmission & distribution function CEB Curepipe Mauritius Corporate Restructuring of Nigeria Electricity Power Authority NEPA - Nigeria Review of RFP for SAP implementation Gujarat Gas Gujarat India Consultancy Services for Loss Reduction subcomponent PEC Sanaa Yemen IT Consultancy for Part A of R-APDRP DHBVN Haryana India Implementation of GIS Tata Power Mumbai India Advisory Services for Business Process Reengineering CSEB Chhattisgarh India IT Consultancy for Part A of R-APDRP CSEB Chhattisgarh India PMC Services for Puri Nabakalebar Project OPTCL Odisha India RE Capacity Building RREC Rajasthan India Training of delegates on Power distribution DABS - Afghanistan Training of delegates from Central Asia on power distribution World Bank Delhi India Functional Advisory on Commercial & Operation Processes DVVNL Uttar Pradesh India
  • 17. TATA POWER – DDL : International Footprint BANGLADESH GHANA NIGERIA Project Value : USD 140,890 Period of Engagement: 6 months, 8 months Client : VIPL Global Services, NEPA UGANDA Project Value : USD 18,000 Period of Engagement: 12 months Client : Electricity Regulatory Authority MAURITIUS Project Value : USD 17,780 Period of Engagement: 12 months Client : Central Electricity Board YEMEN Project Value : USD 87,608 Period of Engagement: 6 months Client : PEC WORLD BANK – CENTRAL ASIA Project Value : USD 13, 854 Period of Engagement: 5 days Client : Delegates from Central Asia AFGHANISTAN Project Value : USD 38,500 Period of Engagement: 11 days Client : DABS CENTRAL ASIA Upcoming opportunity Executed Projects
  • 18. TATA POWER – DDL : CSR Joy of Giving… 223 JJ Clusters across North and North-West Delhi
  • 19. TATA POWER – DDL : Rewards & Recognitions A few of the many…
  • 20. THINK US FOR – BUSINESS PROPOSITION 1 2 3 4 TECHNOLOGY ADOPTION • State-of- the- Technology Implementation in Power Distribution • Seamless Integration of Various Technologies CREATING BUSINESS VALUES • Managing Power Distribution services • Transaction Advisory Services • Consultancy services on -Loss Reduction / Process Re- engineering / Functional Consultancy • Project Management & Managing Capital Investment CAPITALIZING BUSINESS IDEAS • Setting up Green Field Distribution Project • Distribution Privatization & other business transformation model • Managing electrical infrastructure in SEZ / Townships PREPARING FOR FUTURE • Capacity Building Service • Preparation of Business Plan • Technology Roadmap Preparation for Information & Operation Technology
  • 21. Let’s make a difference Smart Green Life For further information, if any Tarun Katiyar Addl. GM – Business Development TATA Power Delhi Distribution Limited Head Office :- NDPL House, Hudson Lane, Kingsway Camp, New Delhi-110009, India Tel. No : +91-11-66112246 Mobile No : +91- 9818100744 Email: tarun.katiyar@tatapower-ddl.com Website : www.tatapower-ddl.com 21