SlideShare uma empresa Scribd logo
1 de 29
Baixar para ler offline
Sayed Abdel-Wahab Mohamed
Senior Mechanical Engineer
(QA/QC – Superintendent- Section Head)
Bldg. 26, Apt 32, Emtidad El-Aml - Deglah, Maadi
Cairo – Egypt
PERSONAL INFORMATION:
Date of Birth : 26 Jan. 1964
Social status : Married
Nationality : Egyptian
Military status : Finished
Phone : (00202) 27011926
Mobile : (002) 01001790927
E-mail : sayed_rashed@hotmail.com
CAREER OBJECTIVE:
Over 23 years' Experience in Project Management, Engineering,
Quality Control / Assurance (QA/QC) and Superintendent for
Mechanical Works with International Firms.
EDUCATION:
Bachelor Degree in Mechanical Power Engineering May 1987
Mechanical Power Engineering Department,
Faculty of Engineering-Helwan University.
Final year project: HVAC design for refrigeration storage plant.
:sourseSpecial C
CONSTRUCTION QUALITY MANAGEMENT FOR
CONTRACTORS -CQM - #784 - USACE Learning Center.
Workshop for Welding Qualifications and
Welding Consumables for SMAW, FCAW, SAW, GMAW, GTAW.
Introductory Management Course.
Workshop for Construction Health & Safety
Procedures and Assessments.
CPR – First Aid Training Courses
Professional Qualification
QA/QC SKILLS INCLUDES FOR:
1. Project Quality plan Managements
- Approval for Project Procedures and Systems methods of Statement.
- Material and Drawing Submittal Registration.
- Preparatory Meetings.
- 3- Phase Inspections.
- T.R, N.C.R, R.F.I, CH.O, S.L, H.O.C.
2. TP and Welding Process Establishment
- Establish the Welding Procedure specification (WPS), Procedure
Qualification Records (PQR), NDT test plan and all required document
as per ANSI B31.1, AWS D1.1, ASNT-TC-IA for Steel Piping and Tanks
Construction.
- Establish the Hydrostatic Test Procedures (HTP) for all Piping Classes
as per ANSI B31.1
- Establish the Holiday Testing of Nonconductive Protective Coating on
Metallic Substrates as per ASTM D5162 – 08.
- Follow-up all process for HVAC system Testing and Air Balancing
(TAB) and all Mech. Equipments Manufacturer Conformance
Certificates.
Project Supervision and Superintendent:
1. Planning, Procurement, Engineering, Co-ordination with other trades
Material Selection &Approval, Cost Control, Site Operations &Procedures,
Safety Measures and Handover for all Mechanical Activities as per Contract
Requirements' to the best quality Aspect as required.
Current JOB:
- CQC Senior Mech. Engineer /Mech. Manager- W912ER-12-C-0033, F-
16 Squadron Upgrades, Peace Vector VII, Package B, Cairo West Air
Base, Egypt
Employer:
- AICI /ARCHIRODON JV
Previous Experience:
Dec. 2011- Nov. 2012, ARCHIRODON Overseas Construction Company
QA/QC Mech. Section Head
• BANHA POWER STATION 750 MW PROJECT (CP-
102) Under the Supervision of PGESCO.
• Duties includes for All QA/QC (Quality Control / Quality
Assurance ) Procedures and Implementation over the
Mechanical activities related to the Power Plant
Construction such Welding Inspection and specification,
Painting and Protection procedures, Testing and Handover
for the Utility piping , HVAC, Plumbing works
Compressed Air system ,Cranes ,Pumps and Tools&
Equipment.
October 2010 – Dec. 2011, ARCHIRODON Overseas Construction Company
Mech. Section Head
• DAMIETTA 500 MW SIMPLE CYCLE GAS
TURBINE UNITS - E/M Section Head Under
Supervision of PGESCO.
• Duties include for All Engineering, Project Management
and Handover for E/M activities related to the Plant Civil
works such Utilities, Power Block Interfaces and Building
Services.
March 2009-October 2010, American International Contractors Inc. (AICI)
Mech. Section Head
• Participated in the Upgrading of Wheeled Vehicle
Facility (14 M.USD); under the Supervision of USA
C.O.Engineers.
• Duties includes for All Engineering, Project Management
and Handover for Mechanical activities related to the
Facility upgrading such Utilities, HVAC, Plumbing works
Compressed Air system ,Cranes ,Pumps and Tools&
Equipment.
April 2002 – 2009, Al Marasem (SBG – Cairo)
Project Mech. Engineer (Owner Representative)
• Al Giza for touristic & development (Owner Rep.) Project
Engineer E/M. Participated in the following projects:
Royal Palaces –Egypt &Morocco, Grand Rotana
Resort & SPA- Sharm El Shiekh; All under the
supervision of Saudi diyar Consultant firm.
• Duties includes for all Engineering and Project
Management for E/M activities such Power plant , SWRO
plant ,Sewage Treatment plant , Chiller Plant ,HVAC,
Utilities , Kitchen & Laundry Equipment, Medium
Voltage Distribution, Low Current System, Transformers,
Pump Station, Waterfalls
& Fountains, Boilers.
Feb 2000 – April 2002, SKANKSA Cementation International Ltd. (SCIL)
Quality Assurance Engineer (QA)
• Building services Engineer. Participated in the
Media production city, Moubark TV Studios
(450M.USD); Responsible for the Site Supervision,
Monitoring and Control Procedures for all Mechanical
Services at the Power Plant (6 MVA Stand by
Generator, 4,300 Ton of Refrigeration Chiller Plant,
Hot Water Boilers, Air Compressor, Fire Pump Room
and Piping), Tunnel (10 Km of piping works), Work
Shop Facility and all Plant Rooms Installation.
1998-Feb 2000 ECG Engineering Consultants Group S.A., Cairo, Egypt
Principal piping Engineer
• Principal Piping Engineer. Working with the
Petroleum & Industrial Division for the Piping design
& Arrangement, Tank Construction Supervision,
Equipment Review and Site Supervision & Controls.
1994-1998, Saudi Archirodon Ltd
Project QA/QC Engineer
• Participated in the following projects: HAA-Lube
Oil Blending Plant, Jeddah, Saudi Arabia for
Mobil Oil Corporation (60M.USD)
Local Fuel Receiving Terminal, Rabigh, Saudi
Arabia for Saudi Consult / Sir Bruce White &
Partner(130M.USD)
Responsible for carrying out all Project control
procedures , and Project Design Review, Preparation of
all Mechanical and Piping Drawings, all Mechanical
Site job Operation and Welding process and field
inspection for piping and tanks , Hydro testing and
Preparation of Commissioning, O & M Manuals as well
as As-built Drawings.
1992-1994, American International Contractors Inc. (AICI)
Subsidiary of Saudi Archirodon Ltd
QA/QC Mechanical Engineer
• Participated in the erection of Sakkara Air Base,
Phase IV (45 M.USD);under the supervision of USA
C.O.Engineers, Responsible for the Preparation of QA/QC
Documents, Drawing and Material submittals, As-built
Documents Related to the Commissioning Programs and
Training Courses and Handing Over the Mechanical Work to
the client upon the completion of the project.
1990-1992, Incorp Amca Inc. and Barco Misr
Mechanical Engineer responsible for
• For the Upgrading of the Air force Maintenance
Facilities (Pacer Chariot) - Egypt (60M. USD);
under the supervision of USA C.O. Engineers,
Responsible for the planning of the Mechanical Works,
Preparation of the Site Mechanical Procedures, Site
Operation and Production, Handing Over the
Mechanical Works to the consultant.
1989-1990, J.A. Jones Inc
Mechanical Engineer responsible for
• The Aeromedical Air Force Center Project
(75M. USD) Egypt; under the supervision of USA
C.O. Engineers, Responsible for the Follow-up of the
Shop Fabrication of 120 Ton Duct Work, Monitoring
and Controlling the progress to the management.
.
COMPUTER SKILLS:
PC Acknowledge ; Working with Spread Sheet, Design Programs and Drawing Files
.
LANGUAGE SKILLS:
Arabic: Mother tongue
English: very good spoken and written
Personal Comments and Hobbies:
- Strength in Personnel Evaluation, Problem Identification and Remedy
with proven skills in Field Supervision, Design Verification, Shop
Details and Preparation of Site Method Statements.
- Strongly familiar with all Relevant International Standard and
Regulation.
- History, Geography, Volley ball, Basketball and darts.
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1
Saw Qualification1

Mais conteúdo relacionado

Mais procurados

C.V. khaled galal - new(1)
C.V. khaled galal - new(1)C.V. khaled galal - new(1)
C.V. khaled galal - new(1)
khaled galal
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
???? ?????
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
muhammad abdullah
 
Maintanance supervisor
Maintanance supervisorMaintanance supervisor
Maintanance supervisor
Mohamed Oweda
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
MOHAMMED ASLAM SHAREEF
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
kalathil716
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
Mohamed Hashim
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
Leonardo David
 

Mais procurados (20)

CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
CV Sheren
CV SherenCV Sheren
CV Sheren
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
C.V. khaled galal - new(1)
C.V. khaled galal - new(1)C.V. khaled galal - new(1)
C.V. khaled galal - new(1)
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
An Introduction to Dione Oil Ltd.
An Introduction to Dione Oil Ltd.An Introduction to Dione Oil Ltd.
An Introduction to Dione Oil Ltd.
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
C.V28-01-2016
C.V28-01-2016C.V28-01-2016
C.V28-01-2016
 
BERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationBERR Industry / MAIN Presentation
BERR Industry / MAIN Presentation
 
C.v. khaled galal new(1)
C.v. khaled galal   new(1)C.v. khaled galal   new(1)
C.v. khaled galal new(1)
 
Maintanance supervisor
Maintanance supervisorMaintanance supervisor
Maintanance supervisor
 
Resume
ResumeResume
Resume
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 

Semelhante a Saw Qualification1

Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Anas Khalifa
 
Mokhtar CV 01-12-2015
Mokhtar CV 01-12-2015Mokhtar CV 01-12-2015
Mokhtar CV 01-12-2015
Ahmad Mokhtar
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
aladin ghaly
 
Saad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC Engineer
Saad mohamed gad
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
Hisham Hegab
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
Ahmed Mishrif
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
Mohamed Hassan
 

Semelhante a Saw Qualification1 (20)

cv
cvcv
cv
 
CV Ahmed1
CV Ahmed1CV Ahmed1
CV Ahmed1
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Mokhtar CV 01-12-2015
Mokhtar CV 01-12-2015Mokhtar CV 01-12-2015
Mokhtar CV 01-12-2015
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
Saad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC Engineer
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
aaa
aaaaaa
aaa
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 
adrian cv
adrian cvadrian cv
adrian cv
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
CV:Resume
CV:ResumeCV:Resume
CV:Resume
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
SABER CV
SABER CVSABER CV
SABER CV
 
Amr Desoky
Amr DesokyAmr Desoky
Amr Desoky
 
M SUBBA RAO CV latest
M SUBBA RAO CV latestM SUBBA RAO CV latest
M SUBBA RAO CV latest
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 

Saw Qualification1

  • 1. Sayed Abdel-Wahab Mohamed Senior Mechanical Engineer (QA/QC – Superintendent- Section Head) Bldg. 26, Apt 32, Emtidad El-Aml - Deglah, Maadi Cairo – Egypt PERSONAL INFORMATION: Date of Birth : 26 Jan. 1964 Social status : Married Nationality : Egyptian Military status : Finished Phone : (00202) 27011926 Mobile : (002) 01001790927 E-mail : sayed_rashed@hotmail.com CAREER OBJECTIVE: Over 23 years' Experience in Project Management, Engineering, Quality Control / Assurance (QA/QC) and Superintendent for Mechanical Works with International Firms. EDUCATION: Bachelor Degree in Mechanical Power Engineering May 1987 Mechanical Power Engineering Department, Faculty of Engineering-Helwan University. Final year project: HVAC design for refrigeration storage plant. :sourseSpecial C CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS -CQM - #784 - USACE Learning Center. Workshop for Welding Qualifications and Welding Consumables for SMAW, FCAW, SAW, GMAW, GTAW. Introductory Management Course. Workshop for Construction Health & Safety Procedures and Assessments. CPR – First Aid Training Courses
  • 2. Professional Qualification QA/QC SKILLS INCLUDES FOR: 1. Project Quality plan Managements - Approval for Project Procedures and Systems methods of Statement. - Material and Drawing Submittal Registration. - Preparatory Meetings. - 3- Phase Inspections. - T.R, N.C.R, R.F.I, CH.O, S.L, H.O.C. 2. TP and Welding Process Establishment - Establish the Welding Procedure specification (WPS), Procedure Qualification Records (PQR), NDT test plan and all required document as per ANSI B31.1, AWS D1.1, ASNT-TC-IA for Steel Piping and Tanks Construction. - Establish the Hydrostatic Test Procedures (HTP) for all Piping Classes as per ANSI B31.1 - Establish the Holiday Testing of Nonconductive Protective Coating on Metallic Substrates as per ASTM D5162 – 08. - Follow-up all process for HVAC system Testing and Air Balancing (TAB) and all Mech. Equipments Manufacturer Conformance Certificates. Project Supervision and Superintendent: 1. Planning, Procurement, Engineering, Co-ordination with other trades Material Selection &Approval, Cost Control, Site Operations &Procedures, Safety Measures and Handover for all Mechanical Activities as per Contract Requirements' to the best quality Aspect as required.
  • 3. Current JOB: - CQC Senior Mech. Engineer /Mech. Manager- W912ER-12-C-0033, F- 16 Squadron Upgrades, Peace Vector VII, Package B, Cairo West Air Base, Egypt Employer: - AICI /ARCHIRODON JV Previous Experience: Dec. 2011- Nov. 2012, ARCHIRODON Overseas Construction Company QA/QC Mech. Section Head • BANHA POWER STATION 750 MW PROJECT (CP- 102) Under the Supervision of PGESCO. • Duties includes for All QA/QC (Quality Control / Quality Assurance ) Procedures and Implementation over the Mechanical activities related to the Power Plant Construction such Welding Inspection and specification, Painting and Protection procedures, Testing and Handover for the Utility piping , HVAC, Plumbing works Compressed Air system ,Cranes ,Pumps and Tools& Equipment. October 2010 – Dec. 2011, ARCHIRODON Overseas Construction Company Mech. Section Head • DAMIETTA 500 MW SIMPLE CYCLE GAS TURBINE UNITS - E/M Section Head Under Supervision of PGESCO. • Duties include for All Engineering, Project Management and Handover for E/M activities related to the Plant Civil works such Utilities, Power Block Interfaces and Building Services. March 2009-October 2010, American International Contractors Inc. (AICI) Mech. Section Head • Participated in the Upgrading of Wheeled Vehicle Facility (14 M.USD); under the Supervision of USA C.O.Engineers. • Duties includes for All Engineering, Project Management and Handover for Mechanical activities related to the Facility upgrading such Utilities, HVAC, Plumbing works Compressed Air system ,Cranes ,Pumps and Tools& Equipment.
  • 4. April 2002 – 2009, Al Marasem (SBG – Cairo) Project Mech. Engineer (Owner Representative) • Al Giza for touristic & development (Owner Rep.) Project Engineer E/M. Participated in the following projects: Royal Palaces –Egypt &Morocco, Grand Rotana Resort & SPA- Sharm El Shiekh; All under the supervision of Saudi diyar Consultant firm. • Duties includes for all Engineering and Project Management for E/M activities such Power plant , SWRO plant ,Sewage Treatment plant , Chiller Plant ,HVAC, Utilities , Kitchen & Laundry Equipment, Medium Voltage Distribution, Low Current System, Transformers, Pump Station, Waterfalls & Fountains, Boilers. Feb 2000 – April 2002, SKANKSA Cementation International Ltd. (SCIL) Quality Assurance Engineer (QA) • Building services Engineer. Participated in the Media production city, Moubark TV Studios (450M.USD); Responsible for the Site Supervision, Monitoring and Control Procedures for all Mechanical Services at the Power Plant (6 MVA Stand by Generator, 4,300 Ton of Refrigeration Chiller Plant, Hot Water Boilers, Air Compressor, Fire Pump Room and Piping), Tunnel (10 Km of piping works), Work Shop Facility and all Plant Rooms Installation. 1998-Feb 2000 ECG Engineering Consultants Group S.A., Cairo, Egypt Principal piping Engineer • Principal Piping Engineer. Working with the Petroleum & Industrial Division for the Piping design & Arrangement, Tank Construction Supervision, Equipment Review and Site Supervision & Controls.
  • 5. 1994-1998, Saudi Archirodon Ltd Project QA/QC Engineer • Participated in the following projects: HAA-Lube Oil Blending Plant, Jeddah, Saudi Arabia for Mobil Oil Corporation (60M.USD) Local Fuel Receiving Terminal, Rabigh, Saudi Arabia for Saudi Consult / Sir Bruce White & Partner(130M.USD) Responsible for carrying out all Project control procedures , and Project Design Review, Preparation of all Mechanical and Piping Drawings, all Mechanical Site job Operation and Welding process and field inspection for piping and tanks , Hydro testing and Preparation of Commissioning, O & M Manuals as well as As-built Drawings. 1992-1994, American International Contractors Inc. (AICI) Subsidiary of Saudi Archirodon Ltd QA/QC Mechanical Engineer • Participated in the erection of Sakkara Air Base, Phase IV (45 M.USD);under the supervision of USA C.O.Engineers, Responsible for the Preparation of QA/QC Documents, Drawing and Material submittals, As-built Documents Related to the Commissioning Programs and Training Courses and Handing Over the Mechanical Work to the client upon the completion of the project. 1990-1992, Incorp Amca Inc. and Barco Misr Mechanical Engineer responsible for • For the Upgrading of the Air force Maintenance Facilities (Pacer Chariot) - Egypt (60M. USD); under the supervision of USA C.O. Engineers, Responsible for the planning of the Mechanical Works, Preparation of the Site Mechanical Procedures, Site Operation and Production, Handing Over the Mechanical Works to the consultant. 1989-1990, J.A. Jones Inc Mechanical Engineer responsible for • The Aeromedical Air Force Center Project (75M. USD) Egypt; under the supervision of USA C.O. Engineers, Responsible for the Follow-up of the Shop Fabrication of 120 Ton Duct Work, Monitoring and Controlling the progress to the management. .
  • 6. COMPUTER SKILLS: PC Acknowledge ; Working with Spread Sheet, Design Programs and Drawing Files . LANGUAGE SKILLS: Arabic: Mother tongue English: very good spoken and written Personal Comments and Hobbies: - Strength in Personnel Evaluation, Problem Identification and Remedy with proven skills in Field Supervision, Design Verification, Shop Details and Preparation of Site Method Statements. - Strongly familiar with all Relevant International Standard and Regulation. - History, Geography, Volley ball, Basketball and darts.