Preliminary Information:
a. General information of the candidate
1. Name- Parab shubham vilas
2. Enrollment No. : 1202016
3. Contact Address-At/Post- Islampur
Tal.Walwa Dist.Sangli
4. Email ID: shubhamparab2212@gmail.com
5. Mobile No-9420728101
b. Name and address of the Company.
Omkar construction Pvt.Ltd bhugaon, Pune.
3 Amey Apartments, Pooja Park Society,
Prabhat Road, Kothrud, Pune-4110038, MH (India)
c. Period of Field Training:
01 Dec to 21Dec, 2014
TotalDays : 21
d. Contact officer in the above organization:
Name: Mr.S.A.Wable & Mr.K.R.Patil
Designation: D.C.E.( RIT Diploma Alumni-Batch 1989)
Phone number: 020-32422346
E-mail address: Omkarconstructions9@gmail.com
3 | P a g e
CERTIFICATE
This is to certify that the Field Training undergone in the Omkar Constructions Pvt.
Ltd..iscarried out by Mr. PARAB SHUBHAM VILAS under my guidance. The report is
submitted towards the partial fulfillment of Third year, full time Under Graduate Programme in
Civil Engineering.
Date:
Name & Sign of Guide Name & Sign of Supervisor
4 | P a g e
ACKNOWLEDGEMENT
I wish to express sincere thanks and gratitude to the DR.H.S.JADHAV(H.O.D.
Department of civil engineering) and PROF. Y.M.PATIL (Department of Civil Engineering,
Rajarambapu Institute of Technology, Rajaramnagar) for the whole hearted encouragement,
advice and timely guidance in completing this field training work.
I have to record my deep sense of indebtedness to Mr.K. R. Patil, (Omkar
Constructions pvt.ltd.)for providing us the facilities and instruments and for their stimulating
guidance and continuous encouragement.
I also like to thank my family for supporting me through this field training activity. It is
my pleasure to thank Dr. S.S.Kulkarni (Director R.I.T) and Prof.D.B.Kulkarni (Field training
in charge) for giving me this opportunity.
It is necessary here to acknowledge the valuable support and suggestions provided by
Mr. Rohit Jadhav, (Site Engineer,Omkar const. pvt lim.)in carrying out training work.
PARAB SHUBHAM VILAS
(Roll No.: -1202016)
5 | P a g e
INDEX
Sr.No. Page No.
1. Project details 6
2. Site layout and drawings 8
3. Works on site 11
4. Daily schedule 23
5. Material rate and labour cost 27
6. Field tests 28
7. Equipments and safety 32
8. Management work 42
9. Interaction with project head 46
10. conclusion 48
6 | P a g e
Chapter 1
Project details
Name of the project: Crystal tower
Client:Paranjape schemes pvt.ltd.
Contractor: Omkar constructions pvt.Ltd.
Consultant:
1.Architectural consultant- Mr. A B Waidya
2.R.C.C. consultant- Mr. S.W. Mone
3.Legal consultant- Adv. H.P.Koparde
Estimated Cost: 18.5crore
Duration of Project:2.5 years
Project commencement Year: 2013
1.1. Project Brief
 General Description and Scope of the Project
 GENERAL DESCRIPTION:
This project is situated in Baner, Pune which is very near to the commercial zone,
schools, colleges, hospitals, bus stand etc. The site is situated in nature‟s beauty i.e it
has fresh air and is pollution free.
7 | P a g e
 SCOPE OF THE PROJECT:
It is a residential project aimed at affordable housing with all faciltites like
wide internal roads, garden, jogging track, internal security with CCTV cameras and
security guard, large parking space, ampitheatre, purified drinking water supply with
solar water heating system, invertor backup system and Ganesh temple.
This project targets to provide residence for about 1,000 people.
 Training Site Details:
Address:
Total Plot Area = 25690.38sq.m.
Total Carpet Area = 2122.13sq.m.
No. of buildings =3
Total flats=144
 Training In charge: Mr. Rohit Jadhav
 Location: Banerphata, Pune
 Organization structure is as given below:-
1) Chairman:- Mr.A.A.Wable & Mr.K.R.Patil
2) Vice-Chairman:- Mr.S.A.Wable
3) M.D.:- Mr. Shrinivas Wable
4) Manager:- Mr.A.S.Gaikwad
5) Site Engineer:-Mr.Rohitjadhav
6) Supervisor:-Mr.SudhakarAade
7)LaborIn charge :-Mr.G. L. Mahamun
8 | P a g e
Site Layout
9 | P a g e
Location Map
Proposed Building
10 | P a g e
Floor Plan
Typical 3BHK Flat
11 | P a g e
Chapter 2
Works On Site
Footing-
Footing is important part of foundation. To provide a level or uniform platform for
structure footing is provided. Footing spread out the weight of the structure so the soil can carry
the load spread out within the footing itself at about 45 degree angle and then spread out in the
soil. They are typically made of concrete with rebar reinforcement that has been poured into an
excavated trench. The choice of suitable type of footing depends on the depth at which the bearing strata
lies, the soil condition and the type of superstructure
Raft footing is used on site by investigating nature of soil and bearing capacity of soil. As
the loading on footing is very large so that the thickness of the raft 0.6m is taken with
reinforcement fitting.After excavating surface is compacted and PCC is provided with
waterproofing. Over the PCC, raft is provided. Column footing is used to transfer the load of the
column to the raft.
Information of site-
 Size of the raft footing- 21 X 35m
 no of column footing-
 Thickness of footing-0.6m
 Concrete used- M25 (cement-50kg, metal-150kg, crushed sand-96kg, admixture-
500ml, water- 21lit
Procedure for the raft footing-
1. The bed is compacted and sprinkled over with water.
2. Then the whole area is dug out to the specified depth and 30 cm more wide than the area
to be covered.
3. a layer PCC concrete is laid to a suitable thickness to act as a bottom cover.
4. After this, the reinforcement is laid. The reinforcement consists of closely spaced bars
placed at right angles to one another.
5. Then the M20 cement concrete is laid and compacted to the required thickness.
6. The concrete slab so laid is then properly cured
7. When loads are excessive, thick concrete beams running under the columns can also be
constructed.
Suitability-
This type of foundation is useful for public buildings, office buildings, school buildings,
residential quarters etc. where the ground conditions are very poor and bearing powerof the
soil is so low that individual spread footing cannot be provided.
12 | P a g e
13 | P a g e
Column
A reinforced concrete column is a structural members designed to carry compressive
loads, composed of concrete with an embedded steel frame to provide reinforcement. For design
purposes, the columns are separated into two categories: short columns and slender columns.
A column may be classified based on different criteria such as:
1. Based on shape
 Rectangle
 Square
 Circular
 Polygon
2. Based on slenderness ratio
 Short column, ? ? 12
 Long column, ? > 12
3. Based on type of loading
 Axially loaded column
 A column subjected to axial load and uniaxial bending
 A column subjected to axial load and biaxial bending
Constructing RCC (Reinforced Cement Concrete) Column involves following four stages of
works -
1. Column layout work
2. Column reinforcement work
3. Column formwork, and
4. Pouring concrete into column.
 Column layout work
In this stage of works the location of columns are determined practically in field. It is
done by laying rope according to grids shown in the drawing and then mark the location of
columns related to rope.
14 | P a g e
15 | P a g e
Retaining wall
Retaining wall is structure used to maintain ground surface at different elevations on
either side of it. Retaining wall provides lateral support to vertical slopes of soil. They retain soil
which will otherwise collapse in to more natural shapes. The retained soil is referred as backfill.
Retaining walls are usually built to hold back soil mass. However, retaining walls can
also be constructed for aesthetic landscaping purposes. Retaining walls are structures that are
constructed to retain soil or any such materials which are unable to stand vertically by
themselves. They are also provided to maintain the grounds at two different levels.
On site of crystal tower retaining wall is used to retain soil between two different levels
ground level basement level. This retaining wall is cast along boundary of site.M 25 grade
concrete is used with reinforcement of 8 mm tor steel bars. For water proofing purpose
“shahabadi” tiles are laid on one side of retaining wall.
16 | P a g e
Slab and beam casting:-
 Reinforcement
It shall be as per BBS(behavior based safety) prepared according to approved drawing. The R/F
shifting and binding shall be started as soon as shuttering is completed. R/F binding shall
continue as formwork and shuttering work is progresses.
 Concreting
 Construction joint
The construction joint shall be pre decided and fixed prior to start of the concreting. It is
planned to have two construction joints for main building as decided. In case of major break
down of the Batching plant, the additional Construction joint may be left. The location of the
construction joint shall be at the one-third span. Construction joint shall be straight and have
profile of „L‟ shape so that successive layer of concrete shall be perfectly bonded with previous
laid layer.
Preparation of construction joint shall include roughening, removing all laitance adhering to the
joint and application of thick slurry before start of the new concrete.
 Production and placement of concrete.
Stock of material shall be sufficient to start the concrete. It shall be ensured by
stores/purchase dept that concreting is not stopped on account of materials.
All plant and machinery are checked and made in working conditions.
Concrete of grade M-25 shall be produced from our batching plant and directly pumped
to the location of concrete placement through the pipeline. The pouring sequence shall be from
grid A towards construction joint. Since the grade of concrete for column is M-40 and
surrounding concrete is M-25, sufficient offset around column shall be casted with M-40.The
offset dimensions shall be provided by PMC.
Proper walkways/platforms shall be arranged so that the supports of the pipeline and
manpower are not directly stand on reinforcement.
17 | P a g e
Sufficient carpenters along with supervisor shall inspect the behavior of supports below the
slab during the casting. Extra Props shall be stocked below slab to provide additional supports in
case of any failure of supports.
 Curing
The curing shall be started immediately after thumb set of the concrete laid. Hessian
clothe /Plastic shall be covered over the set concrete to reduce moisture evaporation from the
concrete during hardening and thus to minimize shrinkage crazy cracks. These cracks are
inheriting property of the concrete specially appears during casting of flat surfaces.
Final curing shall be done by ponding and stacking water for minimum period of 7 days
.
18 | P a g e
19 | P a g e
P.C.C.:-
PCC-plain cement concrete of grades M10 or M15 is used as leveling course in the
foundation trenches to act as level platform for RCC footing for columns / masonry footing for
load bearing walls.it also serves as separating layer between natural soil and footing so that any
harmful chemical present in soil will not act on the footing .PCC has no structural importance.in
case of trances or pits excavated than the required depth ,the extra depth should be filled with
PCC of required grade at the expense of contractor to the required level to place the footing.
For P.C.C., At the site , they were used M10 Grade concrete and thickness of the
P.C.C. was 150mm.
INFORMATION OF SITE :-
Size of the PCC :- 21 x 35 sq.m.
Thickness of PCC:- 0.15 m
Concrete grade :- M10
Procedure for PCC.:-
i) Excavation levels and dimensions to be checked as per drawings.
ii) Remove all the loose earth from the pits.
iii) Do water sprinkling and ramming the cleaned surface of pit by mechanical
rammer.
iv) Do the shuttering by planks and runners wherever if necessary.
v) Mix the concrete with required proportion and water cement ratio by mechanical
mixer machine and place the same in to pits.
vi) Poured surface to be rammed and finished smoothly.
20 | P a g e
Waterproofing:-
Water-proof or water-resistant describes objects relatively unaffected by water or
resisting the ingress of water under specified conditions. Such items may be used in wet
environments or under water to specified depths. Waterproofing describes making a structure
waterproof or water-resistant
"Water resistant" and "waterproof" often refer to penetration of water in its liquid state and
possibly under pressure, whereas damp proof refers to resistance to humidity or
dampness. Permeation of water through a material or structure.
Waterproofing is done by using rough Shahabad tile. Shown in fig.
21 | P a g e
Expansion joints:-
An expansion joint or movement joint is an assembly designed to safely absorb the heat-
induced expansion and contraction of construction materials, to absorb vibration, to hold parts
together, or to allow movement due to ground settlement or earthquakes. They are commonly
found between sections of buildings, bridges, sidewalks, railway tracks, piping systems, ships,
and other structures.
Building faces, concrete slabs, and pipelines expand and contract due to warming and cooling
from seasonal variation, or due to other heat sources. Before expansion joint gaps were built into
these structures, they would crack under the stress induced.
22 | P a g e
Shuttering
Timber is the most common Formwork is an ancillary construction, used as a mould for a
structure. Into this mould, fresh concrete is placed only to harden subsequently. The construction
of formwork takes time and involves expenditure upto 20 to 25% of the cost of the structure or
even more. Design of these temporary structures are made to economic expenditure. The
operation of removing the formwork is known as stripping. Stripped formwork can be reused.
Reusable forms are known as panel forms and non-usable are called stationary forms.
material used for formwork. The disadvantage with timber formwork is that it will warp,
swell and shrink. Application of water impermeable cost to the surface of wood mitigates these
defects.
At our site following types of shuttering is used
 Plywood shuttering
 Steel shuttering
 Mivan shuttering
Mivan shuttering:
Mivan is aluminum formwork system.mivan technology is suitable for constructing large
number of houses in short span of time using room size forms to construct walls and slabs in one
continuous pour on concrete .mivan technology facilitate fast construction, strict quality control,
exact dimensions ,we can form any size as per requirements.mivan panels are costly than
plywood panels ,labour charge is also comparatively more.
23 | P a g e
Chapter 3
Daily schedule
Field Training Details:-
Sr No Day & date Description of work at training site Materials used and Quality
control of work
1 Monday
1/12/2014
Casting of P.C.C. of G building M10 Grade of concrete
Waterproofing work (Above the P.C.C.)
G building
a)Rough Shahbadi tiles
b)Cement c)Water
Formwork for foundation G building
2 Tuesday
2/12/2014 Casting of P.C.C.G building
M10 Grade of concrete
Waterproofing work (Above the P.C.C.)
G building
a)Rough Shahbadi tiles
b)Cement c)Water
Formwork for foundation G building
3
Wednesday
3/12/2014
Casting of Raft , Foundation G building M25 Grade of concrete
by RMC
Checking of reinforcement of slab
H building
4 Thursday
4/12/2014
Casting of P.C.C. G building M10 Grade of concrete
24 | P a g e
Sr No Day & date
Description of work at training site Materials used at site and
Quality control of work
Waterproofing work (Above the P.C.C.)
G building
a)Rough Shahbadi tiles
b)Cement c)Water
Formwork for foundation G building
5 Friday
5/12/2014 Casting of starters of columns G building
M30 Grade concrete
Casting Retaining wall G building M25 Grade concrete
Checking slab reinforcement H building
6 Saturday
6/12/2014 Casting of slab
M25 Grade concrete
Casting Retaining wall G building
M25 Grade concrete
Formwork for foundation G building
7 Sunday
7/12/2014
8 Monday
8/12/2014 De-shuttering of slab on lateral side
H building
Casting of Raft , foundation G building
M25 Grade of concrete by RMC
Formwork for Retaining wall G building
9 Tuesday
9/12/2014
Casting of P.C. G building M10 Grade of concrete
Waterproofing work (Above the P.C.C.)
G building
a)Rough m,Shahbadi tiles
b)Cement c)Water
25 | P a g e
Sr No Day & date Description of work at training site
Materials used at site and
Quality control of work
Formwork for foundation G building
10 Wednesday 10/12/2014Casting Retaining wall G building M25 Grade of concrete
Casting of P.C.C. G building
M10 Grade of concrete
Waterproofing work (Above the P.C.C.) G buildinga)Rough Shahbadi tiles
b)Cement c)Water
11 Thursday
11/12/2014
Formwork for slab of H building
Casting of starters of columns G building M30 Grade concrete
Casting Retaining wall G building
M25 Grade concrete
12 Friday
12/12/2014 Casting of Column up to plinth level G
building
M30 Grade concrete
Formwork for slab of H building
Casting Retaining wall G building
M25 Grade concrete
13 Saturday
13/12/2014 Casting of Column up to plinth level G
building
M30 Grade concrete
Casting of P.C.C. G building M10 Grade of concrete
Waterproofing work (Above the P.C.C.)
G building
a)Rough Shahbadi tiles
b)Cement c)Water
14 Sunday
14/12/2014
15 Monday
15/12/2014
Casting of Raft , Foundation G building M25 Grade of concrete by RMC
Fitting of steel reinforcement of slab
Casting Retaining wall G building M25 Grade concrete
16 Tuesday
16/12/2014
Casting of P.C.C. G building M10 Grade of concrete
26 | P a g e
Waterproofing work (Above the P.C.C.)
G building
a)Rough Shahbadi tiles
b)Cement c)Water
Casting of Column up to plinth level G
building
M30 Grade concrete
17 Wednesday
17/12/2014 Casting of Column up to plinth level G
building
M30 Grade concrete
Casting of P.C.C. G building M10 Grade of concrete
Waterproofing work (Above the P.C.C.) G building
a)Rough Shahbadi tiles
b)Cement c)Water
Fitting of steel reinforcement of slab
18 Thursday
18/12/2014 Casting of Raft , Foundation G building
M25 Grade of concrete by RMC
Fitting of steel reinforcement of slab
Casting Retaining wall G building
M25 Grade concrete
19 Friday
19/12/2014 Casting of starters of columns G building
M30 Grade concrete
Casting Retaining wall G building M25 Grade concrete
Fitting of steel reinforcement of slab
20 Saturday
20/12/2014
Casting of Raft , Foundation
G building
M25 Grade of concrete by RMC
Casting Retaining wall G building
M25 Grade concrete
Fitting of steel reinforcement of slab
27 | P a g e
Raw Material Rate
Sr.No Description of material Unit Rate per unit
1 Cement Per Bag 250 /-
2 Crushed sand Brass 1500 /-
3 Natural sand Brass 4500 /-
4 Aggregate Brass 2000 /-
5 Steel Ton 56000 /-
Labour Rate for items
Sr.No Description Rate per unit
1 Shuttering Contractor Rs-38 (Built up)
2 Bar Bender Rs-15 (per Sq.Ft)
3 Labour Contractor (Brickwork , Plastering) RS-80 ( per Sq.Ft)
4 Tile fitting RS-25 ( per Sq.Ft)
5 Electrition RS-80 ( per Sq.Ft)
6 Plumbing RS-2000 ( per unit)
7 Painter Work RS-15 ( per Sq.Ft)
8 P-O-P Work RS-60 ( per Sq.Ft)
9 Fabricator RS-10 ( per Sq.Ft)
28 | P a g e
Field Tests
Tests on concrete:
1) Slump cone test:-
The concrete slump test is an empirical test that measures the workability of
fresh concrete. It is a term which describes the state of fresh concrete. It refers to the ease with
which the concrete flows. It is used to indicate the degree of wetness. The test is popular due to
the simplicity of apparatus used and simple procedure.
Principle:-The slump test result is a slump of the behavior of a compacted inverted cone of
concrete under the action of gravity. It measures the consistency or the wetness of concrete.
Procedure:-The test is carried out using a mould known as a slump cone or Abrams cone. The
cone is placed on a hard non-absorbent surface. This cone is filled with fresh concrete in three
stages, each time it is tamped using a rod of standard dimensions. At the end of the third stage,
concrete is struck off flush to the top of the mould. The mould is carefully lifted vertically
upwards, so as not to disturb the concrete cone. Concrete subsides. This subsidence is termed as
slump, and is measured in to the nearest 5 mm.
Observations:-slump cone : 80 mm.
Conclusion:- slump cone is below 90mm therefore concrete is consistent.
29 | P a g e
2) Cube testing:
Out of many test applied to the concrete, this is the most important which gives an idea about all
the characteristics of concrete. By this single test one judge that whether Concreting has been
done properly or not. For cube test specimens cubes of 15 cm x 15cm x 15 cm are commonly
used.
This concrete is poured in the mould and tempered properly so as not to have any voids. After 24
hours these moulds are removed and test specimens are put in water for curing. The top surface
of this specimen should be made even and smooth. This is done by putting cement paste and
spreading smoothly on whole area of specimen.
These specimens are tested by compression testing machine after 7 days curing or 28 days
curing. Load should be applied gradually at the rate of 140 kg/cm2 per minute till the Specimens
fails. Load at the failure divided by area of specimen gives the compressive strength of concrete.
Tests on materials used:-
A)Sand and aggregate:-
1) Sieve analysis:-
A sieve analysis is a practice or procedure used to assess the particle size
distribution (also called gradation) of a granular material. The size distribution is often of critical
importance to the way the material performs in use.
Procedure:-
 A gradation test is performed on a sample of aggregate in a laboratory. A typical sieve
analysis involves a nested column of sieves with wire mesh.
 A representative weighed sample is poured into the top sieve which has the largest
screen openings. Each lower sieve in the column has smaller openings than the one
above. At the base is a round pan, called the receiver.
 The column is typically placed in a mechanical shaker. The shaker shakes the column,
usually for some fixed amount of time. After the shaking is complete the material on
each sieve is weighed. The weight of the sample of each sieve is then divided by the
total weight to give a percentage retained on each sieve.
 A suitable sieve size for the aggregate should be selected and placed in order of
decreasing size, from top to bottom, in a mechanical sieve shaker. A pan should be
30 | P a g e
placed underneath the nest of sieves to collect the aggregate that passes through the
smallest. The entire nest is then agitated, and the material whose diameter is smaller than
the mesh opening pass through the sieves. After the aggregate reaches the pan, the
amount of material retained in each sieve is then weighed.
3) Moisture content.
B) Tests on steel:-
1) Tensile test:-
The specimen is subjected to tensile load and extension is noted against the
load within the elastic limit. Loads at, Yield point, Breaking point and Ultimate point are noted.
With these, stress-strain graph is plotted and following results are calculated.
 Modulus of Elasticity = Stress (within the elastic limit)/Strain.
 Yield stress = (Load at yield point /original c/s area)
 Ultimate stress = (Ultimate Load/ original c/s area.)
2) Bend test:-
The ASTM E-290 standard covers bend testing of bars primary for evaluation of
their ductility. Specifications such as size and type, radius of bending, angle of bend, number and
size of visible cracks if any, are reported. The standard demanded that after testing the convex
surface of the bend specimen shall be examined with the unaided eye to identify cracks or other
open defects.
3) Rebend test:-
Reinforcing steel specifications often require a rebend test. This is a
measure of the strain age embrittlement of the bars. After bending through a specified angle
around a specified mandrel diameter, samples are aged in an air oven, and then rebent through a
smaller specified angle. Samples must show no signs of cracking in order to pass this test.
C) Tests on water:-
1) pH
of water.
2) Hardness of water.
31 | P a g e
32 | P a g e
Chapter 4
Equipments & safety
Machines
It is common fact we find wide variety of construction on every construction site. Which
makes the job easy, safe and quicker. Depending on application construction machines are
classified into different types which are
1. Earth moving instrument
2. Construction vehicles
3. Material handling instrument
4. Construction instrument
Following machines are mainly used on site for construction purpose:
Weigh batcher:
Weigh Batcher is used in various industrial applications and is accessed at affordable
prices in the market. These are appreciated for their efficient working ability and long working
life. Weigh batcher is machine used in construction industry to weigh exact quantity of sand
,cement ,aggregates to form concrete.Concrete weigh batcher (double hopper) is an effective
device extensively used for weighing production of controlled concrete.it is suitable to produce
M20,M25,M30 concrete. If lesser quantity of concrete is required then instead of RMC weigh
batcher is used.
Weigh batcher is generally placed on flat surface otherwise we have to level it with level
tube.by adjusting the weights on scale we can measure exact quantity of material to be used
.Then this mixed is send to concrete mixer.
Suitable design for M 15, M 25 & M 30 are provided with:
 Type: Scale Type
 Size: 2.2 x 1.05 x 1.8 meters
 Capacity: 500 Kg (250 Kg Each)
 Mechanism: Lever Type
Operation:
 Capacity of the hopper - 250 / 500 kg each
33 | P a g e
 Level the machine properly on platform
 Clean the machine regularly to get the proper weights of sand & aggregate
 Put the required weights in to the pan (100 kg, 50 kg & 20kg) As per weight required for
odd calibration, adjust the weight on the scale given. (10 mm = 1000 gm)
 Unload the material directly in the mixer hopper, outlet given on rear side.
Water dispenser:
Water dispenser is machine used to add exact amount of water in to mix of
cement ,aggregates, sand etc.For specific concrete grade amount of warter is fixed so we
can digitaly adjust the water and flow of water in to concrete mixer.
34 | P a g e
Cutter machine:
Cutter machine is used to cut the steel for reinforcement it is having rotating blade which
has to change after deterioration .it is portable machine so we an easily move it to any place .it
works on electric power. cutter machine is used also cut binding wires etc.
35 | P a g e
Concrete mixer:
A concrete mixer (also commonly called a cement mixer) is a device that homogeneously
combines cement, aggregate such as sand or gravel, and water to form concrete. A typical
concrete mixer uses a revolving drum to mix the components. For smaller volume works
portable concrete mixers are often used so that the concrete can be made at the construction site,
giving the workers ample time to use the concrete before it hardens. An alternative to a machine
is mixing concrete by hand. This is usually done in a wheelbarrow; however, several companies
have recently begun to sell modified tarps for this purpose.
For smaller jobs, such as residential repairs, renovations, or hobbyist-scale projects, many
cubic yards of concrete are usually not required. Bagged cement is readily available in small-
batch sizes, and aggregate and water are easily obtained in small quantities for the small work
site. To service this small-batch concrete market, there are many types of small portable concrete
mixers available.
36 | P a g e
Vibrator needle:
Since concrete contains particles of varying sizes, the most satisfactory compaction would
perhaps be obtained by using vibrators with different speeds of vibration. Polyfrequency vibrators used
for compacting concrete of stiff consistency are being developed. The vibrators for compacting concrete
are manufactured with frequencies of vibration from 2800 to 15000 rpm. The various types of vibrators
used are described below:
This is perhaps the most commonly used vibrator. It essentially consists of a steel tube
(with one end closed and rounded) having an eccentric vibrating element inside it. This steel tube
called poker is connected to an electric motor or a diesel engine through a flexible tube. They are
available in size varying from 40 to 100 mm diameter. The diameter of the poker is decided from
the consideration of the spacing between the reinforcing bars in the form-work.
The frequency of vibration varies up to 15000 rpm. However a range between 3000 to
6000 rpm is suggested as a desirable minimum with an acceleration of 4g to 10g.
The normal radius of action of an immersion vibrator is 0.50 to 1.0m. However, it would be
preferable to immerse the vibrator into concrete at intervals of not more than 600mm or 8 to 10
times the diameter of the poker.
The period of vibration required may be of the order of 30 seconds to 2 minute. The concrete
should be placed in layers not more than 600mm high.
37 | P a g e
R.M.C. :
Ready-mix concrete is concrete that is manufactured in a factory or batching plant,
according to a set recipe, and then delivered to a work site, by truck mounted intransit machine.
This results in a precise mixture, allowing specialty to be developed and implemented on
construction sites.
Ready-mix concrete is sometimes preferred over on-site concrete mixing because of the
precision of the mixture and reduced work site confusion. However, using a pre-determined
concrete mixture reduces flexibility, both in the supply chain and in the actual components of the
concrete.
Ready-mix concrete is also referred as the customized concrete products for commercial
purpose. Ready-mix concrete, or RMC as it is popularly called, refers to concrete that is
specifically manufactured for delivery to the customer's construction site in a freshly mixed and
plastic or unhardened state. Concrete itself is a mixture of Portland cement, water and aggregates
comprising sand and gravel or crushed stone. In traditional work sites, each of these materials is
procured separately and mixed in specified proportions at site to make concrete. Read-mix
concrete is bought and sold by volume - usually expressed in cubic meters
Disadvantages of R.M.C.
 The materials are batched at a central plant, and the mixing begins at that plant, so the
traveling time from the plant to the site is critical over longer distances. Some sites are
just too far away, though this is usually a commercial rather than a technical issue.
 Generation of additional road traffic. Furthermore, access roads and site access have to be
able to carry the greater weight of the ready-mix truck plus load. (Green concrete is
approx. 2.5 tonne per m³.) This problem can be overcome by utilizing so-called 'minimix'
companies which use smaller 4m³ capacity mixers able to reach more-restricted sites.
 Concrete's limited timespan between mixing and going-off means that ready-mix should
be placed within 210 minutes of batching at the plant Modern admixtures can modify that
timespan precisely, however, so the amount and type of admixture added to the mix is
very important.
 Water pump
 Grinder machine
 Breaker
 Lift and trolley
 Wheel borrow
 Drill machine
38 | P a g e
39 | P a g e
Equipments
Plumb bob:
Plastering tool:
40 | P a g e
Scraper:
Circular sieve:
41 | P a g e
Shikanja:
Span:
42 | P a g e
SITE SAFETY
For achieving safety on the site no. of safety officers are appointed. A better safety
control measures are also adopted on site while construction.
Safety Equipments used on construction site:
a) Compulsory use of helmets on site.
b) Safety belts are used on site while working on height.
c) A horizontal barrigation is provided at building lift ducts, and on the other spot also
d) For safer working on site all construction equipments are regularly surveyed.
e) Safety is enforced by law on sate to each and every worker on site.
f) A trained operators are appointed at crane and other construction equipments.
g) Hand gloves are used as safety tool.
h) A safety sign boards are also provided on site with a much higher density.
i) Safety nets are used to held the materials that fall down during work.
j) Fire Extinguisher.
43 | P a g e
44 | P a g e
CHAPTER5
Management Work
Bar Chart:
Sr.No Activities Duration (weeks)
A. Excavation 2
B. P.C.C.+ Water 3
C. Raft + Column 8
D. Pardi 2
E. First Slab 5
F. Second Slab 5
G. Third Slab 4
45 | P a g e
Details of Labour
Sr. No. Description Category Nos. Rates
1. Carpenter In charge 1 500
. Helper 9 250
Sutar 20 400
2. Fitter In charge 2 500
Helper 12 250
Foreman 3 450
3. Concreting Incharge 1 600
Helper 12 250
Foreman 6 500
4. Centering Incharge 1 700
Helper 10 300
Foreman 2 550
46 | P a g e
Interview of Project Head:-
Interviewee: Mr. Kailas Ramchandra.Patil( Managing Director, Om constrution.)
Age-48 years
Education-diploma in 1989 from RIT
Home town- shirala, dist-sangli
Experience-25 years
Past project- 1st
project-at rajarambapu factory
-at Pratibha construction
-Raj bank,
-ashti sugar nagar
-bhugaon project
Running project-Dmart at Mumbai and kalian
-Toyota show room at miraj
-Sadaphuli,baner
-Crystal towers, baner
 What were the problems faced on the labourer’s front?
 After starting the construction, the workers had carried out strikes in order to increase
their wages i.e when they were provided with insufficient wages. Due to this we
faced problems in calculating estimates and also the time duration of completion of
project was increased.
 Were there any problems while acquiring the land for this project?
 We did not face any problems from people from whom the land was bought but while
construction of compound walls began the neighbors used to threaten us in the name
of a court stay order and due to this we had to pay them some extra amount which
was an indirect loss for the company.
 How is the experience of construction in this project?
 The area for construction of this project is good and the location is also easily
accessible, also materials are available in abundance and due to this we did not face
any material shortage, transportation is also good in this area.
 If we want to start our own company like yours what are your
suggestions for newcomers like us?
 Honestly, I recommend a newcomer in this field to gain some hands on experience in
a company first and then after knowing how things work around here, that person can
start his own company. Starting a company without any job experience will most
probably lead to losses at first as the individual will have to adapt and learn the basics
of the game which will take some time.
Even Im an engineer and only technical knowledge is not enough for someone
to start his own company, an individual needs to learn many more things which are
only learnt by doing jobs as an employee in the industry.
47 | P a g e
48 | P a g e
CONCLUSION:
During Field training, I got lot of practical knowledge of various machines,
tools & various equipments and also taking various precautions during operating
them. I also gained the knowledge how to work efficiently with less effort and
proper care to avoid accident and develop worker relationship.
Regarding the quality of work I like to add that due to poor supervising
the concreting quality was little bad. Proportion of mixing of contents in aggregate
was not stable. In this high society building there is no bathroom in servant
room.
All these features of an organization has really added some good qualities in
me. Thus this vocational training was very helpful for my academic and future life.
49 | P a g e
Appendix:-
 SITE PHOTO GALLARY:-
 Reinforcement: -
o Slab reinforcement: -
50 | P a g e
51 | P a g e

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman Khokan
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
 
Internship review (Civil Engineering)
Internship review (Civil Engineering)Internship review (Civil Engineering)
Internship review (Civil Engineering)
 
Training report of road construction
Training report of road constructionTraining report of road construction
Training report of road construction
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...
 
Internship Report Construction Site and Office Work
Internship Report Construction Site and Office WorkInternship Report Construction Site and Office Work
Internship Report Construction Site and Office Work
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
Industrial training report of construction of the residential building
Industrial training report of construction of the residential buildingIndustrial training report of construction of the residential building
Industrial training report of construction of the residential building
 
Survey camp final_report_(g9)_095556
Survey camp final_report_(g9)_095556Survey camp final_report_(g9)_095556
Survey camp final_report_(g9)_095556
 
Internship report on rcc road
Internship report on rcc roadInternship report on rcc road
Internship report on rcc road
 
Summer training report
Summer training reportSummer training report
Summer training report
 
A project report on flyover internship bihar rajya pul nirman nigam limited p...
A project report on flyover internship bihar rajya pul nirman nigam limited p...A project report on flyover internship bihar rajya pul nirman nigam limited p...
A project report on flyover internship bihar rajya pul nirman nigam limited p...
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
Bridge report
Bridge reportBridge report
Bridge report
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
 
Industrial training seminar PPT
Industrial training seminar PPTIndustrial training seminar PPT
Industrial training seminar PPT
 
PPT on industrial summer training in civil engineer
PPT  on industrial summer training in civil engineer PPT  on industrial summer training in civil engineer
PPT on industrial summer training in civil engineer
 

Destaque

Principles of flight
Principles of flightPrinciples of flight
Principles of flight
deanoson
 
6. petróleo (oil & gas)
6. petróleo (oil & gas)6. petróleo (oil & gas)
6. petróleo (oil & gas)
JorgeVilches1
 
Practical Work Report - Fletcher
Practical Work Report - FletcherPractical Work Report - Fletcher
Practical Work Report - Fletcher
Jade Keswick
 

Destaque (20)

Industrial report for civil engg. training
Industrial report for civil engg. trainingIndustrial report for civil engg. training
Industrial report for civil engg. training
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
Mivan tech
Mivan techMivan tech
Mivan tech
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Bsnl industrial report 2014
Bsnl industrial report 2014Bsnl industrial report 2014
Bsnl industrial report 2014
 
Field project report nhpc
Field project report nhpcField project report nhpc
Field project report nhpc
 
Principles of flight
Principles of flightPrinciples of flight
Principles of flight
 
Apresentação CME Salesopolis
Apresentação CME SalesopolisApresentação CME Salesopolis
Apresentação CME Salesopolis
 
F
FF
F
 
Einführung in die Mediendidaktik
Einführung in die MediendidaktikEinführung in die Mediendidaktik
Einführung in die Mediendidaktik
 
Lista numerada de participantes
Lista numerada de participantes Lista numerada de participantes
Lista numerada de participantes
 
6. petróleo (oil & gas)
6. petróleo (oil & gas)6. petróleo (oil & gas)
6. petróleo (oil & gas)
 
Practical Work Report - Fletcher
Practical Work Report - FletcherPractical Work Report - Fletcher
Practical Work Report - Fletcher
 
Accounting 2 Chapter 8 Jamelli
Accounting 2 Chapter 8 JamelliAccounting 2 Chapter 8 Jamelli
Accounting 2 Chapter 8 Jamelli
 
Monitor de ritmo cardiaco
Monitor de ritmo cardiacoMonitor de ritmo cardiaco
Monitor de ritmo cardiaco
 
Mopece4 vig epid
Mopece4 vig epidMopece4 vig epid
Mopece4 vig epid
 
Actividades didácticas second life
Actividades didácticas second lifeActividades didácticas second life
Actividades didácticas second life
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
 
Remedio el Aire
Remedio  el AireRemedio  el Aire
Remedio el Aire
 
Unmsm teoria psicologia filosofia logica
Unmsm teoria  psicologia filosofia logica Unmsm teoria  psicologia filosofia logica
Unmsm teoria psicologia filosofia logica
 

Semelhante a Svp field training report final

Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
AJAY SHAHU
 
Final Report
Final Report Final Report
Final Report
Jack Ng
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
Amritpal Singh
 

Semelhante a Svp field training report final (20)

Site report 1
Site report 1Site report 1
Site report 1
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
JEEVA.pptx
JEEVA.pptxJEEVA.pptx
JEEVA.pptx
 
Metroppt
MetropptMetroppt
Metroppt
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Shib
ShibShib
Shib
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Dmrc project
Dmrc projectDmrc project
Dmrc project
 
Ayush
AyushAyush
Ayush
 
Maulana azad national institute of technology
Maulana azad national institute of technologyMaulana azad national institute of technology
Maulana azad national institute of technology
 
Final Report
Final Report Final Report
Final Report
 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)
 
31_SHRUTIGARG_BC_GROUPREPORT.pdf
31_SHRUTIGARG_BC_GROUPREPORT.pdf31_SHRUTIGARG_BC_GROUPREPORT.pdf
31_SHRUTIGARG_BC_GROUPREPORT.pdf
 
site report
site reportsite report
site report
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 
Project report
Project reportProject report
Project report
 
Field visit report 2019
Field visit report 2019Field visit report 2019
Field visit report 2019
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
 
Sadab
SadabSadab
Sadab
 

Último

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Último (20)

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Svp field training report final

  • 1. 1 | P a g e FIELD TRAINING REPORT Submitted to Department of Civil Engineering By PARAB SHUBHAM VILAS 1202016 Under The Guidance Of PROF. Y.M.PATIL Under The Supervision Of ER. PATIL KAILAS R. Rajarambapu Institute of Technology, Rajaramnagar (An Autonomous Institute) Affiliated to Shivaji University Kolhapur 2014-15
  • 2. 2 | P a g e Preliminary Information: a. General information of the candidate 1. Name- Parab shubham vilas 2. Enrollment No. : 1202016 3. Contact Address-At/Post- Islampur Tal.Walwa Dist.Sangli 4. Email ID: shubhamparab2212@gmail.com 5. Mobile No-9420728101 b. Name and address of the Company. Omkar construction Pvt.Ltd bhugaon, Pune. 3 Amey Apartments, Pooja Park Society, Prabhat Road, Kothrud, Pune-4110038, MH (India) c. Period of Field Training: 01 Dec to 21Dec, 2014 TotalDays : 21 d. Contact officer in the above organization: Name: Mr.S.A.Wable & Mr.K.R.Patil Designation: D.C.E.( RIT Diploma Alumni-Batch 1989) Phone number: 020-32422346 E-mail address: Omkarconstructions9@gmail.com
  • 3. 3 | P a g e CERTIFICATE This is to certify that the Field Training undergone in the Omkar Constructions Pvt. Ltd..iscarried out by Mr. PARAB SHUBHAM VILAS under my guidance. The report is submitted towards the partial fulfillment of Third year, full time Under Graduate Programme in Civil Engineering. Date: Name & Sign of Guide Name & Sign of Supervisor
  • 4. 4 | P a g e ACKNOWLEDGEMENT I wish to express sincere thanks and gratitude to the DR.H.S.JADHAV(H.O.D. Department of civil engineering) and PROF. Y.M.PATIL (Department of Civil Engineering, Rajarambapu Institute of Technology, Rajaramnagar) for the whole hearted encouragement, advice and timely guidance in completing this field training work. I have to record my deep sense of indebtedness to Mr.K. R. Patil, (Omkar Constructions pvt.ltd.)for providing us the facilities and instruments and for their stimulating guidance and continuous encouragement. I also like to thank my family for supporting me through this field training activity. It is my pleasure to thank Dr. S.S.Kulkarni (Director R.I.T) and Prof.D.B.Kulkarni (Field training in charge) for giving me this opportunity. It is necessary here to acknowledge the valuable support and suggestions provided by Mr. Rohit Jadhav, (Site Engineer,Omkar const. pvt lim.)in carrying out training work. PARAB SHUBHAM VILAS (Roll No.: -1202016)
  • 5. 5 | P a g e INDEX Sr.No. Page No. 1. Project details 6 2. Site layout and drawings 8 3. Works on site 11 4. Daily schedule 23 5. Material rate and labour cost 27 6. Field tests 28 7. Equipments and safety 32 8. Management work 42 9. Interaction with project head 46 10. conclusion 48
  • 6. 6 | P a g e Chapter 1 Project details Name of the project: Crystal tower Client:Paranjape schemes pvt.ltd. Contractor: Omkar constructions pvt.Ltd. Consultant: 1.Architectural consultant- Mr. A B Waidya 2.R.C.C. consultant- Mr. S.W. Mone 3.Legal consultant- Adv. H.P.Koparde Estimated Cost: 18.5crore Duration of Project:2.5 years Project commencement Year: 2013 1.1. Project Brief  General Description and Scope of the Project  GENERAL DESCRIPTION: This project is situated in Baner, Pune which is very near to the commercial zone, schools, colleges, hospitals, bus stand etc. The site is situated in nature‟s beauty i.e it has fresh air and is pollution free.
  • 7. 7 | P a g e  SCOPE OF THE PROJECT: It is a residential project aimed at affordable housing with all faciltites like wide internal roads, garden, jogging track, internal security with CCTV cameras and security guard, large parking space, ampitheatre, purified drinking water supply with solar water heating system, invertor backup system and Ganesh temple. This project targets to provide residence for about 1,000 people.  Training Site Details: Address: Total Plot Area = 25690.38sq.m. Total Carpet Area = 2122.13sq.m. No. of buildings =3 Total flats=144  Training In charge: Mr. Rohit Jadhav  Location: Banerphata, Pune  Organization structure is as given below:- 1) Chairman:- Mr.A.A.Wable & Mr.K.R.Patil 2) Vice-Chairman:- Mr.S.A.Wable 3) M.D.:- Mr. Shrinivas Wable 4) Manager:- Mr.A.S.Gaikwad 5) Site Engineer:-Mr.Rohitjadhav 6) Supervisor:-Mr.SudhakarAade 7)LaborIn charge :-Mr.G. L. Mahamun
  • 8. 8 | P a g e Site Layout
  • 9. 9 | P a g e Location Map Proposed Building
  • 10. 10 | P a g e Floor Plan Typical 3BHK Flat
  • 11. 11 | P a g e Chapter 2 Works On Site Footing- Footing is important part of foundation. To provide a level or uniform platform for structure footing is provided. Footing spread out the weight of the structure so the soil can carry the load spread out within the footing itself at about 45 degree angle and then spread out in the soil. They are typically made of concrete with rebar reinforcement that has been poured into an excavated trench. The choice of suitable type of footing depends on the depth at which the bearing strata lies, the soil condition and the type of superstructure Raft footing is used on site by investigating nature of soil and bearing capacity of soil. As the loading on footing is very large so that the thickness of the raft 0.6m is taken with reinforcement fitting.After excavating surface is compacted and PCC is provided with waterproofing. Over the PCC, raft is provided. Column footing is used to transfer the load of the column to the raft. Information of site-  Size of the raft footing- 21 X 35m  no of column footing-  Thickness of footing-0.6m  Concrete used- M25 (cement-50kg, metal-150kg, crushed sand-96kg, admixture- 500ml, water- 21lit Procedure for the raft footing- 1. The bed is compacted and sprinkled over with water. 2. Then the whole area is dug out to the specified depth and 30 cm more wide than the area to be covered. 3. a layer PCC concrete is laid to a suitable thickness to act as a bottom cover. 4. After this, the reinforcement is laid. The reinforcement consists of closely spaced bars placed at right angles to one another. 5. Then the M20 cement concrete is laid and compacted to the required thickness. 6. The concrete slab so laid is then properly cured 7. When loads are excessive, thick concrete beams running under the columns can also be constructed. Suitability- This type of foundation is useful for public buildings, office buildings, school buildings, residential quarters etc. where the ground conditions are very poor and bearing powerof the soil is so low that individual spread footing cannot be provided.
  • 12. 12 | P a g e
  • 13. 13 | P a g e Column A reinforced concrete column is a structural members designed to carry compressive loads, composed of concrete with an embedded steel frame to provide reinforcement. For design purposes, the columns are separated into two categories: short columns and slender columns. A column may be classified based on different criteria such as: 1. Based on shape  Rectangle  Square  Circular  Polygon 2. Based on slenderness ratio  Short column, ? ? 12  Long column, ? > 12 3. Based on type of loading  Axially loaded column  A column subjected to axial load and uniaxial bending  A column subjected to axial load and biaxial bending Constructing RCC (Reinforced Cement Concrete) Column involves following four stages of works - 1. Column layout work 2. Column reinforcement work 3. Column formwork, and 4. Pouring concrete into column.  Column layout work In this stage of works the location of columns are determined practically in field. It is done by laying rope according to grids shown in the drawing and then mark the location of columns related to rope.
  • 14. 14 | P a g e
  • 15. 15 | P a g e Retaining wall Retaining wall is structure used to maintain ground surface at different elevations on either side of it. Retaining wall provides lateral support to vertical slopes of soil. They retain soil which will otherwise collapse in to more natural shapes. The retained soil is referred as backfill. Retaining walls are usually built to hold back soil mass. However, retaining walls can also be constructed for aesthetic landscaping purposes. Retaining walls are structures that are constructed to retain soil or any such materials which are unable to stand vertically by themselves. They are also provided to maintain the grounds at two different levels. On site of crystal tower retaining wall is used to retain soil between two different levels ground level basement level. This retaining wall is cast along boundary of site.M 25 grade concrete is used with reinforcement of 8 mm tor steel bars. For water proofing purpose “shahabadi” tiles are laid on one side of retaining wall.
  • 16. 16 | P a g e Slab and beam casting:-  Reinforcement It shall be as per BBS(behavior based safety) prepared according to approved drawing. The R/F shifting and binding shall be started as soon as shuttering is completed. R/F binding shall continue as formwork and shuttering work is progresses.  Concreting  Construction joint The construction joint shall be pre decided and fixed prior to start of the concreting. It is planned to have two construction joints for main building as decided. In case of major break down of the Batching plant, the additional Construction joint may be left. The location of the construction joint shall be at the one-third span. Construction joint shall be straight and have profile of „L‟ shape so that successive layer of concrete shall be perfectly bonded with previous laid layer. Preparation of construction joint shall include roughening, removing all laitance adhering to the joint and application of thick slurry before start of the new concrete.  Production and placement of concrete. Stock of material shall be sufficient to start the concrete. It shall be ensured by stores/purchase dept that concreting is not stopped on account of materials. All plant and machinery are checked and made in working conditions. Concrete of grade M-25 shall be produced from our batching plant and directly pumped to the location of concrete placement through the pipeline. The pouring sequence shall be from grid A towards construction joint. Since the grade of concrete for column is M-40 and surrounding concrete is M-25, sufficient offset around column shall be casted with M-40.The offset dimensions shall be provided by PMC. Proper walkways/platforms shall be arranged so that the supports of the pipeline and manpower are not directly stand on reinforcement.
  • 17. 17 | P a g e Sufficient carpenters along with supervisor shall inspect the behavior of supports below the slab during the casting. Extra Props shall be stocked below slab to provide additional supports in case of any failure of supports.  Curing The curing shall be started immediately after thumb set of the concrete laid. Hessian clothe /Plastic shall be covered over the set concrete to reduce moisture evaporation from the concrete during hardening and thus to minimize shrinkage crazy cracks. These cracks are inheriting property of the concrete specially appears during casting of flat surfaces. Final curing shall be done by ponding and stacking water for minimum period of 7 days .
  • 18. 18 | P a g e
  • 19. 19 | P a g e P.C.C.:- PCC-plain cement concrete of grades M10 or M15 is used as leveling course in the foundation trenches to act as level platform for RCC footing for columns / masonry footing for load bearing walls.it also serves as separating layer between natural soil and footing so that any harmful chemical present in soil will not act on the footing .PCC has no structural importance.in case of trances or pits excavated than the required depth ,the extra depth should be filled with PCC of required grade at the expense of contractor to the required level to place the footing. For P.C.C., At the site , they were used M10 Grade concrete and thickness of the P.C.C. was 150mm. INFORMATION OF SITE :- Size of the PCC :- 21 x 35 sq.m. Thickness of PCC:- 0.15 m Concrete grade :- M10 Procedure for PCC.:- i) Excavation levels and dimensions to be checked as per drawings. ii) Remove all the loose earth from the pits. iii) Do water sprinkling and ramming the cleaned surface of pit by mechanical rammer. iv) Do the shuttering by planks and runners wherever if necessary. v) Mix the concrete with required proportion and water cement ratio by mechanical mixer machine and place the same in to pits. vi) Poured surface to be rammed and finished smoothly.
  • 20. 20 | P a g e Waterproofing:- Water-proof or water-resistant describes objects relatively unaffected by water or resisting the ingress of water under specified conditions. Such items may be used in wet environments or under water to specified depths. Waterproofing describes making a structure waterproof or water-resistant "Water resistant" and "waterproof" often refer to penetration of water in its liquid state and possibly under pressure, whereas damp proof refers to resistance to humidity or dampness. Permeation of water through a material or structure. Waterproofing is done by using rough Shahabad tile. Shown in fig.
  • 21. 21 | P a g e Expansion joints:- An expansion joint or movement joint is an assembly designed to safely absorb the heat- induced expansion and contraction of construction materials, to absorb vibration, to hold parts together, or to allow movement due to ground settlement or earthquakes. They are commonly found between sections of buildings, bridges, sidewalks, railway tracks, piping systems, ships, and other structures. Building faces, concrete slabs, and pipelines expand and contract due to warming and cooling from seasonal variation, or due to other heat sources. Before expansion joint gaps were built into these structures, they would crack under the stress induced.
  • 22. 22 | P a g e Shuttering Timber is the most common Formwork is an ancillary construction, used as a mould for a structure. Into this mould, fresh concrete is placed only to harden subsequently. The construction of formwork takes time and involves expenditure upto 20 to 25% of the cost of the structure or even more. Design of these temporary structures are made to economic expenditure. The operation of removing the formwork is known as stripping. Stripped formwork can be reused. Reusable forms are known as panel forms and non-usable are called stationary forms. material used for formwork. The disadvantage with timber formwork is that it will warp, swell and shrink. Application of water impermeable cost to the surface of wood mitigates these defects. At our site following types of shuttering is used  Plywood shuttering  Steel shuttering  Mivan shuttering Mivan shuttering: Mivan is aluminum formwork system.mivan technology is suitable for constructing large number of houses in short span of time using room size forms to construct walls and slabs in one continuous pour on concrete .mivan technology facilitate fast construction, strict quality control, exact dimensions ,we can form any size as per requirements.mivan panels are costly than plywood panels ,labour charge is also comparatively more.
  • 23. 23 | P a g e Chapter 3 Daily schedule Field Training Details:- Sr No Day & date Description of work at training site Materials used and Quality control of work 1 Monday 1/12/2014 Casting of P.C.C. of G building M10 Grade of concrete Waterproofing work (Above the P.C.C.) G building a)Rough Shahbadi tiles b)Cement c)Water Formwork for foundation G building 2 Tuesday 2/12/2014 Casting of P.C.C.G building M10 Grade of concrete Waterproofing work (Above the P.C.C.) G building a)Rough Shahbadi tiles b)Cement c)Water Formwork for foundation G building 3 Wednesday 3/12/2014 Casting of Raft , Foundation G building M25 Grade of concrete by RMC Checking of reinforcement of slab H building 4 Thursday 4/12/2014 Casting of P.C.C. G building M10 Grade of concrete
  • 24. 24 | P a g e Sr No Day & date Description of work at training site Materials used at site and Quality control of work Waterproofing work (Above the P.C.C.) G building a)Rough Shahbadi tiles b)Cement c)Water Formwork for foundation G building 5 Friday 5/12/2014 Casting of starters of columns G building M30 Grade concrete Casting Retaining wall G building M25 Grade concrete Checking slab reinforcement H building 6 Saturday 6/12/2014 Casting of slab M25 Grade concrete Casting Retaining wall G building M25 Grade concrete Formwork for foundation G building 7 Sunday 7/12/2014 8 Monday 8/12/2014 De-shuttering of slab on lateral side H building Casting of Raft , foundation G building M25 Grade of concrete by RMC Formwork for Retaining wall G building 9 Tuesday 9/12/2014 Casting of P.C. G building M10 Grade of concrete Waterproofing work (Above the P.C.C.) G building a)Rough m,Shahbadi tiles b)Cement c)Water
  • 25. 25 | P a g e Sr No Day & date Description of work at training site Materials used at site and Quality control of work Formwork for foundation G building 10 Wednesday 10/12/2014Casting Retaining wall G building M25 Grade of concrete Casting of P.C.C. G building M10 Grade of concrete Waterproofing work (Above the P.C.C.) G buildinga)Rough Shahbadi tiles b)Cement c)Water 11 Thursday 11/12/2014 Formwork for slab of H building Casting of starters of columns G building M30 Grade concrete Casting Retaining wall G building M25 Grade concrete 12 Friday 12/12/2014 Casting of Column up to plinth level G building M30 Grade concrete Formwork for slab of H building Casting Retaining wall G building M25 Grade concrete 13 Saturday 13/12/2014 Casting of Column up to plinth level G building M30 Grade concrete Casting of P.C.C. G building M10 Grade of concrete Waterproofing work (Above the P.C.C.) G building a)Rough Shahbadi tiles b)Cement c)Water 14 Sunday 14/12/2014 15 Monday 15/12/2014 Casting of Raft , Foundation G building M25 Grade of concrete by RMC Fitting of steel reinforcement of slab Casting Retaining wall G building M25 Grade concrete 16 Tuesday 16/12/2014 Casting of P.C.C. G building M10 Grade of concrete
  • 26. 26 | P a g e Waterproofing work (Above the P.C.C.) G building a)Rough Shahbadi tiles b)Cement c)Water Casting of Column up to plinth level G building M30 Grade concrete 17 Wednesday 17/12/2014 Casting of Column up to plinth level G building M30 Grade concrete Casting of P.C.C. G building M10 Grade of concrete Waterproofing work (Above the P.C.C.) G building a)Rough Shahbadi tiles b)Cement c)Water Fitting of steel reinforcement of slab 18 Thursday 18/12/2014 Casting of Raft , Foundation G building M25 Grade of concrete by RMC Fitting of steel reinforcement of slab Casting Retaining wall G building M25 Grade concrete 19 Friday 19/12/2014 Casting of starters of columns G building M30 Grade concrete Casting Retaining wall G building M25 Grade concrete Fitting of steel reinforcement of slab 20 Saturday 20/12/2014 Casting of Raft , Foundation G building M25 Grade of concrete by RMC Casting Retaining wall G building M25 Grade concrete Fitting of steel reinforcement of slab
  • 27. 27 | P a g e Raw Material Rate Sr.No Description of material Unit Rate per unit 1 Cement Per Bag 250 /- 2 Crushed sand Brass 1500 /- 3 Natural sand Brass 4500 /- 4 Aggregate Brass 2000 /- 5 Steel Ton 56000 /- Labour Rate for items Sr.No Description Rate per unit 1 Shuttering Contractor Rs-38 (Built up) 2 Bar Bender Rs-15 (per Sq.Ft) 3 Labour Contractor (Brickwork , Plastering) RS-80 ( per Sq.Ft) 4 Tile fitting RS-25 ( per Sq.Ft) 5 Electrition RS-80 ( per Sq.Ft) 6 Plumbing RS-2000 ( per unit) 7 Painter Work RS-15 ( per Sq.Ft) 8 P-O-P Work RS-60 ( per Sq.Ft) 9 Fabricator RS-10 ( per Sq.Ft)
  • 28. 28 | P a g e Field Tests Tests on concrete: 1) Slump cone test:- The concrete slump test is an empirical test that measures the workability of fresh concrete. It is a term which describes the state of fresh concrete. It refers to the ease with which the concrete flows. It is used to indicate the degree of wetness. The test is popular due to the simplicity of apparatus used and simple procedure. Principle:-The slump test result is a slump of the behavior of a compacted inverted cone of concrete under the action of gravity. It measures the consistency or the wetness of concrete. Procedure:-The test is carried out using a mould known as a slump cone or Abrams cone. The cone is placed on a hard non-absorbent surface. This cone is filled with fresh concrete in three stages, each time it is tamped using a rod of standard dimensions. At the end of the third stage, concrete is struck off flush to the top of the mould. The mould is carefully lifted vertically upwards, so as not to disturb the concrete cone. Concrete subsides. This subsidence is termed as slump, and is measured in to the nearest 5 mm. Observations:-slump cone : 80 mm. Conclusion:- slump cone is below 90mm therefore concrete is consistent.
  • 29. 29 | P a g e 2) Cube testing: Out of many test applied to the concrete, this is the most important which gives an idea about all the characteristics of concrete. By this single test one judge that whether Concreting has been done properly or not. For cube test specimens cubes of 15 cm x 15cm x 15 cm are commonly used. This concrete is poured in the mould and tempered properly so as not to have any voids. After 24 hours these moulds are removed and test specimens are put in water for curing. The top surface of this specimen should be made even and smooth. This is done by putting cement paste and spreading smoothly on whole area of specimen. These specimens are tested by compression testing machine after 7 days curing or 28 days curing. Load should be applied gradually at the rate of 140 kg/cm2 per minute till the Specimens fails. Load at the failure divided by area of specimen gives the compressive strength of concrete. Tests on materials used:- A)Sand and aggregate:- 1) Sieve analysis:- A sieve analysis is a practice or procedure used to assess the particle size distribution (also called gradation) of a granular material. The size distribution is often of critical importance to the way the material performs in use. Procedure:-  A gradation test is performed on a sample of aggregate in a laboratory. A typical sieve analysis involves a nested column of sieves with wire mesh.  A representative weighed sample is poured into the top sieve which has the largest screen openings. Each lower sieve in the column has smaller openings than the one above. At the base is a round pan, called the receiver.  The column is typically placed in a mechanical shaker. The shaker shakes the column, usually for some fixed amount of time. After the shaking is complete the material on each sieve is weighed. The weight of the sample of each sieve is then divided by the total weight to give a percentage retained on each sieve.  A suitable sieve size for the aggregate should be selected and placed in order of decreasing size, from top to bottom, in a mechanical sieve shaker. A pan should be
  • 30. 30 | P a g e placed underneath the nest of sieves to collect the aggregate that passes through the smallest. The entire nest is then agitated, and the material whose diameter is smaller than the mesh opening pass through the sieves. After the aggregate reaches the pan, the amount of material retained in each sieve is then weighed. 3) Moisture content. B) Tests on steel:- 1) Tensile test:- The specimen is subjected to tensile load and extension is noted against the load within the elastic limit. Loads at, Yield point, Breaking point and Ultimate point are noted. With these, stress-strain graph is plotted and following results are calculated.  Modulus of Elasticity = Stress (within the elastic limit)/Strain.  Yield stress = (Load at yield point /original c/s area)  Ultimate stress = (Ultimate Load/ original c/s area.) 2) Bend test:- The ASTM E-290 standard covers bend testing of bars primary for evaluation of their ductility. Specifications such as size and type, radius of bending, angle of bend, number and size of visible cracks if any, are reported. The standard demanded that after testing the convex surface of the bend specimen shall be examined with the unaided eye to identify cracks or other open defects. 3) Rebend test:- Reinforcing steel specifications often require a rebend test. This is a measure of the strain age embrittlement of the bars. After bending through a specified angle around a specified mandrel diameter, samples are aged in an air oven, and then rebent through a smaller specified angle. Samples must show no signs of cracking in order to pass this test. C) Tests on water:- 1) pH of water. 2) Hardness of water.
  • 31. 31 | P a g e
  • 32. 32 | P a g e Chapter 4 Equipments & safety Machines It is common fact we find wide variety of construction on every construction site. Which makes the job easy, safe and quicker. Depending on application construction machines are classified into different types which are 1. Earth moving instrument 2. Construction vehicles 3. Material handling instrument 4. Construction instrument Following machines are mainly used on site for construction purpose: Weigh batcher: Weigh Batcher is used in various industrial applications and is accessed at affordable prices in the market. These are appreciated for their efficient working ability and long working life. Weigh batcher is machine used in construction industry to weigh exact quantity of sand ,cement ,aggregates to form concrete.Concrete weigh batcher (double hopper) is an effective device extensively used for weighing production of controlled concrete.it is suitable to produce M20,M25,M30 concrete. If lesser quantity of concrete is required then instead of RMC weigh batcher is used. Weigh batcher is generally placed on flat surface otherwise we have to level it with level tube.by adjusting the weights on scale we can measure exact quantity of material to be used .Then this mixed is send to concrete mixer. Suitable design for M 15, M 25 & M 30 are provided with:  Type: Scale Type  Size: 2.2 x 1.05 x 1.8 meters  Capacity: 500 Kg (250 Kg Each)  Mechanism: Lever Type Operation:  Capacity of the hopper - 250 / 500 kg each
  • 33. 33 | P a g e  Level the machine properly on platform  Clean the machine regularly to get the proper weights of sand & aggregate  Put the required weights in to the pan (100 kg, 50 kg & 20kg) As per weight required for odd calibration, adjust the weight on the scale given. (10 mm = 1000 gm)  Unload the material directly in the mixer hopper, outlet given on rear side. Water dispenser: Water dispenser is machine used to add exact amount of water in to mix of cement ,aggregates, sand etc.For specific concrete grade amount of warter is fixed so we can digitaly adjust the water and flow of water in to concrete mixer.
  • 34. 34 | P a g e Cutter machine: Cutter machine is used to cut the steel for reinforcement it is having rotating blade which has to change after deterioration .it is portable machine so we an easily move it to any place .it works on electric power. cutter machine is used also cut binding wires etc.
  • 35. 35 | P a g e Concrete mixer: A concrete mixer (also commonly called a cement mixer) is a device that homogeneously combines cement, aggregate such as sand or gravel, and water to form concrete. A typical concrete mixer uses a revolving drum to mix the components. For smaller volume works portable concrete mixers are often used so that the concrete can be made at the construction site, giving the workers ample time to use the concrete before it hardens. An alternative to a machine is mixing concrete by hand. This is usually done in a wheelbarrow; however, several companies have recently begun to sell modified tarps for this purpose. For smaller jobs, such as residential repairs, renovations, or hobbyist-scale projects, many cubic yards of concrete are usually not required. Bagged cement is readily available in small- batch sizes, and aggregate and water are easily obtained in small quantities for the small work site. To service this small-batch concrete market, there are many types of small portable concrete mixers available.
  • 36. 36 | P a g e Vibrator needle: Since concrete contains particles of varying sizes, the most satisfactory compaction would perhaps be obtained by using vibrators with different speeds of vibration. Polyfrequency vibrators used for compacting concrete of stiff consistency are being developed. The vibrators for compacting concrete are manufactured with frequencies of vibration from 2800 to 15000 rpm. The various types of vibrators used are described below: This is perhaps the most commonly used vibrator. It essentially consists of a steel tube (with one end closed and rounded) having an eccentric vibrating element inside it. This steel tube called poker is connected to an electric motor or a diesel engine through a flexible tube. They are available in size varying from 40 to 100 mm diameter. The diameter of the poker is decided from the consideration of the spacing between the reinforcing bars in the form-work. The frequency of vibration varies up to 15000 rpm. However a range between 3000 to 6000 rpm is suggested as a desirable minimum with an acceleration of 4g to 10g. The normal radius of action of an immersion vibrator is 0.50 to 1.0m. However, it would be preferable to immerse the vibrator into concrete at intervals of not more than 600mm or 8 to 10 times the diameter of the poker. The period of vibration required may be of the order of 30 seconds to 2 minute. The concrete should be placed in layers not more than 600mm high.
  • 37. 37 | P a g e R.M.C. : Ready-mix concrete is concrete that is manufactured in a factory or batching plant, according to a set recipe, and then delivered to a work site, by truck mounted intransit machine. This results in a precise mixture, allowing specialty to be developed and implemented on construction sites. Ready-mix concrete is sometimes preferred over on-site concrete mixing because of the precision of the mixture and reduced work site confusion. However, using a pre-determined concrete mixture reduces flexibility, both in the supply chain and in the actual components of the concrete. Ready-mix concrete is also referred as the customized concrete products for commercial purpose. Ready-mix concrete, or RMC as it is popularly called, refers to concrete that is specifically manufactured for delivery to the customer's construction site in a freshly mixed and plastic or unhardened state. Concrete itself is a mixture of Portland cement, water and aggregates comprising sand and gravel or crushed stone. In traditional work sites, each of these materials is procured separately and mixed in specified proportions at site to make concrete. Read-mix concrete is bought and sold by volume - usually expressed in cubic meters Disadvantages of R.M.C.  The materials are batched at a central plant, and the mixing begins at that plant, so the traveling time from the plant to the site is critical over longer distances. Some sites are just too far away, though this is usually a commercial rather than a technical issue.  Generation of additional road traffic. Furthermore, access roads and site access have to be able to carry the greater weight of the ready-mix truck plus load. (Green concrete is approx. 2.5 tonne per m³.) This problem can be overcome by utilizing so-called 'minimix' companies which use smaller 4m³ capacity mixers able to reach more-restricted sites.  Concrete's limited timespan between mixing and going-off means that ready-mix should be placed within 210 minutes of batching at the plant Modern admixtures can modify that timespan precisely, however, so the amount and type of admixture added to the mix is very important.  Water pump  Grinder machine  Breaker  Lift and trolley  Wheel borrow  Drill machine
  • 38. 38 | P a g e
  • 39. 39 | P a g e Equipments Plumb bob: Plastering tool:
  • 40. 40 | P a g e Scraper: Circular sieve:
  • 41. 41 | P a g e Shikanja: Span:
  • 42. 42 | P a g e SITE SAFETY For achieving safety on the site no. of safety officers are appointed. A better safety control measures are also adopted on site while construction. Safety Equipments used on construction site: a) Compulsory use of helmets on site. b) Safety belts are used on site while working on height. c) A horizontal barrigation is provided at building lift ducts, and on the other spot also d) For safer working on site all construction equipments are regularly surveyed. e) Safety is enforced by law on sate to each and every worker on site. f) A trained operators are appointed at crane and other construction equipments. g) Hand gloves are used as safety tool. h) A safety sign boards are also provided on site with a much higher density. i) Safety nets are used to held the materials that fall down during work. j) Fire Extinguisher.
  • 43. 43 | P a g e
  • 44. 44 | P a g e CHAPTER5 Management Work Bar Chart: Sr.No Activities Duration (weeks) A. Excavation 2 B. P.C.C.+ Water 3 C. Raft + Column 8 D. Pardi 2 E. First Slab 5 F. Second Slab 5 G. Third Slab 4
  • 45. 45 | P a g e Details of Labour Sr. No. Description Category Nos. Rates 1. Carpenter In charge 1 500 . Helper 9 250 Sutar 20 400 2. Fitter In charge 2 500 Helper 12 250 Foreman 3 450 3. Concreting Incharge 1 600 Helper 12 250 Foreman 6 500 4. Centering Incharge 1 700 Helper 10 300 Foreman 2 550
  • 46. 46 | P a g e Interview of Project Head:- Interviewee: Mr. Kailas Ramchandra.Patil( Managing Director, Om constrution.) Age-48 years Education-diploma in 1989 from RIT Home town- shirala, dist-sangli Experience-25 years Past project- 1st project-at rajarambapu factory -at Pratibha construction -Raj bank, -ashti sugar nagar -bhugaon project Running project-Dmart at Mumbai and kalian -Toyota show room at miraj -Sadaphuli,baner -Crystal towers, baner  What were the problems faced on the labourer’s front?  After starting the construction, the workers had carried out strikes in order to increase their wages i.e when they were provided with insufficient wages. Due to this we faced problems in calculating estimates and also the time duration of completion of project was increased.  Were there any problems while acquiring the land for this project?  We did not face any problems from people from whom the land was bought but while construction of compound walls began the neighbors used to threaten us in the name of a court stay order and due to this we had to pay them some extra amount which was an indirect loss for the company.  How is the experience of construction in this project?  The area for construction of this project is good and the location is also easily accessible, also materials are available in abundance and due to this we did not face any material shortage, transportation is also good in this area.  If we want to start our own company like yours what are your suggestions for newcomers like us?  Honestly, I recommend a newcomer in this field to gain some hands on experience in a company first and then after knowing how things work around here, that person can start his own company. Starting a company without any job experience will most probably lead to losses at first as the individual will have to adapt and learn the basics of the game which will take some time. Even Im an engineer and only technical knowledge is not enough for someone to start his own company, an individual needs to learn many more things which are only learnt by doing jobs as an employee in the industry.
  • 47. 47 | P a g e
  • 48. 48 | P a g e CONCLUSION: During Field training, I got lot of practical knowledge of various machines, tools & various equipments and also taking various precautions during operating them. I also gained the knowledge how to work efficiently with less effort and proper care to avoid accident and develop worker relationship. Regarding the quality of work I like to add that due to poor supervising the concreting quality was little bad. Proportion of mixing of contents in aggregate was not stable. In this high society building there is no bathroom in servant room. All these features of an organization has really added some good qualities in me. Thus this vocational training was very helpful for my academic and future life.
  • 49. 49 | P a g e Appendix:-  SITE PHOTO GALLARY:-  Reinforcement: - o Slab reinforcement: -