SlideShare uma empresa Scribd logo
1 de 3
11/10/05
CLYDE STEWART 1817 Paris Dr. Godfrey, IL 62035 (618)910-9270
Geometric Americas, Rochester Hills, MI 2007 -Present
EXPERIENCE: Senior Projectl Engineer
John Deere Davenport
 Developed MMP to assemble front loaders on 2 autonomous lines. Formulated
a continuous flow strategy that includes feeder cells, sub assembly cells,
kitting, sequencing and small lot. Developed and implemented lean
manufacturing plan and line design for 2 Forestry products. 7 years on site.
Case New Holland. (CNH)
 Implemented WCM and Kanban for the transmission assembly line. Developed
and implemented data storage for WCM and Kanban in Microsoft Access with
visual basic modules. Develop JIT and JIS flow racks and carts to support lean
manufacturing. Reduced line side inventory by 60 percent. Developed plant
layouts and special carts that reduced floor space by 50 percent.
Consolidated Diesel Corp. (CDC)
 Developed and implemented material flow processes and line side station
layouts.Develop a material master database (PFEP) in Microsoft Access to
support the 750 engines-a-day project. Analyze and document processes and
procedures required to support e-kanban and ERP.
Design Systems Inc., Farmington Hills, MI 2000 - 2007
SeniorProject Egineer
Anniston Army Depot (ANAD)
 Analyzed the flow of parts and components used in the assembly and
disassembly of the V12, Detroit Diesel V6 and V8, Cummins V8 and the APU
engines.Used this data to develop MOST standards for the assembly and
disassembly operations.Developed the line balance and sequence operations
for the Detroit Diesel V6, Cummins V8 and APU engines based on TAKT
time analysis.
AM General
 Responsible for developing and implementing a Storage Analysis Tool for
sizing and slotting the materials stored in the backup warehouse for the
Hummer Plant at Mishawaka, IN. Determine the types and number of storage
racks needed, the sequencing ofparts in the racks, and the level of inventory
needed to sustain 55 units per day production rate.
United States Postal Service
 Responsible for tracking and auditing Equipment Enhancement Program and
Gravity Take-ups installations at the Minneapolis and St. Louis Bulk Mail
Centers. Resolve installation issues,document engineering changes,and write
RFIs for additions/deletions to projects. Completed the Equipment
Enhancement Program and Gravity Take-up Upgrade projects at the Kansas
City Bulk Mail Center in June 2004. Member of team that reviewed labor
costs,and made recommendations for improving labor efficiencies at the
Kansas City BMC. This was a pilot program for the USPS. Member of a team
that evaluated Powered Industrial Vehicles at the Los Angeles Processing and
Distribution Center.
Navistar
 Responsible for setting up a Kanban systemfor the International Truck
Assembly Plant located in Garland, TX. Set up ship-to-sequence programfor
sub-contractors,designed and printed bar code labels for plant, and installed
line pull stations for all assembly departments. Documented and wrote
procedures for each phase of the project.
United States Postal Service
 Proposed solutions and estimated costs forthe Equipment Enhancement
Program at the Dallas and Philadelphia Bulk Mail Centers. Completed the
fork truck flow/emergency egress/aisle striping project at the Dallas Bulk Mail
Center, and assisted on the same project at the Detroit and St. Louis Bulk Mail
Centers. Worked on the SOW II Equipment Enhancement Program at the St.
Louis Bulk Mail Center and assisted with the same project at the New Jersey,
Minneapolis and Los Angeles BMCs.
CLYDE STEWART Page 2 of 3
Sigma Chemical Company, St. Louis, MO 1990 - 2000
Distribution Project Manager
 Responsible for implementing material handling systems and process
improvements at three distribution sites. Designed, obtained approval, and
implemented two vertical carousels in a freezer environment. The project
required retrofitting the freezer and was completed within schedule and
budget. Implemented Crown order pickers at the back-up warehouse that
improved pick times from ten lines per hour to twenty-five lines per hour.
Developed a strategic plan for the distribution centerto implement automated
carousels,conveyors and systems to replace manual process. Formulated and
submitted a $6,000,000 budget to upper management to accomplish project.
Distribution Manager
 Responsible for managing operations at the back-up warehouse. Products
stored within ambient, cooler and freezer environments. Prepared the back-up
warehouse for the implementation of SAP. Developed audit procedures for
prime inventory prior to SAP changeover.
Shipping Project Manager
 Responsible for formulating models to manage stock levels in prime locations.
Designed layouts for new automated distribution center and lab equipment
service center. Redistributed the stockin prime after developing an
ABC/slotting program in Microsoft Access. Developed simulation models for
picking and packing operations. Models used to project manpower
deployment schedules for processing four thousand customerorders per day.
Shipping Manager
 Responsible for managing ninety-eight shipping personnel allocated over two
shifts. Coordinated activities of domestic shipping operations to provide same
day service for four thousand customerorders. Implemented a “focused”
distribution process that improved order processing by 15%.
McDonnell Douglas, St. Louis, MO 1981 - 1990
Managerof Material Operations
 Distribution, Production and Engineering responsibilities including: Material
Handling Methods (supervised five Industrial Engineers); Transportation
(responsible for directing and coordinating the activities of the internal fleet
operations consisting of 86 drivers and 125 vehicles. Reduced the number of
grievances from 400 to 200 in one year; Superintendent of Central Stores
(responsible for 15 storeroom operations in St. Louis); General Foreman
(Responsible for 65 operators in the Shears and Saws Department. Reduced the
backlog of orders from 3000 to 400 in ninety days); Supervisor of Packaging
Engineering (supervised five packaging engineers).
Boise Cascade, St. Louis, MO 1975 - 1981
Administrative Manager
 Management and Accounting responsibilities including: Administration
Manager (responsible for capital and operating budgets,plant accounting,and
inventory control. Reduced spare parts inventory from $2,000,000 to
$500,000 in two and one half years); Stores Manager (responsible for
managing a three shift central stores operation that stocked spare parts for
twenty-one plants. Corrected twenty-three deficiencies identified in a
corporate audit in one year); Administrative Assistant (responsible for assisting
21 plants in implementing process improvements. Implemented a production
plan for the largest plant that eliminated a leased warehouse and save $65,000
per year. Standardized paper roll stock sizes that saved $58,000 per year.
CLYDE STEWART Page 3 of 3
Moog Automotive, St. Louis, MO 1971 – 1975‘
Material Handling Engineer
 Material Handling and Packaging Engineering projects for production and
distribution improvements. Worked with IBM to implement production
processes and procedures for MRP installation and start up.
Laclede Steel, Alton, IL 1967 – 1971
Industrial Engineer
 Time Study and Industrial Engineering duties for steelmill processes.Project
Engineer for the fabrication and assembly of joists used in the construction of
the World Trade Center (NYPA) in New York City.
EDUCATION: Southern Illinois University, Edwardsville, IL Date
MBA- Production/Operation Management Specialization
B.S./B.A. – MIS Specialization
A.A.- Industrial Management
20 Hours of post MBA courses in Advanced Manufacturing Systems
West Point Appointee
25 Work-related training courses and seminars in problem solving,management
skillsand process improvement (Demming and Juran Certificates)
MOST trained
MTM-C certified.
Modaptscertified
1977
1971
1969
1980
1964

Mais conteúdo relacionado

Mais procurados

Resume Earl Willis
Resume Earl WillisResume Earl Willis
Resume Earl WillisEarl Willis
 
general tyres production planning and controlling
general tyres production planning and controllinggeneral tyres production planning and controlling
general tyres production planning and controllingTanveer Ashraf
 
LuceyResume0515
LuceyResume0515LuceyResume0515
LuceyResume0515Dan Lucey
 

Mais procurados (6)

Resume Earl Willis
Resume Earl WillisResume Earl Willis
Resume Earl Willis
 
general tyres production planning and controlling
general tyres production planning and controllinggeneral tyres production planning and controlling
general tyres production planning and controlling
 
Lorraine Centeno 04192015
Lorraine Centeno 04192015Lorraine Centeno 04192015
Lorraine Centeno 04192015
 
Resume Wildenhaus
Resume WildenhausResume Wildenhaus
Resume Wildenhaus
 
LuceyResume0515
LuceyResume0515LuceyResume0515
LuceyResume0515
 
Last 7 years experience
Last 7 years experienceLast 7 years experience
Last 7 years experience
 

Destaque

Programa del 15 de agosto de EXPO 92
Programa del 15 de agosto de EXPO 92Programa del 15 de agosto de EXPO 92
Programa del 15 de agosto de EXPO 92Albero Belmonte
 
대전건마 인천건마 《분당오피》 선릉역건마
대전건마 인천건마 《분당오피》 선릉역건마대전건마 인천건마 《분당오피》 선릉역건마
대전건마 인천건마 《분당오피》 선릉역건마sfalzgyc5
 
강남건마 강남건마 《평촌오피》 강남역건마
강남건마 강남건마 《평촌오피》 강남역건마강남건마 강남건마 《평촌오피》 강남역건마
강남건마 강남건마 《평촌오피》 강남역건마sfalzgyc5
 
대전건마 평촌건마 《부천오피》 역삼역건마
대전건마 평촌건마 《부천오피》 역삼역건마대전건마 평촌건마 《부천오피》 역삼역건마
대전건마 평촌건마 《부천오피》 역삼역건마sfalzgyc5
 
청주건마 부천건마 《공덕오피》 동탄건마
청주건마 부천건마 《공덕오피》 동탄건마청주건마 부천건마 《공덕오피》 동탄건마
청주건마 부천건마 《공덕오피》 동탄건마sfalzgyc3
 
Marmolejo Verduzco y Hernandez Medina
Marmolejo Verduzco y Hernandez Medina Marmolejo Verduzco y Hernandez Medina
Marmolejo Verduzco y Hernandez Medina MARVERWORLD
 
Matemática a – 10º, 11º e 12º
Matemática a – 10º, 11º e 12ºMatemática a – 10º, 11º e 12º
Matemática a – 10º, 11º e 12ºgg1995
 
평촌건마 야탑건마 《안산오피》 부평건마
평촌건마 야탑건마 《안산오피》 부평건마평촌건마 야탑건마 《안산오피》 부평건마
평촌건마 야탑건마 《안산오피》 부평건마sfalzgyc1
 
Mapa curricular-informática
Mapa curricular-informáticaMapa curricular-informática
Mapa curricular-informáticaladygaga10
 
부평건마 영통건마 《역삼오피》 역삼역건마
부평건마 영통건마 《역삼오피》 역삼역건마부평건마 영통건마 《역삼오피》 역삼역건마
부평건마 영통건마 《역삼오피》 역삼역건마sfalzgyc4
 
Contents page layout
Contents page layoutContents page layout
Contents page layoutaamina24
 
Programa del 9 de junio de EXPO 92
Programa del 9 de junio de EXPO 92Programa del 9 de junio de EXPO 92
Programa del 9 de junio de EXPO 92Albero Belmonte
 
Programa del 3 de septiembre de EXPO 92
Programa del 3 de septiembre de EXPO 92Programa del 3 de septiembre de EXPO 92
Programa del 3 de septiembre de EXPO 92Albero Belmonte
 
Programa del 22 de julio de EXPO 92
Programa del 22 de julio de EXPO 92Programa del 22 de julio de EXPO 92
Programa del 22 de julio de EXPO 92Albero Belmonte
 
Introduction to logistics management
Introduction to logistics managementIntroduction to logistics management
Introduction to logistics managementHirfan Ullah
 
Disability for Lupus Seminar Sharon Christie
Disability for Lupus Seminar Sharon ChristieDisability for Lupus Seminar Sharon Christie
Disability for Lupus Seminar Sharon Christielupusdmv
 

Destaque (19)

Programa del 15 de agosto de EXPO 92
Programa del 15 de agosto de EXPO 92Programa del 15 de agosto de EXPO 92
Programa del 15 de agosto de EXPO 92
 
Long tail
Long tailLong tail
Long tail
 
대전건마 인천건마 《분당오피》 선릉역건마
대전건마 인천건마 《분당오피》 선릉역건마대전건마 인천건마 《분당오피》 선릉역건마
대전건마 인천건마 《분당오피》 선릉역건마
 
강남건마 강남건마 《평촌오피》 강남역건마
강남건마 강남건마 《평촌오피》 강남역건마강남건마 강남건마 《평촌오피》 강남역건마
강남건마 강남건마 《평촌오피》 강남역건마
 
대전건마 평촌건마 《부천오피》 역삼역건마
대전건마 평촌건마 《부천오피》 역삼역건마대전건마 평촌건마 《부천오피》 역삼역건마
대전건마 평촌건마 《부천오피》 역삼역건마
 
청주건마 부천건마 《공덕오피》 동탄건마
청주건마 부천건마 《공덕오피》 동탄건마청주건마 부천건마 《공덕오피》 동탄건마
청주건마 부천건마 《공덕오피》 동탄건마
 
Marmolejo Verduzco y Hernandez Medina
Marmolejo Verduzco y Hernandez Medina Marmolejo Verduzco y Hernandez Medina
Marmolejo Verduzco y Hernandez Medina
 
Matemática a – 10º, 11º e 12º
Matemática a – 10º, 11º e 12ºMatemática a – 10º, 11º e 12º
Matemática a – 10º, 11º e 12º
 
평촌건마 야탑건마 《안산오피》 부평건마
평촌건마 야탑건마 《안산오피》 부평건마평촌건마 야탑건마 《안산오피》 부평건마
평촌건마 야탑건마 《안산오피》 부평건마
 
Portada
PortadaPortada
Portada
 
Misión
MisiónMisión
Misión
 
Mapa curricular-informática
Mapa curricular-informáticaMapa curricular-informática
Mapa curricular-informática
 
부평건마 영통건마 《역삼오피》 역삼역건마
부평건마 영통건마 《역삼오피》 역삼역건마부평건마 영통건마 《역삼오피》 역삼역건마
부평건마 영통건마 《역삼오피》 역삼역건마
 
Contents page layout
Contents page layoutContents page layout
Contents page layout
 
Programa del 9 de junio de EXPO 92
Programa del 9 de junio de EXPO 92Programa del 9 de junio de EXPO 92
Programa del 9 de junio de EXPO 92
 
Programa del 3 de septiembre de EXPO 92
Programa del 3 de septiembre de EXPO 92Programa del 3 de septiembre de EXPO 92
Programa del 3 de septiembre de EXPO 92
 
Programa del 22 de julio de EXPO 92
Programa del 22 de julio de EXPO 92Programa del 22 de julio de EXPO 92
Programa del 22 de julio de EXPO 92
 
Introduction to logistics management
Introduction to logistics managementIntroduction to logistics management
Introduction to logistics management
 
Disability for Lupus Seminar Sharon Christie
Disability for Lupus Seminar Sharon ChristieDisability for Lupus Seminar Sharon Christie
Disability for Lupus Seminar Sharon Christie
 

Semelhante a Stewartclyde4

Yamin_Said_Resume-Consultant
Yamin_Said_Resume-ConsultantYamin_Said_Resume-Consultant
Yamin_Said_Resume-ConsultantSaid yamin
 
KachurResume 11-13-14
KachurResume 11-13-14KachurResume 11-13-14
KachurResume 11-13-14Bob Kachur
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011tbshaver
 
John A McVicker resume June 22, 2016
John A McVicker resume June 22, 2016John A McVicker resume June 22, 2016
John A McVicker resume June 22, 2016John A McVicker
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2Sean Hedden
 
Jeff Holly Resume 2015
Jeff Holly Resume 2015Jeff Holly Resume 2015
Jeff Holly Resume 2015Jeff Holly
 
Sargent, Darron Resume
Sargent, Darron ResumeSargent, Darron Resume
Sargent, Darron Resumedlssargent
 
Supply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSupply Chain Analytics with Simulation
Supply Chain Analytics with SimulationProModel Corporation
 
Supply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSupply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSteve Haekler
 
Resume for Steven Newman - Supply Chain Professional
Resume for Steven Newman - Supply Chain ProfessionalResume for Steven Newman - Supply Chain Professional
Resume for Steven Newman - Supply Chain ProfessionalSteve Newman
 
Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016Jim Jankovic
 
Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016Jim Jankovic
 
Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016Jim Jankovic
 
Tom Kelly Resume
Tom Kelly ResumeTom Kelly Resume
Tom Kelly ResumeTom Kelly
 

Semelhante a Stewartclyde4 (20)

Michael Salvatore Valentino CPIM resume 2012
Michael Salvatore Valentino CPIM resume 2012Michael Salvatore Valentino CPIM resume 2012
Michael Salvatore Valentino CPIM resume 2012
 
Yamin_Said_Resume-Consultant
Yamin_Said_Resume-ConsultantYamin_Said_Resume-Consultant
Yamin_Said_Resume-Consultant
 
KachurResume 11-13-14
KachurResume 11-13-14KachurResume 11-13-14
KachurResume 11-13-14
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011
 
John A McVicker resume June 22, 2016
John A McVicker resume June 22, 2016John A McVicker resume June 22, 2016
John A McVicker resume June 22, 2016
 
HeenanResume2016 R1
HeenanResume2016 R1HeenanResume2016 R1
HeenanResume2016 R1
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
 
Jeff Holly Resume 2015
Jeff Holly Resume 2015Jeff Holly Resume 2015
Jeff Holly Resume 2015
 
Tom resume 2016
Tom resume 2016Tom resume 2016
Tom resume 2016
 
Tom resume 2016
Tom resume 2016Tom resume 2016
Tom resume 2016
 
Sargent, Darron Resume
Sargent, Darron ResumeSargent, Darron Resume
Sargent, Darron Resume
 
dapski042116
dapski042116dapski042116
dapski042116
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
Supply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSupply Chain Analytics with Simulation
Supply Chain Analytics with Simulation
 
Supply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSupply Chain Analytics with Simulation
Supply Chain Analytics with Simulation
 
Resume for Steven Newman - Supply Chain Professional
Resume for Steven Newman - Supply Chain ProfessionalResume for Steven Newman - Supply Chain Professional
Resume for Steven Newman - Supply Chain Professional
 
Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016
 
Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016
 
Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016Jankovic jim _resume-7-2016
Jankovic jim _resume-7-2016
 
Tom Kelly Resume
Tom Kelly ResumeTom Kelly Resume
Tom Kelly Resume
 

Stewartclyde4

  • 1. 11/10/05 CLYDE STEWART 1817 Paris Dr. Godfrey, IL 62035 (618)910-9270 Geometric Americas, Rochester Hills, MI 2007 -Present EXPERIENCE: Senior Projectl Engineer John Deere Davenport  Developed MMP to assemble front loaders on 2 autonomous lines. Formulated a continuous flow strategy that includes feeder cells, sub assembly cells, kitting, sequencing and small lot. Developed and implemented lean manufacturing plan and line design for 2 Forestry products. 7 years on site. Case New Holland. (CNH)  Implemented WCM and Kanban for the transmission assembly line. Developed and implemented data storage for WCM and Kanban in Microsoft Access with visual basic modules. Develop JIT and JIS flow racks and carts to support lean manufacturing. Reduced line side inventory by 60 percent. Developed plant layouts and special carts that reduced floor space by 50 percent. Consolidated Diesel Corp. (CDC)  Developed and implemented material flow processes and line side station layouts.Develop a material master database (PFEP) in Microsoft Access to support the 750 engines-a-day project. Analyze and document processes and procedures required to support e-kanban and ERP. Design Systems Inc., Farmington Hills, MI 2000 - 2007 SeniorProject Egineer Anniston Army Depot (ANAD)  Analyzed the flow of parts and components used in the assembly and disassembly of the V12, Detroit Diesel V6 and V8, Cummins V8 and the APU engines.Used this data to develop MOST standards for the assembly and disassembly operations.Developed the line balance and sequence operations for the Detroit Diesel V6, Cummins V8 and APU engines based on TAKT time analysis. AM General  Responsible for developing and implementing a Storage Analysis Tool for sizing and slotting the materials stored in the backup warehouse for the Hummer Plant at Mishawaka, IN. Determine the types and number of storage racks needed, the sequencing ofparts in the racks, and the level of inventory needed to sustain 55 units per day production rate. United States Postal Service  Responsible for tracking and auditing Equipment Enhancement Program and Gravity Take-ups installations at the Minneapolis and St. Louis Bulk Mail Centers. Resolve installation issues,document engineering changes,and write RFIs for additions/deletions to projects. Completed the Equipment Enhancement Program and Gravity Take-up Upgrade projects at the Kansas City Bulk Mail Center in June 2004. Member of team that reviewed labor costs,and made recommendations for improving labor efficiencies at the Kansas City BMC. This was a pilot program for the USPS. Member of a team that evaluated Powered Industrial Vehicles at the Los Angeles Processing and Distribution Center. Navistar  Responsible for setting up a Kanban systemfor the International Truck Assembly Plant located in Garland, TX. Set up ship-to-sequence programfor sub-contractors,designed and printed bar code labels for plant, and installed line pull stations for all assembly departments. Documented and wrote procedures for each phase of the project. United States Postal Service  Proposed solutions and estimated costs forthe Equipment Enhancement Program at the Dallas and Philadelphia Bulk Mail Centers. Completed the fork truck flow/emergency egress/aisle striping project at the Dallas Bulk Mail Center, and assisted on the same project at the Detroit and St. Louis Bulk Mail Centers. Worked on the SOW II Equipment Enhancement Program at the St. Louis Bulk Mail Center and assisted with the same project at the New Jersey, Minneapolis and Los Angeles BMCs.
  • 2. CLYDE STEWART Page 2 of 3 Sigma Chemical Company, St. Louis, MO 1990 - 2000 Distribution Project Manager  Responsible for implementing material handling systems and process improvements at three distribution sites. Designed, obtained approval, and implemented two vertical carousels in a freezer environment. The project required retrofitting the freezer and was completed within schedule and budget. Implemented Crown order pickers at the back-up warehouse that improved pick times from ten lines per hour to twenty-five lines per hour. Developed a strategic plan for the distribution centerto implement automated carousels,conveyors and systems to replace manual process. Formulated and submitted a $6,000,000 budget to upper management to accomplish project. Distribution Manager  Responsible for managing operations at the back-up warehouse. Products stored within ambient, cooler and freezer environments. Prepared the back-up warehouse for the implementation of SAP. Developed audit procedures for prime inventory prior to SAP changeover. Shipping Project Manager  Responsible for formulating models to manage stock levels in prime locations. Designed layouts for new automated distribution center and lab equipment service center. Redistributed the stockin prime after developing an ABC/slotting program in Microsoft Access. Developed simulation models for picking and packing operations. Models used to project manpower deployment schedules for processing four thousand customerorders per day. Shipping Manager  Responsible for managing ninety-eight shipping personnel allocated over two shifts. Coordinated activities of domestic shipping operations to provide same day service for four thousand customerorders. Implemented a “focused” distribution process that improved order processing by 15%. McDonnell Douglas, St. Louis, MO 1981 - 1990 Managerof Material Operations  Distribution, Production and Engineering responsibilities including: Material Handling Methods (supervised five Industrial Engineers); Transportation (responsible for directing and coordinating the activities of the internal fleet operations consisting of 86 drivers and 125 vehicles. Reduced the number of grievances from 400 to 200 in one year; Superintendent of Central Stores (responsible for 15 storeroom operations in St. Louis); General Foreman (Responsible for 65 operators in the Shears and Saws Department. Reduced the backlog of orders from 3000 to 400 in ninety days); Supervisor of Packaging Engineering (supervised five packaging engineers). Boise Cascade, St. Louis, MO 1975 - 1981 Administrative Manager  Management and Accounting responsibilities including: Administration Manager (responsible for capital and operating budgets,plant accounting,and inventory control. Reduced spare parts inventory from $2,000,000 to $500,000 in two and one half years); Stores Manager (responsible for managing a three shift central stores operation that stocked spare parts for twenty-one plants. Corrected twenty-three deficiencies identified in a corporate audit in one year); Administrative Assistant (responsible for assisting 21 plants in implementing process improvements. Implemented a production plan for the largest plant that eliminated a leased warehouse and save $65,000 per year. Standardized paper roll stock sizes that saved $58,000 per year.
  • 3. CLYDE STEWART Page 3 of 3 Moog Automotive, St. Louis, MO 1971 – 1975‘ Material Handling Engineer  Material Handling and Packaging Engineering projects for production and distribution improvements. Worked with IBM to implement production processes and procedures for MRP installation and start up. Laclede Steel, Alton, IL 1967 – 1971 Industrial Engineer  Time Study and Industrial Engineering duties for steelmill processes.Project Engineer for the fabrication and assembly of joists used in the construction of the World Trade Center (NYPA) in New York City. EDUCATION: Southern Illinois University, Edwardsville, IL Date MBA- Production/Operation Management Specialization B.S./B.A. – MIS Specialization A.A.- Industrial Management 20 Hours of post MBA courses in Advanced Manufacturing Systems West Point Appointee 25 Work-related training courses and seminars in problem solving,management skillsand process improvement (Demming and Juran Certificates) MOST trained MTM-C certified. Modaptscertified 1977 1971 1969 1980 1964