1. Page 1 of 4
Curriculum Vitae
Personal Data
o Name: Ayman Sa'eed Abdullah Gom'a
o Gender: Male
o Nationality: Egyptian
o Marital Status: single
o Religion: Muslim
o Birth date: 9-2-1973
o Military conscription: done
o Telephone number: 00201015510777
o Mobile phone number: 0020822314180
o Address: Raga'e St. opposite Dar Al-Deya' Stationary, off Salah Salem St., Bani-Sueif
Governorate, Egypt
o Email: Ayman.ali @759 yahoo.com
Certificates:
o Bachelor of Civil Engineering (May, 1996), Faculty of Engineering, Cairo University,
Fayoum Branch: Acceptable Achievement (Satisfactory)
o Graduation Project: Irrigation (Good)
Computer Skills: Good at Office 2007, Auto CAD 2007
Experience: 18 Years as a civil engineer:
o 6 years in Saudi Arabia
o 12 years in Egypt
Practical Experience:
o Decon Construction Company, Egypt (3-2013 – Present):
A manager of a project constructing buildings and villas in Bani-Sueif Governorate
6-Year Experience in Saudi Arabia:
o Al-Oteshan Consultant Engineers Office, Saudi Arabia ( 2009-2013):
A civil engineer supervising construction of Skaka Housing Project (1), by Housing
Ministry, in Al-Jouf region
Prime contractor: Al-Ereeny Company
Project cost: 166, 000, 000 Saudi riyals
Project constructions:
- 364 Villas consisting of a ground floor (150 m2) + an upper floor (75 m2)
- 3 Mosques
2. Page 2 of 4
A civil engineer supervising University of Hafr Al-Batin Staff Members Housing
Project (University Faculties Compound)
Prime contractor: Al-Terees Company – Steeko, Saudi Arabia
Project cost: 479, 354, 908 Saudi riyals
Project constructions:
- 13 (A) type buildings consisting of a ground floor + 4 upper floors (floor:
577m2)
- 25 (B) type buildings consisting of a ground floor + 4 upper floors
(floor: 496 m2)
- General location
- A ground water tank (8000 m3) for buildings
- A ground water tank (8000 m3) for gardens
- A Septic tank
- Road works (4100 m long)
- Car parks (1500 m2)
- Note: ceilings were constructed according to (Post-Tension System)
o E'maar Office for Constructional Consultations (2007-2009):
A civil engineer supervising Arar Obstetrics and Gynecology Hospital Project (200
beds)
Prime contractor: Al-Mashreq Company
Project cost: 57, 250, 825 Saudi riyals
Project constructions:
- A main building consisting of a ground floor + first floor + second floor + a
roof extension (floor: 7000 m2)
- A service building consisting of a ground floor: 1276 m2
- A warehouse consisting of a ground floor: 1136.5 m2
- 3 Security rooms: 2 rooms without bed rooms
(room: 25, 92 m2), and one room with a bed room (51, 84 m2)
- A mosque consisting of a ground floor: 320 m2
- Aluminium fences are fixed onto concrete columns and ground beams
- A ground water tank (4307 m3)
- General location
3. Page 3 of 4
12-Year Experience in Egypt:
o Al-Marzooq Construction Company (2000-2006):
Al-Manal (1) Tourist Village belonging to Amigo Real Estate
Investment Company, Al-Ein Al-Sokhna, Suez Governorate:
a project manager managing concrete skeleton works and
constructional, sanitary plus electrical finishes
Works cost: 2,000,000 Egyptian pounds
Project constructions:
- 4 Buildings (each building: 250 m2) consisting of 4 (3-flat)
floors, plus a surrounding garden (900 m2)
Amigo Beach Tourist Village, Ra's Sidr, Southern Sinai: a project
manager managing concrete skeleton works and constructional,
sanitary plus electrical finishes
Works cost: 2,700,000 Egyptian pounds
Project constructions:
- 4 Buildings (each building: 450 m2) consisting of 3 (8-flat)
floors, plus a surrounding garden (400 m2)
Amigo Beach Tourist Village, Ra's Sidr, Southern Sinai: a project
manager managing electrical rooms works
Works cost: 32,000 Egyptian pounds
Project constructions:
- 2 Electrical rooms (each room: 30 m2)
Amigo Beach Tourist Village, Ra's Sidr, Southern Sinai: a project
manager managing main waterline works:
Works cost: 100,000 Egyptian pounds
Project constructions:
- A pipe with a 6-inch . 8-inch diameter
- Pressure 10 bar.
- 1700 m long
4. Page 4 of 4
o Al- Hamad Construction Company (1998-2000):
Development and Agricultural Credit Bank, Dermos town, Menia
Governorate: a civil engineer working in concrete skeleton works and
constructional, sanitary plus electrical finishes
Works cost: 750,000 Egyptian pounds
Project constructions:
- A building consisting of a ground floor + first floor+ second
floor (floor: 700 m2)
Development and Agricultural Credit Bank, Tonat Al-Gabal village,
Malawy town, Menia Governorate: a civil engineer working in concrete
skeleton works and constructional, sanitary plus electrical finishes
Works cost: 500,000 Egyptian pounds
Project constructions:
- A building consisting of a ground floor + first floor
(floor: 350 m2)