SlideShare uma empresa Scribd logo
1 de 8
Baixar para ler offline
1
CURRICULUM VITAE
PERSONAL PARTICULARS
Name
Place and Date of Birth
Sex
Address
Telephone
E-Mail
Nationality
Marital Status
Passport No
Place and date issued
Language
FORMAL EDUCATION
Institution
1993 Department of Naval Construction, Diponegoro University
Indonesia
FORMAL DOCUMENTED TRAINING AND COURSES
 Certified Welding Inspector CSWIP 3.1, passed exam 2009.
 Completed training API 570 Piping Inspector, held on Nov 2012 by Oil Instutut.
 Storage Tank Inspector, Piping Inspector held on March and Sept 2003 by MIGAS
(Regulatory body in Indonesia).
 LRQA QMS Internal Auditor, held on July 2008 by IRCA.
 Certified NDT Level II – Radiographic testing , Magnetic Particle testing, Penetrant
testing and Ultrasonic testing, held on Dec 2012 by Flawtech Inspection services.
 BOSIET (Basic Offshore Safety Induction & Emergency Training), held on April 2013
by OPITO, Nigeria.
: Slamet Nurhadi
: Semarang, March 14,1967
: Male
: Perum Az-Zahra No.22 RT.01 RW.12 Desa Cimanganten
Tarogong Kaler, Kab. Garut, West Java – Indonesia
Post code 44151
: +62 822 1848 5285
: snurhadicnl@gmail.com
: Indonesian
: Married
: A 0201343 (Date of expiration April 12, 2016)
: Indonesia, Bandung April 12, 2011
: Indonesia, English
2
WORKING EXPERIENCES SUMMARIES
October 2015 – April 2016
Mc Connell Dowell Indonesia
QA QC Superintendent for DSLNG Condensate Export Facility Phase 2 Project
Responsibilities :
 To establish a system for quality control and quality assurance that will identify and
confirm that the characteristics of work processes and the finished works meet the
requirements of the design.
 Conformity of all construction activities with Company standards, procedures and
policies and with laws, regulations and industry standards.
 The IMS is understood at a level where the Quality Assurance and Quality Control
Coordinator can educate others.
 Collating deliverables required for practical completion.
 Managing project close out and archiving.
 To effectively coordinate Sample submission and approval across all facets of the
works.
 Responsible for coordinating the implementation and maintenance of the project
management system.
 Ensuring the adherence to the McConnell Dowell Integrated Management System
and Project Execution Plan.
June 2012 – June 2014
Baklang Allianz limited (Nigeria)
QA QC Procurement for Chevron Nigeria Limited (Escravos Produced Water Disposal Project)
Responsibilities :
 Ensure the status or availability of the relevant supplier or vendor documents prior
starting of Inspection or FAT (Factory Acceptance Test).
 Involved and witness on the FAT (Factory Acceptance Test) for Control Valves, shut
down valves, Booster Pumps, Pipeline pumps, Injection Pumps, Induction Bends, FBE
Coating, Pig Traps, Pressure vessels, Piping, Flange and fittings etc.
 Control and maintain the running process with supplier / vendor, third party Inspection
and PWD Project team prior shipping or dispatch materials and get resolve in case any
issue or problem.
 Review and response or comment on the relevant vendor documents such as Quality
Plan, Inspection & Test Plan, Testing Procedure, drawing, data sheet and raised the
Purchase Order (PO).
 Verify materials documentations as required in the PO (Purchase Order) prior inspection,
communicate with supplier/vendor to initiate for arrange Inspection to be done by Third
Party Inspection on Various Piping and Fitting materials.
 Verify inspection reports from Third Party as required standard and procedure required
as contain in the PO, base on the report will decide to dispatch materials if accepted.
3
 General Inspection Item for Piping (Visual Inspection, Dimensional Inspection,
Correlation of MTCs with the materials, Verify the authenticity of the certificates,
Physical/ Chemical testing-if required).
 Verify materials documentations as required in the PO (Purchase Order) prior inspection,
communicate with supplier/ vendor to initiate for arrange FAT (Factory Acceptance Test)
for long lead item material which shall be attended by representative of Government
Body in Nigeria (Shutdown Valve with actuator, Chemical Injection unit, Control valve,
Fire Detection system, MCC, Pressure relief valve, Pressure Vessel, Pig Trap, Pumps)
 Reviewed Contractor procedures as like quality plan, ITPs and quality procedures for
fabrication, erection or installation, painting work, I&E and preservation for various
equipments as like pipes and fittings stored on the yard, packages of skid, electrical and
instrument cables, motor and rotating equipment.
 Conduct Quality audit to contractor or sub contractor incompliance with approved Quality
plan & procedures. Issue a NCR for any violations or out of procedures, standards,
drawings. Follow it up non conforming reports issued for closing out.
October 2010 – June 2012
Baklang Allianz limited (Nigeria)
QAQC Coordinator for Chevron Nigeria Limited (Olero Creek Restoration project “Refurbishment
and Reinstallation of Olero water and Flow station in OML 049” for North Water Station (NWS),
North Flow Station (NFS) and Interconnecting Piping NWS to ICP).
Responsibilities :
 Reviewed and approved Contractor’s (Saipem Contracting Nigeria Limited) quality plan,
ITPs and quality procedures for fabrication, erection or installation, painting work, I&E
and preservation for various equipments as like pipes and fittings stored on the yard,
packages of skid, electrical and instrument cables, motor and rotating equipments etc.
 Review work packages prior to approve ready for fabrication and construction on piping,
structural, cast in place, grouting, package of skid equipment, blasting and painting.
 Monitor and verify running process of fabrication, erection and installation on shop
fabrication and barge of Piping spools, under base of structural for Turbine, stairway,
access platform and ladder, cast in place, grouting work, painting work, I&E works to
insure that quality process is in placed in accordance with procedures, standards and
ITPs required.
 Arrange and conduct joint verification, inspection or witness with Contractors and DPR
(Nigeria Government representative) on Piping, structural, stairway, access platform and
ladder, cast in place, grouting work, painting work, I&E works, Cube crushing test and
hydro test of pipes.
 Witnessing, welding procedure qualification, welder performance test and mechanical
tests in accordance to ASME IX, AWS D1.1 and ANSI B31.3.
 Conduct Quality audit to contractor or sub contractor incompliance with approved Quality
plan & procedures. Issue a NCR for any violations or out of procedures, standards,
drawings. Follow it up non conforming reports issued for closing out.
 Verify and walk down on the Zenator Check sheet (Construction stage, testing stage) for
Piping and mechanical prior move forwards to Commissioning stage on the various
equipment as like Piping, Skid package of equipment, concrete compartment tank.
 Conduct material verification, material audit and preservation for materials and
equipments.
4
April 2009 – September 2010
Surya Buddi Utama and SUPRACO (Indonesia)
QAQC Mechanical Coordinator for Chevron Geothermal Indonesia Power Plant, (existing facilities
and new project such as Pipelines, piping, pressure vessel and storage tank).
Responsibilities :
 Develop quality plan, ITP and quality procedures to be implemented at site in accordance
with code, standard and requirements of contract.
 Conduct qualitative and quantitative assessment for existing facilities (Pipeline, Vessel
and PSV) in accordance with RBI program, calculate of corrosion rate, remaining life in
accordance of API 570 for piping and API 510 for pressure vessel and prepare reports to
MIQA department and operation.
 Monitor and verify running process of fabrication, erection and installation to insure that
quality process is implemented in accordance with procedures, standards and ITPs
required.
 Conduct joint verification, inspection or witness with Contractor and Third party inspector
for running process of fabrication and Final Hydro test fabricated of steam pipeline and
piping.
 Review and approved final fabrication, construction and installation of Contractor’s
quality documents.
 Verify incoming materials (documentation, dimensional check, visual check and conduct
NDT if needed to insure no defect on the materials) for Piping, fitting, valve, stud bolts
and steel plates prior stored in the warehouse.
 Witnessing, welding procedure qualification, welder performance test and mechanical
tests in accordance to ASME IX and ANSI B31.3
 Material receiving inspection (documents verification, check heat number, visual,
dimensional inspection and perform NDT if necessary)
 Assist in documents preparation for re certification or renewal of the existing facility such
as Piping line, vessel, switch gear, battery room.
October 2007 – March 2009
PEC-Tech Indonesia
QAQC Coordinator for Santos Gas processing package project, Responsible to develop Quality
Plan, Process of fabrication, internal Audit and continual improvement program (related to ISO
9001:2000) for Gas processing package project TEG and DPC skid to be assembled at Grati, east
of java - Indonesia
Responsibilities :
 Develop quality plan, ITP and quality procedures to be implemented at site in accordance
with code, standard and requirements of contract.
 Monitor and verify running process of fabrication, erection and installation to insure that
quality process is implemented in accordance with procedures, standards and ITPs
required.
 Arrange Company Quality audit program (Internal) for sub contractor/ fabricator
incompliance with Client and contract requirements. Conduct joint audit with sub
contractor/ fabricator or vendor at fabrication yard, issue NCR in accordance with
approved quality procedures for any violations and out of procedures, standards,
drawings required, coordination with team for corrective action and follow it up for
closing.
5
 Arrange for joint verification, inspection, witness with Client and government
representative of Indonesia (MIGAS) of running process of fabrication and Final Hydro
test fabricated of pressure Vessel, Heat exchanger, piping and manual valves, PSV and
welding procedure qualification, welder test and Mechanical tests for structural and
piping.
 Review and approved final fabrication, construction and installation of quality documents.
Assist document control for handover quality documents.
 Reviewed Radiography Film Interpretation, Magnetic particle inspection, PT test (Non
destructive testing)
 Witnessing, welding procedure qualification, welder performance test and mechanical
tests in accordance to ASME IX and ANSI B31.3
 Material receiving inspection (documents verification, check heat number, visual,
dimensional inspection and perform NDT if necessary)
 Arrange and prepare documents for certification of pressure vessel and piping process
on the TEG and DPC skid.
August 2005 – August 2007
Tripatra Fluor Consortium
QC Inspector (Above ground storage Tank & Integrity assessment of existing facilities) for
Chevron at Bekasap or SLN area of Sumatra – Indonesia.
Responsibilities :
 Responsible for Quality aspect on above ground Storage Tank fabrication, erection and
testing in accordance API Standard 650 and responsible for conduct and evaluate
Qualitative and Quantitative assessment on existing of above ground storage Tank piping
and pressure vessel in accordance to API 653, API 570 and API 610.
 Reviewed and approved Contractor’s quality plan, ITP and quality procedures for
fabrication, erection, inspection and testing of Above Ground Storage Tank in accordance
to API Standard 650 (Materials, dimensional check, peaking, banding, plumb check,
pneumatic test for reinforcement of nozzle and COD, vacuum test for bottom and roof,
Diesel test, Hydro test of Storage Tank).
 Reviewed and approved Contractor’s quality plan, ITP and quality procedures as required
for conduct integrity Quantitative assessment of existing facilities (Existing of Storage
Tank and Piping flow lines)
 Monitor and verify running process of fabrication, erection and installation to insure that
quality process is implemented in accordance with procedures, standards and ITPs
required.
 Conduct Qualitative assessment for Existing facilities of Storage Tank and piping flow
lines, prepare and calculate Corrosion rate and remaining life in accordance to API 653
and API 570, the result of assessment to be reported to REM department (Reliability
Engineering & Maintenance)
 On-line and of-line inspection of above ground storage Tank in accordance API 653 and
risk base inspection program.
 Material receiving inspection (documents verification, check heat number, visual,
dimensional inspection and perform NDT if necessary)
 Reviewed Radiography Film Interpretation, Magnetic particle inspection, PT test (Non
destructive testing)
6
February 2003 – Up to June 2005
Istech Resourcess Asia
QC Inspector (Above ground storage Tank & Integrity assessment of existing facilities) for
Chevron at Bekasap or SLN area of Sumatra – Indonesia.
Responsibilities :
 Responsible for Quality aspect on above ground Storage Tank fabrication, erection and
testing in accordance API Standard 650 and responsible for conduct and evaluate
Qualitative and Quantitative assessment on existing of above ground storage Tank piping
and pressure vessel in accordance to API 653, API 570 and API 610.
 Reviewed and approved Contractor’s quality plan, ITP and quality procedures for
fabrication, erection, inspection and testing of Above Ground Storage Tank in accordance
to API Standard 650 (Materials, dimensional check, peaking, banding, plumb check,
pneumatic test for reinforcement of nozzle and COD, vacuum test for bottom and roof,
Diesel test, Hydro test of Storage Tank).
 Reviewed and approved Contractor’s quality plan, ITP and quality procedures as required
for conduct integrity Quantitative assessment of existing facilities (Existing of Storage
Tank and Piping flow lines)
 Monitor and verify running process of fabrication, erection and installation to insure that
quality process is implemented in accordance with procedures, standards and ITPs
required.
 Conduct Qualitative assessment for Existing facilities of Storage Tank and piping flow
lines, prepare and calculate Corrosion rate and remaining life in accordance to API 653
and API 570, the result of assessment to be reported to REM department (Reliability
Engineering & Maintenance)
 On-line and of-line inspection of above ground storage Tank in accordance API 653 and
risk base inspection program.
 Material receiving inspection (documents verification, check heat number, visual,
dimensional inspection and perform NDT if necessary)
 Reviewed Radiography Film Interpretation, Magnetic particle inspection, PT test (Non
destructive testing)
1999 - 2003
Dimensi Barumas perdana & Irsindo
QC Above Ground Strorage TANK Inspector for Chevron Duri Sumatera on above Ground Storage
TANK and Piping (New & Existing) at CVC Cooler and H2s Mitigation project area – 6 Duri, DSF
Slurry Fracture Injection project area – 6, Duri, Petapahan area, Kota batak, Riau, Indonesia.
Responsibilities :
 Responsible for Quality aspect on above ground Storage Tank fabrication, erection and
testing in accordance API Standard 650 and responsible for conduct and evaluate
Qualitative and Quantitative assessment on existing of above ground storage Tank and
piping in accordance to API 653, API 570.
 Reviewed and approved Contractor’s quality plan, ITP and quality procedures for
fabrication, erection, inspection and testing of Above Ground Storage Tank in accordance
to API Standard 650 (Materials, dimensional check, peaking, banding, plumb check,
7
pneumatic test for reinforcement of nozzle and COD, vacuum test for bottom and roof,
Diesel test, Hydro test of Storage Tank).
 Reviewed and approved Contractor’s quality plan, ITP and quality procedures as required
for conduct integrity Quantitative assessment of existing facilities (Existing of Storage
Tank and Piping)
 Monitor and verify running process of fabrication, erection and installation to insure that
quality process is implemented in accordance with procedures, standards and ITPs
required.
 Conduct Qualitative assessment for Existing facilities of Storage Tank and piping flow
lines, prepare and calculate Corrosion rate and remaining life in accordance to API 653
and API 570, the result of assessment to be reported to REM department (Reliability
Engineering & Maintenance).
 On-line and of-line inspection of above ground storage Tank in accordance API 653 and
risk base inspection program.
 Material receiving inspection (documents verification, check heat number, visual,
dimensional inspection and perform NDT if necessary).
 Reviewed Radiography Film Interpretation, Magnetic particle inspection, PT test (Non
destructive testing).
1996 – 1999
Truba Jurong Engineering
QC Engineer for fabrication, erection & assembly of Piping, Storage Tank, Power generation
turbine at Suralaya power plant (Merak-Cilegon, Indonesia), Darajat stage II Geothermal power
plant, Storage tank (Wash and skimming tank) GS-6 Minas, Riau-Indonesia.
Responsibilities :
 Develop quality plan, quality procedures, WPS/PQR, ITP submitted to Client for review
and approve for further to be implemented.
 Arrange or manage Inspection and testing preparation prior witness by Client as required
standard.
 Assessing supplier quality systems for compliance with quality requirements.
 Prepare QC documents audit (Quality log status of procedures and drawings, rejection
rate, update status of equipment calibration, log status of NCR, Quality reports, Hand
over documents preparation, materials issue and certificate, update status of certified
welder, WPS and PQR).
 Issued the NCR when any improperly work process or violation to the required
procedures, standards, specification and contract requirements.
 Conduct internal Quality training for direct manpower on site to improve quality
awareness.
 Prepare and witness per ITP and procedure required prior invite to Client for Final
inspection or verification.
 Material receiving inspection (documents verification, check heat number, visual,
dimensional inspection and perform NDT if necessary).
 Reviewed Radiography Film Interpretation, Magnetic particle inspection, PT test (Non
destructive testing).
8
1993 – 1996
RADIAN UTAMA
Radiographer Interpreter and NDT inspector for Piping, pipeline, steel structure and storage Tank
for fabricator or manufacturer at capital city Jakarta, Polytama Propindo (Indramayu) and
Pipeline Pertamina Project (Pangkalan Brandan-Medan).
Responsibilities :
 Perform Radiograph testing (RT) by using source of radiation Ir-192 for piping, storage
tank, vessel and steel structure.
 Review and interpret NDT result as per required acceptance criteria (ASME V, ASME
B31.3, ASME B31.4, ASME VIII, API 650).
 Prepare Inspection reports and put in the log register prior review and sign off by owner
or Client.
 Perform Eddy current testing for non ferrous material of tubing.
Certified as true and legal,
Slamet Nurhadi
Garut, West Java – Indonesia, December 2016.

Mais conteúdo relacionado

Mais procurados

Krubeshen Naicker's CV - 21-09-16
Krubeshen Naicker's CV - 21-09-16Krubeshen Naicker's CV - 21-09-16
Krubeshen Naicker's CV - 21-09-16Krubeshen Naicker
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_originalSaif Ali
 
Michael Keeney--Resume2015-A
Michael Keeney--Resume2015-AMichael Keeney--Resume2015-A
Michael Keeney--Resume2015-AMichael Keeney
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)MUHAMMAD ASIF
 
Senior HVAC & Plumbing Engineer & QC Inspector
Senior HVAC & Plumbing Engineer & QC Inspector  Senior HVAC & Plumbing Engineer & QC Inspector
Senior HVAC & Plumbing Engineer & QC Inspector SYED MUQTAAR AHAMED
 
Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017martin fuentes
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCkhursheed aiam
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORRegu Mkc
 
Phil hoggett cv 19-aug16
Phil hoggett cv 19-aug16Phil hoggett cv 19-aug16
Phil hoggett cv 19-aug16Phil Hoggett
 
Lenny Lanhart Resume
Lenny Lanhart ResumeLenny Lanhart Resume
Lenny Lanhart ResumeLenny Lanhart
 

Mais procurados (19)

Imran CV
Imran CVImran CV
Imran CV
 
Phairat-CV(2015)
Phairat-CV(2015)Phairat-CV(2015)
Phairat-CV(2015)
 
Krubeshen Naicker's CV - 21-09-16
Krubeshen Naicker's CV - 21-09-16Krubeshen Naicker's CV - 21-09-16
Krubeshen Naicker's CV - 21-09-16
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
Michael Keeney--Resume2015-A
Michael Keeney--Resume2015-AMichael Keeney--Resume2015-A
Michael Keeney--Resume2015-A
 
Resume of md kafil uddin (piping)
Resume of md kafil uddin (piping)Resume of md kafil uddin (piping)
Resume of md kafil uddin (piping)
 
Charles_D_Green
Charles_D_GreenCharles_D_Green
Charles_D_Green
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
Senior HVAC & Plumbing Engineer & QC Inspector
Senior HVAC & Plumbing Engineer & QC Inspector  Senior HVAC & Plumbing Engineer & QC Inspector
Senior HVAC & Plumbing Engineer & QC Inspector
 
Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
Rudyard Ejercito - Resume
Rudyard Ejercito - ResumeRudyard Ejercito - Resume
Rudyard Ejercito - Resume
 
REY CV
REY CVREY CV
REY CV
 
Phil hoggett cv 19-aug16
Phil hoggett cv 19-aug16Phil hoggett cv 19-aug16
Phil hoggett cv 19-aug16
 
BALAJI-2016
BALAJI-2016BALAJI-2016
BALAJI-2016
 
Lenny Lanhart Resume
Lenny Lanhart ResumeLenny Lanhart Resume
Lenny Lanhart Resume
 

Destaque

Destaque (13)

Evaluation
EvaluationEvaluation
Evaluation
 
BONIE / AVATAR
BONIE / AVATARBONIE / AVATAR
BONIE / AVATAR
 
CovarrubiasHartmanNCCWE
CovarrubiasHartmanNCCWECovarrubiasHartmanNCCWE
CovarrubiasHartmanNCCWE
 
Gimnasio
GimnasioGimnasio
Gimnasio
 
Informativo n° 23 4º básico a- viernes 23 de agosto
Informativo n° 23  4º básico a- viernes 23 de agostoInformativo n° 23  4º básico a- viernes 23 de agosto
Informativo n° 23 4º básico a- viernes 23 de agosto
 
Visita na Casa de Weube dia 14/11/11
Visita na Casa de Weube dia 14/11/11Visita na Casa de Weube dia 14/11/11
Visita na Casa de Weube dia 14/11/11
 
Creative commons
Creative commonsCreative commons
Creative commons
 
Licencias Creatives Commons
Licencias Creatives CommonsLicencias Creatives Commons
Licencias Creatives Commons
 
Reserva de la biosfera urdaibai
Reserva de la biosfera urdaibaiReserva de la biosfera urdaibai
Reserva de la biosfera urdaibai
 
Demystifying Operational Features for Product Owners - AgileCam - SkeltonThat...
Demystifying Operational Features for Product Owners - AgileCam - SkeltonThat...Demystifying Operational Features for Product Owners - AgileCam - SkeltonThat...
Demystifying Operational Features for Product Owners - AgileCam - SkeltonThat...
 
2ถิ่นกำเนิด
2ถิ่นกำเนิด2ถิ่นกำเนิด
2ถิ่นกำเนิด
 
Infosys ppt
Infosys pptInfosys ppt
Infosys ppt
 
geología introducción
geología introducción geología introducción
geología introducción
 

Semelhante a Slamet Nurhadi's CV - Jan 2017 (20)

QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
MS-Abinash
MS-AbinashMS-Abinash
MS-Abinash
 
Imran CV
Imran CVImran CV
Imran CV
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Resume 2015updated doc
Resume 2015updated docResume 2015updated doc
Resume 2015updated doc
 
Resume Abdulbari
Resume   AbdulbariResume   Abdulbari
Resume Abdulbari
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
Prem's Resume
Prem's  ResumePrem's  Resume
Prem's Resume
 
cv
cvcv
cv
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
cv
cvcv
cv
 

Slamet Nurhadi's CV - Jan 2017

  • 1. 1 CURRICULUM VITAE PERSONAL PARTICULARS Name Place and Date of Birth Sex Address Telephone E-Mail Nationality Marital Status Passport No Place and date issued Language FORMAL EDUCATION Institution 1993 Department of Naval Construction, Diponegoro University Indonesia FORMAL DOCUMENTED TRAINING AND COURSES  Certified Welding Inspector CSWIP 3.1, passed exam 2009.  Completed training API 570 Piping Inspector, held on Nov 2012 by Oil Instutut.  Storage Tank Inspector, Piping Inspector held on March and Sept 2003 by MIGAS (Regulatory body in Indonesia).  LRQA QMS Internal Auditor, held on July 2008 by IRCA.  Certified NDT Level II – Radiographic testing , Magnetic Particle testing, Penetrant testing and Ultrasonic testing, held on Dec 2012 by Flawtech Inspection services.  BOSIET (Basic Offshore Safety Induction & Emergency Training), held on April 2013 by OPITO, Nigeria. : Slamet Nurhadi : Semarang, March 14,1967 : Male : Perum Az-Zahra No.22 RT.01 RW.12 Desa Cimanganten Tarogong Kaler, Kab. Garut, West Java – Indonesia Post code 44151 : +62 822 1848 5285 : snurhadicnl@gmail.com : Indonesian : Married : A 0201343 (Date of expiration April 12, 2016) : Indonesia, Bandung April 12, 2011 : Indonesia, English
  • 2. 2 WORKING EXPERIENCES SUMMARIES October 2015 – April 2016 Mc Connell Dowell Indonesia QA QC Superintendent for DSLNG Condensate Export Facility Phase 2 Project Responsibilities :  To establish a system for quality control and quality assurance that will identify and confirm that the characteristics of work processes and the finished works meet the requirements of the design.  Conformity of all construction activities with Company standards, procedures and policies and with laws, regulations and industry standards.  The IMS is understood at a level where the Quality Assurance and Quality Control Coordinator can educate others.  Collating deliverables required for practical completion.  Managing project close out and archiving.  To effectively coordinate Sample submission and approval across all facets of the works.  Responsible for coordinating the implementation and maintenance of the project management system.  Ensuring the adherence to the McConnell Dowell Integrated Management System and Project Execution Plan. June 2012 – June 2014 Baklang Allianz limited (Nigeria) QA QC Procurement for Chevron Nigeria Limited (Escravos Produced Water Disposal Project) Responsibilities :  Ensure the status or availability of the relevant supplier or vendor documents prior starting of Inspection or FAT (Factory Acceptance Test).  Involved and witness on the FAT (Factory Acceptance Test) for Control Valves, shut down valves, Booster Pumps, Pipeline pumps, Injection Pumps, Induction Bends, FBE Coating, Pig Traps, Pressure vessels, Piping, Flange and fittings etc.  Control and maintain the running process with supplier / vendor, third party Inspection and PWD Project team prior shipping or dispatch materials and get resolve in case any issue or problem.  Review and response or comment on the relevant vendor documents such as Quality Plan, Inspection & Test Plan, Testing Procedure, drawing, data sheet and raised the Purchase Order (PO).  Verify materials documentations as required in the PO (Purchase Order) prior inspection, communicate with supplier/vendor to initiate for arrange Inspection to be done by Third Party Inspection on Various Piping and Fitting materials.  Verify inspection reports from Third Party as required standard and procedure required as contain in the PO, base on the report will decide to dispatch materials if accepted.
  • 3. 3  General Inspection Item for Piping (Visual Inspection, Dimensional Inspection, Correlation of MTCs with the materials, Verify the authenticity of the certificates, Physical/ Chemical testing-if required).  Verify materials documentations as required in the PO (Purchase Order) prior inspection, communicate with supplier/ vendor to initiate for arrange FAT (Factory Acceptance Test) for long lead item material which shall be attended by representative of Government Body in Nigeria (Shutdown Valve with actuator, Chemical Injection unit, Control valve, Fire Detection system, MCC, Pressure relief valve, Pressure Vessel, Pig Trap, Pumps)  Reviewed Contractor procedures as like quality plan, ITPs and quality procedures for fabrication, erection or installation, painting work, I&E and preservation for various equipments as like pipes and fittings stored on the yard, packages of skid, electrical and instrument cables, motor and rotating equipment.  Conduct Quality audit to contractor or sub contractor incompliance with approved Quality plan & procedures. Issue a NCR for any violations or out of procedures, standards, drawings. Follow it up non conforming reports issued for closing out. October 2010 – June 2012 Baklang Allianz limited (Nigeria) QAQC Coordinator for Chevron Nigeria Limited (Olero Creek Restoration project “Refurbishment and Reinstallation of Olero water and Flow station in OML 049” for North Water Station (NWS), North Flow Station (NFS) and Interconnecting Piping NWS to ICP). Responsibilities :  Reviewed and approved Contractor’s (Saipem Contracting Nigeria Limited) quality plan, ITPs and quality procedures for fabrication, erection or installation, painting work, I&E and preservation for various equipments as like pipes and fittings stored on the yard, packages of skid, electrical and instrument cables, motor and rotating equipments etc.  Review work packages prior to approve ready for fabrication and construction on piping, structural, cast in place, grouting, package of skid equipment, blasting and painting.  Monitor and verify running process of fabrication, erection and installation on shop fabrication and barge of Piping spools, under base of structural for Turbine, stairway, access platform and ladder, cast in place, grouting work, painting work, I&E works to insure that quality process is in placed in accordance with procedures, standards and ITPs required.  Arrange and conduct joint verification, inspection or witness with Contractors and DPR (Nigeria Government representative) on Piping, structural, stairway, access platform and ladder, cast in place, grouting work, painting work, I&E works, Cube crushing test and hydro test of pipes.  Witnessing, welding procedure qualification, welder performance test and mechanical tests in accordance to ASME IX, AWS D1.1 and ANSI B31.3.  Conduct Quality audit to contractor or sub contractor incompliance with approved Quality plan & procedures. Issue a NCR for any violations or out of procedures, standards, drawings. Follow it up non conforming reports issued for closing out.  Verify and walk down on the Zenator Check sheet (Construction stage, testing stage) for Piping and mechanical prior move forwards to Commissioning stage on the various equipment as like Piping, Skid package of equipment, concrete compartment tank.  Conduct material verification, material audit and preservation for materials and equipments.
  • 4. 4 April 2009 – September 2010 Surya Buddi Utama and SUPRACO (Indonesia) QAQC Mechanical Coordinator for Chevron Geothermal Indonesia Power Plant, (existing facilities and new project such as Pipelines, piping, pressure vessel and storage tank). Responsibilities :  Develop quality plan, ITP and quality procedures to be implemented at site in accordance with code, standard and requirements of contract.  Conduct qualitative and quantitative assessment for existing facilities (Pipeline, Vessel and PSV) in accordance with RBI program, calculate of corrosion rate, remaining life in accordance of API 570 for piping and API 510 for pressure vessel and prepare reports to MIQA department and operation.  Monitor and verify running process of fabrication, erection and installation to insure that quality process is implemented in accordance with procedures, standards and ITPs required.  Conduct joint verification, inspection or witness with Contractor and Third party inspector for running process of fabrication and Final Hydro test fabricated of steam pipeline and piping.  Review and approved final fabrication, construction and installation of Contractor’s quality documents.  Verify incoming materials (documentation, dimensional check, visual check and conduct NDT if needed to insure no defect on the materials) for Piping, fitting, valve, stud bolts and steel plates prior stored in the warehouse.  Witnessing, welding procedure qualification, welder performance test and mechanical tests in accordance to ASME IX and ANSI B31.3  Material receiving inspection (documents verification, check heat number, visual, dimensional inspection and perform NDT if necessary)  Assist in documents preparation for re certification or renewal of the existing facility such as Piping line, vessel, switch gear, battery room. October 2007 – March 2009 PEC-Tech Indonesia QAQC Coordinator for Santos Gas processing package project, Responsible to develop Quality Plan, Process of fabrication, internal Audit and continual improvement program (related to ISO 9001:2000) for Gas processing package project TEG and DPC skid to be assembled at Grati, east of java - Indonesia Responsibilities :  Develop quality plan, ITP and quality procedures to be implemented at site in accordance with code, standard and requirements of contract.  Monitor and verify running process of fabrication, erection and installation to insure that quality process is implemented in accordance with procedures, standards and ITPs required.  Arrange Company Quality audit program (Internal) for sub contractor/ fabricator incompliance with Client and contract requirements. Conduct joint audit with sub contractor/ fabricator or vendor at fabrication yard, issue NCR in accordance with approved quality procedures for any violations and out of procedures, standards, drawings required, coordination with team for corrective action and follow it up for closing.
  • 5. 5  Arrange for joint verification, inspection, witness with Client and government representative of Indonesia (MIGAS) of running process of fabrication and Final Hydro test fabricated of pressure Vessel, Heat exchanger, piping and manual valves, PSV and welding procedure qualification, welder test and Mechanical tests for structural and piping.  Review and approved final fabrication, construction and installation of quality documents. Assist document control for handover quality documents.  Reviewed Radiography Film Interpretation, Magnetic particle inspection, PT test (Non destructive testing)  Witnessing, welding procedure qualification, welder performance test and mechanical tests in accordance to ASME IX and ANSI B31.3  Material receiving inspection (documents verification, check heat number, visual, dimensional inspection and perform NDT if necessary)  Arrange and prepare documents for certification of pressure vessel and piping process on the TEG and DPC skid. August 2005 – August 2007 Tripatra Fluor Consortium QC Inspector (Above ground storage Tank & Integrity assessment of existing facilities) for Chevron at Bekasap or SLN area of Sumatra – Indonesia. Responsibilities :  Responsible for Quality aspect on above ground Storage Tank fabrication, erection and testing in accordance API Standard 650 and responsible for conduct and evaluate Qualitative and Quantitative assessment on existing of above ground storage Tank piping and pressure vessel in accordance to API 653, API 570 and API 610.  Reviewed and approved Contractor’s quality plan, ITP and quality procedures for fabrication, erection, inspection and testing of Above Ground Storage Tank in accordance to API Standard 650 (Materials, dimensional check, peaking, banding, plumb check, pneumatic test for reinforcement of nozzle and COD, vacuum test for bottom and roof, Diesel test, Hydro test of Storage Tank).  Reviewed and approved Contractor’s quality plan, ITP and quality procedures as required for conduct integrity Quantitative assessment of existing facilities (Existing of Storage Tank and Piping flow lines)  Monitor and verify running process of fabrication, erection and installation to insure that quality process is implemented in accordance with procedures, standards and ITPs required.  Conduct Qualitative assessment for Existing facilities of Storage Tank and piping flow lines, prepare and calculate Corrosion rate and remaining life in accordance to API 653 and API 570, the result of assessment to be reported to REM department (Reliability Engineering & Maintenance)  On-line and of-line inspection of above ground storage Tank in accordance API 653 and risk base inspection program.  Material receiving inspection (documents verification, check heat number, visual, dimensional inspection and perform NDT if necessary)  Reviewed Radiography Film Interpretation, Magnetic particle inspection, PT test (Non destructive testing)
  • 6. 6 February 2003 – Up to June 2005 Istech Resourcess Asia QC Inspector (Above ground storage Tank & Integrity assessment of existing facilities) for Chevron at Bekasap or SLN area of Sumatra – Indonesia. Responsibilities :  Responsible for Quality aspect on above ground Storage Tank fabrication, erection and testing in accordance API Standard 650 and responsible for conduct and evaluate Qualitative and Quantitative assessment on existing of above ground storage Tank piping and pressure vessel in accordance to API 653, API 570 and API 610.  Reviewed and approved Contractor’s quality plan, ITP and quality procedures for fabrication, erection, inspection and testing of Above Ground Storage Tank in accordance to API Standard 650 (Materials, dimensional check, peaking, banding, plumb check, pneumatic test for reinforcement of nozzle and COD, vacuum test for bottom and roof, Diesel test, Hydro test of Storage Tank).  Reviewed and approved Contractor’s quality plan, ITP and quality procedures as required for conduct integrity Quantitative assessment of existing facilities (Existing of Storage Tank and Piping flow lines)  Monitor and verify running process of fabrication, erection and installation to insure that quality process is implemented in accordance with procedures, standards and ITPs required.  Conduct Qualitative assessment for Existing facilities of Storage Tank and piping flow lines, prepare and calculate Corrosion rate and remaining life in accordance to API 653 and API 570, the result of assessment to be reported to REM department (Reliability Engineering & Maintenance)  On-line and of-line inspection of above ground storage Tank in accordance API 653 and risk base inspection program.  Material receiving inspection (documents verification, check heat number, visual, dimensional inspection and perform NDT if necessary)  Reviewed Radiography Film Interpretation, Magnetic particle inspection, PT test (Non destructive testing) 1999 - 2003 Dimensi Barumas perdana & Irsindo QC Above Ground Strorage TANK Inspector for Chevron Duri Sumatera on above Ground Storage TANK and Piping (New & Existing) at CVC Cooler and H2s Mitigation project area – 6 Duri, DSF Slurry Fracture Injection project area – 6, Duri, Petapahan area, Kota batak, Riau, Indonesia. Responsibilities :  Responsible for Quality aspect on above ground Storage Tank fabrication, erection and testing in accordance API Standard 650 and responsible for conduct and evaluate Qualitative and Quantitative assessment on existing of above ground storage Tank and piping in accordance to API 653, API 570.  Reviewed and approved Contractor’s quality plan, ITP and quality procedures for fabrication, erection, inspection and testing of Above Ground Storage Tank in accordance to API Standard 650 (Materials, dimensional check, peaking, banding, plumb check,
  • 7. 7 pneumatic test for reinforcement of nozzle and COD, vacuum test for bottom and roof, Diesel test, Hydro test of Storage Tank).  Reviewed and approved Contractor’s quality plan, ITP and quality procedures as required for conduct integrity Quantitative assessment of existing facilities (Existing of Storage Tank and Piping)  Monitor and verify running process of fabrication, erection and installation to insure that quality process is implemented in accordance with procedures, standards and ITPs required.  Conduct Qualitative assessment for Existing facilities of Storage Tank and piping flow lines, prepare and calculate Corrosion rate and remaining life in accordance to API 653 and API 570, the result of assessment to be reported to REM department (Reliability Engineering & Maintenance).  On-line and of-line inspection of above ground storage Tank in accordance API 653 and risk base inspection program.  Material receiving inspection (documents verification, check heat number, visual, dimensional inspection and perform NDT if necessary).  Reviewed Radiography Film Interpretation, Magnetic particle inspection, PT test (Non destructive testing). 1996 – 1999 Truba Jurong Engineering QC Engineer for fabrication, erection & assembly of Piping, Storage Tank, Power generation turbine at Suralaya power plant (Merak-Cilegon, Indonesia), Darajat stage II Geothermal power plant, Storage tank (Wash and skimming tank) GS-6 Minas, Riau-Indonesia. Responsibilities :  Develop quality plan, quality procedures, WPS/PQR, ITP submitted to Client for review and approve for further to be implemented.  Arrange or manage Inspection and testing preparation prior witness by Client as required standard.  Assessing supplier quality systems for compliance with quality requirements.  Prepare QC documents audit (Quality log status of procedures and drawings, rejection rate, update status of equipment calibration, log status of NCR, Quality reports, Hand over documents preparation, materials issue and certificate, update status of certified welder, WPS and PQR).  Issued the NCR when any improperly work process or violation to the required procedures, standards, specification and contract requirements.  Conduct internal Quality training for direct manpower on site to improve quality awareness.  Prepare and witness per ITP and procedure required prior invite to Client for Final inspection or verification.  Material receiving inspection (documents verification, check heat number, visual, dimensional inspection and perform NDT if necessary).  Reviewed Radiography Film Interpretation, Magnetic particle inspection, PT test (Non destructive testing).
  • 8. 8 1993 – 1996 RADIAN UTAMA Radiographer Interpreter and NDT inspector for Piping, pipeline, steel structure and storage Tank for fabricator or manufacturer at capital city Jakarta, Polytama Propindo (Indramayu) and Pipeline Pertamina Project (Pangkalan Brandan-Medan). Responsibilities :  Perform Radiograph testing (RT) by using source of radiation Ir-192 for piping, storage tank, vessel and steel structure.  Review and interpret NDT result as per required acceptance criteria (ASME V, ASME B31.3, ASME B31.4, ASME VIII, API 650).  Prepare Inspection reports and put in the log register prior review and sign off by owner or Client.  Perform Eddy current testing for non ferrous material of tubing. Certified as true and legal, Slamet Nurhadi Garut, West Java – Indonesia, December 2016.