B/C Analysis
• B/C analysis encouraged by TxDOT HSIP
• HSIP calls the ratio a Safety Improvement Index (SII)
• SII accounts for:
• increased traffic over projected life
• changes in maintenance costs
• amortization over long service lives
• SII only uses injury and fatal crashes
• (PDO crashes cost less anyway)
• Ratio greater than 1.0 is cost-effective
HSIP Manual pg. 1-11
Calculate Value of Reduced Crashes
(Benefit)
• Estimate number of reduced crashes over the life of the
treatment
• Multiply by cost of crashes
• Most weight for crash costs comes from fatalities
• $9.4M for fatal crash (USDOT)
• $28,000 for crash with minor injuries
• Cost of an “average” crash on a curve: ~$190,000
• A reduction of just a few crashes can be very cost-effective if the
treatment is (relatively) inexpensive
TCDs on Curves
TCDs on Curves
• NCHRP study evaluating traditional devices (NCHRP 03-
106; publication in progress)
• Cross-sectional study in 4 states (Florida, Ohio, Oregon,
Tennessee)
• 541 rural sites
• 271 isolated curves
• 270 curve series
• 3 years of data
• 1,623 site years (3 × 541)
• Generated CMFs from crash prediction models
Treatment Costs
• Survey results (averages) from 23 state DOTs
Treatment (qty. per curve)
Material
Unit Cost Installation Total Cost
Service
Life (yrs)
Advance Warning Signs (2) $136 $488 $760 11.9
Advisory Speed Plaques (2) $47 N/A $94 11.9
Chevrons (12, 6 per direction) $91 $1,368 $2,460 11.1
Large Arrow (2) $150 $335 $635 11.4
Delineators (8) $24 $317 $509 9.1
Does not include maintenance costs
Crash Reductions due to Curve TCDs
• Start with predicted crash frequency from HSM
• 𝑁 = 2.67 × 𝐿 +
138
𝑅
×
𝐴𝐴𝐷𝑇
10,000
N = annual predicted crash frequency at a curve,
L = curve length (mi),
R = curve radius (ft), and
AADT = annual average daily traffic (veh/day),
• Apply crash reduction factor due to TCDs
• Reduced Crashes = 𝑁 × (1 − 𝐶𝑀𝐹)
• 𝐶𝑀𝐹𝐴𝑑𝑣𝑎𝑛𝑐𝑒𝑑 𝑆𝑖𝑔𝑛 = 𝑒0.71 −
636
𝑅
• 𝐶𝑀𝐹𝐶ℎ𝑒𝑣 𝑜𝑟 𝐿𝑎𝑟𝑔𝑒 𝐴𝑟𝑟𝑜𝑤 = 𝑒
0.203 − 0.89×(
𝐴𝐴𝐷𝑇
10,000
)
CMFs (#1)
• CMF of chevrons / large arrows at isolated curves
• The TCDs are more effective with higher volume
0
0.25
0.5
0.75
1
1.25
1.5
1.75
2
0 4,000 8,000 12,000 16,000
CMF
AADT (vpd)
CMFs (#2)
• CMF of advance warning signs at isolated curves
0
0.5
1
1.5
2
2.5
0 5 10 15 20 25
CMF
Degree of Curve
Radius < 400ft
• Crash Reductions Dependent Upon:
• Curve Radius
• Curve Length
• ADT
• TCD treatment
• The present value of a treatment for a site can be
estimated using the above variables, reasonable growth
factors and discount rates, and an average service life
Example of Present Value: Chevrons
$0
$150,000
$300,000
$450,000
$600,000
$750,000
PresentValueofTreatment
Curve Radius (ft)
Chevrons
Assumptions:
ADT=6,000 vpd
curve deflection = 90°
Example of Present Value: Warning Sign
$0
$150,000
$300,000
$450,000
$600,000
$750,000
PresentValueofTreatment
Curve Radius (ft)
Advance Warning Signs
Assumptions:
ADT=6,000 vpd
curve deflection = 90°
B/C Ratios for Curve TCDs
0
200
400
600
800
Benefit-CostRatio
Curve Radius (ft)
Chevrons
Assumptions:
ADT=6,000 vpd
curve deflection = 90°
High-Friction Surface Treatments
High-Friction Surface Treatments
• Reduces horizontal curve road departures
• Polish resistant aggregate in polymer resin binder
Data Collection
• Contract and bidding documents
• Roadway geometry
• Traffic characteristics
• Crash statistics
• 5-yrs before HFST, and after HFST up to present
• Exclude crashes outside HFST limits
• Exclude crashes during construction
• KABCO coding
𝐶𝑟𝑎𝑠ℎ 𝑝𝑒𝑟 𝑚𝑖𝑙𝑙𝑖𝑜𝑛 𝑣𝑒ℎ𝑖𝑐𝑙𝑒𝑠 =
𝐶𝑟𝑎𝑠ℎ𝑒𝑠
𝑦𝑒𝑎𝑟
𝐴𝐴𝐷𝑇 ∗ 365
∗ 1,000,000
Data Analysis
• HFST Section Cost
• Normalized project cost
𝐶𝑜𝑠𝑡 $ = 𝐴𝑣𝑔. 𝑈𝑛𝑖𝑡 𝐻𝐹𝑆𝑇 𝐶𝑜𝑠𝑡 $ 𝑦𝑑2
× 𝐴𝑟𝑒𝑎 𝑦𝑑2
• Benefit Calculation
• Total Crashes by KABCO (FDOT version)
• Total Crashes by average crash cost ($195,000)
• Wet Weather by average crash cost ($195,000)
• Benefit-Cost.
• Average per section type
Cost Type
Cost Per Crash By Type (Thousands $)
K A B C O
Lost Quality of Life $7,750 $919 $252 $108 $31.8
Economic $1,400 $82.0 $23.7 $19.5 $10.4
Societal Impact (Total Cost) $9,140 $1,001 $276 $128 $42.3
FDOT Societal Impact (Total Cost) $10,000 $819 $163 $100 $6.50
Project Data
• 38 sections w/ data
• 16 tight curves
• 16 wide curves/tangents
• 6 intersections/ intersection
approaches
Mainline (Dev 333)
Bridge deck (TSP 403)
Crash Rates (Total Crashes)
Crash Rates (Wet Weather Crashes)
Normalized HFST Project Cost
Benefit-Cost
Benefit-Cost
HFST Recommendations
• Continue promoting HFST for crash reduction around tight
curves with a history of crashes.
• Reduce emphasis of safety benefits when considering
HFST on wide curve/tangent sections that have no history
of crashes.
• Evaluate benefit-cost of HFST as a maintenance
treatment of concrete bridge decks.
• Evaluate in-detail the nature of crashes at intersection/
intersection approach sections and whether the crashes
are related to the installation of HFST.
Thank You.
Questions?
Brad Brimley
bbrimley@tamu.edu
Bryan Wilson
b-wilson@tti.tamu.edu

Mais conteúdo relacionado

Semelhante a Benefit-Cost Analysis of Curve Safety Treatments

ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.pptSoulmananIndia
 
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptx
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptxMULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptx
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptxPanagiotaAmmanatidou
 
Chapter 13 Total Cost of Ownership
Chapter 13 Total Cost of OwnershipChapter 13 Total Cost of Ownership
Chapter 13 Total Cost of OwnershipTran Thang
 
2. Economic Analysis Concepts.pptx
2. Economic Analysis Concepts.pptx2. Economic Analysis Concepts.pptx
2. Economic Analysis Concepts.pptxYogeshShah95
 
CSX Case - NCG Consultant Training Program
CSX Case - NCG Consultant Training ProgramCSX Case - NCG Consultant Training Program
CSX Case - NCG Consultant Training ProgramKatie M. Gustas
 
RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTS
RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTSRISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTS
RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTSDimitrios Kordas
 
COST ANALYSIS (Brief overview)
COST ANALYSIS (Brief overview)COST ANALYSIS (Brief overview)
COST ANALYSIS (Brief overview)Archit Aditya
 
Energy Risks to Activity Systems as a function of urban form
Energy Risks to Activity Systems as a function of urban formEnergy Risks to Activity Systems as a function of urban form
Energy Risks to Activity Systems as a function of urban formAndre Dantas
 
Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Sok-Tharath CHREUNG
 
Fundamentals of Computational Fluid Dynamics
Fundamentals of Computational Fluid DynamicsFundamentals of Computational Fluid Dynamics
Fundamentals of Computational Fluid DynamicsPankaj Koli
 
MNRF CWRA Technical Workshop March 6 2018 Rob Grech and Robert Muir City of M...
MNRF CWRA Technical Workshop March 6 2018 Rob Grech and Robert Muir City of M...MNRF CWRA Technical Workshop March 6 2018 Rob Grech and Robert Muir City of M...
MNRF CWRA Technical Workshop March 6 2018 Rob Grech and Robert Muir City of M...Robert Muir
 
Logistic support
Logistic supportLogistic support
Logistic supporttick_tick
 
2016 11-03 ta bod highway-101-92 interchange
2016 11-03 ta bod highway-101-92 interchange2016 11-03 ta bod highway-101-92 interchange
2016 11-03 ta bod highway-101-92 interchangeAdina Levin
 

Semelhante a Benefit-Cost Analysis of Curve Safety Treatments (20)

ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
 
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptx
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptxMULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptx
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptx
 
Autonomous vtol jun01
Autonomous vtol jun01Autonomous vtol jun01
Autonomous vtol jun01
 
Charging for use of infrastructure by road freight
Charging for use of infrastructure by road freightCharging for use of infrastructure by road freight
Charging for use of infrastructure by road freight
 
Chapter 13 Total Cost of Ownership
Chapter 13 Total Cost of OwnershipChapter 13 Total Cost of Ownership
Chapter 13 Total Cost of Ownership
 
2. Economic Analysis Concepts.pptx
2. Economic Analysis Concepts.pptx2. Economic Analysis Concepts.pptx
2. Economic Analysis Concepts.pptx
 
CSX Case - NCG Consultant Training Program
CSX Case - NCG Consultant Training ProgramCSX Case - NCG Consultant Training Program
CSX Case - NCG Consultant Training Program
 
Cost concepts and behaviors
Cost concepts and behaviorsCost concepts and behaviors
Cost concepts and behaviors
 
Gdmp model workshop 5 - structure of tim
Gdmp model workshop   5 - structure of timGdmp model workshop   5 - structure of tim
Gdmp model workshop 5 - structure of tim
 
RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTS
RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTSRISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTS
RISK SHARING IN TRADITIONAL CONSTRUCTION CONTRACTS FOR BUILDING PROJECTS
 
COST ANALYSIS (Brief overview)
COST ANALYSIS (Brief overview)COST ANALYSIS (Brief overview)
COST ANALYSIS (Brief overview)
 
Energy Risks to Activity Systems as a function of urban form
Energy Risks to Activity Systems as a function of urban formEnergy Risks to Activity Systems as a function of urban form
Energy Risks to Activity Systems as a function of urban form
 
Cost function
Cost functionCost function
Cost function
 
Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Presentation transport economics 17_may2106
Presentation transport economics 17_may2106
 
Cost analysis
Cost analysisCost analysis
Cost analysis
 
Fundamentals of Computational Fluid Dynamics
Fundamentals of Computational Fluid DynamicsFundamentals of Computational Fluid Dynamics
Fundamentals of Computational Fluid Dynamics
 
MNRF CWRA Technical Workshop March 6 2018 Rob Grech and Robert Muir City of M...
MNRF CWRA Technical Workshop March 6 2018 Rob Grech and Robert Muir City of M...MNRF CWRA Technical Workshop March 6 2018 Rob Grech and Robert Muir City of M...
MNRF CWRA Technical Workshop March 6 2018 Rob Grech and Robert Muir City of M...
 
Logistic support
Logistic supportLogistic support
Logistic support
 
2016 11-03 ta bod highway-101-92 interchange
2016 11-03 ta bod highway-101-92 interchange2016 11-03 ta bod highway-101-92 interchange
2016 11-03 ta bod highway-101-92 interchange
 
Operating costing
Operating costingOperating costing
Operating costing
 

Mais de Texas A&M Transportation Institute

The Transportation Revenue Estimator and Needs Determination System
The Transportation Revenue Estimator and Needs Determination SystemThe Transportation Revenue Estimator and Needs Determination System
The Transportation Revenue Estimator and Needs Determination SystemTexas A&M Transportation Institute
 
Texas A&M Transportation Institute - 60th Anniversary Brochure
Texas A&M Transportation Institute - 60th Anniversary BrochureTexas A&M Transportation Institute - 60th Anniversary Brochure
Texas A&M Transportation Institute - 60th Anniversary BrochureTexas A&M Transportation Institute
 

Mais de Texas A&M Transportation Institute (20)

When Your Urban Core Arrives
When Your Urban Core Arrives When Your Urban Core Arrives
When Your Urban Core Arrives
 
Methods to Measure & Monitor Pedestrian Travel
Methods to Measure & Monitor Pedestrian TravelMethods to Measure & Monitor Pedestrian Travel
Methods to Measure & Monitor Pedestrian Travel
 
Pedestrian Safety in North Texas
Pedestrian Safety in North Texas Pedestrian Safety in North Texas
Pedestrian Safety in North Texas
 
TTI's Visibility Laboratory
TTI's Visibility LaboratoryTTI's Visibility Laboratory
TTI's Visibility Laboratory
 
Truck Platooning at TTI
Truck Platooning at TTI Truck Platooning at TTI
Truck Platooning at TTI
 
The Transportation Revenue Estimator and Needs Determination System
The Transportation Revenue Estimator and Needs Determination SystemThe Transportation Revenue Estimator and Needs Determination System
The Transportation Revenue Estimator and Needs Determination System
 
Travel Forecasting Program
Travel Forecasting Program Travel Forecasting Program
Travel Forecasting Program
 
Transportation Planning
Transportation Planning Transportation Planning
Transportation Planning
 
Transit Mobility Program at TTI
Transit Mobility Program at TTI Transit Mobility Program at TTI
Transit Mobility Program at TTI
 
Driving Simulator Facilities at TTI
Driving Simulator Facilities at TTI Driving Simulator Facilities at TTI
Driving Simulator Facilities at TTI
 
Sediment and Erosion Control (SEC) Laboratory
Sediment and Erosion Control (SEC) Laboratory Sediment and Erosion Control (SEC) Laboratory
Sediment and Erosion Control (SEC) Laboratory
 
Texas A&M University System - RELLIS Campus
Texas A&M University System - RELLIS CampusTexas A&M University System - RELLIS Campus
Texas A&M University System - RELLIS Campus
 
Multimodal Freight Program
Multimodal Freight Program Multimodal Freight Program
Multimodal Freight Program
 
Public Engagement Planning
Public Engagement PlanningPublic Engagement Planning
Public Engagement Planning
 
I-35 Corridor Project in Texas
I-35 Corridor Project in Texas I-35 Corridor Project in Texas
I-35 Corridor Project in Texas
 
Intelligent Transportation Systems (ITS) Research at TTI
Intelligent Transportation Systems (ITS) Research at TTIIntelligent Transportation Systems (ITS) Research at TTI
Intelligent Transportation Systems (ITS) Research at TTI
 
TTI Facilities for Human Factors Research
TTI Facilities for Human Factors ResearchTTI Facilities for Human Factors Research
TTI Facilities for Human Factors Research
 
Human Factors at TTI
Human Factors at TTIHuman Factors at TTI
Human Factors at TTI
 
Texas A&M Transportation Institute - 60th Anniversary Brochure
Texas A&M Transportation Institute - 60th Anniversary BrochureTexas A&M Transportation Institute - 60th Anniversary Brochure
Texas A&M Transportation Institute - 60th Anniversary Brochure
 
TTI Aviation Research and Planning
TTI Aviation Research and PlanningTTI Aviation Research and Planning
TTI Aviation Research and Planning
 

Último

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 

Último (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

Benefit-Cost Analysis of Curve Safety Treatments

  • 1. Benefit-Cost Analysis of Curve Safety Treatments Bryan Wilson, Brad Brimley Texas A&M Transportation Institute
  • 2. B/C Analysis • B/C analysis encouraged by TxDOT HSIP • HSIP calls the ratio a Safety Improvement Index (SII) • SII accounts for: • increased traffic over projected life • changes in maintenance costs • amortization over long service lives • SII only uses injury and fatal crashes • (PDO crashes cost less anyway) • Ratio greater than 1.0 is cost-effective HSIP Manual pg. 1-11
  • 3. Calculate Value of Reduced Crashes (Benefit) • Estimate number of reduced crashes over the life of the treatment • Multiply by cost of crashes • Most weight for crash costs comes from fatalities • $9.4M for fatal crash (USDOT) • $28,000 for crash with minor injuries • Cost of an “average” crash on a curve: ~$190,000 • A reduction of just a few crashes can be very cost-effective if the treatment is (relatively) inexpensive
  • 5. TCDs on Curves • NCHRP study evaluating traditional devices (NCHRP 03- 106; publication in progress) • Cross-sectional study in 4 states (Florida, Ohio, Oregon, Tennessee) • 541 rural sites • 271 isolated curves • 270 curve series • 3 years of data • 1,623 site years (3 × 541) • Generated CMFs from crash prediction models
  • 6. Treatment Costs • Survey results (averages) from 23 state DOTs Treatment (qty. per curve) Material Unit Cost Installation Total Cost Service Life (yrs) Advance Warning Signs (2) $136 $488 $760 11.9 Advisory Speed Plaques (2) $47 N/A $94 11.9 Chevrons (12, 6 per direction) $91 $1,368 $2,460 11.1 Large Arrow (2) $150 $335 $635 11.4 Delineators (8) $24 $317 $509 9.1 Does not include maintenance costs
  • 7. Crash Reductions due to Curve TCDs • Start with predicted crash frequency from HSM • 𝑁 = 2.67 × 𝐿 + 138 𝑅 × 𝐴𝐴𝐷𝑇 10,000 N = annual predicted crash frequency at a curve, L = curve length (mi), R = curve radius (ft), and AADT = annual average daily traffic (veh/day), • Apply crash reduction factor due to TCDs • Reduced Crashes = 𝑁 × (1 − 𝐶𝑀𝐹) • 𝐶𝑀𝐹𝐴𝑑𝑣𝑎𝑛𝑐𝑒𝑑 𝑆𝑖𝑔𝑛 = 𝑒0.71 − 636 𝑅 • 𝐶𝑀𝐹𝐶ℎ𝑒𝑣 𝑜𝑟 𝐿𝑎𝑟𝑔𝑒 𝐴𝑟𝑟𝑜𝑤 = 𝑒 0.203 − 0.89×( 𝐴𝐴𝐷𝑇 10,000 )
  • 8. CMFs (#1) • CMF of chevrons / large arrows at isolated curves • The TCDs are more effective with higher volume 0 0.25 0.5 0.75 1 1.25 1.5 1.75 2 0 4,000 8,000 12,000 16,000 CMF AADT (vpd)
  • 9. CMFs (#2) • CMF of advance warning signs at isolated curves 0 0.5 1 1.5 2 2.5 0 5 10 15 20 25 CMF Degree of Curve Radius < 400ft
  • 10. • Crash Reductions Dependent Upon: • Curve Radius • Curve Length • ADT • TCD treatment • The present value of a treatment for a site can be estimated using the above variables, reasonable growth factors and discount rates, and an average service life
  • 11. Example of Present Value: Chevrons $0 $150,000 $300,000 $450,000 $600,000 $750,000 PresentValueofTreatment Curve Radius (ft) Chevrons Assumptions: ADT=6,000 vpd curve deflection = 90°
  • 12. Example of Present Value: Warning Sign $0 $150,000 $300,000 $450,000 $600,000 $750,000 PresentValueofTreatment Curve Radius (ft) Advance Warning Signs Assumptions: ADT=6,000 vpd curve deflection = 90°
  • 13. B/C Ratios for Curve TCDs 0 200 400 600 800 Benefit-CostRatio Curve Radius (ft) Chevrons Assumptions: ADT=6,000 vpd curve deflection = 90°
  • 15. High-Friction Surface Treatments • Reduces horizontal curve road departures • Polish resistant aggregate in polymer resin binder
  • 16. Data Collection • Contract and bidding documents • Roadway geometry • Traffic characteristics • Crash statistics • 5-yrs before HFST, and after HFST up to present • Exclude crashes outside HFST limits • Exclude crashes during construction • KABCO coding 𝐶𝑟𝑎𝑠ℎ 𝑝𝑒𝑟 𝑚𝑖𝑙𝑙𝑖𝑜𝑛 𝑣𝑒ℎ𝑖𝑐𝑙𝑒𝑠 = 𝐶𝑟𝑎𝑠ℎ𝑒𝑠 𝑦𝑒𝑎𝑟 𝐴𝐴𝐷𝑇 ∗ 365 ∗ 1,000,000
  • 17. Data Analysis • HFST Section Cost • Normalized project cost 𝐶𝑜𝑠𝑡 $ = 𝐴𝑣𝑔. 𝑈𝑛𝑖𝑡 𝐻𝐹𝑆𝑇 𝐶𝑜𝑠𝑡 $ 𝑦𝑑2 × 𝐴𝑟𝑒𝑎 𝑦𝑑2 • Benefit Calculation • Total Crashes by KABCO (FDOT version) • Total Crashes by average crash cost ($195,000) • Wet Weather by average crash cost ($195,000) • Benefit-Cost. • Average per section type Cost Type Cost Per Crash By Type (Thousands $) K A B C O Lost Quality of Life $7,750 $919 $252 $108 $31.8 Economic $1,400 $82.0 $23.7 $19.5 $10.4 Societal Impact (Total Cost) $9,140 $1,001 $276 $128 $42.3 FDOT Societal Impact (Total Cost) $10,000 $819 $163 $100 $6.50
  • 18. Project Data • 38 sections w/ data • 16 tight curves • 16 wide curves/tangents • 6 intersections/ intersection approaches Mainline (Dev 333) Bridge deck (TSP 403)
  • 19. Crash Rates (Total Crashes)
  • 20. Crash Rates (Wet Weather Crashes)
  • 24. HFST Recommendations • Continue promoting HFST for crash reduction around tight curves with a history of crashes. • Reduce emphasis of safety benefits when considering HFST on wide curve/tangent sections that have no history of crashes. • Evaluate benefit-cost of HFST as a maintenance treatment of concrete bridge decks. • Evaluate in-detail the nature of crashes at intersection/ intersection approach sections and whether the crashes are related to the installation of HFST.