SlideShare uma empresa Scribd logo
1 de 24
Diploma Project Management
       Captain Cook College
                Sharon Boyle
   Introduced Risk Management concepts
   Attempted Activity 1, 2 & 3
   Discuss results for Activity 1 & 2
   Risk Assessment for Great Tastes of Manly –
    due in last week ? ? ?
   Risk Assessment & Risk Register tables not
    good – re-typed
   Risk Assessment Item 2. due 2 November
    ◦ Today revised template available for Fred’s Shed
   From Assessments
    ◦ Close out process - lots of things go on here
        Cost,
        Quality,
        Schedule,
        Risk,
        Procurement
    ◦ Structure of Communication plan
   From my re-typing
    ◦ Risk Threshold
As a minimum
 Always an introduction
    ◦ 2 sentences!!!
   Stakeholder analysis showing
    ◦ Who & their roles/power
    ◦ Why & how
    ◦ internal and external stakeholders
   Networks – ie who & possibly covered above
   Close-out procedures
   PMIS – for this exercise just convince me you have
    thought about it.
    ◦ What sort eg pen & paper or computer based,
    ◦ Where is the info coming from
    ◦ Why are you doing this.
   1. Determine project risks
   2. Monitor and control project risks
   3. Assess risk management outcomes
   Identify, document and analyse risks, in consultation
    with stakeholders and higher project authority
   Use established risk management techniques &
    tools, within delegated authority, to
    ◦ analyse risks,
    ◦ assess options
    ◦ recommend preferred risk approaches
   Develop risk management plans, secure agreement of
    stakeholders and communicate plans
   Establish designated risk management processes
    and procedures
   personal experience
   subject matter experts
   conducting or supervising qualitative and/or
    quantitative
   risk analysis,
    ◦   schedule simulation – using multiple Gantt charts
    ◦   decision analysis
    ◦   contingency planning – what if?
    ◦   alternative strategy development – what if?
    ◦   using specialist risk analysis tools
   Please fill in and submit
   Get these to me as a matter of urgency
   communication with stakeholders, dispute
    resolution & modification procedures
   implementation of risk control trigger mechanisms
   measurement of actual progress against planned
    milestones –
    ◦ remember our baselines (or starting point)?
   recording and reporting of major variance
    ◦ how far are we from the baseline?
   setting key milestones
    ◦ If we have reached this milestone how are our risks?
   Manage using established project & risk
    management plans to ensure achievement of
    objectives
   Monitor progress against project plans to
    ◦ identify variances
    ◦ recommend responses
   Implement agreed
    ◦ risk responses
    ◦ modify plans to reflect changing
   We used the risk assessment table
   For what purpose?
   Priorities??? Judgements????
   Review project outcomes to determine
    effectiveness of risk management processes
    and procedures
   Identify & document
    ◦ risk issues and
    ◦ recommend improvements
    ◦ pass on to higher project authority for application
      in future projects
http://www.youtube.com/watch?v=7-
 x7W_tZ30Q jimbo

http://www.youtube.com/watch?v=sPBYXuqITK
 g&feature=related Fun@ grand canyon – will
 reinforce messages so far.
   Progress or Status report
    ◦ Lots of things go in here – but focus on Risk.
   Great Tastes of Manly
    ◦ 48 hours from start & there is a real threat to power
      security – brown outs due to major network glitch.
        What do we do?
        What impact is this likely to have?
        Who do we tell/get to do something?
        How do we report this – think Status report.
Great Tastes of Manly
 Scope the ideas/risk properly –
    ◦ ask the correct people
   Look at our risk register
    ◦ Does any of this change?
    ◦ If so, how?
    ◦ Re-assess the risks
   Report using Status report.
   Lunch
   Powerpoint pres.
    ◦   Last week’s progress & Some feedback
    ◦   Closeout report
    ◦   Structure Comms Plan
    ◦   Risk Threshold
    ◦   Balance of Risk Management & PM
    ◦   Monitor and control project risks
Morning Tea
 Discussion 2. & Assessment Item 3. – Great Taste of Manly
 Monitoring Risks
 Progress report
Lunch
    ◦ Fred’s Shed RMP – due 2 November
    ◦ Finish Assessment Item 3.
    ◦ Complete assessment items – do what you haven’t yet finished
   ????
   Cost, Schedule
   Morning Tea
   Risk Management Plan for Fred’s shed
   Lunch
   Continue Risk Management Plan
   Or
   Activities 1,2 & 3.
   Brainstorming – you are the experts on Fred’s
    Shed
 3. Assess risk management outcomes
 Assessment strategies for evolving risk
 Tools & techniques - variances
 Who needs to be told

Morning Tea
 Discussion 2. Great Tastes of Manly big changes
  a week out – Status report.
 Lunch

 Some changes in risks for Fred’s Shed
 Do up status report for Fred’s Shed Due 2 Nov
http://www.youtube.com/watch?v=7-
 x7W_tZ30Q jimbo

http://www.youtube.com/watch?v=sPBYXuqITK
 g&feature=related Fun@ grand canyon – will
 reinforce messages so far.

Mais conteúdo relacionado

Mais procurados

Risk management plan
Risk management planRisk management plan
Risk management plan
Kashif Mastan
 
BSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage RiskBSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage Risk
Muna Haider
 
Qualitative & Quantitative Analysis
Qualitative & Quantitative AnalysisQualitative & Quantitative Analysis
Qualitative & Quantitative Analysis
Alin Veronika
 

Mais procurados (19)

Project Risk Register
Project Risk Register Project Risk Register
Project Risk Register
 
Risk management plan
Risk management planRisk management plan
Risk management plan
 
Project Risk Management and Uncertainty
Project Risk Management and UncertaintyProject Risk Management and Uncertainty
Project Risk Management and Uncertainty
 
BSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage RiskBSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage Risk
 
Analyzing And Managing Project Risk
Analyzing And Managing Project RiskAnalyzing And Managing Project Risk
Analyzing And Managing Project Risk
 
Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value Analysis
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
Qualitative risk analysis
Qualitative risk analysisQualitative risk analysis
Qualitative risk analysis
 
Qualitative & Quantitative Analysis
Qualitative & Quantitative AnalysisQualitative & Quantitative Analysis
Qualitative & Quantitative Analysis
 
Kuala Lumpur - PMI Global Congress 2009 - Risk Management
Kuala Lumpur - PMI Global Congress 2009 - Risk ManagementKuala Lumpur - PMI Global Congress 2009 - Risk Management
Kuala Lumpur - PMI Global Congress 2009 - Risk Management
 
Project Auditing
Project AuditingProject Auditing
Project Auditing
 
Risk management
Risk managementRisk management
Risk management
 
07 managing risk
07 managing risk07 managing risk
07 managing risk
 
Risk Management Assignment
Risk Management AssignmentRisk Management Assignment
Risk Management Assignment
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
RMMM-Risk Management,Mitigation and Monitoring.
RMMM-Risk Management,Mitigation and Monitoring.RMMM-Risk Management,Mitigation and Monitoring.
RMMM-Risk Management,Mitigation and Monitoring.
 
Manage risks
Manage risksManage risks
Manage risks
 
Risk assessment at workplace
Risk assessment at workplaceRisk assessment at workplace
Risk assessment at workplace
 
Risk management
Risk managementRisk management
Risk management
 

Destaque

Chapter 2 section 3
Chapter 2 section 3Chapter 2 section 3
Chapter 2 section 3
Jason Hauck
 
Chapter 2 Patient Safety and Risk Management
Chapter 2 Patient Safety and Risk ManagementChapter 2 Patient Safety and Risk Management
Chapter 2 Patient Safety and Risk Management
czvelasco4248
 
Lecture slide chapter 2 insurance and risk management
Lecture slide chapter 2 insurance and risk managementLecture slide chapter 2 insurance and risk management
Lecture slide chapter 2 insurance and risk management
Dashing Shithil
 

Destaque (17)

Mr. Richar Kerby's presentation at QITCOM 2011
Mr. Richar Kerby's presentation at QITCOM 2011Mr. Richar Kerby's presentation at QITCOM 2011
Mr. Richar Kerby's presentation at QITCOM 2011
 
Mr. Faisal Fayyaz's presentation at QITCOM 2011
Mr. Faisal Fayyaz's presentation at QITCOM 2011Mr. Faisal Fayyaz's presentation at QITCOM 2011
Mr. Faisal Fayyaz's presentation at QITCOM 2011
 
5 QITCOM 2012 - Jawad Abbassi (Next Gen Broadband)
5  QITCOM 2012 - Jawad Abbassi  (Next Gen Broadband)5  QITCOM 2012 - Jawad Abbassi  (Next Gen Broadband)
5 QITCOM 2012 - Jawad Abbassi (Next Gen Broadband)
 
2 QITCOM 2012 - Stagg Newman (Next Gen Broadband)
2 QITCOM 2012 - Stagg Newman (Next Gen Broadband)2 QITCOM 2012 - Stagg Newman (Next Gen Broadband)
2 QITCOM 2012 - Stagg Newman (Next Gen Broadband)
 
3 QITCOM 2012 - Patrick Kidney (Next Gen Broadband)
3 QITCOM 2012 - Patrick Kidney  (Next Gen Broadband)3 QITCOM 2012 - Patrick Kidney  (Next Gen Broadband)
3 QITCOM 2012 - Patrick Kidney (Next Gen Broadband)
 
1 QITCOM 2012 - Nilo Mitra (Iptv)
1  QITCOM 2012 - Nilo Mitra  (Iptv)1  QITCOM 2012 - Nilo Mitra  (Iptv)
1 QITCOM 2012 - Nilo Mitra (Iptv)
 
4 QITCOM 2012 - Chris Bowley (Iptv)
4 QITCOM 2012 - Chris Bowley (Iptv)4 QITCOM 2012 - Chris Bowley (Iptv)
4 QITCOM 2012 - Chris Bowley (Iptv)
 
7 QITCOM 2012 - Waleed Al Sayed (Next Gen Broadband)
7 QITCOM 2012 - Waleed Al Sayed  (Next Gen Broadband)7 QITCOM 2012 - Waleed Al Sayed  (Next Gen Broadband)
7 QITCOM 2012 - Waleed Al Sayed (Next Gen Broadband)
 
Chapter 2 section 3
Chapter 2 section 3Chapter 2 section 3
Chapter 2 section 3
 
Chapter 3 section 2 powerpoint
Chapter 3 section 2 powerpointChapter 3 section 2 powerpoint
Chapter 3 section 2 powerpoint
 
Chapter 1 risk management
Chapter 1 risk managementChapter 1 risk management
Chapter 1 risk management
 
Chapter 2 Patient Safety and Risk Management
Chapter 2 Patient Safety and Risk ManagementChapter 2 Patient Safety and Risk Management
Chapter 2 Patient Safety and Risk Management
 
Introduction to Performance Management by Derek Hendrikz
Introduction to Performance Management by Derek HendrikzIntroduction to Performance Management by Derek Hendrikz
Introduction to Performance Management by Derek Hendrikz
 
Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)
 
Chapter 2 Financial Institutions, Financial Intermediaries and Asset Manageme...
Chapter 2 Financial Institutions, Financial Intermediaries and Asset Manageme...Chapter 2 Financial Institutions, Financial Intermediaries and Asset Manageme...
Chapter 2 Financial Institutions, Financial Intermediaries and Asset Manageme...
 
Chapter 1 Introduction
Chapter 1 IntroductionChapter 1 Introduction
Chapter 1 Introduction
 
Lecture slide chapter 2 insurance and risk management
Lecture slide chapter 2 insurance and risk managementLecture slide chapter 2 insurance and risk management
Lecture slide chapter 2 insurance and risk management
 

Semelhante a Risk management part 2

Cost unit 2012
Cost unit 2012Cost unit 2012
Cost unit 2012
Skript
 
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docxPJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
ARIV4
 
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docxPJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
stilliegeorgiana
 
Project Risk Management - Week 2 Individual Assignmen
 Project Risk Management - Week 2  Individual Assignmen Project Risk Management - Week 2  Individual Assignmen
Project Risk Management - Week 2 Individual Assignmen
troutmanboris
 

Semelhante a Risk management part 2 (20)

PROJECT PLANNING.pptx
PROJECT PLANNING.pptxPROJECT PLANNING.pptx
PROJECT PLANNING.pptx
 
PROJECT PLANNING.pptx
PROJECT PLANNING.pptxPROJECT PLANNING.pptx
PROJECT PLANNING.pptx
 
Cost unit 2012
Cost unit 2012Cost unit 2012
Cost unit 2012
 
Project Management
Project ManagementProject Management
Project Management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
A Guide to Risk Management
A Guide to Risk ManagementA Guide to Risk Management
A Guide to Risk Management
 
PRINCE2 Overview Paradigm Consulting Group PCGI
PRINCE2 Overview   Paradigm Consulting Group PCGIPRINCE2 Overview   Paradigm Consulting Group PCGI
PRINCE2 Overview Paradigm Consulting Group PCGI
 
Session 18 -2 PMP 4th edition
Session 18 -2  PMP 4th editionSession 18 -2  PMP 4th edition
Session 18 -2 PMP 4th edition
 
Planning Tools and Techniques_Estrella.pptx
Planning Tools and Techniques_Estrella.pptxPlanning Tools and Techniques_Estrella.pptx
Planning Tools and Techniques_Estrella.pptx
 
Andy Abu Bakar - Risk Management: the human factor
Andy Abu Bakar - Risk Management: the human factorAndy Abu Bakar - Risk Management: the human factor
Andy Abu Bakar - Risk Management: the human factor
 
Risk management
Risk managementRisk management
Risk management
 
Getting the basics right
Getting the basics rightGetting the basics right
Getting the basics right
 
Relationship Business-Projects-Operations
Relationship Business-Projects-OperationsRelationship Business-Projects-Operations
Relationship Business-Projects-Operations
 
Project Managment Good Practices
Project Managment Good PracticesProject Managment Good Practices
Project Managment Good Practices
 
2018-Case-Study.pdf
2018-Case-Study.pdf2018-Case-Study.pdf
2018-Case-Study.pdf
 
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docxPJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
 
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docxPJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
 
Project Risk Management - Week 2 Individual Assignmen
 Project Risk Management - Week 2  Individual Assignmen Project Risk Management - Week 2  Individual Assignmen
Project Risk Management - Week 2 Individual Assignmen
 
Cost estimating
Cost estimatingCost estimating
Cost estimating
 
Risk management concepts and learning
Risk management   concepts and learningRisk management   concepts and learning
Risk management concepts and learning
 

Mais de Skript

Quality unit 2012 part 1. day 1 - 31 jan
Quality unit 2012   part 1. day 1 - 31 janQuality unit 2012   part 1. day 1 - 31 jan
Quality unit 2012 part 1. day 1 - 31 jan
Skript
 
Quality unit 2012 part 1. day 1 - 31 jan
Quality unit 2012   part 1. day 1 - 31 janQuality unit 2012   part 1. day 1 - 31 jan
Quality unit 2012 part 1. day 1 - 31 jan
Skript
 
Cost unit 2013 part 2. 24 jan
Cost unit 2013 part 2. 24 janCost unit 2013 part 2. 24 jan
Cost unit 2013 part 2. 24 jan
Skript
 
Cost unit 2013 part 1. 18 jan
Cost unit 2013 part 1. 18 janCost unit 2013 part 1. 18 jan
Cost unit 2013 part 1. 18 jan
Skript
 
Cost unit 2013 part 1. 17 jan
Cost unit 2013 part 1. 17  janCost unit 2013 part 1. 17  jan
Cost unit 2013 part 1. 17 jan
Skript
 
Hr unit 2012 part 1
Hr unit 2012 part 1 Hr unit 2012 part 1
Hr unit 2012 part 1
Skript
 
Time unit 2012 nov part 2
Time unit 2012 nov part 2 Time unit 2012 nov part 2
Time unit 2012 nov part 2
Skript
 
Hr unit 2
Hr unit 2Hr unit 2
Hr unit 2
Skript
 
Time unit 2012 nov part 2.
Time unit 2012 nov part 2.Time unit 2012 nov part 2.
Time unit 2012 nov part 2.
Skript
 
Time unit 2012 nov 12 part 1
Time unit 2012 nov 12   part 1 Time unit 2012 nov 12   part 1
Time unit 2012 nov 12 part 1
Skript
 
Quality unit 2012
Quality unit 2012 Quality unit 2012
Quality unit 2012
Skript
 
Table of contents_1_without_questions
Table of contents_1_without_questionsTable of contents_1_without_questions
Table of contents_1_without_questions
Skript
 
Templates without questions
Templates without questionsTemplates without questions
Templates without questions
Skript
 
Table of contents_3_without_questions
Table of contents_3_without_questionsTable of contents_3_without_questions
Table of contents_3_without_questions
Skript
 
Table of contents_2_without_questions
Table of contents_2_without_questionsTable of contents_2_without_questions
Table of contents_2_without_questions
Skript
 
Mail merge 2_without_questions
Mail merge 2_without_questionsMail merge 2_without_questions
Mail merge 2_without_questions
Skript
 
Mail merge 1_without_questions
Mail merge 1_without_questionsMail merge 1_without_questions
Mail merge 1_without_questions
Skript
 
Headers footers without_questions
Headers footers without_questionsHeaders footers without_questions
Headers footers without_questions
Skript
 
Headers footers document_selection_without_questions
Headers footers document_selection_without_questionsHeaders footers document_selection_without_questions
Headers footers document_selection_without_questions
Skript
 
Bullets numbering lists_without_questions
Bullets numbering lists_without_questionsBullets numbering lists_without_questions
Bullets numbering lists_without_questions
Skript
 

Mais de Skript (20)

Quality unit 2012 part 1. day 1 - 31 jan
Quality unit 2012   part 1. day 1 - 31 janQuality unit 2012   part 1. day 1 - 31 jan
Quality unit 2012 part 1. day 1 - 31 jan
 
Quality unit 2012 part 1. day 1 - 31 jan
Quality unit 2012   part 1. day 1 - 31 janQuality unit 2012   part 1. day 1 - 31 jan
Quality unit 2012 part 1. day 1 - 31 jan
 
Cost unit 2013 part 2. 24 jan
Cost unit 2013 part 2. 24 janCost unit 2013 part 2. 24 jan
Cost unit 2013 part 2. 24 jan
 
Cost unit 2013 part 1. 18 jan
Cost unit 2013 part 1. 18 janCost unit 2013 part 1. 18 jan
Cost unit 2013 part 1. 18 jan
 
Cost unit 2013 part 1. 17 jan
Cost unit 2013 part 1. 17  janCost unit 2013 part 1. 17  jan
Cost unit 2013 part 1. 17 jan
 
Hr unit 2012 part 1
Hr unit 2012 part 1 Hr unit 2012 part 1
Hr unit 2012 part 1
 
Time unit 2012 nov part 2
Time unit 2012 nov part 2 Time unit 2012 nov part 2
Time unit 2012 nov part 2
 
Hr unit 2
Hr unit 2Hr unit 2
Hr unit 2
 
Time unit 2012 nov part 2.
Time unit 2012 nov part 2.Time unit 2012 nov part 2.
Time unit 2012 nov part 2.
 
Time unit 2012 nov 12 part 1
Time unit 2012 nov 12   part 1 Time unit 2012 nov 12   part 1
Time unit 2012 nov 12 part 1
 
Quality unit 2012
Quality unit 2012 Quality unit 2012
Quality unit 2012
 
Table of contents_1_without_questions
Table of contents_1_without_questionsTable of contents_1_without_questions
Table of contents_1_without_questions
 
Templates without questions
Templates without questionsTemplates without questions
Templates without questions
 
Table of contents_3_without_questions
Table of contents_3_without_questionsTable of contents_3_without_questions
Table of contents_3_without_questions
 
Table of contents_2_without_questions
Table of contents_2_without_questionsTable of contents_2_without_questions
Table of contents_2_without_questions
 
Mail merge 2_without_questions
Mail merge 2_without_questionsMail merge 2_without_questions
Mail merge 2_without_questions
 
Mail merge 1_without_questions
Mail merge 1_without_questionsMail merge 1_without_questions
Mail merge 1_without_questions
 
Headers footers without_questions
Headers footers without_questionsHeaders footers without_questions
Headers footers without_questions
 
Headers footers document_selection_without_questions
Headers footers document_selection_without_questionsHeaders footers document_selection_without_questions
Headers footers document_selection_without_questions
 
Bullets numbering lists_without_questions
Bullets numbering lists_without_questionsBullets numbering lists_without_questions
Bullets numbering lists_without_questions
 

Risk management part 2

  • 1. Diploma Project Management Captain Cook College Sharon Boyle
  • 2. Introduced Risk Management concepts  Attempted Activity 1, 2 & 3  Discuss results for Activity 1 & 2  Risk Assessment for Great Tastes of Manly – due in last week ? ? ?  Risk Assessment & Risk Register tables not good – re-typed  Risk Assessment Item 2. due 2 November ◦ Today revised template available for Fred’s Shed
  • 3. From Assessments ◦ Close out process - lots of things go on here  Cost,  Quality,  Schedule,  Risk,  Procurement ◦ Structure of Communication plan  From my re-typing ◦ Risk Threshold
  • 4. As a minimum  Always an introduction ◦ 2 sentences!!!  Stakeholder analysis showing ◦ Who & their roles/power ◦ Why & how ◦ internal and external stakeholders  Networks – ie who & possibly covered above  Close-out procedures  PMIS – for this exercise just convince me you have thought about it. ◦ What sort eg pen & paper or computer based, ◦ Where is the info coming from ◦ Why are you doing this.
  • 5. 1. Determine project risks  2. Monitor and control project risks  3. Assess risk management outcomes
  • 6. Identify, document and analyse risks, in consultation with stakeholders and higher project authority  Use established risk management techniques & tools, within delegated authority, to ◦ analyse risks, ◦ assess options ◦ recommend preferred risk approaches  Develop risk management plans, secure agreement of stakeholders and communicate plans  Establish designated risk management processes and procedures
  • 7. personal experience  subject matter experts  conducting or supervising qualitative and/or quantitative  risk analysis, ◦ schedule simulation – using multiple Gantt charts ◦ decision analysis ◦ contingency planning – what if? ◦ alternative strategy development – what if? ◦ using specialist risk analysis tools
  • 8. Please fill in and submit  Get these to me as a matter of urgency
  • 9. communication with stakeholders, dispute resolution & modification procedures  implementation of risk control trigger mechanisms  measurement of actual progress against planned milestones – ◦ remember our baselines (or starting point)?  recording and reporting of major variance ◦ how far are we from the baseline?  setting key milestones ◦ If we have reached this milestone how are our risks?
  • 10. Manage using established project & risk management plans to ensure achievement of objectives  Monitor progress against project plans to ◦ identify variances ◦ recommend responses  Implement agreed ◦ risk responses ◦ modify plans to reflect changing
  • 11. We used the risk assessment table  For what purpose?  Priorities??? Judgements????
  • 12. Review project outcomes to determine effectiveness of risk management processes and procedures  Identify & document ◦ risk issues and ◦ recommend improvements ◦ pass on to higher project authority for application in future projects
  • 13.
  • 14. http://www.youtube.com/watch?v=7- x7W_tZ30Q jimbo http://www.youtube.com/watch?v=sPBYXuqITK g&feature=related Fun@ grand canyon – will reinforce messages so far.
  • 15.
  • 16. Progress or Status report ◦ Lots of things go in here – but focus on Risk.  Great Tastes of Manly ◦ 48 hours from start & there is a real threat to power security – brown outs due to major network glitch.  What do we do?  What impact is this likely to have?  Who do we tell/get to do something?  How do we report this – think Status report.
  • 17. Great Tastes of Manly  Scope the ideas/risk properly – ◦ ask the correct people  Look at our risk register ◦ Does any of this change? ◦ If so, how? ◦ Re-assess the risks  Report using Status report.
  • 18. Lunch
  • 19. Powerpoint pres. ◦ Last week’s progress & Some feedback ◦ Closeout report ◦ Structure Comms Plan ◦ Risk Threshold ◦ Balance of Risk Management & PM ◦ Monitor and control project risks Morning Tea  Discussion 2. & Assessment Item 3. – Great Taste of Manly  Monitoring Risks  Progress report Lunch ◦ Fred’s Shed RMP – due 2 November ◦ Finish Assessment Item 3. ◦ Complete assessment items – do what you haven’t yet finished
  • 20. ????  Cost, Schedule  Morning Tea  Risk Management Plan for Fred’s shed  Lunch  Continue Risk Management Plan  Or  Activities 1,2 & 3.
  • 21. Brainstorming – you are the experts on Fred’s Shed
  • 22.  3. Assess risk management outcomes  Assessment strategies for evolving risk  Tools & techniques - variances  Who needs to be told Morning Tea  Discussion 2. Great Tastes of Manly big changes a week out – Status report.  Lunch  Some changes in risks for Fred’s Shed  Do up status report for Fred’s Shed Due 2 Nov
  • 23.
  • 24. http://www.youtube.com/watch?v=7- x7W_tZ30Q jimbo http://www.youtube.com/watch?v=sPBYXuqITK g&feature=related Fun@ grand canyon – will reinforce messages so far.

Notas do Editor

  1. We only progressed to here on Thursday 11 october