 In an irrigation project, the network of main
canals, branch canals, distributaries, etc. are
provided.
 These canals may have to cross the natural
drainages like rivers, streams, etc. at different
points within the command area of the project.
11/9/2018
2
 The crossing of the canals with such obstacle
cannot be avoided.
 So, suitable structures must be constructed at
the crossing point for the easy flow of water of
the canal and drainage in the respective
directions.
 These structures are known as cross-drainage
works.
11/9/2018
3
 The water-shed canals do not cross natural
drainage.
 But in actual orientation of the canal network,
this ideal condition may not be available and the
obstacles like natural drainages may be present
across the canal.
11/9/2018
4
 So, for the smooth running of the canal with its
design discharge the cross drainage works are
required.
 The site condition of the crossing point may be
such that without any suitable structure, the
water of the canal and drainage can not be
diverted to their natural directions.
 So, the cross drainage works must be provided
to maintain their natural direction of flow.
11/9/2018
5
Type I (Irrigation canal passes over the
drainage) [HFL < FSL]
(a) Aqueduct
(b) Siphon aqueduct
Type II (Drainage passes over the irrigation
canal)
(a) Super passage
(b) Siphon super passage
11/9/2018
6
Type III (Drainage and canal intersection each
other of the same level) (HFL = FSL)
(a) Level Crossing
(b) Inlet and outlet
11/9/2018
7
 In an aqueduct, the canal bed level is above the
drainage bed level so canal is to be constructed
above drainage.
 A canal trough is to be constructed in which
canal water flows from upstream to downstream.
 This canal trough is to be rested on number of
piers. The drained water flows through these
piers upstream to downstream.
11/9/2018
8
 The aqueduct is just like a bridge where a canal
is taken over the deck supported by piers instead
of a road or railway.
 A free board of about 0.50 m should be provided.
 The height and section of piers are designed
according to the highest flood level
 The piers may be of brick masonry, stone
masonry or reinforced cement concrete.
11/9/2018
9
 The canal water level is referred as full supply
level (FSL) and drainage water level is referred
as high flood level (HFL).
11/9/2018
10
 The siphon aqueduct, the bed of the drainage is
depressed below the bottom level of the canal
trough by providing sloping apron on both sides
of the crossing.
 The section of the drainage below the canal
trough is constructed with cement concrete in the
form of tunnel. This tunnel acts as a siphon.
 Cut off walls are provided on both sides of the
apron to prevent scouring
11/9/2018
11
 The other components like canal trough, piers,
inspection road, etc. should be designed
according to the methods adopted in case of
aqueduct.
 Syphonic aqueducts are more often constructed
and better preferred than simple Aqueduct,
though costlier
11/9/2018
12
11/9/2018
13
 The super passage is just opposite of the
aqueduct. In this case, It carries drainage above
canal as the canal bed level is below drainage
bed level.
 The drainage trough is to be constructed at road
level and drainage water flows through this from
upstream to downstream and the canal water
flows through the piers which are constructed
below this drainage trough as supports.
11/9/2018
14
 The section of the drainage trough depends on
the high flood discharge
 A free board of about 1.5 m should be provided
for safety
 The bed and banks of the canal below the
drainage trough should be protected by boulder
pitching or lining with concrete slabs
11/9/2018
15
11/9/2018
16
 In a siphon super passage, drainage is carried
over canal similar to a super passage but the full
supply level of canal is above than the drainage
trough.
 so the canal water flows under siphonic action
and there is no presence of atmospheric
pressure in canal.
11/9/2018
17
 When compared, super passage is more often
preferred than canal Siphon because in a canal
Siphon, big disadvantage is that the canal water
is under drainage trough so any defective
minerals or sediment deposited cannot be
removed with ease like in the case of a Siphon
Aqueduct
11/9/2018
18
11/9/2018
19
 When the bed level of canal is equal to the
drainage bed level, then level crossing is to be
constructed.
 This consists of following steps:
 Construction of weir to stop drainage water
behind it
 Construction of canal regulator across a canal
 Construction of head regulator across a
Drainage
11/9/2018
20
Crest Wall: It is provided across the
drainage just at the upstream side of the
crossing point. The top level of the crest wall is
kept at the full supply level of the canal
Drainage Regulator: It is provided across
the drainage just at the downstream side of the
crossing point. The regulator consists of
adjustable shutters at different tiers.
Canal Regulator: It is provided across the
canal just at the downstream side of the
crossing point. This regulator also consists of
adjustable shutters at different tiers
11/9/2018
21
11/9/2018
22
 In the crossing of small drainage with small
channel no hydraulic structure is constructed.
Simple openings are provided for the flow of
water in their respective directions. This
arrangement is known as inlet and outlet.
 In this system, an inlet is provided in the channel
bank simply by open cut and the drainage water
is allowed to join the channel.
 At the points of inlet and outlet, the bed and
banks of the drainage are protected by stone
pitching.
11/9/2018
23
11/9/2018
24
 Relative bed levels :
According to the relative bed levels of the canal
and the river or drainage, the type of cross
drainage work are generally selected which has
been discussed earlier. But some problems may
come at the crossing point.
11/9/2018
25
The following points should be remembered
while recommending the type of work:
 The crossing should be at right angle to each
other
 Well defined cross-section of the river or
drainage
 At the crossing point the drainage should be
straight for a considerable length.
 The width of the drainage should be narrow
as far as possible. Considering the above
points The C/s can be shifted to the
downstream or upstream
11/9/2018
26
 Availability of Suitable Foundation:
For the construction of cross drainage works
suitable foundation is required. By boring test, if
suitable foundation is not available, then the type
of cross drainage work should be selected to site
Condition,
 Economic Consideration:
The cost of construction of cross drainage works
should be justified with respect to the project cost
and overall benefits of the project. So, the type of
works should be selected considering the
economical point of view.
11/9/2018
27
 Discharge of the drainage:
Practically the discharge of the drainage is very
uncertain in rainy season. So, the structure should
be carefully selected so that it may not be
destroyed due to unexpected heavy discharge of
the river or drainage.
 Construction of Problems:
Different types of constructional problems may
arise at the site such as sub soil water,
construction materials, communication, availability
of land etc. So the type of works should be
selected according to the site condition.
11/9/2018
28
THANK YOU !!!!
11/9/2018
29

Mais conteúdo relacionado

Mais procurados

Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptxBibhabasu Mohanty
 
WRE II canal structures
WRE II canal structuresWRE II canal structures
WRE II canal structuresMitaliShelke
 
Canal irrigation (Mr. Kiran B. Mane)
Canal irrigation (Mr. Kiran B. Mane)Canal irrigation (Mr. Kiran B. Mane)
Canal irrigation (Mr. Kiran B. Mane)Kiran Mane
 
Canal falls and its classification
Canal falls and its classificationCanal falls and its classification
Canal falls and its classificationGNANA PRAKASH
 
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...Denish Jangid
 
CANAL REGULATIONS
CANAL REGULATIONSCANAL REGULATIONS
CANAL REGULATIONSKarthick MK
 
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Denish Jangid
 
Canal MASONRY WORK
Canal MASONRY WORKCanal MASONRY WORK
Canal MASONRY WORKSAGAR RAUT
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation WorksAbdul Sahid
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation WorksSANJEEV Wazir
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningRamanuj Jaldhari
 
Canal regulation work 1
Canal regulation work 1Canal regulation work 1
Canal regulation work 1manjeet singh
 
design of hydraulic controls and structures
design of hydraulic  controls and structuresdesign of hydraulic  controls and structures
design of hydraulic controls and structuresavirup naskar
 
design of aqueduct
design of aqueductdesign of aqueduct
design of aqueductsanthosh2121
 

Mais procurados (20)

Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Gt ppt
Gt pptGt ppt
Gt ppt
 
Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
 
WRE II canal structures
WRE II canal structuresWRE II canal structures
WRE II canal structures
 
Vertical canal fall
Vertical canal fallVertical canal fall
Vertical canal fall
 
Canal irrigation (Mr. Kiran B. Mane)
Canal irrigation (Mr. Kiran B. Mane)Canal irrigation (Mr. Kiran B. Mane)
Canal irrigation (Mr. Kiran B. Mane)
 
Canal falls and its classification
Canal falls and its classificationCanal falls and its classification
Canal falls and its classification
 
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
 
Canal
CanalCanal
Canal
 
CANAL REGULATIONS
CANAL REGULATIONSCANAL REGULATIONS
CANAL REGULATIONS
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
 
Canal MASONRY WORK
Canal MASONRY WORKCanal MASONRY WORK
Canal MASONRY WORK
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal Lining
 
Canal regulation work 1
Canal regulation work 1Canal regulation work 1
Canal regulation work 1
 
design of hydraulic controls and structures
design of hydraulic  controls and structuresdesign of hydraulic  controls and structures
design of hydraulic controls and structures
 
design of aqueduct
design of aqueductdesign of aqueduct
design of aqueduct
 
Canals
CanalsCanals
Canals
 

Semelhante a WHAT IS CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC DESIGN ASPECTS

Canal Regulation & Canal Types
Canal Regulation & Canal TypesCanal Regulation & Canal Types
Canal Regulation & Canal TypesAbbasZafar3
 
presentation of industrial training irrigation (2).pptx
presentation of industrial training irrigation (2).pptxpresentation of industrial training irrigation (2).pptx
presentation of industrial training irrigation (2).pptxMaloth3
 
CIV_604_IHS-6th_CIVIL-Chapter-3_Notes.pdf
CIV_604_IHS-6th_CIVIL-Chapter-3_Notes.pdfCIV_604_IHS-6th_CIVIL-Chapter-3_Notes.pdf
CIV_604_IHS-6th_CIVIL-Chapter-3_Notes.pdfRamenRoyAEKHSD2PWRD
 
Diversion head work
Diversion head workDiversion head work
Diversion head workdhruvalsu
 
08. Classification of Canals.pdf
08. Classification of Canals.pdf08. Classification of Canals.pdf
08. Classification of Canals.pdfMuhammadAjmal326519
 
intakes and transportation of water
intakes and transportation of waterintakes and transportation of water
intakes and transportation of wateratul azad
 
hydraulic structures in civil engineering
hydraulic structures in civil engineeringhydraulic structures in civil engineering
hydraulic structures in civil engineeringBittuRajkumar
 
Hydraulic structures pdf
Hydraulic structures pdfHydraulic structures pdf
Hydraulic structures pdfSaqib Imran
 
Regulating structure for canal flow
Regulating structure for canal flowRegulating structure for canal flow
Regulating structure for canal flowCivil engeeneer
 
Railway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdfRailway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdfSwapnilGorade1
 

Semelhante a WHAT IS CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC DESIGN ASPECTS (20)

06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf
 
Chapter 9
Chapter 9Chapter 9
Chapter 9
 
Canal Regulation & Canal Types
Canal Regulation & Canal TypesCanal Regulation & Canal Types
Canal Regulation & Canal Types
 
presentation of industrial training irrigation (2).pptx
presentation of industrial training irrigation (2).pptxpresentation of industrial training irrigation (2).pptx
presentation of industrial training irrigation (2).pptx
 
CIV_604_IHS-6th_CIVIL-Chapter-3_Notes.pdf
CIV_604_IHS-6th_CIVIL-Chapter-3_Notes.pdfCIV_604_IHS-6th_CIVIL-Chapter-3_Notes.pdf
CIV_604_IHS-6th_CIVIL-Chapter-3_Notes.pdf
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
Cross drainage work.pptx
Cross drainage work.pptxCross drainage work.pptx
Cross drainage work.pptx
 
Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
 
14. Cross Drainage Works.pdf
14. Cross Drainage Works.pdf14. Cross Drainage Works.pdf
14. Cross Drainage Works.pdf
 
Lecture 8
Lecture 8Lecture 8
Lecture 8
 
08. Classification of Canals.pdf
08. Classification of Canals.pdf08. Classification of Canals.pdf
08. Classification of Canals.pdf
 
intakes and transportation of water
intakes and transportation of waterintakes and transportation of water
intakes and transportation of water
 
hydraulic structures in civil engineering
hydraulic structures in civil engineeringhydraulic structures in civil engineering
hydraulic structures in civil engineering
 
Canal structures
Canal structuresCanal structures
Canal structures
 
Canal structures
Canal structuresCanal structures
Canal structures
 
Hydraulic structures pdf
Hydraulic structures pdfHydraulic structures pdf
Hydraulic structures pdf
 
Canals
Canals Canals
Canals
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Regulating structure for canal flow
Regulating structure for canal flowRegulating structure for canal flow
Regulating structure for canal flow
 
Railway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdfRailway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdf
 

Último

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 

Último (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 

WHAT IS CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC DESIGN ASPECTS

  • 1. DONE BY, SUFIYAN AHMED JEDDY 150011601105 CIVIL-C 11/9/2018 1
  • 2.  In an irrigation project, the network of main canals, branch canals, distributaries, etc. are provided.  These canals may have to cross the natural drainages like rivers, streams, etc. at different points within the command area of the project. 11/9/2018 2
  • 3.  The crossing of the canals with such obstacle cannot be avoided.  So, suitable structures must be constructed at the crossing point for the easy flow of water of the canal and drainage in the respective directions.  These structures are known as cross-drainage works. 11/9/2018 3
  • 4.  The water-shed canals do not cross natural drainage.  But in actual orientation of the canal network, this ideal condition may not be available and the obstacles like natural drainages may be present across the canal. 11/9/2018 4
  • 5.  So, for the smooth running of the canal with its design discharge the cross drainage works are required.  The site condition of the crossing point may be such that without any suitable structure, the water of the canal and drainage can not be diverted to their natural directions.  So, the cross drainage works must be provided to maintain their natural direction of flow. 11/9/2018 5
  • 6. Type I (Irrigation canal passes over the drainage) [HFL < FSL] (a) Aqueduct (b) Siphon aqueduct Type II (Drainage passes over the irrigation canal) (a) Super passage (b) Siphon super passage 11/9/2018 6
  • 7. Type III (Drainage and canal intersection each other of the same level) (HFL = FSL) (a) Level Crossing (b) Inlet and outlet 11/9/2018 7
  • 8.  In an aqueduct, the canal bed level is above the drainage bed level so canal is to be constructed above drainage.  A canal trough is to be constructed in which canal water flows from upstream to downstream.  This canal trough is to be rested on number of piers. The drained water flows through these piers upstream to downstream. 11/9/2018 8
  • 9.  The aqueduct is just like a bridge where a canal is taken over the deck supported by piers instead of a road or railway.  A free board of about 0.50 m should be provided.  The height and section of piers are designed according to the highest flood level  The piers may be of brick masonry, stone masonry or reinforced cement concrete. 11/9/2018 9
  • 10.  The canal water level is referred as full supply level (FSL) and drainage water level is referred as high flood level (HFL). 11/9/2018 10
  • 11.  The siphon aqueduct, the bed of the drainage is depressed below the bottom level of the canal trough by providing sloping apron on both sides of the crossing.  The section of the drainage below the canal trough is constructed with cement concrete in the form of tunnel. This tunnel acts as a siphon.  Cut off walls are provided on both sides of the apron to prevent scouring 11/9/2018 11
  • 12.  The other components like canal trough, piers, inspection road, etc. should be designed according to the methods adopted in case of aqueduct.  Syphonic aqueducts are more often constructed and better preferred than simple Aqueduct, though costlier 11/9/2018 12
  • 14.  The super passage is just opposite of the aqueduct. In this case, It carries drainage above canal as the canal bed level is below drainage bed level.  The drainage trough is to be constructed at road level and drainage water flows through this from upstream to downstream and the canal water flows through the piers which are constructed below this drainage trough as supports. 11/9/2018 14
  • 15.  The section of the drainage trough depends on the high flood discharge  A free board of about 1.5 m should be provided for safety  The bed and banks of the canal below the drainage trough should be protected by boulder pitching or lining with concrete slabs 11/9/2018 15
  • 17.  In a siphon super passage, drainage is carried over canal similar to a super passage but the full supply level of canal is above than the drainage trough.  so the canal water flows under siphonic action and there is no presence of atmospheric pressure in canal. 11/9/2018 17
  • 18.  When compared, super passage is more often preferred than canal Siphon because in a canal Siphon, big disadvantage is that the canal water is under drainage trough so any defective minerals or sediment deposited cannot be removed with ease like in the case of a Siphon Aqueduct 11/9/2018 18
  • 20.  When the bed level of canal is equal to the drainage bed level, then level crossing is to be constructed.  This consists of following steps:  Construction of weir to stop drainage water behind it  Construction of canal regulator across a canal  Construction of head regulator across a Drainage 11/9/2018 20
  • 21. Crest Wall: It is provided across the drainage just at the upstream side of the crossing point. The top level of the crest wall is kept at the full supply level of the canal Drainage Regulator: It is provided across the drainage just at the downstream side of the crossing point. The regulator consists of adjustable shutters at different tiers. Canal Regulator: It is provided across the canal just at the downstream side of the crossing point. This regulator also consists of adjustable shutters at different tiers 11/9/2018 21
  • 23.  In the crossing of small drainage with small channel no hydraulic structure is constructed. Simple openings are provided for the flow of water in their respective directions. This arrangement is known as inlet and outlet.  In this system, an inlet is provided in the channel bank simply by open cut and the drainage water is allowed to join the channel.  At the points of inlet and outlet, the bed and banks of the drainage are protected by stone pitching. 11/9/2018 23
  • 25.  Relative bed levels : According to the relative bed levels of the canal and the river or drainage, the type of cross drainage work are generally selected which has been discussed earlier. But some problems may come at the crossing point. 11/9/2018 25
  • 26. The following points should be remembered while recommending the type of work:  The crossing should be at right angle to each other  Well defined cross-section of the river or drainage  At the crossing point the drainage should be straight for a considerable length.  The width of the drainage should be narrow as far as possible. Considering the above points The C/s can be shifted to the downstream or upstream 11/9/2018 26
  • 27.  Availability of Suitable Foundation: For the construction of cross drainage works suitable foundation is required. By boring test, if suitable foundation is not available, then the type of cross drainage work should be selected to site Condition,  Economic Consideration: The cost of construction of cross drainage works should be justified with respect to the project cost and overall benefits of the project. So, the type of works should be selected considering the economical point of view. 11/9/2018 27
  • 28.  Discharge of the drainage: Practically the discharge of the drainage is very uncertain in rainy season. So, the structure should be carefully selected so that it may not be destroyed due to unexpected heavy discharge of the river or drainage.  Construction of Problems: Different types of constructional problems may arise at the site such as sub soil water, construction materials, communication, availability of land etc. So the type of works should be selected according to the site condition. 11/9/2018 28