SlideShare uma empresa Scribd logo
1 de 4
`
SRIDHAR OMMI
MECHANICAL DESIGN ENGINEER
PRODUCT DEVELOPMENT | VALIDATION | CONCEPT DESIGNING
SUMMARY
 8 + years in Design,ProductDevelopment,and Virtual Engineering in Automobiles.
 Having a valid H1B visa upto Sep 2017.
 High Level experience in managing Large Engine Assemblies
 Proficientin conceptdesign,modeling and Harness routing,manufacturing support,design Validation,Trouble shooting.
 Processing Engineering Drawings upto Release level.
 Good knowledge in Bumper to Bumper chassis equipmentin CAT trucks .
 Extensively worked on large assemblies and packaging.
 Experienced in Creo2.0,vismockup 8.0, JT files,EDS, HVC and Teamcenter Engineering
 Good knowledge in GD&T and applying them in various levels.
 Major 3D modeling (Componentlevel and Assemblylevel) for Structures.
 Providing Conceptual Harness routings,bundle creation.Awareness on Schematic Drawings.
 Extensively worked on Solid modeling,Parametric design,Detailing ofpiece partdrawings,Assemblydrawing,Composite
drawing,Hydraulics and Harness Assemblyfrom a variety of source documents.
 Undergone a training programme on Perkins Engine Disassemblyand Assemblyin Caterpillar EDC-I,Chennai.
 Trained on Advanced Engine technology in CAT EDC-I.
 Implementation and resolving design issues thus reducing costofthe product.
 Experience in Virtual Design Review and Auditing of different Caterpillar Engines.
 Worked on Supermodels ofCaterpillar Engines ofdifferent platforms.
 Knowledge on Engine Structure and creating the JT models for differentEngine Modules.
 Expertise in NPI product BOM validation and Virtual Build for defining the mostefficientsequence of
operations and workflow using Teamcenter Vis Mockup.
 Excellent smart work in Validating virtually on Interference issues, Compatibility, Minimum clearance and Serviceability
Issues.
 Knowledge on different sub systems of engines
 Trained on Creo Simulate in South Milwaukee, WI.
 Worked on Conversion Projects Well Frac Service Machine, Bucyrus and Exodus.
COMPETENCIES
- Design
 Creo2.0
 Well Frac Trailer
 NewProductImplementation
 ContinuousProductImprovement
 TCE 10
- Manufacturing
 VDRA
 VB
 CAPP+,ECM (EngineeringChange Management)
 Vismockup10.1
- DrawingStandards
 GD&T
- MS Office
 PowerPoint
 Excel
`
PROFESSIONAL EXPERIENCE:
1) Employer: Automotive Robotics. Inc. since Aug 2010
Deployed to South Milwaukee May’16 to Aug’16
 Worked for Hydraulic Mining Shovels.
 Working on NPI projects by providing engineering support in design.
 Worked on NPI changes of Fuel Tanks, Power Module Frame Assembly, Oil Cooler Module.
 Interpreting the NPI design changes and preparing new models.
 Collaborating with the Analysis team and making necessary modifications.
 Converting Solid works models to Creo Models.
 Doing FEA on the models prepared and presenting to the clients.
 Uploading the models creation of Workflow process and collaborating with the detailing team and guiding them in
releasing the drawings.
2) Employer: Automotive Robotics. Inc. since Aug 2010
Deployed to Griffin Team April’ 14 to April’16
 Currently working for Griffin Well Frac Trailer.
 Working on NPI and CPI projects by providing engineering support in design.
 Providing conceptual designs based on the scope to the client for NPI projects.
 Making changes to existing products thus support the engineering team in Continuous Product changes for free flow of
manufacturing.
 Working on the feasibility of hydraulics according to the change in program on Truck
 Worked on the Chassis, Fuel System, Starting system, Hydraulic Systems, and other electrical systems of Well Frac
Machine.
 Developing concepts for all Vertical exhaust and fitments
 Efficient in Drawing Definition and standards of CAT and Navistar Trucks
 Worked on Sub-assemblies on chassis and validating for serviceability.
 Updating the Design Notice of the Engineering Releases and changes.
 Updating drawings with base line dimensions and updating as per new standards.
 Creating background for Group drawings.
 Creation of change package and Workflow process, uploading the drawings and associated models to Teamcenter and
following up with the Engineer for the final release of the drawings.
Deployed to Caterpillar Chassis and Machines Mar’ 13 to Mar’ 14
 Projects worked for Exodus, Aurora, MWL and Bucyrus.
 CAT Machines projects - 795AC Truck, 994, 988K EEF & NEEF, 950L, 950H
 Conversion Projects handled for Bucyrus and Exodus HMS - 6030/6060, MH3037/3027
 Provide mechanical design and development of new products for automotive equipment.
 Develop and recommend changes if any for manufacturing processes.
 Efficient in managing large assemblies by using simplified reps
 Preparing Solid & Sheet metal design, assembling, drafting & detailing of automotive parts.
 Developing models for Sheet metal components based on reference drawings and detailing them.
Project Scope
 Continuous process improvementteam to reduce the costin production oftrim parts.
 Reduce waste by eliminating Non value-added steps include Electrical parts and Hoses.
 Reduce potential componentdamage,earlyhour failure potential,warranty and maintenance cost.
 Collaborated early in design phases with suppliers to bring them in line with design special necessities and to develop
supplier specialties by sharing expertise and knowledge transfer.
 Conducting a peer review before sending the files to checking.
`
Deployed to Engine Validation Virtual Design Review Audit Aug’ 10 to Sep’ 12
 Providing the technical support to ensure all production new releases (NPI) and their changes (CPI) are introduced in a
timely and efficient manner.
 Identifying scope for Modifications process flow, ensuring components, assemblies and their drawings as per new
requirements, checking the BOM for component.
 Assembly in PRO-E with the available drawings from client and converting it into lightweight models (JT) whenever
required.
 Worked on the Supermodels of CAT Engines based on Platforms.
 Responsible for physical Implementation of ECO’s at Suppliers and coordinating with global purchasing Team for
identifying the Supplier for NPI part and procuring them for proving design.
 Product Data Management: Engineering Change Management, Bill of material (BOM) Management, and Life Cycle
Management of ECR/ECN
 The Pricelist process involves analyzing the various engine arrangements and different attachment groups for
compatibility by breaking up feature codes (FC's) and pricing arrangement (PA's) numbers to piece part level.
 Experience in Virtual Build for Caterpillar Engines using Vismockup 8.0
 Checking for tooling accessibility and other types of build and serviceability issues.
 Virtually auditing and reviewing all Engines which include Tier IV Engines using Jt files through Teamcenter Visualization
Mockup before Iron Built.
 Auditing of Bill of material, Tolerances and Compatibility between different Groups/Parts.
 Validating and reviewing all the Issues after correction.
 Communicating with the project Lead and Process Partner on any issues and follow up the solution to the team.
 Performing Virtual manufacturing by validating part fitment and also tool usage in the perspective of the workman
assembling the part.
 Validating CATERPILLAR Engines virtually on Interference issue with other parts, Minimum clearance with other parts,
Safety issues, Design related issue, Removals, Tool clearance, Fixture clearance and also with Cold and Hot Test
Equipment.
Roles and Responsibilities:
 Mentoring people regularly and guiding them in the process.
 Leading the team by resolving their issues.
 Conducting initial level of interview of new associates before forwarding to client.
 Maintenance of Monthly Reports.
 Conducting a quality check of the work handled by the associates before delivery.
 Providing a Standard Operating Procedure to be followed for the process.
3) Employer: Klas Industries Aug’ 09 – Jan’ 10
 Interpreting customer drawing & developing 3D model of components.
 Preparation of solid models and assembly of complex Pan Mixers and Concrete Block’s making machine.
 Responsible for issuing the Manufacturing drawings and get the required job done.
 Collaborated with Suppliers to develop alternative strategies for assembly techniques
 Maintain daily report and inventory report.
 Material and Cost Analysis for the required job.
 Responsible for the delivery of orders in time.
 Inspecting incoming raw material, Check in process inspection & final inspection of
Material.
 Checking dimensional & visual inspection of all process Products.
 Investigate and resolving Customer Complaints.
 Worked with local suppliers to understand alternative component availability to reduce cost.
`
4) Employer: Satyam BPO Engineering services Jan’ 08 – July’ 09
 Process involves Documentation of Engineering changes for Engine Assembly Line.
 To check the Team center for new releases, ECNR (engineering change no removals), CDR (Cancel and Destroy
Records).
 To check whether the MCS (Material control system) is updated or not.
 Validation and updating of BOM for latest Engineering changes in Material Control System with reference to Drawing
Engineering Notices and Team center JT files.
 To set and calculate standard time for different operations of assembly line (CATERPILLAR, MCOE unit).
 To create visuals for the operations in Photoshop using Vismockup.
 To link up the visuals to operations in Capp+.
EDUCATIONAL QUALIFICATION
 B.E in Mechanical Engineering (2007).

Mais conteúdo relacionado

Mais procurados (20)

Resume_Purushothaman
Resume_PurushothamanResume_Purushothaman
Resume_Purushothaman
 
Sandeep_CV_Updated
Sandeep_CV_UpdatedSandeep_CV_Updated
Sandeep_CV_Updated
 
Resume Subrahmanyam P
Resume Subrahmanyam PResume Subrahmanyam P
Resume Subrahmanyam P
 
Suresh Mamidi_Mechnical Design Engineer
Suresh Mamidi_Mechnical Design EngineerSuresh Mamidi_Mechnical Design Engineer
Suresh Mamidi_Mechnical Design Engineer
 
Resume of mandar_yadav
Resume of mandar_yadavResume of mandar_yadav
Resume of mandar_yadav
 
resume chetan (4)
resume chetan (4)resume chetan (4)
resume chetan (4)
 
CAE for Digital Development
CAE for Digital DevelopmentCAE for Digital Development
CAE for Digital Development
 
RichardStephensResume2
RichardStephensResume2RichardStephensResume2
RichardStephensResume2
 
Likhit_Resume
Likhit_ResumeLikhit_Resume
Likhit_Resume
 
Resume-Shrikant Kumbhar-2
Resume-Shrikant Kumbhar-2Resume-Shrikant Kumbhar-2
Resume-Shrikant Kumbhar-2
 
Sr. Estimation engineer
Sr. Estimation engineerSr. Estimation engineer
Sr. Estimation engineer
 
Praveen_Resume
Praveen_ResumePraveen_Resume
Praveen_Resume
 
Suresh resume
Suresh resumeSuresh resume
Suresh resume
 
sai-charan-das-katla-CV
sai-charan-das-katla-CVsai-charan-das-katla-CV
sai-charan-das-katla-CV
 
Noreen Resume 9-19-16
Noreen Resume 9-19-16Noreen Resume 9-19-16
Noreen Resume 9-19-16
 
Pushkaraj Bhagwat Resume CAE Engineer
Pushkaraj Bhagwat Resume CAE EngineerPushkaraj Bhagwat Resume CAE Engineer
Pushkaraj Bhagwat Resume CAE Engineer
 
Sagar cv
Sagar cvSagar cv
Sagar cv
 
Sarath
SarathSarath
Sarath
 
MANJU ME NPD
MANJU ME NPDMANJU ME NPD
MANJU ME NPD
 
Curriculum Vitae - Eddy Manurung - October2016
Curriculum Vitae - Eddy Manurung - October2016Curriculum Vitae - Eddy Manurung - October2016
Curriculum Vitae - Eddy Manurung - October2016
 

Destaque

14 perfect space saving solutions and storage ideas
14 perfect space saving solutions and storage ideas14 perfect space saving solutions and storage ideas
14 perfect space saving solutions and storage ideasAnn Traves
 
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Marketing
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc MarketingSách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Marketing
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc MarketingBạn Là Triệu Phú
 
Andres Felipe Rojas Arias
Andres Felipe Rojas Arias	Andres Felipe Rojas Arias
Andres Felipe Rojas Arias astrydquintero
 
Brand China - a presentation to Chinese Trademark Officials Dec2016
Brand China - a presentation to Chinese Trademark Officials Dec2016Brand China - a presentation to Chinese Trademark Officials Dec2016
Brand China - a presentation to Chinese Trademark Officials Dec2016Harry Falber
 
Newsletter CSC 158, 27 de novembro 2015
Newsletter CSC 158, 27 de novembro   2015Newsletter CSC 158, 27 de novembro   2015
Newsletter CSC 158, 27 de novembro 2015Rui de Almeida
 
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Nhân Sự
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Nhân SựSách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Nhân Sự
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Nhân SựBạn Là Triệu Phú
 
Prova3 tec banc
Prova3 tec bancProva3 tec banc
Prova3 tec bancJ M
 
Digitalni cas - KONACNA VERZIJA
Digitalni cas - KONACNA VERZIJADigitalni cas - KONACNA VERZIJA
Digitalni cas - KONACNA VERZIJAAnđelka Petrović
 
Ar.SADAM ALI CV
Ar.SADAM ALI CVAr.SADAM ALI CV
Ar.SADAM ALI CVSadam Ali
 
Sara, mayren, maria jose portafolio copia
Sara, mayren, maria jose portafolio   copiaSara, mayren, maria jose portafolio   copia
Sara, mayren, maria jose portafolio copiaMayren Arredondo
 
Formato hoja de_vida_version_2
Formato hoja de_vida_version_2Formato hoja de_vida_version_2
Formato hoja de_vida_version_2Margy Gómes
 
Newsletter 113, 16 de janeiro 2015
Newsletter 113, 16 de janeiro  2015Newsletter 113, 16 de janeiro  2015
Newsletter 113, 16 de janeiro 2015Rui de Almeida
 

Destaque (16)

14 perfect space saving solutions and storage ideas
14 perfect space saving solutions and storage ideas14 perfect space saving solutions and storage ideas
14 perfect space saving solutions and storage ideas
 
Ijasah Update
Ijasah UpdateIjasah Update
Ijasah Update
 
VI Presentation cmf
VI Presentation cmfVI Presentation cmf
VI Presentation cmf
 
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Marketing
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc MarketingSách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Marketing
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Marketing
 
C language assignment help
C language assignment helpC language assignment help
C language assignment help
 
Andres Felipe Rojas Arias
Andres Felipe Rojas Arias	Andres Felipe Rojas Arias
Andres Felipe Rojas Arias
 
Brand China - a presentation to Chinese Trademark Officials Dec2016
Brand China - a presentation to Chinese Trademark Officials Dec2016Brand China - a presentation to Chinese Trademark Officials Dec2016
Brand China - a presentation to Chinese Trademark Officials Dec2016
 
Newsletter CSC 158, 27 de novembro 2015
Newsletter CSC 158, 27 de novembro   2015Newsletter CSC 158, 27 de novembro   2015
Newsletter CSC 158, 27 de novembro 2015
 
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Nhân Sự
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Nhân SựSách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Nhân Sự
Sách Hướng Nghiệp Bạn Là Triệu Phú - Chức vụ Giám Đốc Nhân Sự
 
Prova3 tec banc
Prova3 tec bancProva3 tec banc
Prova3 tec banc
 
Digitalni cas - KONACNA VERZIJA
Digitalni cas - KONACNA VERZIJADigitalni cas - KONACNA VERZIJA
Digitalni cas - KONACNA VERZIJA
 
Ar.SADAM ALI CV
Ar.SADAM ALI CVAr.SADAM ALI CV
Ar.SADAM ALI CV
 
Sara, mayren, maria jose portafolio copia
Sara, mayren, maria jose portafolio   copiaSara, mayren, maria jose portafolio   copia
Sara, mayren, maria jose portafolio copia
 
Democracia en América
Democracia en América Democracia en América
Democracia en América
 
Formato hoja de_vida_version_2
Formato hoja de_vida_version_2Formato hoja de_vida_version_2
Formato hoja de_vida_version_2
 
Newsletter 113, 16 de janeiro 2015
Newsletter 113, 16 de janeiro  2015Newsletter 113, 16 de janeiro  2015
Newsletter 113, 16 de janeiro 2015
 

Semelhante a SridharOmmi_Resume

Semelhante a SridharOmmi_Resume (20)

Sandeep_CV_Updated
Sandeep_CV_UpdatedSandeep_CV_Updated
Sandeep_CV_Updated
 
Sampath_Resume
Sampath_ResumeSampath_Resume
Sampath_Resume
 
Resume - Merwyn Cheruvathur
Resume - Merwyn CheruvathurResume - Merwyn Cheruvathur
Resume - Merwyn Cheruvathur
 
Shivaraj_Kumar_2016 (1)
Shivaraj_Kumar_2016 (1)Shivaraj_Kumar_2016 (1)
Shivaraj_Kumar_2016 (1)
 
Sandeep B_resume
Sandeep B_resumeSandeep B_resume
Sandeep B_resume
 
Marwan Shehata-CV.pdf
Marwan Shehata-CV.pdfMarwan Shehata-CV.pdf
Marwan Shehata-CV.pdf
 
Santhosh resume
Santhosh resumeSanthosh resume
Santhosh resume
 
chirag cv_
chirag cv_chirag cv_
chirag cv_
 
Mechanical Design Engineer_Jignesh Bhagat
Mechanical Design Engineer_Jignesh BhagatMechanical Design Engineer_Jignesh Bhagat
Mechanical Design Engineer_Jignesh Bhagat
 
Resume
ResumeResume
Resume
 
Resume_Periasamy_R
Resume_Periasamy_RResume_Periasamy_R
Resume_Periasamy_R
 
Resume-Aero
Resume-AeroResume-Aero
Resume-Aero
 
Resume 2018
Resume 2018Resume 2018
Resume 2018
 
Gerry Meyerink Resume(03)-2016-General Mech Design Resume
Gerry Meyerink Resume(03)-2016-General Mech Design ResumeGerry Meyerink Resume(03)-2016-General Mech Design Resume
Gerry Meyerink Resume(03)-2016-General Mech Design Resume
 
ARUNBALAJI_5.5_YRS_EXP_PRDT DEV
ARUNBALAJI_5.5_YRS_EXP_PRDT DEVARUNBALAJI_5.5_YRS_EXP_PRDT DEV
ARUNBALAJI_5.5_YRS_EXP_PRDT DEV
 
M_ANBARASU_Rn
M_ANBARASU_RnM_ANBARASU_Rn
M_ANBARASU_Rn
 
Akshay CV1
Akshay CV1Akshay CV1
Akshay CV1
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Sanchit - Resume
Sanchit - ResumeSanchit - Resume
Sanchit - Resume
 

SridharOmmi_Resume

  • 1. ` SRIDHAR OMMI MECHANICAL DESIGN ENGINEER PRODUCT DEVELOPMENT | VALIDATION | CONCEPT DESIGNING SUMMARY  8 + years in Design,ProductDevelopment,and Virtual Engineering in Automobiles.  Having a valid H1B visa upto Sep 2017.  High Level experience in managing Large Engine Assemblies  Proficientin conceptdesign,modeling and Harness routing,manufacturing support,design Validation,Trouble shooting.  Processing Engineering Drawings upto Release level.  Good knowledge in Bumper to Bumper chassis equipmentin CAT trucks .  Extensively worked on large assemblies and packaging.  Experienced in Creo2.0,vismockup 8.0, JT files,EDS, HVC and Teamcenter Engineering  Good knowledge in GD&T and applying them in various levels.  Major 3D modeling (Componentlevel and Assemblylevel) for Structures.  Providing Conceptual Harness routings,bundle creation.Awareness on Schematic Drawings.  Extensively worked on Solid modeling,Parametric design,Detailing ofpiece partdrawings,Assemblydrawing,Composite drawing,Hydraulics and Harness Assemblyfrom a variety of source documents.  Undergone a training programme on Perkins Engine Disassemblyand Assemblyin Caterpillar EDC-I,Chennai.  Trained on Advanced Engine technology in CAT EDC-I.  Implementation and resolving design issues thus reducing costofthe product.  Experience in Virtual Design Review and Auditing of different Caterpillar Engines.  Worked on Supermodels ofCaterpillar Engines ofdifferent platforms.  Knowledge on Engine Structure and creating the JT models for differentEngine Modules.  Expertise in NPI product BOM validation and Virtual Build for defining the mostefficientsequence of operations and workflow using Teamcenter Vis Mockup.  Excellent smart work in Validating virtually on Interference issues, Compatibility, Minimum clearance and Serviceability Issues.  Knowledge on different sub systems of engines  Trained on Creo Simulate in South Milwaukee, WI.  Worked on Conversion Projects Well Frac Service Machine, Bucyrus and Exodus. COMPETENCIES - Design  Creo2.0  Well Frac Trailer  NewProductImplementation  ContinuousProductImprovement  TCE 10 - Manufacturing  VDRA  VB  CAPP+,ECM (EngineeringChange Management)  Vismockup10.1 - DrawingStandards  GD&T - MS Office  PowerPoint  Excel
  • 2. ` PROFESSIONAL EXPERIENCE: 1) Employer: Automotive Robotics. Inc. since Aug 2010 Deployed to South Milwaukee May’16 to Aug’16  Worked for Hydraulic Mining Shovels.  Working on NPI projects by providing engineering support in design.  Worked on NPI changes of Fuel Tanks, Power Module Frame Assembly, Oil Cooler Module.  Interpreting the NPI design changes and preparing new models.  Collaborating with the Analysis team and making necessary modifications.  Converting Solid works models to Creo Models.  Doing FEA on the models prepared and presenting to the clients.  Uploading the models creation of Workflow process and collaborating with the detailing team and guiding them in releasing the drawings. 2) Employer: Automotive Robotics. Inc. since Aug 2010 Deployed to Griffin Team April’ 14 to April’16  Currently working for Griffin Well Frac Trailer.  Working on NPI and CPI projects by providing engineering support in design.  Providing conceptual designs based on the scope to the client for NPI projects.  Making changes to existing products thus support the engineering team in Continuous Product changes for free flow of manufacturing.  Working on the feasibility of hydraulics according to the change in program on Truck  Worked on the Chassis, Fuel System, Starting system, Hydraulic Systems, and other electrical systems of Well Frac Machine.  Developing concepts for all Vertical exhaust and fitments  Efficient in Drawing Definition and standards of CAT and Navistar Trucks  Worked on Sub-assemblies on chassis and validating for serviceability.  Updating the Design Notice of the Engineering Releases and changes.  Updating drawings with base line dimensions and updating as per new standards.  Creating background for Group drawings.  Creation of change package and Workflow process, uploading the drawings and associated models to Teamcenter and following up with the Engineer for the final release of the drawings. Deployed to Caterpillar Chassis and Machines Mar’ 13 to Mar’ 14  Projects worked for Exodus, Aurora, MWL and Bucyrus.  CAT Machines projects - 795AC Truck, 994, 988K EEF & NEEF, 950L, 950H  Conversion Projects handled for Bucyrus and Exodus HMS - 6030/6060, MH3037/3027  Provide mechanical design and development of new products for automotive equipment.  Develop and recommend changes if any for manufacturing processes.  Efficient in managing large assemblies by using simplified reps  Preparing Solid & Sheet metal design, assembling, drafting & detailing of automotive parts.  Developing models for Sheet metal components based on reference drawings and detailing them. Project Scope  Continuous process improvementteam to reduce the costin production oftrim parts.  Reduce waste by eliminating Non value-added steps include Electrical parts and Hoses.  Reduce potential componentdamage,earlyhour failure potential,warranty and maintenance cost.  Collaborated early in design phases with suppliers to bring them in line with design special necessities and to develop supplier specialties by sharing expertise and knowledge transfer.  Conducting a peer review before sending the files to checking.
  • 3. ` Deployed to Engine Validation Virtual Design Review Audit Aug’ 10 to Sep’ 12  Providing the technical support to ensure all production new releases (NPI) and their changes (CPI) are introduced in a timely and efficient manner.  Identifying scope for Modifications process flow, ensuring components, assemblies and their drawings as per new requirements, checking the BOM for component.  Assembly in PRO-E with the available drawings from client and converting it into lightweight models (JT) whenever required.  Worked on the Supermodels of CAT Engines based on Platforms.  Responsible for physical Implementation of ECO’s at Suppliers and coordinating with global purchasing Team for identifying the Supplier for NPI part and procuring them for proving design.  Product Data Management: Engineering Change Management, Bill of material (BOM) Management, and Life Cycle Management of ECR/ECN  The Pricelist process involves analyzing the various engine arrangements and different attachment groups for compatibility by breaking up feature codes (FC's) and pricing arrangement (PA's) numbers to piece part level.  Experience in Virtual Build for Caterpillar Engines using Vismockup 8.0  Checking for tooling accessibility and other types of build and serviceability issues.  Virtually auditing and reviewing all Engines which include Tier IV Engines using Jt files through Teamcenter Visualization Mockup before Iron Built.  Auditing of Bill of material, Tolerances and Compatibility between different Groups/Parts.  Validating and reviewing all the Issues after correction.  Communicating with the project Lead and Process Partner on any issues and follow up the solution to the team.  Performing Virtual manufacturing by validating part fitment and also tool usage in the perspective of the workman assembling the part.  Validating CATERPILLAR Engines virtually on Interference issue with other parts, Minimum clearance with other parts, Safety issues, Design related issue, Removals, Tool clearance, Fixture clearance and also with Cold and Hot Test Equipment. Roles and Responsibilities:  Mentoring people regularly and guiding them in the process.  Leading the team by resolving their issues.  Conducting initial level of interview of new associates before forwarding to client.  Maintenance of Monthly Reports.  Conducting a quality check of the work handled by the associates before delivery.  Providing a Standard Operating Procedure to be followed for the process. 3) Employer: Klas Industries Aug’ 09 – Jan’ 10  Interpreting customer drawing & developing 3D model of components.  Preparation of solid models and assembly of complex Pan Mixers and Concrete Block’s making machine.  Responsible for issuing the Manufacturing drawings and get the required job done.  Collaborated with Suppliers to develop alternative strategies for assembly techniques  Maintain daily report and inventory report.  Material and Cost Analysis for the required job.  Responsible for the delivery of orders in time.  Inspecting incoming raw material, Check in process inspection & final inspection of Material.  Checking dimensional & visual inspection of all process Products.  Investigate and resolving Customer Complaints.  Worked with local suppliers to understand alternative component availability to reduce cost.
  • 4. ` 4) Employer: Satyam BPO Engineering services Jan’ 08 – July’ 09  Process involves Documentation of Engineering changes for Engine Assembly Line.  To check the Team center for new releases, ECNR (engineering change no removals), CDR (Cancel and Destroy Records).  To check whether the MCS (Material control system) is updated or not.  Validation and updating of BOM for latest Engineering changes in Material Control System with reference to Drawing Engineering Notices and Team center JT files.  To set and calculate standard time for different operations of assembly line (CATERPILLAR, MCOE unit).  To create visuals for the operations in Photoshop using Vismockup.  To link up the visuals to operations in Capp+. EDUCATIONAL QUALIFICATION  B.E in Mechanical Engineering (2007).