Topics:
 Power Sector overview
 Hierarchy of structure
 Transmission loss & interrupts
 Fundamental Problems in
Power Sector
 Gap between supply & demand
 Initiatives for mitigation
 On going power plants
 Financial requirements
 Major transmission projects
 Future challenges
5/14/2016 2
overview
Electricity Growth : 7.0 % Av. since 1990
 Present Generation Capacity : 10000 MW
 Total Consumer : 13.5 Million
 Transmission Line : 9,300 km
 Distribution Line : 2,60,000 km
 Distribution Loss : 14.6 %
 Per Capita Generation : 220 kWh
Access to Electricity : 47 %
5/14/20163
Generation
Capacity 10000
MW
But running on
7500 MW on avg.
Hierarchy of structure
5/14/2016 4
BPDB generates &
sends high voltage to
PGCB & it stepdown
voltage to send to
consumers
Transmission loss & interrupts
5/14/2016 5
Year by year
transmission loss
Is increasing &
then decrease
tend in BPDB but
interrupt is
decreasing rate.
Fundamental Problems
5/14/2016 6
Shortage of
natural
resourse
Gap between supply &
demand
5/14/2016 7
Demand is on
rise & supply
is trying to
cope with
Initiatives for mitigation
5/14/2016
Steps taken to add around 9000 MW to the grid
Reached understanding with India for cross border trade
Renewable energy development through strengthening
SEDA
 Development of new transmission facilities e.g. 400 KV
lines, NLDC, shunt compensation project etc.
Development of distribution network
DSM measures
8
On going Power Plants
5/14/2016 9
Ruppur
nuclear plant
& Rampal coal
plant are also
on process
Financial Requirements
Generation : 7,000 M US $
Transmission : 1,000 M US $
Distribution : 1,500 M US $
Total for Power : 9,500 M US $
LNG terminal : 320 M US $
20-26 tcf Gas by 2025 : 7,700 M US $
Gas Transmission : 1,500 M US $
Total for Gas : 9,520 M US $
5/14/2016 10
Major transmission Projects
5/14/2016 11
Future Challenges
Sustained primary fuel supply: gas, coal and petroleum
products
Financing capital intensive projects
Enhancing operational and financial efficiency and
transparency
Improving sector efficiency by strengthening regulation
capacity and ensuring good governance
5/14/2016 12
New source
of energy is
necessary
Conclusion
Government is committed to realize it’s ‘Vision’.
Government is committed to ensure transparency in the
procurement process
Private Sector will play a key role to meet the challenge of
huge amount of financing requirement
Continuous efficiency improvement ensuring good
governance is key for sustainable development
Concerted efforts from all quarters can ensure affordable and
quality power supply to the people of Bangladesh
5/14/2016 13
5/14/2016 14

Mais conteúdo relacionado

Mais procurados

Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdfSourav Bhunia
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in IndiaDaya Kherwar
 
Renewable energy grid integration
Renewable energy grid integrationRenewable energy grid integration
Renewable energy grid integrationRCREEE
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladeshImran Hossain
 
Hybrid distributed generation
Hybrid distributed generationHybrid distributed generation
Hybrid distributed generationNIT MEGHALAYA
 
Introduction to electric power transmission and distribution
Introduction to electric power transmission and distributionIntroduction to electric power transmission and distribution
Introduction to electric power transmission and distributionABDULRAHMANALGHANIM
 
POWER QUALITY IMPROVEMENT
POWER QUALITY IMPROVEMENTPOWER QUALITY IMPROVEMENT
POWER QUALITY IMPROVEMENTUday Wankar
 
Feasibility of nuclear power plant in Bangladesh
Feasibility of nuclear power plant in BangladeshFeasibility of nuclear power plant in Bangladesh
Feasibility of nuclear power plant in BangladeshTapasriBarua
 
Electrical power distribution and utilization
Electrical power distribution and utilizationElectrical power distribution and utilization
Electrical power distribution and utilizationMuhammadAliImran11
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorIPPAI
 
Renewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot ProjectRenewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot ProjectPartha Deb
 
Solar power plant presentation.pdf
Solar power plant presentation.pdfSolar power plant presentation.pdf
Solar power plant presentation.pdfAmarRajAnand
 
Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Pritesh Priyadarshi
 
PSCAD Final Report
PSCAD Final ReportPSCAD Final Report
PSCAD Final ReportJeff Ge
 
A report on solar power plant visit
A report on solar power plant visitA report on solar power plant visit
A report on solar power plant visitMahipalSoni4
 
Economic analysis of power plant
Economic analysis of power plantEconomic analysis of power plant
Economic analysis of power plantAmol Kokare
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorVijay Menghani
 
Hydroelectric Power
Hydroelectric PowerHydroelectric Power
Hydroelectric Powertudorgeog
 

Mais procurados (20)

Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdf
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Renewable energy grid integration
Renewable energy grid integrationRenewable energy grid integration
Renewable energy grid integration
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladesh
 
Hybrid distributed generation
Hybrid distributed generationHybrid distributed generation
Hybrid distributed generation
 
Introduction to electric power transmission and distribution
Introduction to electric power transmission and distributionIntroduction to electric power transmission and distribution
Introduction to electric power transmission and distribution
 
POWER QUALITY IMPROVEMENT
POWER QUALITY IMPROVEMENTPOWER QUALITY IMPROVEMENT
POWER QUALITY IMPROVEMENT
 
Feasibility of nuclear power plant in Bangladesh
Feasibility of nuclear power plant in BangladeshFeasibility of nuclear power plant in Bangladesh
Feasibility of nuclear power plant in Bangladesh
 
Electrical power distribution and utilization
Electrical power distribution and utilizationElectrical power distribution and utilization
Electrical power distribution and utilization
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power Sector
 
Renewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot ProjectRenewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot Project
 
Corona effect
Corona effectCorona effect
Corona effect
 
Solar power plant presentation.pdf
Solar power plant presentation.pdfSolar power plant presentation.pdf
Solar power plant presentation.pdf
 
Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment
 
PSCAD Final Report
PSCAD Final ReportPSCAD Final Report
PSCAD Final Report
 
A report on solar power plant visit
A report on solar power plant visitA report on solar power plant visit
A report on solar power plant visit
 
Economic analysis of power plant
Economic analysis of power plantEconomic analysis of power plant
Economic analysis of power plant
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 
Power generation
Power  generationPower  generation
Power generation
 
Hydroelectric Power
Hydroelectric PowerHydroelectric Power
Hydroelectric Power
 

Semelhante a Power Sector In Bangladesh

L’esperienza della California, Mark Rothleder
L’esperienza della California, Mark RothlederL’esperienza della California, Mark Rothleder
L’esperienza della California, Mark RothlederTerna SpA
 
GloSho'14: Accessing the Water and Energy Markets of California - Michael Web...
GloSho'14: Accessing the Water and Energy Markets of California - Michael Web...GloSho'14: Accessing the Water and Energy Markets of California - Michael Web...
GloSho'14: Accessing the Water and Energy Markets of California - Michael Web...Los Angeles Cleantech Incubator (LACI)
 
Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman Shoby P.Jacob
 
DSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full SlidepackDSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full SlidepackPower Responsive
 
Meeting the Challenge: Maintaining System Reliability While Meeting Both Econ...
Meeting the Challenge: Maintaining System Reliability While Meeting Both Econ...Meeting the Challenge: Maintaining System Reliability While Meeting Both Econ...
Meeting the Challenge: Maintaining System Reliability While Meeting Both Econ...Energy Network marcus evans
 
The role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAEThe role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAEReedExhibitionsMiddl
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseLeonardo ENERGY
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWLeonardo ENERGY
 
Load Research Concept and Approach _Kolkata.pptx
Load Research Concept and Approach  _Kolkata.pptxLoad Research Concept and Approach  _Kolkata.pptx
Load Research Concept and Approach _Kolkata.pptxRAMAPANDA6
 
Final presentation on power sector t&d
Final presentation on power sector  t&dFinal presentation on power sector  t&d
Final presentation on power sector t&dCareerAnna
 
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMouhcine Benmeziane
 
India energy Power Sector Review 2024.pptx
India energy Power Sector Review 2024.pptxIndia energy Power Sector Review 2024.pptx
India energy Power Sector Review 2024.pptxkarikalcholanmayavan1
 
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...KTN
 
Policy feedback FGD (power) Indonesian 2019
Policy feedback FGD (power) Indonesian 2019Policy feedback FGD (power) Indonesian 2019
Policy feedback FGD (power) Indonesian 2019Danang Yogisworo
 
Southwest Power Pool Today And In The Future
Southwest Power Pool Today And In The FutureSouthwest Power Pool Today And In The Future
Southwest Power Pool Today And In The FutureWindEnergyKen
 
Paths for decarbonizing power and transport in the LAC region
Paths for decarbonizing power and  transport in the LAC regionPaths for decarbonizing power and  transport in the LAC region
Paths for decarbonizing power and transport in the LAC regionAIDA_Americas
 

Semelhante a Power Sector In Bangladesh (20)

L’esperienza della California, Mark Rothleder
L’esperienza della California, Mark RothlederL’esperienza della California, Mark Rothleder
L’esperienza della California, Mark Rothleder
 
GloSho'14: Accessing the Water and Energy Markets of California - Michael Web...
GloSho'14: Accessing the Water and Energy Markets of California - Michael Web...GloSho'14: Accessing the Water and Energy Markets of California - Michael Web...
GloSho'14: Accessing the Water and Energy Markets of California - Michael Web...
 
Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman
 
Barrack
BarrackBarrack
Barrack
 
DSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full SlidepackDSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full Slidepack
 
Meeting the Challenge: Maintaining System Reliability While Meeting Both Econ...
Meeting the Challenge: Maintaining System Reliability While Meeting Both Econ...Meeting the Challenge: Maintaining System Reliability While Meeting Both Econ...
Meeting the Challenge: Maintaining System Reliability While Meeting Both Econ...
 
The role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAEThe role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAE
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa case
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
 
Uk approach – Matching demand to inflexible generation
Uk approach – Matching demand to inflexible generationUk approach – Matching demand to inflexible generation
Uk approach – Matching demand to inflexible generation
 
Load Research Concept and Approach _Kolkata.pptx
Load Research Concept and Approach  _Kolkata.pptxLoad Research Concept and Approach  _Kolkata.pptx
Load Research Concept and Approach _Kolkata.pptx
 
Final presentation on power sector t&d
Final presentation on power sector  t&dFinal presentation on power sector  t&d
Final presentation on power sector t&d
 
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy Sector
 
India energy Power Sector Review 2024.pptx
India energy Power Sector Review 2024.pptxIndia energy Power Sector Review 2024.pptx
India energy Power Sector Review 2024.pptx
 
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
 
Morales_PES_GM_2015.pdf
Morales_PES_GM_2015.pdfMorales_PES_GM_2015.pdf
Morales_PES_GM_2015.pdf
 
Policy feedback FGD (power) Indonesian 2019
Policy feedback FGD (power) Indonesian 2019Policy feedback FGD (power) Indonesian 2019
Policy feedback FGD (power) Indonesian 2019
 
CII-PWC report: Round the Clock Power Supply
CII-PWC report: Round the Clock Power SupplyCII-PWC report: Round the Clock Power Supply
CII-PWC report: Round the Clock Power Supply
 
Southwest Power Pool Today And In The Future
Southwest Power Pool Today And In The FutureSouthwest Power Pool Today And In The Future
Southwest Power Pool Today And In The Future
 
Paths for decarbonizing power and transport in the LAC region
Paths for decarbonizing power and  transport in the LAC regionPaths for decarbonizing power and  transport in the LAC region
Paths for decarbonizing power and transport in the LAC region
 

Mais de Sayanton Vhaduri

Mais de Sayanton Vhaduri (7)

CSS_Dibbo
CSS_DibboCSS_Dibbo
CSS_Dibbo
 
Driver_linux
Driver_linuxDriver_linux
Driver_linux
 
Result_Processing
Result_ProcessingResult_Processing
Result_Processing
 
Cell Phone Operated Land Rover
Cell Phone Operated Land RoverCell Phone Operated Land Rover
Cell Phone Operated Land Rover
 
Place_Identifier_App
Place_Identifier_AppPlace_Identifier_App
Place_Identifier_App
 
Diabetic_Monitor
Diabetic_MonitorDiabetic_Monitor
Diabetic_Monitor
 
Memento pattern
Memento patternMemento pattern
Memento pattern
 

Power Sector In Bangladesh

  • 1. Power Sector In Bangladesh Sayanton Vhaduri Dibbo(37) Md.Khalid Rahman(11) Md.Sazzadul Islam(41) Salman Ahmed(09) Md.Rokibul Islam(55) Submitted By: 1
  • 2. Topics:  Power Sector overview  Hierarchy of structure  Transmission loss & interrupts  Fundamental Problems in Power Sector  Gap between supply & demand  Initiatives for mitigation  On going power plants  Financial requirements  Major transmission projects  Future challenges 5/14/2016 2
  • 3. overview Electricity Growth : 7.0 % Av. since 1990  Present Generation Capacity : 10000 MW  Total Consumer : 13.5 Million  Transmission Line : 9,300 km  Distribution Line : 2,60,000 km  Distribution Loss : 14.6 %  Per Capita Generation : 220 kWh Access to Electricity : 47 % 5/14/20163 Generation Capacity 10000 MW But running on 7500 MW on avg.
  • 4. Hierarchy of structure 5/14/2016 4 BPDB generates & sends high voltage to PGCB & it stepdown voltage to send to consumers
  • 5. Transmission loss & interrupts 5/14/2016 5 Year by year transmission loss Is increasing & then decrease tend in BPDB but interrupt is decreasing rate.
  • 7. Gap between supply & demand 5/14/2016 7 Demand is on rise & supply is trying to cope with
  • 8. Initiatives for mitigation 5/14/2016 Steps taken to add around 9000 MW to the grid Reached understanding with India for cross border trade Renewable energy development through strengthening SEDA  Development of new transmission facilities e.g. 400 KV lines, NLDC, shunt compensation project etc. Development of distribution network DSM measures 8
  • 9. On going Power Plants 5/14/2016 9 Ruppur nuclear plant & Rampal coal plant are also on process
  • 10. Financial Requirements Generation : 7,000 M US $ Transmission : 1,000 M US $ Distribution : 1,500 M US $ Total for Power : 9,500 M US $ LNG terminal : 320 M US $ 20-26 tcf Gas by 2025 : 7,700 M US $ Gas Transmission : 1,500 M US $ Total for Gas : 9,520 M US $ 5/14/2016 10
  • 12. Future Challenges Sustained primary fuel supply: gas, coal and petroleum products Financing capital intensive projects Enhancing operational and financial efficiency and transparency Improving sector efficiency by strengthening regulation capacity and ensuring good governance 5/14/2016 12 New source of energy is necessary
  • 13. Conclusion Government is committed to realize it’s ‘Vision’. Government is committed to ensure transparency in the procurement process Private Sector will play a key role to meet the challenge of huge amount of financing requirement Continuous efficiency improvement ensuring good governance is key for sustainable development Concerted efforts from all quarters can ensure affordable and quality power supply to the people of Bangladesh 5/14/2016 13