MEANING
Process whereby “project inputs are converted to project
outputs”. May be looked at as:
Putting in action the activities of the project.
Putting into practice what was proposed in
the project document (i.e. transforming the
project proposal into the actual project.)
Management of the project or executing the
project intentions.
▪ 2
Contn…
Implementation usually done by implementing
agency (organization) that prepared the project and
received funding for it.
Other organizations that participate in the
implementation of the project :
by way of collaboration, say by according good working
relationship, extending technical advice or seconding their
staff to the project
are referred to as co-operating agencies.
Project Implementation Phase
 Project activation, and
 Project operation
▪ Project activation
This means making arrangements to have the
project started. It involves coordination and
allocation of resources to make project operational.
▪ Project operation
This is practical management of a project. Here,
project inputs are transformed into outputs to
achieve immediate objectives
Approaches to Project Implementation
▪ Top-down approach
Implementation mainly done by agencies from outside
the community with limited involvement by the
beneficiaries.
▪ Bottom-up approach
Beneficiaries implement the project. Outside agencies
may provide the financial resources and technical
assistance.
▪ Collaborative participatory approach
Both top-down and bottom-up approaches to project
implementation are applied in the process.
Project Implementation Plan (PIP)
If PIP not carried out during the project design process and embodied in the
project documents, it is carried out at the project activation stage. This is Similar
to a Work plan / Action Plan or a Gantt. Chart.
Project implementation plan includes:
a)The project implementation schedule
This is concerned with:
▪ What activities can produce expected project outputs?
▪ What is the sequence of these activities?
▪ What is the time frame for these activities?
▪ Who will be responsible for carrying out each activity?
The following methods may be used to answer
the those questions:
▪Gantt chart
▪Critical Path Method (CPM) or Net work analysis
▪ Project Evaluation and Review Techniques
▪(PERT)
▪Simple formats
Project implementation plan includes:
b) Organizational structure and staffing
Here the following are sought:
▪  Project structure for purposes of management
▪  Qualifications and skills for the staff
▪  Job descriptions and specifications for the staff
▪  Technical assistance if needed
c) Financial management
This looks at funds management, accounting period, financial
reports and statements and how often they will be made?
▪ 12
Project implementation plan includes:
f) Reporting system
This looks at who will be reporting to whom and how often.There
is need to design standard reporting formats.
g) Sustainability
The concept of sustainability is based on belief that project
should result in benefits that have lasting effect. Project should
be sustained beyond the life of funding - especially if it is a grant.
Project should not exhaust the available resources likeraw
materials and labor.
Project implementation plan includes:
h ) Time control and remedial action
Time taken to implement project activities is one measure of
successfulness of supervision or monitoring of project implementation.
Supervisor pays particular attention to time supervision, time extension
and postponement,
damages for non-completion and defect or warranty period.
I ) Supervision of implementation of project schedule
This involves a set of checks and balances to ensure that the schedule is being
adhered to.
To ensure that the time schedule is being adhered to, the project activity time
listing can be of great importance.
Factors Affecting Project Implementation
Factors that lead to success of projects
 Political Commitment
 Simplicity of Design
 Careful preparation
 Good management
 Involvement of beneficiaries/community
Factors Affecting Project Implementation
Factors and problems that lead to failure of
Projects
 Financial Problems
 Management problems
 Technical problems
 Political problems
Factors Affecting Project Implementation
Other typical implementation problems :
 Poor scheduling of projects leading to delays in
implementation.
 Misallocation of funds
 Delay and sometimes lack of counterpart funding
 Lack of accountability and transparency
 Bureaucracy in decision-making.
 Selfishness/nepotism/favoritism by some project
managers.
▪ 17
Factors Affecting Project Implementation
Other typical implementation problems :
 Weak monitoring systems
 Natural calamities like drought, earthquakes,
landslides, and hailstorms.
 Policy changes
 Migration of beneficiaries
 Lack of team work
 Lack of incentives for implementers. Etc.
THANK YOU…!

Mais conteúdo relacionado

Mais procurados

1 project & project cycle management
1   project & project cycle management1   project & project cycle management
1 project & project cycle management
Sundasmushtaq
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
rexcris
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]
skzarif
 

Mais procurados (20)

Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
Project execution and implementation
Project execution and implementationProject execution and implementation
Project execution and implementation
 
Project cycle
Project cycleProject cycle
Project cycle
 
Project monitoring
Project monitoringProject monitoring
Project monitoring
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
1 project & project cycle management
1   project & project cycle management1   project & project cycle management
1 project & project cycle management
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
project appraisal
project appraisal project appraisal
project appraisal
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management
 
Project cycle
Project cycleProject cycle
Project cycle
 
Project Planning, Design and Management
Project Planning, Design and ManagementProject Planning, Design and Management
Project Planning, Design and Management
 
Project management PPT
Project management  PPTProject management  PPT
Project management PPT
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]
 

Semelhante a Project Implementation

Project Management Summary 2012
Project Management Summary 2012Project Management Summary 2012
Project Management Summary 2012
CPA Australia
 

Semelhante a Project Implementation (20)

Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Project implementation
Project implementationProject implementation
Project implementation
 
Project management revised
Project management revisedProject management revised
Project management revised
 
Project management
Project managementProject management
Project management
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
PME- CH 1.pptx
PME- CH 1.pptxPME- CH 1.pptx
PME- CH 1.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
ASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICEASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICE
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
Presentation of project management (907, scm. mir mohammed shorab hossein)
Presentation of project management (907, scm. mir mohammed shorab hossein)Presentation of project management (907, scm. mir mohammed shorab hossein)
Presentation of project management (907, scm. mir mohammed shorab hossein)
 
Presentation of project management synopsis 1
Presentation of project management synopsis 1Presentation of project management synopsis 1
Presentation of project management synopsis 1
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Presentation of project management (905, scm. rajib ahashan rashel)
Presentation of project management (905, scm. rajib ahashan rashel)Presentation of project management (905, scm. rajib ahashan rashel)
Presentation of project management (905, scm. rajib ahashan rashel)
 
Project Planning and Estimation
Project Planning and EstimationProject Planning and Estimation
Project Planning and Estimation
 
Project management – standard for today´s modern company
Project management – standard for today´s modern companyProject management – standard for today´s modern company
Project management – standard for today´s modern company
 
Project Management Summary 2012
Project Management Summary 2012Project Management Summary 2012
Project Management Summary 2012
 

Mais de Shidin Divakar

Mais de Shidin Divakar (10)

Factors Influencing Potential Home Buyers Purchase Intention On Super Luxury ...
Factors Influencing Potential Home Buyers Purchase Intention On Super Luxury ...Factors Influencing Potential Home Buyers Purchase Intention On Super Luxury ...
Factors Influencing Potential Home Buyers Purchase Intention On Super Luxury ...
 
Sustainable Development & Sustainable Consumption I SD & Climate Change
Sustainable Development & Sustainable Consumption I SD & Climate Change Sustainable Development & Sustainable Consumption I SD & Climate Change
Sustainable Development & Sustainable Consumption I SD & Climate Change
 
Consume Protection Act -1986
Consume Protection Act  -1986Consume Protection Act  -1986
Consume Protection Act -1986
 
The Indian Partnership Act 1932
The Indian Partnership Act 1932The Indian Partnership Act 1932
The Indian Partnership Act 1932
 
Supply Chain Management - Warehousing
Supply Chain Management - WarehousingSupply Chain Management - Warehousing
Supply Chain Management - Warehousing
 
Organisational Culture & Ethics
Organisational Culture & EthicsOrganisational Culture & Ethics
Organisational Culture & Ethics
 
A Study on Human Resource Management in Idea Cellular Office in Cochin,Kerala
A Study on Human Resource Management in Idea Cellular Office in Cochin,KeralaA Study on Human Resource Management in Idea Cellular Office in Cochin,Kerala
A Study on Human Resource Management in Idea Cellular Office in Cochin,Kerala
 
Project Report : A comparitive Analysis on Perception And Satisfaction Toward...
Project Report : A comparitive Analysis on Perception And Satisfaction Toward...Project Report : A comparitive Analysis on Perception And Satisfaction Toward...
Project Report : A comparitive Analysis on Perception And Satisfaction Toward...
 
Executive Infomation System
Executive Infomation SystemExecutive Infomation System
Executive Infomation System
 
Supervision
Supervision Supervision
Supervision
 

Último

Indian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girlsIndian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girls
Monica Sydney
 
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
Health
 
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
ZurliaSoop
 
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdfEnabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Smartinfologiks
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
dollysharma2066
 

Último (15)

Indian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girlsIndian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girls
 
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
 
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
 
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
 
Famedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . FullsailFamedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . Fullsail
 
CARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDC
CARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDCCARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDC
CARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDC
 
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdfEnabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
 
Dàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptxDàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptx
 
Supply Chain Location Decision and Management
Supply Chain Location Decision and ManagementSupply Chain Location Decision and Management
Supply Chain Location Decision and Management
 
How Multicultural Toys Helps in Child Development.pptx
How Multicultural Toys Helps in Child Development.pptxHow Multicultural Toys Helps in Child Development.pptx
How Multicultural Toys Helps in Child Development.pptx
 
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.inEV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
 
EXPERIENCE THE FUTURE OF WORK FOR FUTURE OF BUSINESSES
EXPERIENCE  THE FUTURE OF WORK FOR FUTURE OF BUSINESSESEXPERIENCE  THE FUTURE OF WORK FOR FUTURE OF BUSINESSES
EXPERIENCE THE FUTURE OF WORK FOR FUTURE OF BUSINESSES
 
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
 
How to structure your pitch - B4i template
How to structure your pitch - B4i templateHow to structure your pitch - B4i template
How to structure your pitch - B4i template
 

Project Implementation

  • 2. MEANING Process whereby “project inputs are converted to project outputs”. May be looked at as: Putting in action the activities of the project. Putting into practice what was proposed in the project document (i.e. transforming the project proposal into the actual project.) Management of the project or executing the project intentions. ▪ 2
  • 3. Contn… Implementation usually done by implementing agency (organization) that prepared the project and received funding for it. Other organizations that participate in the implementation of the project : by way of collaboration, say by according good working relationship, extending technical advice or seconding their staff to the project are referred to as co-operating agencies.
  • 4. Project Implementation Phase  Project activation, and  Project operation ▪ Project activation This means making arrangements to have the project started. It involves coordination and allocation of resources to make project operational. ▪ Project operation This is practical management of a project. Here, project inputs are transformed into outputs to achieve immediate objectives
  • 5. Approaches to Project Implementation ▪ Top-down approach Implementation mainly done by agencies from outside the community with limited involvement by the beneficiaries. ▪ Bottom-up approach Beneficiaries implement the project. Outside agencies may provide the financial resources and technical assistance. ▪ Collaborative participatory approach Both top-down and bottom-up approaches to project implementation are applied in the process.
  • 6. Project Implementation Plan (PIP) If PIP not carried out during the project design process and embodied in the project documents, it is carried out at the project activation stage. This is Similar to a Work plan / Action Plan or a Gantt. Chart. Project implementation plan includes: a)The project implementation schedule This is concerned with: ▪ What activities can produce expected project outputs? ▪ What is the sequence of these activities? ▪ What is the time frame for these activities? ▪ Who will be responsible for carrying out each activity?
  • 7. The following methods may be used to answer the those questions: ▪Gantt chart ▪Critical Path Method (CPM) or Net work analysis ▪ Project Evaluation and Review Techniques ▪(PERT) ▪Simple formats
  • 8. Project implementation plan includes: b) Organizational structure and staffing Here the following are sought: ▪  Project structure for purposes of management ▪  Qualifications and skills for the staff ▪  Job descriptions and specifications for the staff ▪  Technical assistance if needed c) Financial management This looks at funds management, accounting period, financial reports and statements and how often they will be made? ▪ 12
  • 9. Project implementation plan includes: f) Reporting system This looks at who will be reporting to whom and how often.There is need to design standard reporting formats. g) Sustainability The concept of sustainability is based on belief that project should result in benefits that have lasting effect. Project should be sustained beyond the life of funding - especially if it is a grant. Project should not exhaust the available resources likeraw materials and labor.
  • 10. Project implementation plan includes: h ) Time control and remedial action Time taken to implement project activities is one measure of successfulness of supervision or monitoring of project implementation. Supervisor pays particular attention to time supervision, time extension and postponement, damages for non-completion and defect or warranty period. I ) Supervision of implementation of project schedule This involves a set of checks and balances to ensure that the schedule is being adhered to. To ensure that the time schedule is being adhered to, the project activity time listing can be of great importance.
  • 11. Factors Affecting Project Implementation Factors that lead to success of projects  Political Commitment  Simplicity of Design  Careful preparation  Good management  Involvement of beneficiaries/community
  • 12. Factors Affecting Project Implementation Factors and problems that lead to failure of Projects  Financial Problems  Management problems  Technical problems  Political problems
  • 13. Factors Affecting Project Implementation Other typical implementation problems :  Poor scheduling of projects leading to delays in implementation.  Misallocation of funds  Delay and sometimes lack of counterpart funding  Lack of accountability and transparency  Bureaucracy in decision-making.  Selfishness/nepotism/favoritism by some project managers. ▪ 17
  • 14. Factors Affecting Project Implementation Other typical implementation problems :  Weak monitoring systems  Natural calamities like drought, earthquakes, landslides, and hailstorms.  Policy changes  Migration of beneficiaries  Lack of team work  Lack of incentives for implementers. Etc.