SlideShare uma empresa Scribd logo
1 de 23
Baixar para ler offline
General Company Presentation
July 2016
Enersea introduced
• WHY: We believe the future of energy is at sea
• HOW: Offshore environment requires knowledgeable team
• WHAT: Integrated technical solutions for best return on investment
Consultancy | Structure Engineering | System Engineering
• 20 year cooperation between the three founders
• Founded in 2015 from this successful cooperation
• Privately held by DEP Beheer BV, successful in offshore since 2008
• Enersea is determined to bring together a team of decisive specialists
3
Our Offshore Expertise Services
4
Services
market | oil & gas
Asset Owners, Operators,
T&I Contractors
market | renewables
Utilities, OWP Operators,
T&I Contractors
Consultancy
Technical Management
Decision Support
Production System Design
Identify, Select & FEED
Topside & Subsea systems
Structural Design
Concept, Basic & Detailed
Fixed structures & Equipment
Ambition
Y1 to Y3
Available
at start
3 FTE
Senior
Level
5-10 FTE
5–10 FTE
Senior
Level
Value Proposition
5
We are specialists offshore engineering
driving projects to success
Specialist
Knowledge
We align technical and commercial objectives
for best return on investment
Owners
Understanding
Managing interfaces with all offshore disciplines
is natural to us
Multi-Discipline
interfacing
We create value by innovative concepts for the
challenging offshore environment
Early Phase
Innovation
Enersea Team Experience
OVERVIEW PROJECTS
Team Experience
Substructure design
Platforms:
- Wikinger - Gemini (Buitengaats & Zeeenergie)
- Meerwind - Riffgat
- Dan Tysk - Sandbank
- Ravn - Amrumbank West (concept)
Turbines:
- Hohe See (jackets)
- Eldepasco (monopiles & jackets)
- Dan Tysk (monopiles & jackets)
- Luchterduinen (owner’s engineering - monopiles)
- Nordsee Ost (owner’s engineering - jackets)
- Norther (owner’s engineering - monopiles)
Team Experience
Cable/pipelay vessel deck lay out
- Living Stone Deck layout (Tideway) - Gjoa & BritNed (Global Marine)
- NDurance deck layout (Boskalis) - Nexus Deck layout (Van Oord)
- Northwind in-field cables deck layout (Olympic Taurus, Tideway) - Thornton bank repair deck layout (Neptune, Tideway)
- Thornton bank export reroute deck layout (Pompei, Tideway) - Q13 export reroute (Pompei, Tideway)
- Hanjin Pioneer 2 x 4000 ton (LS Cable) - Concept design Stinger (Seven borealis, Subsea 7)
- Detail design fly-jib (Seven borealis, Subsea 7) - Detail design various pipe lay details (Global 1200, Technip)
- Auxiliary reel bearing redesign (Apache II, Technip)
Team Experience
Installation equipment design:
- Westermost Rough pile gripper (Innovation, Geosea)
- Various quadrants (Jan de Nul, Tideway)
- Various turntables (500 ton liftable, Rentocean, etc.)
- Various lifting and cable handling tools (stiff joint lifting beams, pull-in winch modules)
- Quadrant handlers (Van Oord, Boskalis)
- 2000 ton umbilical loading towers (Rentocean)
- Inclined fall pipe system (Rolling Stone, Tideway)
- Compensated gangway design (L-type, slideway, Ampelmann)
Team Experience – Client selection
Enersea Projects
OVERVIEW SELECTION ENERSEA PROJECTS
13
References – P11 Composite Pipe Study
Feasibility study to the application of
Thermoplastic Compisite Pipe for P11E
Development of ONE BV.
On-bottom stability, Bottom roughness, Install-
ability
14
References – Bluewater Tidal Energy
Engineering & Management support for the
design and development of tidal energy
arrays with BlueTec by Bluewater Energy.
Pilot test ongoing since Q2 2015 in SNS NL
15
References – Robin Hood Development
Engineering Management for the development
of Broder Tuck (gas) and Lille John (oil) field in
Danish sector for Dana Pertroleum.
Technical studies and cost estimating.
Declaration of Commerciality achieved 2016.
16
References - P11 E Platform for ONE BV
Engineering and Installation Management for
Substructure, Topside (structure & interfaces)
and Risers for ONE BV P11 E platform.
Concept, FEED, Execution design. Offshore
Client rep. Succesful installed May 2016!
18
References – L11-B Pipeline Replacement
Replacement of the exisiting export felxible
with Thermoplatsic Composite pipe for the
L11-B Platform of ONE BV.
Flow assurance, pipeline design, riser design
and installation methods.
20
Reference – P8 Oil Field Concept Study
Concept study to the development of Horizon
West oil field of Petrogas E&P NL.
New oil tie-in with high GOR at aging
infrastructure requires adequate process
knowledge and out of the box thinking.
21
Reference – Verification Studies for UK
Platform
Helideck verification studies for Sean P
Platform in UK sector of SNS.
22
Reference – Deck lay-out for Cable Vessel
Basic Design of deck lay-out for New Built
Cable Lay vessel. Client confidential.
Design includes for deck arrangement and
equipment for best in class installation of in
and inter field offshore wind park cable
23
Reference – Deck lay-out for Cable Vessel
Deck lay-out for Thorntonbank cable repair for
Rollingstone and Flintstone rockdump vessels
Tideway
24
References – Management Support
Engineering Management support for Petrogas
Projects Department.
Strategic development of the engineering
department to suit company ambitions.
25
Those who are innovative see more.
They dig deeper where others don’t.
They come up with more opportunities and solutions.
In other words, they sea the future.
26
Enersea BV
Jan Evertsenweg 12
3115 JA SCHIEDAM
+31 10 31 32 100
www.enersea.nl
27

Mais conteúdo relacionado

Mais procurados

Marine risk topic heavy lift cargo 2013
Marine risk topic heavy lift cargo 2013Marine risk topic heavy lift cargo 2013
Marine risk topic heavy lift cargo 2013Luis Vitiritti
 
Selected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoSelected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoJorge Cabaco
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copydon rawson
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13iain_cameron
 
Preparing Trinidad and Tobago for deepwater developments
Preparing Trinidad and Tobago for deepwater developmentsPreparing Trinidad and Tobago for deepwater developments
Preparing Trinidad and Tobago for deepwater developmentsAdvisian
 
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis
 
CKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCarmen Squires
 
CARL PERRIGUE Resume
CARL PERRIGUE ResumeCARL PERRIGUE Resume
CARL PERRIGUE Resumecarl perrigue
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16Iain Cameron
 
Challenges to deepwater developments in West Africa
Challenges to deepwater developments in West AfricaChallenges to deepwater developments in West Africa
Challenges to deepwater developments in West AfricaAdvisian
 
project_report_bulgaria_mall_
project_report_bulgaria_mall_project_report_bulgaria_mall_
project_report_bulgaria_mall_Georgi Kolchakov
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)Norfadzly Nordin
 
Project - Various Unit - Kaiwan
Project - Various Unit - KaiwanProject - Various Unit - Kaiwan
Project - Various Unit - KaiwanKaiwan Hasani
 

Mais procurados (20)

Marine risk topic heavy lift cargo 2013
Marine risk topic heavy lift cargo 2013Marine risk topic heavy lift cargo 2013
Marine risk topic heavy lift cargo 2013
 
Selected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoSelected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge Cabaco
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copy
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 
Hafeeda. v
Hafeeda. vHafeeda. v
Hafeeda. v
 
Preparing Trinidad and Tobago for deepwater developments
Preparing Trinidad and Tobago for deepwater developmentsPreparing Trinidad and Tobago for deepwater developments
Preparing Trinidad and Tobago for deepwater developments
 
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1
 
CKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILL
 
CARL PERRIGUE Resume
CARL PERRIGUE ResumeCARL PERRIGUE Resume
CARL PERRIGUE Resume
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
Challenges to deepwater developments in West Africa
Challenges to deepwater developments in West AfricaChallenges to deepwater developments in West Africa
Challenges to deepwater developments in West Africa
 
CV JBNov14
CV JBNov14CV JBNov14
CV JBNov14
 
PAVAN
PAVANPAVAN
PAVAN
 
OT Resume
OT ResumeOT Resume
OT Resume
 
project_report_bulgaria_mall_
project_report_bulgaria_mall_project_report_bulgaria_mall_
project_report_bulgaria_mall_
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)
 
Project - Various Unit - Kaiwan
Project - Various Unit - KaiwanProject - Various Unit - Kaiwan
Project - Various Unit - Kaiwan
 
CV Sada
CV SadaCV Sada
CV Sada
 
Resume of blake
Resume of blakeResume of blake
Resume of blake
 

Destaque

Girish-Kabra-Centrica-Energy1
Girish-Kabra-Centrica-Energy1Girish-Kabra-Centrica-Energy1
Girish-Kabra-Centrica-Energy1Girish Kabra
 
The Importance of Integration of subsurface with surface facilities design
The Importance of Integration of subsurface with surface facilities designThe Importance of Integration of subsurface with surface facilities design
The Importance of Integration of subsurface with surface facilities designRiley Smith
 
Separador de hidrocarburos,separador de grasas, bombeo, pluviales, tratamient...
Separador de hidrocarburos,separador de grasas, bombeo, pluviales, tratamient...Separador de hidrocarburos,separador de grasas, bombeo, pluviales, tratamient...
Separador de hidrocarburos,separador de grasas, bombeo, pluviales, tratamient...Techneau España S.L.
 
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons LearnedMajor CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons LearnedEnergy Construction Forum
 
Staalbouwdag-oktober-2013-normen-voor-de-offshore
Staalbouwdag-oktober-2013-normen-voor-de-offshoreStaalbouwdag-oktober-2013-normen-voor-de-offshore
Staalbouwdag-oktober-2013-normen-voor-de-offshoreArno Landewers
 
Offshore Wind Infrastructure Applicaiton Lab - Launch 2012-01-24 - REpower
Offshore Wind Infrastructure Applicaiton Lab - Launch 2012-01-24 - REpowerOffshore Wind Infrastructure Applicaiton Lab - Launch 2012-01-24 - REpower
Offshore Wind Infrastructure Applicaiton Lab - Launch 2012-01-24 - REpowerSirris
 
Decision making in the oil and gas industry
Decision making in the oil and gas industryDecision making in the oil and gas industry
Decision making in the oil and gas industryPalantir_Solutions
 
Offshore windenergie essentieel onderdeel van een duurzame energievoorziening...
Offshore windenergie essentieel onderdeel van een duurzame energievoorziening...Offshore windenergie essentieel onderdeel van een duurzame energievoorziening...
Offshore windenergie essentieel onderdeel van een duurzame energievoorziening...Chris Westra
 
Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157Shaoor Kamal
 
Enterprise Project Management
Enterprise Project ManagementEnterprise Project Management
Enterprise Project ManagementMartin Mehalchin
 
How Advanced Simulation will Impact the Offshore Industry both Now and in the...
How Advanced Simulation will Impact the Offshore Industry both Now and in the...How Advanced Simulation will Impact the Offshore Industry both Now and in the...
How Advanced Simulation will Impact the Offshore Industry both Now and in the...Altair
 
DNV_GL_launches_initiatives_to_reduce_cost
DNV_GL_launches_initiatives_to_reduce_costDNV_GL_launches_initiatives_to_reduce_cost
DNV_GL_launches_initiatives_to_reduce_costJan Weitzenböck
 
Fibre Reinforced Plastic manufacturing methods
Fibre Reinforced Plastic manufacturing methodsFibre Reinforced Plastic manufacturing methods
Fibre Reinforced Plastic manufacturing methodsjeff jose
 
Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1Suhas Khedkar
 
"Industrial applications of Composite Polymers" by Oan
"Industrial applications of Composite Polymers" by Oan"Industrial applications of Composite Polymers" by Oan
"Industrial applications of Composite Polymers" by OanOan Sahito
 

Destaque (20)

Girish-Kabra-Centrica-Energy1
Girish-Kabra-Centrica-Energy1Girish-Kabra-Centrica-Energy1
Girish-Kabra-Centrica-Energy1
 
The Importance of Integration of subsurface with surface facilities design
The Importance of Integration of subsurface with surface facilities designThe Importance of Integration of subsurface with surface facilities design
The Importance of Integration of subsurface with surface facilities design
 
Separador de hidrocarburos,separador de grasas, bombeo, pluviales, tratamient...
Separador de hidrocarburos,separador de grasas, bombeo, pluviales, tratamient...Separador de hidrocarburos,separador de grasas, bombeo, pluviales, tratamient...
Separador de hidrocarburos,separador de grasas, bombeo, pluviales, tratamient...
 
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons LearnedMajor CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
 
Staalbouwdag-oktober-2013-normen-voor-de-offshore
Staalbouwdag-oktober-2013-normen-voor-de-offshoreStaalbouwdag-oktober-2013-normen-voor-de-offshore
Staalbouwdag-oktober-2013-normen-voor-de-offshore
 
Composite
CompositeComposite
Composite
 
Offshore Wind Infrastructure Applicaiton Lab - Launch 2012-01-24 - REpower
Offshore Wind Infrastructure Applicaiton Lab - Launch 2012-01-24 - REpowerOffshore Wind Infrastructure Applicaiton Lab - Launch 2012-01-24 - REpower
Offshore Wind Infrastructure Applicaiton Lab - Launch 2012-01-24 - REpower
 
AMIF2014 – [Nautica] Andreas Echtermeyer, Compositi in applicazioni navali e ...
AMIF2014 – [Nautica] Andreas Echtermeyer, Compositi in applicazioni navali e ...AMIF2014 – [Nautica] Andreas Echtermeyer, Compositi in applicazioni navali e ...
AMIF2014 – [Nautica] Andreas Echtermeyer, Compositi in applicazioni navali e ...
 
Decision making in the oil and gas industry
Decision making in the oil and gas industryDecision making in the oil and gas industry
Decision making in the oil and gas industry
 
Offshore windenergie essentieel onderdeel van een duurzame energievoorziening...
Offshore windenergie essentieel onderdeel van een duurzame energievoorziening...Offshore windenergie essentieel onderdeel van een duurzame energievoorziening...
Offshore windenergie essentieel onderdeel van een duurzame energievoorziening...
 
Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157
 
Enterprise Project Management
Enterprise Project ManagementEnterprise Project Management
Enterprise Project Management
 
How Advanced Simulation will Impact the Offshore Industry both Now and in the...
How Advanced Simulation will Impact the Offshore Industry both Now and in the...How Advanced Simulation will Impact the Offshore Industry both Now and in the...
How Advanced Simulation will Impact the Offshore Industry both Now and in the...
 
MSc group project presentation
MSc group project presentationMSc group project presentation
MSc group project presentation
 
AMIF2014 – [Plenaria] Aniello Cammarano, Materiali compositi avanzati per il ...
AMIF2014 – [Plenaria] Aniello Cammarano, Materiali compositi avanzati per il ...AMIF2014 – [Plenaria] Aniello Cammarano, Materiali compositi avanzati per il ...
AMIF2014 – [Plenaria] Aniello Cammarano, Materiali compositi avanzati per il ...
 
DNV_GL_launches_initiatives_to_reduce_cost
DNV_GL_launches_initiatives_to_reduce_costDNV_GL_launches_initiatives_to_reduce_cost
DNV_GL_launches_initiatives_to_reduce_cost
 
Fibre Reinforced Plastic manufacturing methods
Fibre Reinforced Plastic manufacturing methodsFibre Reinforced Plastic manufacturing methods
Fibre Reinforced Plastic manufacturing methods
 
AMIF2014 – [Nautica] Alfonso Barbato, Fincantieri’s experience in shipbuildin...
AMIF2014 – [Nautica] Alfonso Barbato, Fincantieri’s experience in shipbuildin...AMIF2014 – [Nautica] Alfonso Barbato, Fincantieri’s experience in shipbuildin...
AMIF2014 – [Nautica] Alfonso Barbato, Fincantieri’s experience in shipbuildin...
 
Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1
 
"Industrial applications of Composite Polymers" by Oan
"Industrial applications of Composite Polymers" by Oan"Industrial applications of Composite Polymers" by Oan
"Industrial applications of Composite Polymers" by Oan
 

Semelhante a 000-GENERAL presentation_rev06

Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibilityguest651e92c
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study NoordzeeSander_van_oirschot
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialistisbengineering
 
ArupConceptElevatingACEPlatformsbrochurecopyrightArup
ArupConceptElevatingACEPlatformsbrochurecopyrightArupArupConceptElevatingACEPlatformsbrochurecopyrightArup
ArupConceptElevatingACEPlatformsbrochurecopyrightArupGlynn Thomas
 
NauticAWT Brochure
NauticAWT BrochureNauticAWT Brochure
NauticAWT BrochureAga Manhao
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015Des Jameson
 
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Torben Haagh
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1robinking277
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webNora Kohlhase
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webPaul Heinrich
 
Euro-Rigging presentation 2013
Euro-Rigging presentation 2013Euro-Rigging presentation 2013
Euro-Rigging presentation 2013wesseln
 
Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Global CCS Institute
 

Semelhante a 000-GENERAL presentation_rev06 (20)

Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibility
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study Noordzee
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialist
 
ArupConceptElevatingACEPlatformsbrochurecopyrightArup
ArupConceptElevatingACEPlatformsbrochurecopyrightArupArupConceptElevatingACEPlatformsbrochurecopyrightArup
ArupConceptElevatingACEPlatformsbrochurecopyrightArup
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
NauticAWT Brochure
NauticAWT BrochureNauticAWT Brochure
NauticAWT Brochure
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015
 
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
 
Viswanath_AMD
Viswanath_AMDViswanath_AMD
Viswanath_AMD
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
WL CV 2016
WL CV 2016WL CV 2016
WL CV 2016
 
MOC Presentation
MOC PresentationMOC Presentation
MOC Presentation
 
Euro-Rigging presentation 2013
Euro-Rigging presentation 2013Euro-Rigging presentation 2013
Euro-Rigging presentation 2013
 
CV CBK 2015 N
CV CBK 2015 NCV CBK 2015 N
CV CBK 2015 N
 
Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...
 

000-GENERAL presentation_rev06

  • 2. Enersea introduced • WHY: We believe the future of energy is at sea • HOW: Offshore environment requires knowledgeable team • WHAT: Integrated technical solutions for best return on investment Consultancy | Structure Engineering | System Engineering • 20 year cooperation between the three founders • Founded in 2015 from this successful cooperation • Privately held by DEP Beheer BV, successful in offshore since 2008 • Enersea is determined to bring together a team of decisive specialists 3
  • 3. Our Offshore Expertise Services 4 Services market | oil & gas Asset Owners, Operators, T&I Contractors market | renewables Utilities, OWP Operators, T&I Contractors Consultancy Technical Management Decision Support Production System Design Identify, Select & FEED Topside & Subsea systems Structural Design Concept, Basic & Detailed Fixed structures & Equipment Ambition Y1 to Y3 Available at start 3 FTE Senior Level 5-10 FTE 5–10 FTE Senior Level
  • 4. Value Proposition 5 We are specialists offshore engineering driving projects to success Specialist Knowledge We align technical and commercial objectives for best return on investment Owners Understanding Managing interfaces with all offshore disciplines is natural to us Multi-Discipline interfacing We create value by innovative concepts for the challenging offshore environment Early Phase Innovation
  • 6. Team Experience Substructure design Platforms: - Wikinger - Gemini (Buitengaats & Zeeenergie) - Meerwind - Riffgat - Dan Tysk - Sandbank - Ravn - Amrumbank West (concept) Turbines: - Hohe See (jackets) - Eldepasco (monopiles & jackets) - Dan Tysk (monopiles & jackets) - Luchterduinen (owner’s engineering - monopiles) - Nordsee Ost (owner’s engineering - jackets) - Norther (owner’s engineering - monopiles)
  • 7. Team Experience Cable/pipelay vessel deck lay out - Living Stone Deck layout (Tideway) - Gjoa & BritNed (Global Marine) - NDurance deck layout (Boskalis) - Nexus Deck layout (Van Oord) - Northwind in-field cables deck layout (Olympic Taurus, Tideway) - Thornton bank repair deck layout (Neptune, Tideway) - Thornton bank export reroute deck layout (Pompei, Tideway) - Q13 export reroute (Pompei, Tideway) - Hanjin Pioneer 2 x 4000 ton (LS Cable) - Concept design Stinger (Seven borealis, Subsea 7) - Detail design fly-jib (Seven borealis, Subsea 7) - Detail design various pipe lay details (Global 1200, Technip) - Auxiliary reel bearing redesign (Apache II, Technip)
  • 8. Team Experience Installation equipment design: - Westermost Rough pile gripper (Innovation, Geosea) - Various quadrants (Jan de Nul, Tideway) - Various turntables (500 ton liftable, Rentocean, etc.) - Various lifting and cable handling tools (stiff joint lifting beams, pull-in winch modules) - Quadrant handlers (Van Oord, Boskalis) - 2000 ton umbilical loading towers (Rentocean) - Inclined fall pipe system (Rolling Stone, Tideway) - Compensated gangway design (L-type, slideway, Ampelmann)
  • 9. Team Experience – Client selection
  • 11. 13 References – P11 Composite Pipe Study Feasibility study to the application of Thermoplastic Compisite Pipe for P11E Development of ONE BV. On-bottom stability, Bottom roughness, Install- ability
  • 12. 14 References – Bluewater Tidal Energy Engineering & Management support for the design and development of tidal energy arrays with BlueTec by Bluewater Energy. Pilot test ongoing since Q2 2015 in SNS NL
  • 13. 15 References – Robin Hood Development Engineering Management for the development of Broder Tuck (gas) and Lille John (oil) field in Danish sector for Dana Pertroleum. Technical studies and cost estimating. Declaration of Commerciality achieved 2016.
  • 14. 16 References - P11 E Platform for ONE BV Engineering and Installation Management for Substructure, Topside (structure & interfaces) and Risers for ONE BV P11 E platform. Concept, FEED, Execution design. Offshore Client rep. Succesful installed May 2016!
  • 15. 18 References – L11-B Pipeline Replacement Replacement of the exisiting export felxible with Thermoplatsic Composite pipe for the L11-B Platform of ONE BV. Flow assurance, pipeline design, riser design and installation methods.
  • 16. 20 Reference – P8 Oil Field Concept Study Concept study to the development of Horizon West oil field of Petrogas E&P NL. New oil tie-in with high GOR at aging infrastructure requires adequate process knowledge and out of the box thinking.
  • 17. 21 Reference – Verification Studies for UK Platform Helideck verification studies for Sean P Platform in UK sector of SNS.
  • 18. 22 Reference – Deck lay-out for Cable Vessel Basic Design of deck lay-out for New Built Cable Lay vessel. Client confidential. Design includes for deck arrangement and equipment for best in class installation of in and inter field offshore wind park cable
  • 19. 23 Reference – Deck lay-out for Cable Vessel Deck lay-out for Thorntonbank cable repair for Rollingstone and Flintstone rockdump vessels Tideway
  • 20. 24 References – Management Support Engineering Management support for Petrogas Projects Department. Strategic development of the engineering department to suit company ambitions.
  • 21. 25 Those who are innovative see more. They dig deeper where others don’t. They come up with more opportunities and solutions. In other words, they sea the future.
  • 22. 26 Enersea BV Jan Evertsenweg 12 3115 JA SCHIEDAM +31 10 31 32 100 www.enersea.nl
  • 23. 27