SlideShare uma empresa Scribd logo
1 de 17
Baixar para ler offline
Bear River
Development Project
Providing Northern Utah’s Future Water Supply
1
Bear River Development Project. August 2014. All information subject to change.
Why Are We Planning for the Bear
River Project?
 Utah’s population will double by 2060
 We need additional water for that population
 This will require three strategies to be successful:
2
- Education
- Rates
- Reuse
- Infrastructure modernization
- Agricultural conversions
- Bear River Development Project
- Lake Powell Pipeline Project
Bear River Development Project. August 2014. All information subject to change.
Bear River Project Participants
 State of Utah Division of Water Resources
 Participating Agencies
• Bear River Water Conservancy District
• Cache County
• Jordan Valley Water Conservancy District
• Weber Basin Water Conservancy District
 Study Team
• Bowen Collins, HDR, Gerhart Cole
3
Bear River Development Project. August 2014. All information subject to change.
Bear River Watershed4
Bear River Development Project. August 2014. All information subject to change.
Bear River Compact
 Agreement between Utah, Idaho, and
Wyoming in 1958
 Amended in in 1980
 Allocates water between the three
states
5
Bear River Development Project. August 2014. All information subject to change.
Bear River Development Act -1991
“The Division shall develop the surface waters of
the Bear River and its tributaries through the
planning and construction of reservoirs and
associated facilities as authorized and funded by
the Legislature; own and operate the facilities
constructed; and market the developed waters”
6
Bear River Development Project. August 2014. All information subject to change.
Bear River Development Act -1991
Total project water rights: 220,000 ac-ft
7
60,000
60,000
50,000
50,000
Project Allocation
State of Utah Water Rights (acre-feet)
BRWCD (Box Elder)
Cache County
JVWCD
WBWCD
Bear River Development Project. August 2014. All information subject to change.
Previous Studies
 Studies on the Bear River began in the 1960s by
USBR
 State of Utah has studied project since 1970s
• Various reservoir sites in the basin
 JVWCD and WBWCD
• Routing studies on pipelines from state project to their
service areas
• Purchase of right-of-way
 Ongoing State of Utah studies
• Bear River water quality sampling, 1996-present
• Bear River Project preliminary studies, since 2006-2014
8
Bear River Development Project. August 2014. All information subject to change.
Water Supply Development9
0
50,000
100,000
150,000
200,000
250,000
0 50,000 100,000 150,000 200,000 250,000
FirmWaterSupply(acre-feet)
Total Storage Volume (acre-feet)
Firm Water Supply Versus
Total Storage Volume
Bear River Development Project. August 2014. All information subject to change.
Potential Reservoir Sites in the Basin10
Bear River Development Project. August 2014. All information subject to change.
Current Project Study Areas
 Storage is required to develop the 220,000 ac-ft
 Project has examined numerous storage sites
within the Bear River Basin
 State of Utah studied Washakie site in 2006
 Project has shortlisted six other potential
reservoir sites for further study:
11
• Whites Valley
• Above Cutler
• Cub River
• Temple Fork
• Fielding
• Weber Bay
Bear River Development Project. August 2014. All information subject to change.
Project Features
 Multiple reservoirs
 Diversions from the Bear River
 Cache County delivery
 Raw water pipelines to West Haven WTP
 Box Elder County delivery facilities
 Finished water pipeline/storage reservoir/pump
stations to Weber, Davis, and Salt Lake Counties
12
Bear River Development Project. August 2014. All information subject to change.
Study Activities
 Perform site investigations at six potential
reservoir locations
 Further refine overall project facilities
 Prepare updated cost estimates
 Begin environmental permitting process
 Agency coordination
13
Bear River Development Project. August 2014. All information subject to change.
Conceptual
Design
 Seven shortlisted
reservoir sites
 Raw water pipeline
system to West
Haven WTP
 Finished water
pipeline from West
Haven to Weber,
Davis, and Salt Lake
Counties
 Cache County
delivery facilities
14
Bear River Development Project. August 2014. All information subject to change.
Preliminary Project Investment
Total investment over four phases: $1.5 billion
15
$197,012,613
$918,025,455
$217,343,665
$149,913,500
Bear River Project Costs by Phase
Bear River Project. August 2014. All information subject to change.
Initial storage and pipeline to Box Elder County
Additional storage and pipeline to West Haven WTP
Cache County storage and delivery facilities
Project completion
Project
Components
Preliminary Project Schedule
(Based on First Water Needed by 2035)
16
Bear River Development Project. August 2014. All information subject to change.
Questions?
 Marisa Egbert, Division of Water Resources, Project Manager
• Phone: 801-538-7230
• Email: marisaegbert@utah.gov
17
Bear River Development Project. August 2014. All information subject to change.

Mais conteúdo relacionado

Mais procurados

Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Fairfax County
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Fairfax County
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream RestorationFairfax County
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationFairfax County
 
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectColvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectFairfax County
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesFairfax County
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationFairfax County
 
Water Resources Department 5 Year Capital Improvement Plan
Water Resources Department 5 Year Capital Improvement PlanWater Resources Department 5 Year Capital Improvement Plan
Water Resources Department 5 Year Capital Improvement PlanClermont County, Ohio
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Fairfax County
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016Fairfax County
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park NorthFairfax County
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectFairfax County
 
Flatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFlatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFairfax County
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationFairfax County
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingFairfax County
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration ProjectFairfax County
 

Mais procurados (20)

Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
 
Paul Helliker - BDCP
Paul Helliker - BDCPPaul Helliker - BDCP
Paul Helliker - BDCP
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream Restoration
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream Restoration
 
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectColvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton Estates
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Water Resources Department 5 Year Capital Improvement Plan
Water Resources Department 5 Year Capital Improvement PlanWater Resources Department 5 Year Capital Improvement Plan
Water Resources Department 5 Year Capital Improvement Plan
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park North
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Flatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFlatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream Restoration
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter Way
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Master Plan Public Hearing Presentation - January 9, 2014
Master Plan Public Hearing Presentation - January 9, 2014Master Plan Public Hearing Presentation - January 9, 2014
Master Plan Public Hearing Presentation - January 9, 2014
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration Project
 

Destaque

Sandy city survey presentation 9 february2015
Sandy city survey presentation 9 february2015Sandy city survey presentation 9 february2015
Sandy city survey presentation 9 february2015sandycityutah
 
2015 Broadband Tech Summit - Emperitas Preparing the Grid for the Coming Data...
2015 Broadband Tech Summit - Emperitas Preparing the Grid for the Coming Data...2015 Broadband Tech Summit - Emperitas Preparing the Grid for the Coming Data...
2015 Broadband Tech Summit - Emperitas Preparing the Grid for the Coming Data...Utah Broadband Project
 
Southern Utah Technology Council 12-14-12
Southern Utah Technology Council 12-14-12Southern Utah Technology Council 12-14-12
Southern Utah Technology Council 12-14-12Utah Broadband Project
 
Analysis of germans as tourists
Analysis of germans as touristsAnalysis of germans as tourists
Analysis of germans as touristsOleksandra Soroka
 
Extinct animal of my country
Extinct animal of my countryExtinct animal of my country
Extinct animal of my countryMarta Martín
 
Prečo tvoj šéf zarába 100x viac ako ty
Prečo tvoj šéf zarába 100x viac ako tyPrečo tvoj šéf zarába 100x viac ako ty
Prečo tvoj šéf zarába 100x viac ako tyPeter Ulcin
 
Christmas in my county
Christmas in my countyChristmas in my county
Christmas in my countyMarta Martín
 
Bangladesh e-TB Manager updates-Nov 2016
Bangladesh e-TB Manager updates-Nov 2016Bangladesh e-TB Manager updates-Nov 2016
Bangladesh e-TB Manager updates-Nov 2016Golam Kibria Madhurza
 
Double spread articles analysis
Double spread articles analysisDouble spread articles analysis
Double spread articles analysisminayakinyaaa
 
Ascending & Descending Tracts Of The Spinal Cord
Ascending & Descending Tracts Of The Spinal Cord Ascending & Descending Tracts Of The Spinal Cord
Ascending & Descending Tracts Of The Spinal Cord Dr.Faris Muhammed
 
Laporan penelitian-tindakan-kelas-kelompok-5
Laporan penelitian-tindakan-kelas-kelompok-5Laporan penelitian-tindakan-kelas-kelompok-5
Laporan penelitian-tindakan-kelas-kelompok-5Rusinah21
 

Destaque (20)

UDOT Funding
UDOT FundingUDOT Funding
UDOT Funding
 
Support for Amendment B
Support for Amendment BSupport for Amendment B
Support for Amendment B
 
Sandy city survey presentation 9 february2015
Sandy city survey presentation 9 february2015Sandy city survey presentation 9 february2015
Sandy city survey presentation 9 february2015
 
GOED Presentation to Higher Ed Committee 2016
GOED Presentation to Higher Ed Committee 2016GOED Presentation to Higher Ed Committee 2016
GOED Presentation to Higher Ed Committee 2016
 
2015 Broadband Tech Summit - Emperitas Preparing the Grid for the Coming Data...
2015 Broadband Tech Summit - Emperitas Preparing the Grid for the Coming Data...2015 Broadband Tech Summit - Emperitas Preparing the Grid for the Coming Data...
2015 Broadband Tech Summit - Emperitas Preparing the Grid for the Coming Data...
 
Appropriations 2015
Appropriations 2015Appropriations 2015
Appropriations 2015
 
Southern Utah Technology Council 12-14-12
Southern Utah Technology Council 12-14-12Southern Utah Technology Council 12-14-12
Southern Utah Technology Council 12-14-12
 
Education in India
Education in IndiaEducation in India
Education in India
 
Analysis of germans as tourists
Analysis of germans as touristsAnalysis of germans as tourists
Analysis of germans as tourists
 
Extinct animal of my country
Extinct animal of my countryExtinct animal of my country
Extinct animal of my country
 
Prečo tvoj šéf zarába 100x viac ako ty
Prečo tvoj šéf zarába 100x viac ako tyPrečo tvoj šéf zarába 100x viac ako ty
Prečo tvoj šéf zarába 100x viac ako ty
 
Christmas in my county
Christmas in my countyChristmas in my county
Christmas in my county
 
More setting prompts
More setting promptsMore setting prompts
More setting prompts
 
Bangladesh e-TB Manager updates-Nov 2016
Bangladesh e-TB Manager updates-Nov 2016Bangladesh e-TB Manager updates-Nov 2016
Bangladesh e-TB Manager updates-Nov 2016
 
Double spread articles analysis
Double spread articles analysisDouble spread articles analysis
Double spread articles analysis
 
Ascending & Descending Tracts Of The Spinal Cord
Ascending & Descending Tracts Of The Spinal Cord Ascending & Descending Tracts Of The Spinal Cord
Ascending & Descending Tracts Of The Spinal Cord
 
tugas tiik
tugas tiiktugas tiik
tugas tiik
 
Bitraf Arduino workshop
Bitraf Arduino workshopBitraf Arduino workshop
Bitraf Arduino workshop
 
RESOLUCIÓN MINISTERIAL Nº 148-2012-TR
RESOLUCIÓN MINISTERIAL Nº 148-2012-TRRESOLUCIÓN MINISTERIAL Nº 148-2012-TR
RESOLUCIÓN MINISTERIAL Nº 148-2012-TR
 
Laporan penelitian-tindakan-kelas-kelompok-5
Laporan penelitian-tindakan-kelas-kelompok-5Laporan penelitian-tindakan-kelas-kelompok-5
Laporan penelitian-tindakan-kelas-kelompok-5
 

Semelhante a Bear River Development Project

BIP Overview and Next Steps
BIP Overview and Next StepsBIP Overview and Next Steps
BIP Overview and Next StepsWalter Davidson
 
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...TWCA
 
Reducing sediment and nutrient loadings through river and streambank restoration
Reducing sediment and nutrient loadings through river and streambank restorationReducing sediment and nutrient loadings through river and streambank restoration
Reducing sediment and nutrient loadings through river and streambank restorationSoil and Water Conservation Society
 
Strengthening the White River Watershed: CRO Retreat Pecha Kucha
Strengthening the White River Watershed: CRO Retreat Pecha KuchaStrengthening the White River Watershed: CRO Retreat Pecha Kucha
Strengthening the White River Watershed: CRO Retreat Pecha KuchaCommunityResilienceOrgs
 
Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)Fairfax County
 
Rio Vista Drive Channel Stabilization
Rio Vista Drive Channel StabilizationRio Vista Drive Channel Stabilization
Rio Vista Drive Channel StabilizationFairfax County
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationFairfax County
 
Sequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectSequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectFairfax County
 
MASEFinalReport (2)
MASEFinalReport (2)MASEFinalReport (2)
MASEFinalReport (2)Sunil Satish
 
Dolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag ProjectDolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag ProjectFairfax County
 
2012 transportation summit r middleton
2012 transportation summit r middleton2012 transportation summit r middleton
2012 transportation summit r middletonwprf
 
Armfield Farm Detention Basin Retrofit
Armfield Farm Detention Basin RetrofitArmfield Farm Detention Basin Retrofit
Armfield Farm Detention Basin RetrofitFairfax County
 
Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Fairfax County
 
Piney Run at Lake Werowance Stream Restoration Project Oct 2019
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Piney Run at Lake Werowance Stream Restoration Project Oct 2019
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Fairfax County
 
Colfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectColfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectFairfax County
 
Long Branch Central Watershed Management Area 03-03-2021
Long Branch Central Watershed Management Area 03-03-2021Long Branch Central Watershed Management Area 03-03-2021
Long Branch Central Watershed Management Area 03-03-2021Fairfax County
 

Semelhante a Bear River Development Project (20)

BIP Overview and Next Steps
BIP Overview and Next StepsBIP Overview and Next Steps
BIP Overview and Next Steps
 
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...
 
Reducing sediment and nutrient loadings through river and streambank restoration
Reducing sediment and nutrient loadings through river and streambank restorationReducing sediment and nutrient loadings through river and streambank restoration
Reducing sediment and nutrient loadings through river and streambank restoration
 
College Station Water Supply
College Station Water SupplyCollege Station Water Supply
College Station Water Supply
 
Strengthening the White River Watershed: CRO Retreat Pecha Kucha
Strengthening the White River Watershed: CRO Retreat Pecha KuchaStrengthening the White River Watershed: CRO Retreat Pecha Kucha
Strengthening the White River Watershed: CRO Retreat Pecha Kucha
 
Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)
 
Rio Vista Drive Channel Stabilization
Rio Vista Drive Channel StabilizationRio Vista Drive Channel Stabilization
Rio Vista Drive Channel Stabilization
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
 
Sequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectSequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit Project
 
MASEFinalReport (2)
MASEFinalReport (2)MASEFinalReport (2)
MASEFinalReport (2)
 
Dolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag ProjectDolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag Project
 
2012 transportation summit r middleton
2012 transportation summit r middleton2012 transportation summit r middleton
2012 transportation summit r middleton
 
Armfield Farm Detention Basin Retrofit
Armfield Farm Detention Basin RetrofitArmfield Farm Detention Basin Retrofit
Armfield Farm Detention Basin Retrofit
 
Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014
 
2015-2016 Bay-Delta Workplan - February 26, 2015
2015-2016 Bay-Delta Workplan - February 26, 20152015-2016 Bay-Delta Workplan - February 26, 2015
2015-2016 Bay-Delta Workplan - February 26, 2015
 
Piney Run at Lake Werowance Stream Restoration Project Oct 2019
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Piney Run at Lake Werowance Stream Restoration Project Oct 2019
Piney Run at Lake Werowance Stream Restoration Project Oct 2019
 
City council 7 16-13 river project
City council 7 16-13 river projectCity council 7 16-13 river project
City council 7 16-13 river project
 
Honeycutt farm 2014 farm bill
Honeycutt farm   2014 farm billHoneycutt farm   2014 farm bill
Honeycutt farm 2014 farm bill
 
Colfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectColfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation Project
 
Long Branch Central Watershed Management Area 03-03-2021
Long Branch Central Watershed Management Area 03-03-2021Long Branch Central Watershed Management Area 03-03-2021
Long Branch Central Watershed Management Area 03-03-2021
 

Mais de State of Utah, Salt Lake City

Health Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims DatabaseHealth Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims DatabaseState of Utah, Salt Lake City
 
Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019State of Utah, Salt Lake City
 
The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...State of Utah, Salt Lake City
 
Utah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 LegislatureUtah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 LegislatureState of Utah, Salt Lake City
 
Utah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and AccomplishmentsUtah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and AccomplishmentsState of Utah, Salt Lake City
 
Fourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFSFourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFSState of Utah, Salt Lake City
 
Transportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging TrendsTransportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging TrendsState of Utah, Salt Lake City
 

Mais de State of Utah, Salt Lake City (20)

Utah Veterinary Diagnostic Laboratory
Utah Veterinary Diagnostic LaboratoryUtah Veterinary Diagnostic Laboratory
Utah Veterinary Diagnostic Laboratory
 
Health Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims DatabaseHealth Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims Database
 
Utah Division of Juvenile and Justice Services
Utah Division of Juvenile and Justice ServicesUtah Division of Juvenile and Justice Services
Utah Division of Juvenile and Justice Services
 
Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019
 
Localscapes
LocalscapesLocalscapes
Localscapes
 
Status of Translocated Tortoises in Southwest Utah
Status of Translocated Tortoises in Southwest UtahStatus of Translocated Tortoises in Southwest Utah
Status of Translocated Tortoises in Southwest Utah
 
The Logan River Observatory
The Logan River ObservatoryThe Logan River Observatory
The Logan River Observatory
 
Utah Strategic Workforce Presentation
Utah Strategic Workforce PresentationUtah Strategic Workforce Presentation
Utah Strategic Workforce Presentation
 
The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...
 
Utah Forestry, Fire and State Lands 2019
Utah Forestry, Fire and State Lands 2019Utah Forestry, Fire and State Lands 2019
Utah Forestry, Fire and State Lands 2019
 
Utah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 LegislatureUtah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 Legislature
 
UDOT Presentation to 2019 Legislature
UDOT Presentation to 2019 LegislatureUDOT Presentation to 2019 Legislature
UDOT Presentation to 2019 Legislature
 
Utah System of Technical Colleges
Utah System of Technical CollegesUtah System of Technical Colleges
Utah System of Technical Colleges
 
Public Water System Identification in Utah
Public Water System Identification in UtahPublic Water System Identification in Utah
Public Water System Identification in Utah
 
State of Utah Suicide Prevention
State of Utah Suicide PreventionState of Utah Suicide Prevention
State of Utah Suicide Prevention
 
Utah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and AccomplishmentsUtah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and Accomplishments
 
Fourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFSFourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFS
 
Update on FirstNet in Utah
Update on FirstNet in UtahUpdate on FirstNet in Utah
Update on FirstNet in Utah
 
Energy Incentives in Utah - 2018 Audit
Energy Incentives in Utah - 2018 AuditEnergy Incentives in Utah - 2018 Audit
Energy Incentives in Utah - 2018 Audit
 
Transportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging TrendsTransportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging Trends
 

Último

VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 

Último (20)

VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...
Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...
Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 

Bear River Development Project

  • 1. Bear River Development Project Providing Northern Utah’s Future Water Supply 1 Bear River Development Project. August 2014. All information subject to change.
  • 2. Why Are We Planning for the Bear River Project?  Utah’s population will double by 2060  We need additional water for that population  This will require three strategies to be successful: 2 - Education - Rates - Reuse - Infrastructure modernization - Agricultural conversions - Bear River Development Project - Lake Powell Pipeline Project Bear River Development Project. August 2014. All information subject to change.
  • 3. Bear River Project Participants  State of Utah Division of Water Resources  Participating Agencies • Bear River Water Conservancy District • Cache County • Jordan Valley Water Conservancy District • Weber Basin Water Conservancy District  Study Team • Bowen Collins, HDR, Gerhart Cole 3 Bear River Development Project. August 2014. All information subject to change.
  • 4. Bear River Watershed4 Bear River Development Project. August 2014. All information subject to change.
  • 5. Bear River Compact  Agreement between Utah, Idaho, and Wyoming in 1958  Amended in in 1980  Allocates water between the three states 5 Bear River Development Project. August 2014. All information subject to change.
  • 6. Bear River Development Act -1991 “The Division shall develop the surface waters of the Bear River and its tributaries through the planning and construction of reservoirs and associated facilities as authorized and funded by the Legislature; own and operate the facilities constructed; and market the developed waters” 6 Bear River Development Project. August 2014. All information subject to change.
  • 7. Bear River Development Act -1991 Total project water rights: 220,000 ac-ft 7 60,000 60,000 50,000 50,000 Project Allocation State of Utah Water Rights (acre-feet) BRWCD (Box Elder) Cache County JVWCD WBWCD Bear River Development Project. August 2014. All information subject to change.
  • 8. Previous Studies  Studies on the Bear River began in the 1960s by USBR  State of Utah has studied project since 1970s • Various reservoir sites in the basin  JVWCD and WBWCD • Routing studies on pipelines from state project to their service areas • Purchase of right-of-way  Ongoing State of Utah studies • Bear River water quality sampling, 1996-present • Bear River Project preliminary studies, since 2006-2014 8 Bear River Development Project. August 2014. All information subject to change.
  • 9. Water Supply Development9 0 50,000 100,000 150,000 200,000 250,000 0 50,000 100,000 150,000 200,000 250,000 FirmWaterSupply(acre-feet) Total Storage Volume (acre-feet) Firm Water Supply Versus Total Storage Volume Bear River Development Project. August 2014. All information subject to change.
  • 10. Potential Reservoir Sites in the Basin10 Bear River Development Project. August 2014. All information subject to change.
  • 11. Current Project Study Areas  Storage is required to develop the 220,000 ac-ft  Project has examined numerous storage sites within the Bear River Basin  State of Utah studied Washakie site in 2006  Project has shortlisted six other potential reservoir sites for further study: 11 • Whites Valley • Above Cutler • Cub River • Temple Fork • Fielding • Weber Bay Bear River Development Project. August 2014. All information subject to change.
  • 12. Project Features  Multiple reservoirs  Diversions from the Bear River  Cache County delivery  Raw water pipelines to West Haven WTP  Box Elder County delivery facilities  Finished water pipeline/storage reservoir/pump stations to Weber, Davis, and Salt Lake Counties 12 Bear River Development Project. August 2014. All information subject to change.
  • 13. Study Activities  Perform site investigations at six potential reservoir locations  Further refine overall project facilities  Prepare updated cost estimates  Begin environmental permitting process  Agency coordination 13 Bear River Development Project. August 2014. All information subject to change.
  • 14. Conceptual Design  Seven shortlisted reservoir sites  Raw water pipeline system to West Haven WTP  Finished water pipeline from West Haven to Weber, Davis, and Salt Lake Counties  Cache County delivery facilities 14 Bear River Development Project. August 2014. All information subject to change.
  • 15. Preliminary Project Investment Total investment over four phases: $1.5 billion 15 $197,012,613 $918,025,455 $217,343,665 $149,913,500 Bear River Project Costs by Phase Bear River Project. August 2014. All information subject to change. Initial storage and pipeline to Box Elder County Additional storage and pipeline to West Haven WTP Cache County storage and delivery facilities Project completion Project Components
  • 16. Preliminary Project Schedule (Based on First Water Needed by 2035) 16 Bear River Development Project. August 2014. All information subject to change.
  • 17. Questions?  Marisa Egbert, Division of Water Resources, Project Manager • Phone: 801-538-7230 • Email: marisaegbert@utah.gov 17 Bear River Development Project. August 2014. All information subject to change.