SlideShare uma empresa Scribd logo
1 de 3
STEVE MAJORS
3471 West 101st
Place Home Phone: (303) 460-1927
Westminster, Colorado 80031 E-mail stevemajors@yahoo.com
SENIOR MANUFACTURING ENGINEER
Experienced in process/product design, plant layout, product and cost management, labor standards
development and methods analysis. Proven ability to improve efficiencies, yields and reduce costs.
Proficient in transferring and supporting product/manufacturing at offshore manufacturing locations.
EMPLOYMENT HISTORY
Spectralink Incorporated, Boulder, Colorado 2013 - Present
Manager, Manufacturing and Test Engineering – Enterprise Wireless Phones
• Provided leadership of the operations group professional staff consisting of Document control,
Project Management, Manufacturing Engineering and Test Engineering.
• Monitored the team’s support of day-to-day production through process monitoring, requesting
follow up and troubleshooting for production issues at three contract manufacturing sites located in
China, Thailand, and US.
• Identified, planned and implemented manufacturing projects according to return on investment,
focusing on elements contributing to yield loss and reducing scrap costs.
• Assured that all production and test processes were robust and are fully documented.
Sr. Manufacturing Engineer 2010 - 2012
• Determined root cause of quality problems and drove design and process improvements to enhance
existing product performance and quality.
• Coordinated quality improvements with suppliers based on internal quality inspection requirements.
• Developed and documented assembly processes for production of products built at offshore contract
manufacturing locations and trained contract manufacturers on processes and procedures.
• Created, reviewed and approved Bills of Materials using Agile document control.
JDS Uniphase / Picolight Incorporated, Louisville, Colorado 2000 – 2009
Sr Manufacturing Engineer – Optical/Electronic Components
• Technical lead for support of offshore contract manufacturing of high volume (100K/month)
optical/electrical components, providing guidance for manufacturing and quality issues.
• Responsible for in-house manufacturing and test of prototype optical components for customer
samples and engineering development
• Supported Product Management for introduction of new designs to meet customer requests,
developing Bills of Materials and test requirements.
Sr. Manufacturing Engineer – Optical Transceivers
• Reviewed device test performance and failure analysis data for process improvements within JDSU
and contract manufacturers and recommended corrective actions.
• Responsible for quick-turn sample and prototype transceivers to meet on time delivery requirements
to customers.
• Created and reviewed Bill of Materials, in Agile and Matrix, for accuracy to ensure components meet
performance requirements.
Artesyn Technologies, Broomfield, Colorado
Sr. Manufacturing Engineer – Power supplies 1995 – 2000
• Set up wave solder process, utilizing designed experiments (DOE) to optimize parameter settings,
creating one profile reducing changeover times.
• Trained production personnel on PCBA inspection requirements based on IPC-610 class 2
requirements.
• Developed plant layout, incorporating lean manufacturing concepts, to reduce work in process and
improve product quality.
• Co-developed LabView based vision system for inspection of hand soldered assemblies to ensure
100% soldered leads.
Kimball Electronics, Jasper, Indiana
Manufacturing/Process Engineer – Network card Assemblies 1993 - 1995
• Lead engineer responsible for manufacturing processes, quality requirements based on IPC standards,
and line balancing for high volume electronics assembly (100K units/month).
• Developed plant layouts to improve efficiencies by reducing the manpower required and reduction of
work in-process. Created spreadsheet models to perform capacity analysis and determine capital
equipment requirements.
• Coordinated the college internship program for Industrial Engineering students, providing a hands on
approach to basic engineering functions and problem analysis.
• Assisted quoting department in development of labor estimates for new business proposals and work
orders resulting in accurate and timely costing of products.
Lockheed Martin, Denver, Colorado 1986 - 1993
Manufacturing Engineer – Aerospace electronics (1990 -
1993)
• Justified, specified and implemented SMT equipment for the production space flight hardware.
• Coordinated software interfaces for downloading CAD data to SMT placement equipment.
• Developed processes and procedures for stencil printer and placement equipment.
• Applied statistical process control and design of experiment concepts to the implementation of new
production equipment which resulted in first pass yields of 99.89 percent.
Industrial Engineer - Electronics Manufacturing (1989 -
1990)
• Lead Engineer responsible for manufacturing budget allocation, time standard application,
performance reporting and manpower planning.
• Performed feasibility studies and methods analysis for reduction of production costs. Results of
investigation included new tool designs, and simplified production methods.
Industrial Engineer - Machine Shop/Sheet Metal (1986 - 1989)
• Developed time standards using a predetermined time system for sheet metal and machine shop
processes to measure job performance and develop capacity planning models.
• Created spreadsheets for labor reporting to track program costs to allocated budgets.
• Analyzed cost variances resulting from manufacturing problems to resolve discrepancies between
budgeted and actual costs.
Education: B.S.: Industrial Technology/Management
Central Missouri State University
Certified Associate in Project Management (CAPM) 2010

Mais conteúdo relacionado

Mais procurados (20)

Resume_LI
Resume_LIResume_LI
Resume_LI
 
Carlos_Aragon_100816
Carlos_Aragon_100816Carlos_Aragon_100816
Carlos_Aragon_100816
 
MJP Resume
MJP ResumeMJP Resume
MJP Resume
 
Jps16
Jps16Jps16
Jps16
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
Resume _ Sathishkumar
Resume _ SathishkumarResume _ Sathishkumar
Resume _ Sathishkumar
 
Rob VanBuren resume
Rob VanBuren resumeRob VanBuren resume
Rob VanBuren resume
 
Todd Watson Resume
Todd Watson ResumeTodd Watson Resume
Todd Watson Resume
 
Ashok Kumar_CV_Mar2015
Ashok Kumar_CV_Mar2015Ashok Kumar_CV_Mar2015
Ashok Kumar_CV_Mar2015
 
Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1
 
Jason_Harvey_Resume
Jason_Harvey_ResumeJason_Harvey_Resume
Jason_Harvey_Resume
 
Meenu Resume
Meenu ResumeMeenu Resume
Meenu Resume
 
RESUME RANDALL V TOINTON 2016
RESUME RANDALL V TOINTON 2016RESUME RANDALL V TOINTON 2016
RESUME RANDALL V TOINTON 2016
 
Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer,
Antonya vijaya raj  CV -4 Years Experiences in Senior Sustain Engineer,Antonya vijaya raj  CV -4 Years Experiences in Senior Sustain Engineer,
Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer,
 
Aftab resume
Aftab resumeAftab resume
Aftab resume
 
Gerdeman_Lance_Resume 1.7.16
Gerdeman_Lance_Resume 1.7.16Gerdeman_Lance_Resume 1.7.16
Gerdeman_Lance_Resume 1.7.16
 
Pedro M Dones Resume Review Q2-2015
Pedro M Dones Resume Review Q2-2015Pedro M Dones Resume Review Q2-2015
Pedro M Dones Resume Review Q2-2015
 
Huy Pham_Resume
Huy Pham_ResumeHuy Pham_Resume
Huy Pham_Resume
 

Destaque (11)

resume
resume resume
resume
 
Bryatt_Cooper_Resume
Bryatt_Cooper_ResumeBryatt_Cooper_Resume
Bryatt_Cooper_Resume
 
Resume AMS 011217
Resume AMS 011217 Resume AMS 011217
Resume AMS 011217
 
James p 3 2016 word
James p 3 2016 wordJames p 3 2016 word
James p 3 2016 word
 
Resume Sept 2016
Resume Sept 2016Resume Sept 2016
Resume Sept 2016
 
Bradley Hunt CV
Bradley Hunt CVBradley Hunt CV
Bradley Hunt CV
 
zeffiroa Resume Mar 2016
zeffiroa Resume Mar 2016zeffiroa Resume Mar 2016
zeffiroa Resume Mar 2016
 
Jason_Ellick's_Resume_4815
Jason_Ellick's_Resume_4815Jason_Ellick's_Resume_4815
Jason_Ellick's_Resume_4815
 
Pierre_Van_der_Steichel_Resume
Pierre_Van_der_Steichel_ResumePierre_Van_der_Steichel_Resume
Pierre_Van_der_Steichel_Resume
 
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
Javier Garcia - Verdugo Sanchez -  The Poka - Yoke SystemJavier Garcia - Verdugo Sanchez -  The Poka - Yoke System
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
 
Resume functional automotive
Resume functional   automotiveResume functional   automotive
Resume functional automotive
 

Semelhante a Steve Majors resume (20)

Merrill_Resume_2015
Merrill_Resume_2015Merrill_Resume_2015
Merrill_Resume_2015
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATD
 
W White Resume
W White ResumeW White Resume
W White Resume
 
Crivac Mark
Crivac MarkCrivac Mark
Crivac Mark
 
Besander Allen FINAL 011216 mr.rev.kw
Besander Allen FINAL 011216 mr.rev.kwBesander Allen FINAL 011216 mr.rev.kw
Besander Allen FINAL 011216 mr.rev.kw
 
Karamjit Sekhon Resume
Karamjit Sekhon ResumeKaramjit Sekhon Resume
Karamjit Sekhon Resume
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Resume_Anthony Brennan
Resume_Anthony BrennanResume_Anthony Brennan
Resume_Anthony Brennan
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resume
 
Allen D. Polowinczak 2016
Allen D. Polowinczak 2016Allen D. Polowinczak 2016
Allen D. Polowinczak 2016
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
 
Joe Ragusa Resume
Joe Ragusa Resume Joe Ragusa Resume
Joe Ragusa Resume
 
Derek Paquette Resume
Derek Paquette ResumeDerek Paquette Resume
Derek Paquette Resume
 
John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)
 
Resume.DOC
Resume.DOCResume.DOC
Resume.DOC
 
Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
 
Alcione_Colecha_EN_NOVEMBER_2016
Alcione_Colecha_EN_NOVEMBER_2016Alcione_Colecha_EN_NOVEMBER_2016
Alcione_Colecha_EN_NOVEMBER_2016
 

Steve Majors resume

  • 1. STEVE MAJORS 3471 West 101st Place Home Phone: (303) 460-1927 Westminster, Colorado 80031 E-mail stevemajors@yahoo.com SENIOR MANUFACTURING ENGINEER Experienced in process/product design, plant layout, product and cost management, labor standards development and methods analysis. Proven ability to improve efficiencies, yields and reduce costs. Proficient in transferring and supporting product/manufacturing at offshore manufacturing locations. EMPLOYMENT HISTORY Spectralink Incorporated, Boulder, Colorado 2013 - Present Manager, Manufacturing and Test Engineering – Enterprise Wireless Phones • Provided leadership of the operations group professional staff consisting of Document control, Project Management, Manufacturing Engineering and Test Engineering. • Monitored the team’s support of day-to-day production through process monitoring, requesting follow up and troubleshooting for production issues at three contract manufacturing sites located in China, Thailand, and US. • Identified, planned and implemented manufacturing projects according to return on investment, focusing on elements contributing to yield loss and reducing scrap costs. • Assured that all production and test processes were robust and are fully documented. Sr. Manufacturing Engineer 2010 - 2012 • Determined root cause of quality problems and drove design and process improvements to enhance existing product performance and quality. • Coordinated quality improvements with suppliers based on internal quality inspection requirements. • Developed and documented assembly processes for production of products built at offshore contract manufacturing locations and trained contract manufacturers on processes and procedures. • Created, reviewed and approved Bills of Materials using Agile document control. JDS Uniphase / Picolight Incorporated, Louisville, Colorado 2000 – 2009 Sr Manufacturing Engineer – Optical/Electronic Components • Technical lead for support of offshore contract manufacturing of high volume (100K/month) optical/electrical components, providing guidance for manufacturing and quality issues. • Responsible for in-house manufacturing and test of prototype optical components for customer samples and engineering development • Supported Product Management for introduction of new designs to meet customer requests, developing Bills of Materials and test requirements. Sr. Manufacturing Engineer – Optical Transceivers • Reviewed device test performance and failure analysis data for process improvements within JDSU and contract manufacturers and recommended corrective actions. • Responsible for quick-turn sample and prototype transceivers to meet on time delivery requirements to customers. • Created and reviewed Bill of Materials, in Agile and Matrix, for accuracy to ensure components meet performance requirements.
  • 2. Artesyn Technologies, Broomfield, Colorado Sr. Manufacturing Engineer – Power supplies 1995 – 2000 • Set up wave solder process, utilizing designed experiments (DOE) to optimize parameter settings, creating one profile reducing changeover times. • Trained production personnel on PCBA inspection requirements based on IPC-610 class 2 requirements. • Developed plant layout, incorporating lean manufacturing concepts, to reduce work in process and improve product quality. • Co-developed LabView based vision system for inspection of hand soldered assemblies to ensure 100% soldered leads. Kimball Electronics, Jasper, Indiana Manufacturing/Process Engineer – Network card Assemblies 1993 - 1995 • Lead engineer responsible for manufacturing processes, quality requirements based on IPC standards, and line balancing for high volume electronics assembly (100K units/month). • Developed plant layouts to improve efficiencies by reducing the manpower required and reduction of work in-process. Created spreadsheet models to perform capacity analysis and determine capital equipment requirements. • Coordinated the college internship program for Industrial Engineering students, providing a hands on approach to basic engineering functions and problem analysis. • Assisted quoting department in development of labor estimates for new business proposals and work orders resulting in accurate and timely costing of products. Lockheed Martin, Denver, Colorado 1986 - 1993 Manufacturing Engineer – Aerospace electronics (1990 - 1993) • Justified, specified and implemented SMT equipment for the production space flight hardware. • Coordinated software interfaces for downloading CAD data to SMT placement equipment. • Developed processes and procedures for stencil printer and placement equipment. • Applied statistical process control and design of experiment concepts to the implementation of new production equipment which resulted in first pass yields of 99.89 percent. Industrial Engineer - Electronics Manufacturing (1989 - 1990) • Lead Engineer responsible for manufacturing budget allocation, time standard application, performance reporting and manpower planning. • Performed feasibility studies and methods analysis for reduction of production costs. Results of investigation included new tool designs, and simplified production methods. Industrial Engineer - Machine Shop/Sheet Metal (1986 - 1989) • Developed time standards using a predetermined time system for sheet metal and machine shop processes to measure job performance and develop capacity planning models. • Created spreadsheets for labor reporting to track program costs to allocated budgets. • Analyzed cost variances resulting from manufacturing problems to resolve discrepancies between budgeted and actual costs. Education: B.S.: Industrial Technology/Management
  • 3. Central Missouri State University Certified Associate in Project Management (CAPM) 2010