SlideShare uma empresa Scribd logo
1 de 5
Baixar para ler offline
Performance review for
Hotel Load Converter
Restricted | © Siemens Mobility 2022 | RC-IN SMO CS
Category Wise Major Failures
Restricted | © Siemens Mobility 2022 | RC-IN SMO CS
• Over temperature of modules are coming due to dust blockage in heat sink of
modules. Procedure of the same giving in slide 5.
Over temperature
• There is a leakage from the plate inside the panel, informed engineer to seal that
leakage by silica gel after cleaning the panel (as per slide 3)
Dust in panel
• This is basically due to dust on cards and optical fiber connectors. After cleaning
of panels & sealing the air leakage, optical fibre connectors to be clean in IOH.
PWR UCE
• This fault majorly comes due to temperature rise and that is happening due to
blockage of air filters of HLC doors.
HLC door filters has to be clean in interval of 3 months and in case if those are
permanently block and unable to clean then those has to replace with new. (slide
4)
M9000 fault
• Old couplers to be modify by zonal railway as per RDSO revised drawing no.
RDSO/PE/SPEC/AC/0177 (Rev.01)-2013 (Date of amendment 29/11/21)
Couplers
• F50 & F51 fuse of 6.3 amp to be replace by 15amp fuse.
• (250 locos completed out of 590 locos)
Control Fuse
• In a phase manner arranging input chokes to different shed for replacement of
suspected lot of input chokes
Input Choke
Attention in schedule for arresting dust in panel
Restricted | © Siemens Mobility 2022 | RC-IN SMO CS
 Leakage of air is there on top & bottom of plate mounted
in front of the blower. With the help of silica gel that need
to be seal.
 Sealing of cable entry
Attention in schedule for arresting dust in panel
Restricted | © Siemens Mobility 2022 | RC-IN SMO CS
 In interval of 3 months HLC door filters has to clean, so that proper
air circulation will happen inside the converter. In case if those are
permanently block and unable to clean then those has to replace
with new.
 After cleaning the same fit the filters properly and close the door
Process For Cleaning Of Heat Sink Of Modules
(Only in IOH OR when HLC removed from the loco)
Restricted | © Siemens Mobility 2022 | RC-IN SMO CS
Step-1:- remove top
and bottom louvers
Step-2:- Take high pressure air pipe from shed and insert it
from the gaps of impeller of blower towards downside.
Step-3:- Move/shake the
pipe from right to left and
left to right for approx. 5 to
10 min
Step-4:- Repeat the same process from other louver window

Mais conteúdo relacionado

Semelhante a Process of cleaing heatsink of modules.pdf

En Pres Cryogenic 0710 V2
En Pres Cryogenic 0710 V2En Pres Cryogenic 0710 V2
En Pres Cryogenic 0710 V2
eurolinx
 
3 Tiger - INTRODUCTION
3 Tiger - INTRODUCTION3 Tiger - INTRODUCTION
3 Tiger - INTRODUCTION
Taha Iqbal
 
298232596-HVAC-Handbook-CARRIER-2-Air-Distributer.pdf
298232596-HVAC-Handbook-CARRIER-2-Air-Distributer.pdf298232596-HVAC-Handbook-CARRIER-2-Air-Distributer.pdf
298232596-HVAC-Handbook-CARRIER-2-Air-Distributer.pdf
AhmadHamouda3
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
fujsked9dikdkd
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
jiuliu14811471
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
qianxu35543635
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
jfkksemmdmd
 

Semelhante a Process of cleaing heatsink of modules.pdf (20)

The Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyThe Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case study
 
Dental_Chair_2.doc
Dental_Chair_2.docDental_Chair_2.doc
Dental_Chair_2.doc
 
En Pres Cryogenic 0710 V2
En Pres Cryogenic 0710 V2En Pres Cryogenic 0710 V2
En Pres Cryogenic 0710 V2
 
Project review
Project reviewProject review
Project review
 
Fox Commercial Services PMA Presentation
Fox Commercial Services PMA PresentationFox Commercial Services PMA Presentation
Fox Commercial Services PMA Presentation
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
 
Brookvent part f compliance guide
Brookvent part f compliance guideBrookvent part f compliance guide
Brookvent part f compliance guide
 
Design HVAC System for Hospital
Design HVAC System for Hospital Design HVAC System for Hospital
Design HVAC System for Hospital
 
Aircraft Propulsion-Intakes.pptx
Aircraft Propulsion-Intakes.pptxAircraft Propulsion-Intakes.pptx
Aircraft Propulsion-Intakes.pptx
 
Cable blowing machine Up-electro
Cable blowing machine Up-electroCable blowing machine Up-electro
Cable blowing machine Up-electro
 
Webasto AIRTOP 3500/5000 Installation Instructions
Webasto AIRTOP 3500/5000 Installation InstructionsWebasto AIRTOP 3500/5000 Installation Instructions
Webasto AIRTOP 3500/5000 Installation Instructions
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentation
 
CPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationCPD Presentation: Car Park Ventilation
CPD Presentation: Car Park Ventilation
 
3 Tiger - INTRODUCTION
3 Tiger - INTRODUCTION3 Tiger - INTRODUCTION
3 Tiger - INTRODUCTION
 
298232596-HVAC-Handbook-CARRIER-2-Air-Distributer.pdf
298232596-HVAC-Handbook-CARRIER-2-Air-Distributer.pdf298232596-HVAC-Handbook-CARRIER-2-Air-Distributer.pdf
298232596-HVAC-Handbook-CARRIER-2-Air-Distributer.pdf
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
 

Último

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 

Process of cleaing heatsink of modules.pdf

  • 1. Performance review for Hotel Load Converter Restricted | © Siemens Mobility 2022 | RC-IN SMO CS
  • 2. Category Wise Major Failures Restricted | © Siemens Mobility 2022 | RC-IN SMO CS • Over temperature of modules are coming due to dust blockage in heat sink of modules. Procedure of the same giving in slide 5. Over temperature • There is a leakage from the plate inside the panel, informed engineer to seal that leakage by silica gel after cleaning the panel (as per slide 3) Dust in panel • This is basically due to dust on cards and optical fiber connectors. After cleaning of panels & sealing the air leakage, optical fibre connectors to be clean in IOH. PWR UCE • This fault majorly comes due to temperature rise and that is happening due to blockage of air filters of HLC doors. HLC door filters has to be clean in interval of 3 months and in case if those are permanently block and unable to clean then those has to replace with new. (slide 4) M9000 fault • Old couplers to be modify by zonal railway as per RDSO revised drawing no. RDSO/PE/SPEC/AC/0177 (Rev.01)-2013 (Date of amendment 29/11/21) Couplers • F50 & F51 fuse of 6.3 amp to be replace by 15amp fuse. • (250 locos completed out of 590 locos) Control Fuse • In a phase manner arranging input chokes to different shed for replacement of suspected lot of input chokes Input Choke
  • 3. Attention in schedule for arresting dust in panel Restricted | © Siemens Mobility 2022 | RC-IN SMO CS  Leakage of air is there on top & bottom of plate mounted in front of the blower. With the help of silica gel that need to be seal.  Sealing of cable entry
  • 4. Attention in schedule for arresting dust in panel Restricted | © Siemens Mobility 2022 | RC-IN SMO CS  In interval of 3 months HLC door filters has to clean, so that proper air circulation will happen inside the converter. In case if those are permanently block and unable to clean then those has to replace with new.  After cleaning the same fit the filters properly and close the door
  • 5. Process For Cleaning Of Heat Sink Of Modules (Only in IOH OR when HLC removed from the loco) Restricted | © Siemens Mobility 2022 | RC-IN SMO CS Step-1:- remove top and bottom louvers Step-2:- Take high pressure air pipe from shed and insert it from the gaps of impeller of blower towards downside. Step-3:- Move/shake the pipe from right to left and left to right for approx. 5 to 10 min Step-4:- Repeat the same process from other louver window