The 13th Science Projects Workshop in the Future Classroom Lab, organised by Scientix, in collaboration with the STEM Alliance and OPENSKIMR took place in Brussels in October 2016, from Friday 14 (starting time: 19:30) to Sunday 16 (end ~14h).
13. ENGINEERING COMPANY
www.QUIONNEngineering.com
WE CAN DO EVERYTHING
• Any kind of prototypes
• Engineering developments
• Product development
• Feaseability studies
• Project mannagement
SERVICES
Freelance engineers network we coolaborate with
So we can cover almos every engineering área.
Case we cannot, we learn it.
14. DAKAR RENEWABLE CAR
RST ELECTRIC CAR ON DAKAR RALLY RACE
Marcos Rupérez Cerqueda
CEO of Quionne
QUIONNE FIRST BIG PROJECT!!!
31. CUSTOM BATTERY PACK
Number cells: 110
Voltage: 365 to 450V
Weight: 450Kg
Dimensions: 1650x750mm
Cooling: Water or air
Energy: 35kwh
Manufacturer: Quionne
38. CONSTRUCTION
CRAZY CHALLENGE
Design time: <1 month
Delivery pieces: 2 month
Mount time: 1,5 month
Test time: ???¿¿
HOW MUCH TIME YOU NEED TO
DESIGN, BUILD AND TEST ALL THOSE
PROTOTYPES?
THE SPONSOR GIVE US JUST 5
MONTHS…
48. THE RACE
1ST
STAGE END WITH NO PROBLEMS ----Nani Roma is out of race!
2nd
stage --some problems one of the hardest stage ever on DAKAR
70 cars out of race...
DAKAR IS HARD 3rd
stage we were out
56. WHAT DO THEY LOVE TO DO?
MOTIVATION!!!
HELP YOUR STUDENTS TO FIND THEIR REAL MOTIVATION, THEIR PROPOSE ON LIVE.
WHAT ARE YOUR
STUDENTS
DREAMS?
57. WHICH WAS THE PROBABABILITY FOR ME TO
CREATE A SUCH A STRANGE COMPANY?
IS´T IT AMAZING this happens?
CONFIDENCE
58. Tell your students everything is possible
Motivate them to follow their dreams
CONFIDENCE
59. PERSISTENCE ( Be patient)
IDEAS VALUE IS 0 EUROS!!!!
WORK FOR YOUR IDEA
BE PATIENT AND TRUST YOUR IDEA.
ENTERPRENEUR IS A LONG WAY
MANY INCONVENIENCES, reality is not your planning
Be confidence and patient
67. Hydrogen Refill logistics
• Compress hydrogen up to 350 bar.
• From external low pressure hydrogen source.
• Hydrogen Transport certified
68. BUSCAMOS
ST ELECTRIC CAR ON DAKAR RALLY RACE
´´Buscamos empresas con capacidad y
motivación para proponernos retos disruptivos
que abordar en conjunto``
69. COMUNICACIÓN
COMUNICACIÓN CERCANA CON EL CLIENTE
DIFUSIÓN DE LOS RESULTADOS DEL PROYECTO
La comunicación es uno de los pilares fundamentales del éxito
70. Fuel Cell (Range Extender)
Number of fuel cells: 2
Peak Power: 60kW
Mass: 65Kg
Max.Voltaje: 120VDC
Water Cooled
71. Hydrogen On board Storage
Number of deposits: 4
Internal volume: 205 liters
Hydrogen pressure: 350 bar
Type: Carbon fiber Type 3
Stored H2: 20Kg
Dimensions: D = 415 mm L = 2110 mmm
Weight: 95 kg
Range: >800Km
Specifically certificated for Vehicle use.
72. Hydrogen Refill logistics
• 2 portable hydrogen stations.
• Refill directly from the hydrogen station at the end of the stage.
• Specifically designed for car refilling ( Normative)
74. COOLING SYSTEM
Manufacturer cooling sketch
Inverter max temp: 90ºC (60ºC full performance)
Motor max temp :150ºC
Independent Cooling system just for
inverter
75. GEARS
•Not gear box
•Custom design differential
•Fixed ratio to wheels
•Optimized to high efficiency
•And High torq
•Limit top speed to 140kmh