SlideShare uma empresa Scribd logo
1 de 26
Project Risk Management
Table 11-5. Sample Risk Register /
                              Risk Analysis
No.   Rank   Risk   Description   Category   Root    Triggers   Potential   Risk    Probability   Impact   Severity   Status
                                             Cause              Responses   Owner
R44   1



R21   2



R7    3




                Project severity = expectation (1-10) * impact (1-10)
                When should risk analysis be formed?
                Is not a time activity
                Periodic update and reviewed


                                                                                                                               2
Calculating severity
Problem                      Expectation       Impact      Severity
Staff                              6              5             30
Late delivery of hardware          5              8             40
Communication and Networks         5              5             25
problem




        Project severity = expectation (1-10) * impact (1-10)



                                                                      3
Qualitative Risk Analysis
 Assess the likelihood and impact of identified risks
  to determine their magnitude and priority.
 Risk quantification tools and techniques include:
    Probability/impact matrixes
    The Top Ten Risk Item Tracking
    Expert judgment




                                                         4
Probability/Impact Matrix
 A probability/impact matrix or chart lists the relative
  probability of a risk occurring on one side of a matrix
  or axis on a chart and the relative impact of the risk
  occurring on the other.
 List the risks and then label each one as high, medium,
  or low in terms of its probability of occurrence and its
  impact if it did occur.
 Can also calculate risk factors:
    Numbers that represent the overall risk of specific
     events based on their probability of occurring and the
     consequences to the project if they do occur.

                                                              5
Figure 11-4. Sample
Probability/Impact Matrix




                            6
Table 11-6. Sample Probability/Impact
Matrix for Qualitative Risk Assessment




                                         7
Figure 11-5. Chart Showing High-, Medium-,
        and Low-Risk Technologies




                                             8
Top Ten Risk Item Tracking
 Top Ten Risk Item Tracking is a qualitative risk
  analysis tool that helps to identify risks and maintain
  an awareness of risks throughout the life of a project.
 Establish a periodic review of the top ten project risk
  items.
 List the current ranking, previous ranking, number of
  times the risk appears on the list over a period of
  time, and a summary of progress made in resolving
  the risk item.



                                                            9
Table 11-7. Example of Top Ten Risk Item
                Tracking
                          Monthly Ranking
 Risk Item         This      Last    Number    Risk Resolution
                                     of Months Progress
                   Month     Month
 Inadequate        1         2       4          Working on revising the
 planning                                       entire project plan
 Poor definition   2         3       3          Holding meetings with
 of scope                                       project customer and
                                                sponsor to clarify scope
 Absence of        3         1       2          Just assigned a new
 leadership                                     project manager to lead
                                                the project after old one
                                                quit
 Poor cost         4         4       3          Revising cost estimates
 estimates
 Poor time         5         5       3          Revising schedule
 estimates                                      estimates

                                                                            10
Expert Judgment
 Many organizations rely on the intuitive feelings and
  past experience of experts to help identify potential
  project risks.
 Experts can categorize risks as high, medium, or low
  with or without more sophisticated techniques.
 Can also help create and monitor a watch list, a list of
  risks that are low priority, but are still identified as
  potential risks.




                                                             11
Quantitative Risk Analysis
 Often follows qualitative risk analysis, but both can be
  done together.
 Large, complex projects involving leading edge
  technologies often require extensive quantitative risk
  analysis.
 Main techniques include:
    Decision tree analysis
    Simulation
    Sensitivity analysis



                                                             12
Decision Trees and Expected
        Monetary Value (EMV)
 A decision tree is a diagramming analysis technique
  used to help select the best course of action in
  situations in which future outcomes are uncertain.
 Estimated monetary value (EMV) is the product of a
  risk event probability and the risk event’s monetary
  value.
 You can draw a decision tree to help find the EMV.




                                                         13
Figure 11-6. Expected Monetary
    Value (EMV) Example




                                 14
Sensitivity Analysis
 Sensitivity analysis is a technique used to show the
  effects of changing one or more variables on an
  outcome.
 For example, many people use it to determine what the
  monthly payments for a loan will be given different
  interest rates or periods of the loan, or for determining
  break-even points based on different assumptions.
 Spreadsheet software, such as Excel, is a common tool
  for performing sensitivity analysis.


                                                              15
Figure 11-8. Sample Sensitivity Analysis for
      Determining Break-Even Point




                                               16
Risk Response Planning
 After identifying and quantifying risks, you must
  decide how to respond to them.
 Four main response strategies for negative risks:
      Risk avoidance
      Risk acceptance
      Risk transference
      Risk mitigation




                                                      17
Table 11-8. General Risk Mitigation Strategies
  for Technical, Cost, and Schedule Risks




                                                 18
Response Strategies for Positive
                  Risks
   Risk exploitation
   Risk sharing
   Risk enhancement
   Risk acceptance




                                         19
Residual and Secondary Risks
 It’s also important to identify residual and secondary
  risks.
 Residual risks are risks that remain after all of the
  response strategies have been implemented.
 Secondary risks are a direct result of implementing a
  risk response.




                                                           20
Media Snapshot
 A highly publicized example of a risk response to
  corporate financial scandals, such as those affecting
  Enron, Arthur Andersen, and WorldCom, was legal
  action.
 The Sarbanes-Oxley Act of 2002 is considered the
  most significant change to federal securities laws in the
  United States since the New Deal.
 This Act has caused many organizations to initiate
  projects and other actions to avoid litigation.*

*Iosub, John C., “What the Sarbanes-Oxley Act Means for IT Managers,” TechRepublic,
(March 19, 2003) (http://techrepublic.com.com/5100-6313-5034345.html).

                                                                                      21
Risk Monitoring and Control
 Involves executing the risk management process to
  respond to risk events.
 Workarounds are unplanned responses to risk events
  that must be done when there are no contingency plans.
 Main outputs of risk monitoring and control are:
    Requested changes.
    Recommended corrective and preventive actions.
    Updates to the risk register, project management plan,
     and organizational process assets.



                                                              22
Using Software to Assist in Project
          Risk Management
 Risk registers can be created in a simple Word or Excel
  file or as part of a database.
 More sophisticated risk management software, such as
  Monte Carlo simulation tools, help in analyzing project
  risks.
 The PMI Risk Specific Interest Group’s Web site at
  www.risksig.com has a detailed list of software
  products to assist in risk management.



                                                            23
Results of Good Project Risk
               Management
 Unlike crisis management, good project risk
  management often goes unnoticed.
 Well-run projects appear to be almost effortless, but a
  lot of work goes into running a project well.
 Project managers should strive to make their jobs look
  easy to reflect the results of well-run projects.




                                                            24
Chapter Summary
 Project risk management is the art and science of
  identifying, analyzing, and responding to risk
  throughout the life of a project and in the best interests
  of meeting project objectives.
 Main processes include:
      Risk management planning
      Risk identification
      Qualitative risk analysis
      Quantitative risk analysis
      Risk response planning
      Risk monitoring and control

                                                               25
Table 11-2. Topics Addressed in a
       Risk Management Plan
 Methodology

 Roles and responsibilities

 Budget and schedule

 Risk categories

 Risk probability and impact

 Risk documentation
                                      26

Mais conteúdo relacionado

Mais procurados

Project risk management
Project risk managementProject risk management
Project risk managementDewang Agrawal
 
Project Management
Project ManagementProject Management
Project ManagementMark Roman
 
Project Risk Management PMBOK
Project Risk Management PMBOKProject Risk Management PMBOK
Project Risk Management PMBOKGeoDiga
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasMazen Zbib
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMarkos Mulat G
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Dhamo daran
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk AnalysisIntaver Insititute
 
Project Risk Management (10)
 Project Risk Management (10) Project Risk Management (10)
Project Risk Management (10)Serdar Temiz
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentationRaven Morgan
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMauro Jasse
 
Project Risk Management
Project  Risk ManagementProject  Risk Management
Project Risk ManagementKelvin Fredson
 
Risk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation SlidesRisk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation SlidesSlideTeam
 

Mais procurados (20)

Project risk management
Project risk managementProject risk management
Project risk management
 
project management
project managementproject management
project management
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Management
Project ManagementProject Management
Project Management
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Project Management
Project ManagementProject Management
Project Management
 
Project Risk Management PMBOK
Project Risk Management PMBOKProject Risk Management PMBOK
Project Risk Management PMBOK
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk Analysis
 
Project Risk Management (10)
 Project Risk Management (10) Project Risk Management (10)
Project Risk Management (10)
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
Risk Management in Project Management
Risk Management in Project ManagementRisk Management in Project Management
Risk Management in Project Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Risk Management
Project  Risk ManagementProject  Risk Management
Project Risk Management
 
Risk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation SlidesRisk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation Slides
 

Destaque

Project Decription
Project DecriptionProject Decription
Project DecriptionMalav Patel
 
اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222nashaat algrara
 
Scenario Models and Sensitivity Analysis in Operational Risk
Scenario Models and Sensitivity Analysis in Operational Risk Scenario Models and Sensitivity Analysis in Operational Risk
Scenario Models and Sensitivity Analysis in Operational Risk RUIXIN BAO
 
An Expert System For Power Plants Paper Presentation
An Expert System For Power Plants Paper PresentationAn Expert System For Power Plants Paper Presentation
An Expert System For Power Plants Paper Presentationguestac67362
 
Presentation by Inchul Shin on 'Performance Management System for Civil Serva...
Presentation by Inchul Shin on 'Performance Management System for Civil Serva...Presentation by Inchul Shin on 'Performance Management System for Civil Serva...
Presentation by Inchul Shin on 'Performance Management System for Civil Serva...OECD Governance
 
R.F.I.D Expert System Weekly Presentation By Muhammad Faizan Butt(1043) and Z...
R.F.I.D Expert System Weekly Presentation By Muhammad Faizan Butt(1043) and Z...R.F.I.D Expert System Weekly Presentation By Muhammad Faizan Butt(1043) and Z...
R.F.I.D Expert System Weekly Presentation By Muhammad Faizan Butt(1043) and Z...Faizan Butt
 
Using Risk Analysis and Simulation in Project Management
Using Risk Analysis and Simulation in Project ManagementUsing Risk Analysis and Simulation in Project Management
Using Risk Analysis and Simulation in Project ManagementMike Tulkoff
 
Design and implementation of an expert system for monitoring and management o...
Design and implementation of an expert system for monitoring and management o...Design and implementation of an expert system for monitoring and management o...
Design and implementation of an expert system for monitoring and management o...Ahmed Spirit
 
Sensitivity, specificity and likelihood ratios
Sensitivity, specificity and likelihood ratiosSensitivity, specificity and likelihood ratios
Sensitivity, specificity and likelihood ratiosChew Keng Sheng
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkRahul Sudame
 
Sensitivity Analysis
Sensitivity AnalysisSensitivity Analysis
Sensitivity Analysisashishtqm
 
Sensitivity analysis
Sensitivity analysisSensitivity analysis
Sensitivity analysisMohamed Yaser
 
Expert system presentation
Expert system presentationExpert system presentation
Expert system presentationmaryam shaikh
 

Destaque (20)

Risk ppt1672
Risk ppt1672Risk ppt1672
Risk ppt1672
 
aaoczc2252
aaoczc2252aaoczc2252
aaoczc2252
 
Project Decription
Project DecriptionProject Decription
Project Decription
 
اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222اهم برزنتيشن لجنك2222
اهم برزنتيشن لجنك2222
 
Scenario Models and Sensitivity Analysis in Operational Risk
Scenario Models and Sensitivity Analysis in Operational Risk Scenario Models and Sensitivity Analysis in Operational Risk
Scenario Models and Sensitivity Analysis in Operational Risk
 
An Expert System For Power Plants Paper Presentation
An Expert System For Power Plants Paper PresentationAn Expert System For Power Plants Paper Presentation
An Expert System For Power Plants Paper Presentation
 
Presentation by Inchul Shin on 'Performance Management System for Civil Serva...
Presentation by Inchul Shin on 'Performance Management System for Civil Serva...Presentation by Inchul Shin on 'Performance Management System for Civil Serva...
Presentation by Inchul Shin on 'Performance Management System for Civil Serva...
 
Intro Expert Systems test-me.co.uk
Intro Expert Systems test-me.co.ukIntro Expert Systems test-me.co.uk
Intro Expert Systems test-me.co.uk
 
Pmp session 5
Pmp session 5Pmp session 5
Pmp session 5
 
R.F.I.D Expert System Weekly Presentation By Muhammad Faizan Butt(1043) and Z...
R.F.I.D Expert System Weekly Presentation By Muhammad Faizan Butt(1043) and Z...R.F.I.D Expert System Weekly Presentation By Muhammad Faizan Butt(1043) and Z...
R.F.I.D Expert System Weekly Presentation By Muhammad Faizan Butt(1043) and Z...
 
Using Risk Analysis and Simulation in Project Management
Using Risk Analysis and Simulation in Project ManagementUsing Risk Analysis and Simulation in Project Management
Using Risk Analysis and Simulation in Project Management
 
Design and implementation of an expert system for monitoring and management o...
Design and implementation of an expert system for monitoring and management o...Design and implementation of an expert system for monitoring and management o...
Design and implementation of an expert system for monitoring and management o...
 
RMMM Plan
RMMM PlanRMMM Plan
RMMM Plan
 
Sensitivity, specificity and likelihood ratios
Sensitivity, specificity and likelihood ratiosSensitivity, specificity and likelihood ratios
Sensitivity, specificity and likelihood ratios
 
Sensitivity analysis
Sensitivity analysisSensitivity analysis
Sensitivity analysis
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Sensitivity Analysis
Sensitivity AnalysisSensitivity Analysis
Sensitivity Analysis
 
Sensitivity Analysis
Sensitivity AnalysisSensitivity Analysis
Sensitivity Analysis
 
Sensitivity analysis
Sensitivity analysisSensitivity analysis
Sensitivity analysis
 
Expert system presentation
Expert system presentationExpert system presentation
Expert system presentation
 

Semelhante a Project risk management

Risk Management
Risk ManagementRisk Management
Risk Managementrajuinstru
 
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxFinal Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxGeorgeKabongah2
 
11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptxKamranKhan353531
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk ManagementSAJJAD KHUDHUR ABBAS
 
Sameer Mitter Bournemouth - What do understand by Risk management
Sameer Mitter Bournemouth - What do understand by Risk managementSameer Mitter Bournemouth - What do understand by Risk management
Sameer Mitter Bournemouth - What do understand by Risk managementSameer Mitter
 
presentation project risk management description
presentation project risk management descriptionpresentation project risk management description
presentation project risk management descriptionmambojumb
 
2.11 risk management 1
2.11 risk management 12.11 risk management 1
2.11 risk management 1reddvise
 
Schwalbe-11ProjectRisk.ppt
Schwalbe-11ProjectRisk.pptSchwalbe-11ProjectRisk.ppt
Schwalbe-11ProjectRisk.pptAyidAlmgati
 
Risk management(software engineering)
Risk management(software engineering)Risk management(software engineering)
Risk management(software engineering)Priya Tomar
 
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects UCISA Toolkit - Effective Risk Management for Business Change and IT Projects
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects Mark Ritchie
 
PMI project_risk_management_final_2022.ppt
PMI project_risk_management_final_2022.pptPMI project_risk_management_final_2022.ppt
PMI project_risk_management_final_2022.pptDorraLamouchi1
 
project_risk_mgmt_final.ppt
project_risk_mgmt_final.pptproject_risk_mgmt_final.ppt
project_risk_mgmt_final.pptavisha23
 
project_risk_mgmt_final.ppt
project_risk_mgmt_final.pptproject_risk_mgmt_final.ppt
project_risk_mgmt_final.pptAyidAlmgati
 
Software Project Risk Management Practice in Oman
Software Project Risk Management Practice in OmanSoftware Project Risk Management Practice in Oman
Software Project Risk Management Practice in OmanEECJOURNAL
 
Risk-management
 Risk-management Risk-management
Risk-managementUmesh Gupta
 
Risk management
Risk managementRisk management
Risk managementbipulpwc
 
Bertrand's Individual Essay
Bertrand's Individual EssayBertrand's Individual Essay
Bertrand's Individual EssayPrince Bertrand
 

Semelhante a Project risk management (20)

Risk Management
Risk ManagementRisk Management
Risk Management
 
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxFinal Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
 
11 risk management
11 risk management11 risk management
11 risk management
 
11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptx
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk Management
 
Sameer Mitter Bournemouth - What do understand by Risk management
Sameer Mitter Bournemouth - What do understand by Risk managementSameer Mitter Bournemouth - What do understand by Risk management
Sameer Mitter Bournemouth - What do understand by Risk management
 
presentation project risk management description
presentation project risk management descriptionpresentation project risk management description
presentation project risk management description
 
2.11 risk management 1
2.11 risk management 12.11 risk management 1
2.11 risk management 1
 
Schwalbe-11ProjectRisk.ppt
Schwalbe-11ProjectRisk.pptSchwalbe-11ProjectRisk.ppt
Schwalbe-11ProjectRisk.ppt
 
Risk management(software engineering)
Risk management(software engineering)Risk management(software engineering)
Risk management(software engineering)
 
8. project risk management
8. project risk management8. project risk management
8. project risk management
 
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects UCISA Toolkit - Effective Risk Management for Business Change and IT Projects
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects
 
PMI project_risk_management_final_2022.ppt
PMI project_risk_management_final_2022.pptPMI project_risk_management_final_2022.ppt
PMI project_risk_management_final_2022.ppt
 
project_risk_mgmt_final.ppt
project_risk_mgmt_final.pptproject_risk_mgmt_final.ppt
project_risk_mgmt_final.ppt
 
project_risk_mgmt_final.ppt
project_risk_mgmt_final.pptproject_risk_mgmt_final.ppt
project_risk_mgmt_final.ppt
 
Software Project Risk Management Practice in Oman
Software Project Risk Management Practice in OmanSoftware Project Risk Management Practice in Oman
Software Project Risk Management Practice in Oman
 
Risk-management
 Risk-management Risk-management
Risk-management
 
Risk management
Risk managementRisk management
Risk management
 
Bertrand's Individual Essay
Bertrand's Individual EssayBertrand's Individual Essay
Bertrand's Individual Essay
 
Risk Management
Risk ManagementRisk Management
Risk Management
 

Último

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxNikitaBankoti2
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 

Último (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Project risk management

  • 2. Table 11-5. Sample Risk Register / Risk Analysis No. Rank Risk Description Category Root Triggers Potential Risk Probability Impact Severity Status Cause Responses Owner R44 1 R21 2 R7 3  Project severity = expectation (1-10) * impact (1-10)  When should risk analysis be formed?  Is not a time activity  Periodic update and reviewed 2
  • 3. Calculating severity Problem Expectation Impact Severity Staff 6 5 30 Late delivery of hardware 5 8 40 Communication and Networks 5 5 25 problem Project severity = expectation (1-10) * impact (1-10) 3
  • 4. Qualitative Risk Analysis  Assess the likelihood and impact of identified risks to determine their magnitude and priority.  Risk quantification tools and techniques include:  Probability/impact matrixes  The Top Ten Risk Item Tracking  Expert judgment 4
  • 5. Probability/Impact Matrix  A probability/impact matrix or chart lists the relative probability of a risk occurring on one side of a matrix or axis on a chart and the relative impact of the risk occurring on the other.  List the risks and then label each one as high, medium, or low in terms of its probability of occurrence and its impact if it did occur.  Can also calculate risk factors:  Numbers that represent the overall risk of specific events based on their probability of occurring and the consequences to the project if they do occur. 5
  • 7. Table 11-6. Sample Probability/Impact Matrix for Qualitative Risk Assessment 7
  • 8. Figure 11-5. Chart Showing High-, Medium-, and Low-Risk Technologies 8
  • 9. Top Ten Risk Item Tracking  Top Ten Risk Item Tracking is a qualitative risk analysis tool that helps to identify risks and maintain an awareness of risks throughout the life of a project.  Establish a periodic review of the top ten project risk items.  List the current ranking, previous ranking, number of times the risk appears on the list over a period of time, and a summary of progress made in resolving the risk item. 9
  • 10. Table 11-7. Example of Top Ten Risk Item Tracking Monthly Ranking Risk Item This Last Number Risk Resolution of Months Progress Month Month Inadequate 1 2 4 Working on revising the planning entire project plan Poor definition 2 3 3 Holding meetings with of scope project customer and sponsor to clarify scope Absence of 3 1 2 Just assigned a new leadership project manager to lead the project after old one quit Poor cost 4 4 3 Revising cost estimates estimates Poor time 5 5 3 Revising schedule estimates estimates 10
  • 11. Expert Judgment  Many organizations rely on the intuitive feelings and past experience of experts to help identify potential project risks.  Experts can categorize risks as high, medium, or low with or without more sophisticated techniques.  Can also help create and monitor a watch list, a list of risks that are low priority, but are still identified as potential risks. 11
  • 12. Quantitative Risk Analysis  Often follows qualitative risk analysis, but both can be done together.  Large, complex projects involving leading edge technologies often require extensive quantitative risk analysis.  Main techniques include:  Decision tree analysis  Simulation  Sensitivity analysis 12
  • 13. Decision Trees and Expected Monetary Value (EMV)  A decision tree is a diagramming analysis technique used to help select the best course of action in situations in which future outcomes are uncertain.  Estimated monetary value (EMV) is the product of a risk event probability and the risk event’s monetary value.  You can draw a decision tree to help find the EMV. 13
  • 14. Figure 11-6. Expected Monetary Value (EMV) Example 14
  • 15. Sensitivity Analysis  Sensitivity analysis is a technique used to show the effects of changing one or more variables on an outcome.  For example, many people use it to determine what the monthly payments for a loan will be given different interest rates or periods of the loan, or for determining break-even points based on different assumptions.  Spreadsheet software, such as Excel, is a common tool for performing sensitivity analysis. 15
  • 16. Figure 11-8. Sample Sensitivity Analysis for Determining Break-Even Point 16
  • 17. Risk Response Planning  After identifying and quantifying risks, you must decide how to respond to them.  Four main response strategies for negative risks:  Risk avoidance  Risk acceptance  Risk transference  Risk mitigation 17
  • 18. Table 11-8. General Risk Mitigation Strategies for Technical, Cost, and Schedule Risks 18
  • 19. Response Strategies for Positive Risks  Risk exploitation  Risk sharing  Risk enhancement  Risk acceptance 19
  • 20. Residual and Secondary Risks  It’s also important to identify residual and secondary risks.  Residual risks are risks that remain after all of the response strategies have been implemented.  Secondary risks are a direct result of implementing a risk response. 20
  • 21. Media Snapshot  A highly publicized example of a risk response to corporate financial scandals, such as those affecting Enron, Arthur Andersen, and WorldCom, was legal action.  The Sarbanes-Oxley Act of 2002 is considered the most significant change to federal securities laws in the United States since the New Deal.  This Act has caused many organizations to initiate projects and other actions to avoid litigation.* *Iosub, John C., “What the Sarbanes-Oxley Act Means for IT Managers,” TechRepublic, (March 19, 2003) (http://techrepublic.com.com/5100-6313-5034345.html). 21
  • 22. Risk Monitoring and Control  Involves executing the risk management process to respond to risk events.  Workarounds are unplanned responses to risk events that must be done when there are no contingency plans.  Main outputs of risk monitoring and control are:  Requested changes.  Recommended corrective and preventive actions.  Updates to the risk register, project management plan, and organizational process assets. 22
  • 23. Using Software to Assist in Project Risk Management  Risk registers can be created in a simple Word or Excel file or as part of a database.  More sophisticated risk management software, such as Monte Carlo simulation tools, help in analyzing project risks.  The PMI Risk Specific Interest Group’s Web site at www.risksig.com has a detailed list of software products to assist in risk management. 23
  • 24. Results of Good Project Risk Management  Unlike crisis management, good project risk management often goes unnoticed.  Well-run projects appear to be almost effortless, but a lot of work goes into running a project well.  Project managers should strive to make their jobs look easy to reflect the results of well-run projects. 24
  • 25. Chapter Summary  Project risk management is the art and science of identifying, analyzing, and responding to risk throughout the life of a project and in the best interests of meeting project objectives.  Main processes include:  Risk management planning  Risk identification  Qualitative risk analysis  Quantitative risk analysis  Risk response planning  Risk monitoring and control 25
  • 26. Table 11-2. Topics Addressed in a Risk Management Plan  Methodology  Roles and responsibilities  Budget and schedule  Risk categories  Risk probability and impact  Risk documentation 26