Personal Information
Organização/Local de trabalho
Pakistan Pakistan
Cargo
Power Engineer at Nera Telecommunications Ltd
Setor
Electronics / Computer Hardware
Sobre
Major Projects:
Zong Pakistan full MSC Power work Installation, Configuration and Troubleshooting of Rectifiers and Eltek Valere at Lahore
Installation/configuration/ATP of ELTAK Power rectifier 48V/16 kw system Flatpack-2 (FP-2000HE) on Telenor GSM sites all over Pakistan
installation/configuration of Eltek Rectifier swaps with Power One in Telenor Sites in North region.
Installation/configuration/ATP of ELTAK Power rectifier 48V/500 kw system Powerpack (11kW 48V 480/400VAC) at Telenor GF MSC I-9 Islamabad , kot lakhpat lahore, korangi karachi, Faislabad.
Installation/configuration/ATP of ELTAK Power rectifier 48V/116kw system Powerpack (Powerpack 48/5800 ) at CM PAK MSC Chak Shahez...
Marcadores
cdc
Ver mais
Apresentações
(4)Documentos
(1)Personal Information
Organização/Local de trabalho
Pakistan Pakistan
Cargo
Power Engineer at Nera Telecommunications Ltd
Setor
Electronics / Computer Hardware
Sobre
Major Projects:
Zong Pakistan full MSC Power work Installation, Configuration and Troubleshooting of Rectifiers and Eltek Valere at Lahore
Installation/configuration/ATP of ELTAK Power rectifier 48V/16 kw system Flatpack-2 (FP-2000HE) on Telenor GSM sites all over Pakistan
installation/configuration of Eltek Rectifier swaps with Power One in Telenor Sites in North region.
Installation/configuration/ATP of ELTAK Power rectifier 48V/500 kw system Powerpack (11kW 48V 480/400VAC) at Telenor GF MSC I-9 Islamabad , kot lakhpat lahore, korangi karachi, Faislabad.
Installation/configuration/ATP of ELTAK Power rectifier 48V/116kw system Powerpack (Powerpack 48/5800 ) at CM PAK MSC Chak Shahez...
Marcadores
cdc
Ver mais