Showcase the process by which an organization deals with a disruptive and unexpected event using the Crisis Management PowerPoint Presentation Slides. Discuss the potential threats such as loss in sales, customer dissatisfaction, decrease in customer loyalty, increased overall expenses, tarnished reputation, and their impact on the firm’s overall performance. Take the assistance of our content-ready emergency management PowerPoint slide deck and highlight the methods used by the organization to deal with these threats. Discuss the purpose of the crisis management plan such as to minimize losses, to undertake the rescue operations, to ensure the security and safety of staff and visitors, etc. Make strategic decisions in order to reduce response time and provide guidance to the rest of the organization by taking the help of these crisis management planning PPT visuals. Highlight the steps to create the crisis management plan with the help of business continuity planning PowerPoint slideshow. Therefore, download our professionally designed contingency planning PowerPoint slide design and ensure that the organization is appropriately prepared for a crisis. https://bit.ly/31Oy8cj
4. 4
To respond in timely
and efficient manner.
To undertake the
rescue operations.
To
minimize losses.
To facilitate a fully integrated
multidisciplinary approach in
event of external disaster.
To ensure the safety and
security of staff and visitors.
Purpose
6. Plan Template (2/2)
6
Disaster
Management Plan
Mitigation Response Long Term
Measures
Rescue
Relief
Your
Text Here
Rehab
Reconstruct &
Recovery
Your
Text Here
Preparedness
Warning and
Evacuation
Planning
of Disaster
Response
Structural
Measures
Non-Structural
Measures
Risk
Analysis
Vulnerability
Analysis
Hazard
Assessment
Risk
Assessment
Prevention
7. Date List of Equipment Serial No.
Parts in Scope –
Maintenance Schedule
Frequency
Service Engineer
Name
Status
12th Jan 2018 Fire extinguisher Your text here Add your Text here 1 month Er. John Smith Installed
12th Jan 2018 Extension Cord Your text here Add your Text here 2 month Er. Paul Watson In progress
12th Jan 2018 Ropes Your text here Add your Text here 2 weeks Add your Text here Your text here
12th Jan 2018 Generator Your text here Add your Text here 3 month Add your Text here Your text here
12th Jan 2018 Add your Text here Your text here Add your Text here Your text here Add your Text here Your text here
12th Jan 2018 Add your Text here Your text here Add your Text here Your text here Add your Text here Your text here
Maintenance Review
7
8. 8
› Mitigation e.g. risk
prevention
› Preparedness e.g.
training programs
Pre - Event
› Response e.g.
immediate intervention
› Recovery e.g. Long
Term Plans
Post - Event
Scope
9. Prepare for your Event
9
Plan in advance
Do a short online check
search for your event in Google; search
for the event #hashtag on Twitter
› Objective
› Target Audience
› Main message
› Tactics per channel
› Timeline
› Budget
Create a solid pre, during
& post event approach
Objective: Create
awareness & excitement
around event
Main message:
promote event
details/launches
› Create a landing page to inform,
inspire & activate
› Drive traffic to your page with SEA
& social media
› Follow event activities on social
media channels
› Ask your colleagues to help by
sharing social posts
Objective: Create awareness
& excitement around event
Main message:
amplify your presence at
the event
› Drive traffic to your page with SEA
& social media
› Follow event activities on social
media channels
› Ask your colleagues to help by
sharing social posts
“the earlier,
the better”
PREPARARTION
Objective: Remember &
recycle event content is key
Main message:
reminder of event agenda
by recycling
› Update landing page with
event content
› Follow up with thank you
e-mail to attendees
› Reuse event message on
social media channels
› Report to your
organization
PRE EVENT
1-8 weeks before
event
DURING EVENT
the week of the
event
POST EVENT
1- 3 weeks after
event
12. 12
Project Director
NCRMP
Advisor
Policy & Plan
Advisor
Operations
Advisor
Mitigation
Joint Secretary
Administration
Financial
Advisor
Add Member
Name Here
Add Member
Name Here
Add Member
Name Here
Add Member
Name Here
Vice Chairman
Chairman
Assistant
Advisor
IT
Assistant
Advisor
Communication
Under
Secretary
Administration
Under
Secretary
General &Coord.
Joint
Advisor
Joint Advisor
Text Here
Joint Advisor
Operations
Joint Advisor
Mitigation
Projects
Procurements
Joint Advisor
Mitigation
Projects
Joint Advisor
Comn & IT
Deputy
Secretary
Joint Advisor
Text Here
Director
Finance
Project
Director
Assistant
Advisor
Assistant
Advisor
Text Here
Assistant
Advisor
Operations
Assistant
Advisor
Mitigation
Projects
Under
Secretary
Text Here
Assistant
Advisor
Finance
Project
Manager
Assistant Advisor
Mitigation
Projects
Procurements
Emergency Preparedness Planning and Management Committee Members (1/2)
13. 13
Compensation
time Unit
Documentation
Procurement /
Accounting
Claims
Cost / Budget
Food Service
Care & Shelter
Supply Unit
Information Systems /
Communications
Personnel &
Volunteer Unit
Demobilization &
Recovery
Situation Unit
Resource Unit
Damage Assessment
Text here
Law Enforcement
Facilities Operations
Evacuation / Residential
Operations
Medical Services
Fire Services
Incident
Commander
Management
Team
Safety Officer
EOC Director Add text here
Operations Logistics
Planning /
Intelligence
Finance
Administration
Emergency Preparedness Planning and Management Committee Members (2/2)
17. Hazard Identification
17
General Layout
Area is tidy and well kept. Yes / No
Adequate storage of provided for. Yes / No
Floor is free from obstructions. Yes / No
Sufficient space has been
allocated for each work area and
desk.
Yes / No
Walkways are free from
obstructions.
Yes / No
First Aid Facilities
Location of first aid kits is known to people. Yes / No
First aid kits are accessible within 5 minutes. Yes / No
First aid kits contents are checked every three months. Yes / No
Your Text Here Yes / No
Your Text Here Yes / No
Environment
Temperature is comfortable. Yes / No
Lighting is adequate. Yes / No
Area is free from odors. Yes / No
Your Text Here Yes / No
Your Text Here Yes / No
General Facilities
Washing facilities are adequate. Yes / No
Storage space for personal
belongings is available.
Yes / No
Cleaning off area is adequate. Yes / No
Cleaning chemicals are labelled. Yes / No
Your Text Here Yes / No
Environmental Issues
Use of energy resource is minimized. Yes / No
Recycling of used office supplies ( i . e . paper , toner,
cartridges. etc )
Yes / No
Workshop has had an energy audit. Yes / No
E-mail is used where possible . Yes / No
Your Text Here Yes / No
18. Risk Assessment
18
Risk Scoring Results
Consequences
Insignificant Minor Moderate Major Catastrophic
Likelihood 1 2 3 4 5
A. Almost
Certain
- - - - -
B. Likely - - - - -
C. Possible - - - - -
D. Unlikely - - - - -
E. Rare - - - - -
Extreme Risk
Immediate Action where senior
management
get involved
High Risk
Management
responsibility should be
specified
Moderate Risk
Managed by specific
responsible person
Low Risk
Managed by
routine process
19. Operational Impact Analysis
19
A B C D E
Cash Flow Profitability Impact 1 Impact 2 Impact 3
1 First Aid Injury Low Low Medium Medium High
2 Medical Treatment Injury Low Medium Medium High Extreme
3
Last time Injury less that 7
days
Medium Medium High Extreme Extreme
4 LTI > 7 days PTD or fatality Medium High Extreme Extreme Extreme
5 Multiple PTD or fatalities High High Extreme Extreme Extreme
Likelihood
Consequences
Low
Monitor and manage
Medium
Monitor and maintain strict
measures
High
Review and introduce additional
controls to lower the level of risk
Extreme
Do not proceed - immediately
introduce further control
measures to lower the risk. Re
assess before proceeding
20. Financial Impact Analysis
20
Factors Year Financial Losses Impact (% GDP)
Target Market 2018 $ 12,500 Decrease by 12%
Market Share 2018 $ 32,500 Decrease by 30%
Credit Risk 2018 $ 20,000 Increase by 40%
Marketing Strategies 2018 $ 17,000 Decrease by 18%
Liquidity Risk 2018 $ 2500 Increase by 30%
Asset Quality Risk 2018 $ 34,560 Increase by 28%
Interest Rate Risk 2018 $ 13,700 Increase by 23%
21. Plan for Impact on Employees and Customers Completed In Progress Not Started
Allow for employee absences during a pandemic due to factors such as personal illness, family
member illness, and public transportation closures.
Implement guidelines to modify the frequency and type of face-to-face contact among employees
Encourage and track annual influenza vaccination for employees.
Evaluate what employee access to health care services would be during a pandemic. and d
improve services as needed.
Your Text Here
Your Text Here
Client Safety “Get Prepared” Guide
21
23. Business Continuity Planning (1/3)
23
Business
Impact Analysis
Critical applications
Recovery Time
Objectives
Recovery Point
Objectives
Key Users
Equipment
Existing Risk(s)
analysis
Recovery
Strategy
Recovery Objectives
Design Criteria
Vital Records
Technical Architecture
Critical Business
Process
Business Continuity
Plan
Maintenance
Recovery
Capability
Testing
Training
Revision & Update
24. Business Continuity Planning Team (2/3)
24
Network
Servers
Desktop / Laptops
Application Data
rehabilitation
Process 1
Process 2
Process 3
Process 4
Process 5
Sales & Customer
Service
Human Resource
Finance Accounting
/ Purchasing
Facilities /
Engineering
Legal
Emergency
Response Team
Management
Business Continuity
Team Leader
Information
Technology
Production
Recovery Team
Support
Team
25. Business Continuity Planning (3/3)
25
Where are we now?
Where Do we want to
be?
How will we Get
there?
Who must do what How are we doing ?
Environmental Assessment Outcomes Implementation Review
Vision Mission / Core Values Develop Goals Scenario Analysis Measures
Identify Market Needs
Identify our
Capabilities
Objectives
Organizational
Strategies
Delegated Objectives Reward & Recognition
Strength and
Weaknesses
Opportunities and
Threats
Program Responsibilities Funding Strategies Defined Action Plans Outcomes & Tracking
Competitive Analysis Industry Trends Your Text Here
Board and
Organizational
Alignment
Your Text Here
Identify Current
Resources
Financial Capabilities Your Text Here Your Text Here
Priority Issues
Strategic Planning Implementation Management
27. Immediate steps to take in an Emergency
27
Activity Responsibility Timeframe Sign Off
Coordinate with Business Continuity
Plan team
if there is loss of site
Add Text Here Immediate Add Text Here
Coordinate with the Building Officer
if there is
a loss of site
Add Text Here Immediate Add Text Here
Conduct Team leaders meeting Add Text Here X minutes of incident Add Text Here
Contact back up facilities for
recovery of systems
Add Text Here X minutes of incident Add Text Here
Add Text Here Add Text Here X minutes of incident Add Text Here
Add Text Here Add Text Here X minutes of incident Add Text Here
Add Text Here Add Text Here X minutes of incident Add Text Here
Ref.
01
02
03
04
05
06
07
28. Communication with Staff
28
Text Here
Text Here
Text Here
Text Here
Text Here
Text Here
Text Here
Text Here Text Here Text Here
Text Here
Text Here
Text Here
Text Here Text Here
Text Here
Text Here
Text Here
Text Here Text Here
29. No of Points Alert Level Direct Action Response
≥ 6 3 Very High
Total Closure of all risk areas
• Complete closure to machine and worker of risk areas
• Operations allowed only outside the max. run-out zones
• Monitoring and visual observations are increased
Site investigation by geotechnical
engineer. Changing in alert level only
after engineer’s advice
≥ 3
2 High
Total Closure of high risk areas
• Closure of crushing installations for people’s safety
• No extraction works at the bottom of the slope
Movement/ weather situation
checked by geotechnical engineer.
Changing in alert level only after
engineer’s advice
> 1 1 Moderate
Partial Closure of high risk areas
• Access to crushing installations behind the barriers
• No extraction works at the bottom of the slope
Re-valuation of the situation every
24h by the production manager.
Geotechnical engineer are informed
≤ 1 0 Normal Situation
Acceptable risk Level
• Normal quarry operations following safety rules.
Real-time evaluation by quarry
workers and production Manager.
Company and state safety rules are
applied
Response Procedure
29
30. Response Level (1/2)
30
An Emergency Management Team
(EMT) is convened by Manager Security
Services.
› Security
› Campus Infrastructure Services
› Occupational Health Services
› Human Resource
› Student Services
› Add your text here
Possible EMT Membership
EMT Role
› Monitors effectiveness of local
response
› Add your text here
› Add your text here
› Add your text here
› In the event of fatality or serious
threat to life
› There is a potential for serious
implications for multiple areas.
› Add your text here
Emergency escalates to Crisis when:
Emergency
› Local Staff
› ECO (Directed by the chief Warden)
› Security Patrol
› Emergency Services (where necessary)
Responders
› Chief Warden liaises with local staff and
Security Patrol
› Security Patrol liaises with Chief Warden,
CMS and Emergency Services.
› Add your text here
› Add your text here
Communication
› There are multiple injuries, Threats to
life or environment significant damage
› Multiple building are impacted
› Add your text here
› Add your text here
Incident escalates to
Emergency when
Incident
A multi – disciplinary corporate
Crisis Management Team (CMT) is
convened by the Chief Operating
Officer
› Reviews and expands the EMT overall
response strategy
› Initiates action to minimize impact on
business and protect the University’s
Brand, reputation, image etc.
› Add your text here
› Add your text here
› Add your text here
› Add your text here
› Add your text here
CMT Role
Crisis
31. Response level (2/2)
31
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Potential or
Actual Threat
03
In Progress -
Response
Activities
required
01
Event in
Progress-
Major Event
02
Normal
Operations
04
33. Recovery Checklist
33
Economic Impact Status
Does the project re-establish existing business opportunities or provide new jobs?
Does the project improve deteriorated neighborhoods?
Does the provide new affordable lease or rent opportunities and / or ownership opportunities for new and existing businesses?
Does the project increase existing business incomes or contribute to additional spending?
Does the project provide new opportunities to diversify the economy by establishing programs or capital projects (e.g. training facility ,fiber option infrastructure:
distribution center) that would jump – start new industries?
Does the project create avenues for job trainnig or apprenticeships that would lead to increased wages for skills in demand?
Add Your Text Here
High Visibility and Builds Community Capacity
Does the project receive financial or physical investment from various segments of the community?
Does the project have have the ability to generate national interest through media attention. Public agency support. etc.?
Does the project have high visibility and distinct recognition within the community?
Does the project server as an essential building block and critical element for the community? Without these fundamental or essential public and private sector projects.
Elements services the community would be limited in its ability to flounce ( e.g. city Hall :Water distribution: waste hauling : post office : etc.)
Add Your Text Here
Add Your Text Here
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
Crosscutting Benefits
35. Crisis Management KPI Metrics
35
% of IT Risk
management
framework
covered by
defined methods
% of IT risk
management
structures and
activities set up
Vs planned
Degree of
completeness of IT
risk management
framework
76% 84% 92%
36. Crisis Management dashboard showing risk consequences type
36
40%
30%
20%
10%
Environment Safety Community Health
Risk Consequence Type
Risk By Site
Likelihood
Consequence
Rare Unlikely Possible Probable
Almost
Certain
1 (Insignificant)
3 (Minor)
3 (Moderate)
4 (Major)
5 (catastrophic)
Consequence Vs Likelihood
0 2 4 6 8 10
Location 1
Location 2
Location 3
Location 4
Location 5
37. Crisis Management dashboard showing risk heat map risk score
37
Risk Compared to Cost of Controls
Risk Heat Map
Impact
Likelihood
Risk Score Current
Annualized Cost of Control
GRC Risk History
4 6 8
4 11 4
3 16 6 9 3
4 4 5 3
2
3
4
5
4
4
5
6
8
9
0 2 4 6 8 10
Product Safety Review
Create Emergency Funds
Incearse Reserves
Security Training for all Emplloyees
GPS on Delivery Trucks
Cloud Provider Data Protection…
Product libility Insurance Policies
Competitive Financial Compensation
Advertising Budget
Arti-Malware/ Arti virus Softw are…
Dollar in Millions
In
Dollars
0%
20%
50%
80%
100%
10%
30%
40% 60%
70%
90%
70%
0
2
4
6
8
10
Annualized Cost (Milions) Average Current Risk Score
East Mid West Mountain
This graph/chart is linked to
excel and changes
automatically based on date.
Just left click on it and select
“Edit data”
No Data
38. 38
Risk Distribution By Business Process Risk Distribution By Country Inherent Risk Score
Risk Distribution By Business Process Risk Drivers Management Control Score
Travel and
Expanses
Accounts
Payable
Revenue
Inventory
General
Ledger
Treasury
Fixed
Assets
P Cards
Payroll
Office
Risk
Range
Inherent Risk
Score
Management
Controls Score
Office 1 Critical 252.5 3.6
Office 2 Critical 131.2 3.6
Office 3 Critical 123.0 6.6
Office 4 Critical 111.6 6.4
Office 5 Critical 116.2 4.3
Office 6 Critical 135.6 4.2
Office 7 Critical 113.1 4.3
Low Moderate Critical
High
Reputationa
l
Reporting
Compliance
Startegic
Operational
Minimal
0%
20%
50%
80%
100%
10%
30%
40% 60%
70%
90%
70%
0%
20%
50%
80%
100%
10%
30%
40% 60%
70%
90%
40%
Crisis Management Dashboard showing Risk Distribution by Business Process
39. Crisis Management Dashboard showing Company Compliance and Risk Posture
39
Company Compliance and Risk Posture
This graph is linked to excel, & changes automatically based on data. Just left click on it select “Edit Data”.
Compliance and Risk Trends
0%
10%
20%
30%
40%
50%
60%
SOX PCI HIPAA GLBA Overall
Low Medium High Full
This graph is linked to excel, & changes automatically based on data. Just left click on it select “Edit Data”.
Regulatory Compliance
Product 01 Add Name Here
Product 02 Add Name Here
Product 03 Add Name Here
Product 04 Add Name Here
Product 05 Add Name Here 60
62
66
96
89
High
High
High
Medium
High
Risk
Criticality
Owner
Asset
Top 5 Highest Risk Assets
0%
10%
20%
30%
40%
50%
Jan Feb Mar Apr May Jun Jul
Overall Compliance Overall Security Risk
Overall Compliance
0%
20%
50%
80%
100%
10%
30%
40% 60%
70%
90%
30%
Overall Security Risk
0%
20%
50%
80%
100%
10%
30%
40% 60%
70%
90%
70%
43. 3
4
7
12 12
13
14
17
18
2012 2013 2014 2015 2016 2017 2018 2019 2020
Clustered Column
43
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
44. Clustered Column - Line
44
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2016 2017 2018 2019
In
Percentage
Financial Year 2019
Product 01
This graph/chart is linked to excel, and
changes automatically based on data. Just
left click on it and select “Edit Data”.
Product 02
This graph/chart is linked to excel, and
changes automatically based on data. Just
left click on it and select “Edit Data”.
Product 03
This graph/chart is linked to excel, and
changes automatically based on data. Just
left click on it and select “Edit Data”.
46. Our Mission
46
Vision
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Mission
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Goal
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
47. Anne Davis
Manager
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Jane Brown
Web Designer
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Anne Davis
CEO
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Meet Our Team
47
48. 48
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Value Clients
Premium Services
Target Audiences
About Us
49. Venn
49
Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
03 01
02
50. Comparison
50
60% Male
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
40%
Female
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
51. Financial
51
60% 70%
50%
Minimum Medium Maximum
This slide is 100% editable.
Adapt it to your needs and
capture your
audience's attention.
This slide is 100% editable.
Adapt it to your needs and
capture your
audience's attention.
This slide is 100% editable.
Adapt it to your needs and
capture your
audience's attention.