Reliability and Maintenance Engineering
                Lecture 8
   Introduction
   Job Planning
   Steps of Job Planning
   Job Manual
   Steps in preparing Job Manual
   Uses of Job Manual
   Short Term Planning
   Long Term Planning
   References
Effective planning and scheduling
  contribute significantly to the following:
 Reduced maintenance cost.
 Improved utilization of maintenance workforce

  by reducing delays and interruptions.
 Improved quality of maintenance work by

  adopting best methods and procedures and
  assigning the most qualified worker for the jobs.
   Planning of maintenance jobs basically deals with
    answering two questions, “what ” and “How” of the job;
    i.e., “what jobs/activities are to be done” and “how those
    jobs and activities are to be done.

   The job planning forms the basic foundation, over which
    the efficiency and cost of further actions (e.g.
    scheduling, execution and control etc) will be decided.

   Person responsible for job planning should have
    adequate qualities/capabilities, such as knowledge about
    jobs and available techniques facilities and resources.
   Knowledge Base: It includes knowledge about
    equipment, job, available techniques, material and
    facilities etc.

   Job Investigation at Site: It gives a clear perception of
    the total job and also helps in ascertaining the physical
    access and space limitation.
         Lifting & handling facilities
         Disposal of oil/gases/hazardous material facility
         Safety enclosures for m/c under repair


   Identify and document the work: knowing earlier two
    steps and knowing the needs of preventive, predictive and
    other maintenance jobs, a complete job/work list is made.
4. Development of Repair Plan: Preparation of step-step
  procedures which would accomplish the work with the
  most economical use of time, manpower and material.
  (see fig(a)).

5. Preparation of Tools, Tackles & Facilities Lists:
     Job Plan sheet


6.Estimation of Time Required to do the Job: For
  smaller jobs, it is easier, but for bigger jobs it may need
  knowledge       of    “Work       simplification”,   “Work
  measurement” and Critical Path analysis.
Planning sheet for Changing V belt of Blower-X

Equipment Name: Blower                W.O Number            Planner         Date      Seq
X                                     ----                  Mr, ---         -----     -----
Equipment Code----

Job Title- Change V belt (Cracked & worm)
Job scope                                      Material, Tools & Equipments

Job Steps                       Cre
                                w
                                       Est.
                                       hours
                                               Description                   Qty     Stock as
                                                                                     on
                                                                                                Co
                                                                                                st



1.  Look out, disconnect &             0.25
    Tag Motor starter,
2. Remove belt guard, loosen
    & jack motor, remove               0.75    Sheave guage(tool kit)
    bolts
3. Check both sheaves for                      Mag. base dial Indicator      1set    4, SH-1
    side wall wear & radial            1.0     •Big sheave (Part No.)        1 set   4 ,SH-1
    run-out (should not be                     •Bushing (Part No.)           1 set   3, SH-1
    more the +1mm for big &                    •Small Sheave(Part No.)       1 set   3, SH-1
    +0.25 for small end),                      •Bushing (Part No.)
    Replace Worn-out sheaves
    if needed
Drawing No:-                 Total time:-                    Total cost:-
Open repair file

          ok                                        Check
                       planning                     spares
    waiting time                                    &matl


                    Postpon
                    e repair
     no
Discuss with
    Plant
  Engineer
maintenance
                               no
   I/c and
 others for                 Finalization of
 alternative                  repair plan

                   Print Repair plans/work-orders
   Job manuals includes methodologies, tools
    tackles and facilities for all maintenance jobs
    which may have to be done in future.

   This also involves saving the different plans and
    modifying and expanding those plans for other
    similar machines.
1.   Make a list of all major and medium jobs of the plant
     and codify for proper identification,

3.   For each coded job, a separate job manual is to be
     made in the form of job plan, indicating job steps,
     tools, tackles, spares, consumables and facilities
     needed and also indicating safety and statutory
     clearance.

5.   Each job manual, thus prepared, should and cross
     checked and cleared by maintenance in-charge.
4. Different job manuals should be bunched and sent
  to respective potential users.

5. Necessary updating of job manuals, as needed, in
  consultation with respective users.
   For actual planning and scheduling of any job, the
    job manuals provide ready information for use as it
    is or for further micro-planning.

   The executing agencies refer to the job manual
    before starting the job, to avoid frequent visits to
    stores and thus save time.

   Material department may also use job manual for
    better material procurement strategy.
   Short term plans are generally short term schedule and
    its duration may be hours, day weeks or months and it
    is tactical(particular goal) planning.

   It covers 10% to 15% of the schedule of total job.

   These jobs are normally derived from master schedule
    of total job and carried out on day-to-day basis or at
    shorter notice.
1.   Lubrication plans and schedules,
2.   Small defect rectification
3.   Vibrating monitoring of few critical equipments,
4.   Lubricant monitoring, thermography and other
     monitoring as per need,
5.   Small predictive maintenance and preventive
     maintenance jobs etc.,
6.   Occasionally, small shutdowns, for some urgent
     repairs, may also be included in short term planning.
   Long term plans are generally for future purpose
    and the duration may be months or years.

   It includes the jobs/actions which are helpful in
    maintaining original level of performance in
    terms of output, efficiency and reliability.

   These jobs call for more resources, coordination
    with many agencies and planning much in
    advance.
   Major Repairs: It includes jobs required to restore
    a seriously deteriorated or broken-down equipment
    . The frequency of such repair is normally once or
    twice a year.

   Capital Repairs: It includes major dismantling
    and nearly rebuilding of the equipment /plant,
    needing lot of resources. Frequency of such
    repairs is once in two years or even later.
   Annual overhauls :- These apparently appears like
    major repairs/overhauls and may include job of
    similar nature but it is generally taken on yearly basis
    and mainly taken for following reasons –

1. Annual maintenance cleaning, painting and corrosion
  prevention of equipments, machines, tanks,
  reservoirs, filters and heat exchangers etc.,
2. Annual operational cleaning and painting jobs, like
  removal of mill-scales, dust & debris, cobbles and
  crop- pieces and reconditioning of deflectors,
  diverters etc.,
   Renovation & Revamping: After the equipment has
    deteriorated to such an extent that the amount of major/
    capital repairs, PM,PdM and other maintenance repairs
    do not yield desired result and maintenance becomes
    uneconomical.

   These includes almost total rebuilding of the
    equipment, using either similar type of technology with
    some redesign or improved technology and equipment.

   Up-gradation of equipment availability and reliability
    are definitely the aim for such plans.
   Modernization: It is planned when the
    operation and profitability of the plant or
    section uneconomical and no
    improvement can be made.
   Five year Rolling Plan(3 to 10)
   Turn around Planning(for total
    maintenance jobs)
   Corporate Maintenance Plans(like 5-yr
    or 10-yr rolling plan)
   Sushil Kumar Srivastava, Industrial maintenance
    management, s.chand & co.
   www.maintenanceworld.com/articles/rushton/effective
   www.bin95.com
A presentation on job planning job manuals,

Mais conteúdo relacionado

Mais procurados

Job evaluation & merit rating
Job evaluation & merit ratingJob evaluation & merit rating
Job evaluation & merit rating
Bibin Ssb
 
Compensation
CompensationCompensation
Compensation
amitgleam
 
The contract labour (regulation and abolition), 1970
The contract labour (regulation and abolition), 1970The contract labour (regulation and abolition), 1970
The contract labour (regulation and abolition), 1970
ACS Shalu Saraf
 
Labour management ppt
Labour management  pptLabour management  ppt
Labour management ppt
Anit Datta
 

Mais procurados (20)

Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Worker education
Worker educationWorker education
Worker education
 
wage and salary administration
wage and salary administrationwage and salary administration
wage and salary administration
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
HRM module 4
HRM module 4HRM module 4
HRM module 4
 
The factories act 1948
The factories act 1948The factories act 1948
The factories act 1948
 
Method study
Method studyMethod study
Method study
 
Compensation management in international context
Compensation management in international contextCompensation management in international context
Compensation management in international context
 
Job evaluation & merit rating
Job evaluation & merit ratingJob evaluation & merit rating
Job evaluation & merit rating
 
Salient trends of Industrial Relations (IR)
Salient trends of Industrial Relations (IR)Salient trends of Industrial Relations (IR)
Salient trends of Industrial Relations (IR)
 
Contract labour
Contract labourContract labour
Contract labour
 
Extruder Manual Less System Essentials
Extruder Manual Less System EssentialsExtruder Manual Less System Essentials
Extruder Manual Less System Essentials
 
Compensation
CompensationCompensation
Compensation
 
The contract labour (regulation and abolition), 1970
The contract labour (regulation and abolition), 1970The contract labour (regulation and abolition), 1970
The contract labour (regulation and abolition), 1970
 
method of job evaluation
method of job evaluationmethod of job evaluation
method of job evaluation
 
Induction and Orientation
Induction and OrientationInduction and Orientation
Induction and Orientation
 
Labour welfare
Labour welfareLabour welfare
Labour welfare
 
Esic benifits ppt
Esic benifits pptEsic benifits ppt
Esic benifits ppt
 
Labour management ppt
Labour management  pptLabour management  ppt
Labour management ppt
 
12.3 Staffing Procedures
12.3  Staffing Procedures12.3  Staffing Procedures
12.3 Staffing Procedures
 

Destaque (8)

Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
 
Jobs in-English-
Jobs in-English-Jobs in-English-
Jobs in-English-
 
job scheduling
job schedulingjob scheduling
job scheduling
 
Veterinarian powerpoint
Veterinarian powerpointVeterinarian powerpoint
Veterinarian powerpoint
 
Veterinary slideshow (presentation of career)
Veterinary slideshow (presentation of career)Veterinary slideshow (presentation of career)
Veterinary slideshow (presentation of career)
 
Life@SlideShare
Life@SlideShareLife@SlideShare
Life@SlideShare
 
Resource allocation
Resource allocationResource allocation
Resource allocation
 
Human resource planning ppt.
Human resource planning ppt.Human resource planning ppt.
Human resource planning ppt.
 

Semelhante a A presentation on job planning job manuals,

Module_2_Industrial_Maintenance_Manageme.pptx
Module_2_Industrial_Maintenance_Manageme.pptxModule_2_Industrial_Maintenance_Manageme.pptx
Module_2_Industrial_Maintenance_Manageme.pptx
AnaAna856803
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
ARIV4
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
pikuoec
 

Semelhante a A presentation on job planning job manuals, (20)

Industrial Machines Maintenance
Industrial Machines MaintenanceIndustrial Machines Maintenance
Industrial Machines Maintenance
 
Module_2_Industrial_Maintenance_Manageme.pptx
Module_2_Industrial_Maintenance_Manageme.pptxModule_2_Industrial_Maintenance_Manageme.pptx
Module_2_Industrial_Maintenance_Manageme.pptx
 
OR&A - Bridging the gap
OR&A - Bridging the gapOR&A - Bridging the gap
OR&A - Bridging the gap
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
IRJET- Production Plan and Control
IRJET- Production Plan and ControlIRJET- Production Plan and Control
IRJET- Production Plan and Control
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
 
PRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMP
PRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMPPRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMP
PRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMP
 
PEPD MODULE 1.pdf
PEPD MODULE 1.pdfPEPD MODULE 1.pdf
PEPD MODULE 1.pdf
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Chap 8 Organization of Maintenance Resources.ppt
Chap 8 Organization of Maintenance Resources.pptChap 8 Organization of Maintenance Resources.ppt
Chap 8 Organization of Maintenance Resources.ppt
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOLLEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
Maintenance Work Order
Maintenance Work OrderMaintenance Work Order
Maintenance Work Order
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
Viziya
Viziya Viziya
Viziya
 

Último

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Krashi Coaching
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Último (20)

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 

A presentation on job planning job manuals,

  • 1. Reliability and Maintenance Engineering Lecture 8
  • 2. Introduction  Job Planning  Steps of Job Planning  Job Manual  Steps in preparing Job Manual  Uses of Job Manual  Short Term Planning  Long Term Planning  References
  • 3. Effective planning and scheduling contribute significantly to the following:  Reduced maintenance cost.  Improved utilization of maintenance workforce by reducing delays and interruptions.  Improved quality of maintenance work by adopting best methods and procedures and assigning the most qualified worker for the jobs.
  • 4. Planning of maintenance jobs basically deals with answering two questions, “what ” and “How” of the job; i.e., “what jobs/activities are to be done” and “how those jobs and activities are to be done.  The job planning forms the basic foundation, over which the efficiency and cost of further actions (e.g. scheduling, execution and control etc) will be decided.  Person responsible for job planning should have adequate qualities/capabilities, such as knowledge about jobs and available techniques facilities and resources.
  • 5.
  • 6. Knowledge Base: It includes knowledge about equipment, job, available techniques, material and facilities etc.  Job Investigation at Site: It gives a clear perception of the total job and also helps in ascertaining the physical access and space limitation.  Lifting & handling facilities  Disposal of oil/gases/hazardous material facility  Safety enclosures for m/c under repair  Identify and document the work: knowing earlier two steps and knowing the needs of preventive, predictive and other maintenance jobs, a complete job/work list is made.
  • 7. 4. Development of Repair Plan: Preparation of step-step procedures which would accomplish the work with the most economical use of time, manpower and material. (see fig(a)). 5. Preparation of Tools, Tackles & Facilities Lists: Job Plan sheet 6.Estimation of Time Required to do the Job: For smaller jobs, it is easier, but for bigger jobs it may need knowledge of “Work simplification”, “Work measurement” and Critical Path analysis.
  • 8. Planning sheet for Changing V belt of Blower-X Equipment Name: Blower W.O Number Planner Date Seq X ---- Mr, --- ----- ----- Equipment Code---- Job Title- Change V belt (Cracked & worm) Job scope Material, Tools & Equipments Job Steps Cre w Est. hours Description Qty Stock as on Co st 1. Look out, disconnect & 0.25 Tag Motor starter, 2. Remove belt guard, loosen & jack motor, remove 0.75 Sheave guage(tool kit) bolts 3. Check both sheaves for Mag. base dial Indicator 1set 4, SH-1 side wall wear & radial 1.0 •Big sheave (Part No.) 1 set 4 ,SH-1 run-out (should not be •Bushing (Part No.) 1 set 3, SH-1 more the +1mm for big & •Small Sheave(Part No.) 1 set 3, SH-1 +0.25 for small end), •Bushing (Part No.) Replace Worn-out sheaves if needed Drawing No:- Total time:- Total cost:-
  • 9. Open repair file ok Check planning spares waiting time &matl Postpon e repair no Discuss with Plant Engineer maintenance no I/c and others for Finalization of alternative repair plan Print Repair plans/work-orders
  • 10. Job manuals includes methodologies, tools tackles and facilities for all maintenance jobs which may have to be done in future.  This also involves saving the different plans and modifying and expanding those plans for other similar machines.
  • 11. 1. Make a list of all major and medium jobs of the plant and codify for proper identification, 3. For each coded job, a separate job manual is to be made in the form of job plan, indicating job steps, tools, tackles, spares, consumables and facilities needed and also indicating safety and statutory clearance. 5. Each job manual, thus prepared, should and cross checked and cleared by maintenance in-charge.
  • 12. 4. Different job manuals should be bunched and sent to respective potential users. 5. Necessary updating of job manuals, as needed, in consultation with respective users.
  • 13. For actual planning and scheduling of any job, the job manuals provide ready information for use as it is or for further micro-planning.  The executing agencies refer to the job manual before starting the job, to avoid frequent visits to stores and thus save time.  Material department may also use job manual for better material procurement strategy.
  • 14.
  • 15. Short term plans are generally short term schedule and its duration may be hours, day weeks or months and it is tactical(particular goal) planning.  It covers 10% to 15% of the schedule of total job.  These jobs are normally derived from master schedule of total job and carried out on day-to-day basis or at shorter notice.
  • 16. 1. Lubrication plans and schedules, 2. Small defect rectification 3. Vibrating monitoring of few critical equipments, 4. Lubricant monitoring, thermography and other monitoring as per need, 5. Small predictive maintenance and preventive maintenance jobs etc., 6. Occasionally, small shutdowns, for some urgent repairs, may also be included in short term planning.
  • 17. Long term plans are generally for future purpose and the duration may be months or years.  It includes the jobs/actions which are helpful in maintaining original level of performance in terms of output, efficiency and reliability.  These jobs call for more resources, coordination with many agencies and planning much in advance.
  • 18. Major Repairs: It includes jobs required to restore a seriously deteriorated or broken-down equipment . The frequency of such repair is normally once or twice a year.  Capital Repairs: It includes major dismantling and nearly rebuilding of the equipment /plant, needing lot of resources. Frequency of such repairs is once in two years or even later.
  • 19. Annual overhauls :- These apparently appears like major repairs/overhauls and may include job of similar nature but it is generally taken on yearly basis and mainly taken for following reasons – 1. Annual maintenance cleaning, painting and corrosion prevention of equipments, machines, tanks, reservoirs, filters and heat exchangers etc., 2. Annual operational cleaning and painting jobs, like removal of mill-scales, dust & debris, cobbles and crop- pieces and reconditioning of deflectors, diverters etc.,
  • 20. Renovation & Revamping: After the equipment has deteriorated to such an extent that the amount of major/ capital repairs, PM,PdM and other maintenance repairs do not yield desired result and maintenance becomes uneconomical.  These includes almost total rebuilding of the equipment, using either similar type of technology with some redesign or improved technology and equipment.  Up-gradation of equipment availability and reliability are definitely the aim for such plans.
  • 21. Modernization: It is planned when the operation and profitability of the plant or section uneconomical and no improvement can be made.  Five year Rolling Plan(3 to 10)  Turn around Planning(for total maintenance jobs)  Corporate Maintenance Plans(like 5-yr or 10-yr rolling plan)