SlideShare uma empresa Scribd logo
1 de 4
Baixar para ler offline
Page 1 of 4
Curriculum Vitae
 Personal Data
o Name: Ayman Sa'eed Abdullah Gom'a
o Gender: Male
o Nationality: Egyptian
o Marital Status: single
o Religion: Muslim
o Birth date: 9-2-1973
o Military conscription: done
o Telephone number: 00201015510777
o Mobile phone number: 0020822314180
o Address: Raga'e St. opposite Dar Al-Deya' Stationary, off Salah Salem St., Bani-Sueif
Governorate, Egypt
o Email: Ayman.ali @759 yahoo.com
 Certificates:
o Bachelor of Civil Engineering (May, 1996), Faculty of Engineering, Cairo University,
Fayoum Branch: Acceptable Achievement (Satisfactory)
o Graduation Project: Irrigation (Good)
 Computer Skills: Good at Office 2007, Auto CAD 2007
 Experience: 18 Years as a civil engineer:
o 6 years in Saudi Arabia
o 12 years in Egypt
 Practical Experience:
o Decon Construction Company, Egypt (3-2013 – Present):
A manager of a project constructing buildings and villas in Bani-Sueif Governorate
6-Year Experience in Saudi Arabia:
o Al-Oteshan Consultant Engineers Office, Saudi Arabia ( 2009-2013):
 A civil engineer supervising construction of Skaka Housing Project (1), by Housing
Ministry, in Al-Jouf region
 Prime contractor: Al-Ereeny Company
 Project cost: 166, 000, 000 Saudi riyals
 Project constructions:
- 364 Villas consisting of a ground floor (150 m2) + an upper floor (75 m2)
- 3 Mosques
Page 2 of 4
 A civil engineer supervising University of Hafr Al-Batin Staff Members Housing
Project (University Faculties Compound)
 Prime contractor: Al-Terees Company – Steeko, Saudi Arabia
 Project cost: 479, 354, 908 Saudi riyals
 Project constructions:
- 13 (A) type buildings consisting of a ground floor + 4 upper floors (floor:
577m2)
- 25 (B) type buildings consisting of a ground floor + 4 upper floors
(floor: 496 m2)
- General location
- A ground water tank (8000 m3) for buildings
- A ground water tank (8000 m3) for gardens
- A Septic tank
- Road works (4100 m long)
- Car parks (1500 m2)
- Note: ceilings were constructed according to (Post-Tension System)
o E'maar Office for Constructional Consultations (2007-2009):
 A civil engineer supervising Arar Obstetrics and Gynecology Hospital Project (200
beds)
 Prime contractor: Al-Mashreq Company
 Project cost: 57, 250, 825 Saudi riyals
 Project constructions:
- A main building consisting of a ground floor + first floor + second floor + a
roof extension (floor: 7000 m2)
- A service building consisting of a ground floor: 1276 m2
- A warehouse consisting of a ground floor: 1136.5 m2
- 3 Security rooms: 2 rooms without bed rooms
(room: 25, 92 m2), and one room with a bed room (51, 84 m2)
- A mosque consisting of a ground floor: 320 m2
- Aluminium fences are fixed onto concrete columns and ground beams
- A ground water tank (4307 m3)
- General location
Page 3 of 4
12-Year Experience in Egypt:
o Al-Marzooq Construction Company (2000-2006):
 Al-Manal (1) Tourist Village belonging to Amigo Real Estate
Investment Company, Al-Ein Al-Sokhna, Suez Governorate:
a project manager managing concrete skeleton works and
constructional, sanitary plus electrical finishes
 Works cost: 2,000,000 Egyptian pounds
 Project constructions:
- 4 Buildings (each building: 250 m2) consisting of 4 (3-flat)
floors, plus a surrounding garden (900 m2)
 Amigo Beach Tourist Village, Ra's Sidr, Southern Sinai: a project
manager managing concrete skeleton works and constructional,
sanitary plus electrical finishes
 Works cost: 2,700,000 Egyptian pounds
 Project constructions:
- 4 Buildings (each building: 450 m2) consisting of 3 (8-flat)
floors, plus a surrounding garden (400 m2)
 Amigo Beach Tourist Village, Ra's Sidr, Southern Sinai: a project
manager managing electrical rooms works
 Works cost: 32,000 Egyptian pounds
 Project constructions:
- 2 Electrical rooms (each room: 30 m2)
 Amigo Beach Tourist Village, Ra's Sidr, Southern Sinai: a project
manager managing main waterline works:
 Works cost: 100,000 Egyptian pounds
 Project constructions:
- A pipe with a 6-inch . 8-inch diameter
- Pressure 10 bar.
- 1700 m long
Page 4 of 4
o Al- Hamad Construction Company (1998-2000):
 Development and Agricultural Credit Bank, Dermos town, Menia
Governorate: a civil engineer working in concrete skeleton works and
constructional, sanitary plus electrical finishes
 Works cost: 750,000 Egyptian pounds
 Project constructions:
- A building consisting of a ground floor + first floor+ second
floor (floor: 700 m2)
 Development and Agricultural Credit Bank, Tonat Al-Gabal village,
Malawy town, Menia Governorate: a civil engineer working in concrete
skeleton works and constructional, sanitary plus electrical finishes
 Works cost: 500,000 Egyptian pounds
 Project constructions:
- A building consisting of a ground floor + first floor
(floor: 350 m2)

Mais conteúdo relacionado

Mais procurados (20)

construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation Slides
 
Samy Gaber CV sep18
Samy Gaber CV sep18Samy Gaber CV sep18
Samy Gaber CV sep18
 
CurriculumVitae
CurriculumVitaeCurriculumVitae
CurriculumVitae
 
Ahmed as Road design eng
Ahmed as Road design engAhmed as Road design eng
Ahmed as Road design eng
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics Presentation
 
amir cv
amir cvamir cv
amir cv
 
2016.06 CV DELERNIAS_N_GBR
2016.06  CV DELERNIAS_N_GBR2016.06  CV DELERNIAS_N_GBR
2016.06 CV DELERNIAS_N_GBR
 
my cv
my cvmy cv
my cv
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics Presentation
 
Eng.Hossam1 - Copy
Eng.Hossam1 - CopyEng.Hossam1 - Copy
Eng.Hossam1 - Copy
 
Eng Mina Samir c.v final
Eng Mina Samir c.v finalEng Mina Samir c.v final
Eng Mina Samir c.v final
 
osama C.V
osama  C.V osama  C.V
osama C.V
 
Mẫu CV đẹp - CV kỹ sư xây dựng tiếng anh CV English enigeering
Mẫu CV đẹp - CV kỹ sư xây dựng tiếng anh CV English enigeeringMẫu CV đẹp - CV kỹ sư xây dựng tiếng anh CV English enigeering
Mẫu CV đẹp - CV kỹ sư xây dựng tiếng anh CV English enigeering
 
CV
CVCV
CV
 
mohamed solyman Cv22
mohamed solyman Cv22 mohamed solyman Cv22
mohamed solyman Cv22
 
aldarat
aldarataldarat
aldarat
 
eng. nabih cv
eng. nabih cveng. nabih cv
eng. nabih cv
 
KLupdate 2015
KLupdate 2015KLupdate 2015
KLupdate 2015
 
NEAMT YOUSSEF 1
NEAMT YOUSSEF 1NEAMT YOUSSEF 1
NEAMT YOUSSEF 1
 

Destaque (7)

Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
Cv ghazi may 2016 last 1 pdf
Cv ghazi may 2016 last 1 pdfCv ghazi may 2016 last 1 pdf
Cv ghazi may 2016 last 1 pdf
 
C.V.
C.V.C.V.
C.V.
 
3D DC
3D DC3D DC
3D DC
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineer
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
TLE/ HE Cookery Curriculum Guide
TLE/ HE Cookery Curriculum GuideTLE/ HE Cookery Curriculum Guide
TLE/ HE Cookery Curriculum Guide
 

Semelhante a 18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)

Semelhante a 18-Year Experience Civil Engineering Project Manager CV (TRANSLATION) (20)

C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)
 
cv بدون
cv بدونcv بدون
cv بدون
 
C.V
C.VC.V
C.V
 
english CV
english CVenglish CV
english CV
 
C.V wesam -UPDATED-
C.V wesam -UPDATED-C.V wesam -UPDATED-
C.V wesam -UPDATED-
 
Wael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCEDWael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCED
 
Ahmed C.V
Ahmed C.VAhmed C.V
Ahmed C.V
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
emadosmancv-FINAL
emadosmancv-FINALemadosmancv-FINAL
emadosmancv-FINAL
 
C.V Eng Mohamed Samy
C.V  Eng Mohamed SamyC.V  Eng Mohamed Samy
C.V Eng Mohamed Samy
 
ashraf frieg CV
ashraf frieg CVashraf frieg CV
ashraf frieg CV
 
Ahm elbouz cv 2016 new
Ahm elbouz cv  2016 newAhm elbouz cv  2016 new
Ahm elbouz cv 2016 new
 
Ahm Elbouz_CV_ 2016 new
Ahm Elbouz_CV_ 2016 newAhm Elbouz_CV_ 2016 new
Ahm Elbouz_CV_ 2016 new
 
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
 
curriculum vitae with a photo
curriculum vitae with a photocurriculum vitae with a photo
curriculum vitae with a photo
 
CV (1)1
CV (1)1CV (1)1
CV (1)1
 
Nazmy Nabil Nazmy
Nazmy Nabil NazmyNazmy Nabil Nazmy
Nazmy Nabil Nazmy
 
elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 

Mais de Sawsan Ali

Official Detailed Lesson Plan
Official Detailed Lesson Plan Official Detailed Lesson Plan
Official Detailed Lesson Plan
Sawsan Ali
 
Semantic Contrastive Analysis
Semantic Contrastive AnalysisSemantic Contrastive Analysis
Semantic Contrastive Analysis
Sawsan Ali
 
Assignmemt (Sample Test Design)
Assignmemt (Sample Test Design)Assignmemt (Sample Test Design)
Assignmemt (Sample Test Design)
Sawsan Ali
 

Mais de Sawsan Ali (20)

CCQs: Vocab & Gram.
CCQs: Vocab & Gram. CCQs: Vocab & Gram.
CCQs: Vocab & Gram.
 
Microteaching Lesson Plan
Microteaching Lesson PlanMicroteaching Lesson Plan
Microteaching Lesson Plan
 
Designing a Test
Designing a TestDesigning a Test
Designing a Test
 
SampleTest Specifications Table
SampleTest Specifications TableSampleTest Specifications Table
SampleTest Specifications Table
 
CCQs Assignment
CCQs Assignment CCQs Assignment
CCQs Assignment
 
Sample Vocab Lesson: Family Vocab
Sample Vocab Lesson: Family Vocab Sample Vocab Lesson: Family Vocab
Sample Vocab Lesson: Family Vocab
 
Sociolinguistics Paper: Br. vs. Am. English
Sociolinguistics Paper: Br. vs. Am. English Sociolinguistics Paper: Br. vs. Am. English
Sociolinguistics Paper: Br. vs. Am. English
 
Output Functions (Feedback)
Output Functions (Feedback)Output Functions (Feedback)
Output Functions (Feedback)
 
Modified Input (Competition Model)
Modified Input (Competition Model)Modified Input (Competition Model)
Modified Input (Competition Model)
 
Modified Input (Foreigner Talk)
 Modified Input (Foreigner Talk) Modified Input (Foreigner Talk)
Modified Input (Foreigner Talk)
 
Halliday's Ch 6 Summary (Below the Clause Level: Groups and Phrases)
Halliday's Ch 6 Summary (Below the Clause Level: Groups and Phrases)Halliday's Ch 6 Summary (Below the Clause Level: Groups and Phrases)
Halliday's Ch 6 Summary (Below the Clause Level: Groups and Phrases)
 
Official Detailed Lesson Plan
Official Detailed Lesson Plan Official Detailed Lesson Plan
Official Detailed Lesson Plan
 
CA of (Im)politeness in Am. & Egy. Movies
CA of (Im)politeness in Am. & Egy. MoviesCA of (Im)politeness in Am. & Egy. Movies
CA of (Im)politeness in Am. & Egy. Movies
 
Semantic Contrastive Analysis
Semantic Contrastive AnalysisSemantic Contrastive Analysis
Semantic Contrastive Analysis
 
Assignmemt (Sample Test Design)
Assignmemt (Sample Test Design)Assignmemt (Sample Test Design)
Assignmemt (Sample Test Design)
 
Assignmemt (Test Specifications)
Assignmemt (Test Specifications)Assignmemt (Test Specifications)
Assignmemt (Test Specifications)
 
SFS School Activities
SFS School ActivitiesSFS School Activities
SFS School Activities
 
Certificates of Appreciation
Certificates of AppreciationCertificates of Appreciation
Certificates of Appreciation
 
Promissing Young Writers Certificate (4)
Promissing Young Writers Certificate (4)Promissing Young Writers Certificate (4)
Promissing Young Writers Certificate (4)
 
Drama: The Tempest Worksheet
Drama: The Tempest WorksheetDrama: The Tempest Worksheet
Drama: The Tempest Worksheet
 

18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)

  • 1. Page 1 of 4 Curriculum Vitae  Personal Data o Name: Ayman Sa'eed Abdullah Gom'a o Gender: Male o Nationality: Egyptian o Marital Status: single o Religion: Muslim o Birth date: 9-2-1973 o Military conscription: done o Telephone number: 00201015510777 o Mobile phone number: 0020822314180 o Address: Raga'e St. opposite Dar Al-Deya' Stationary, off Salah Salem St., Bani-Sueif Governorate, Egypt o Email: Ayman.ali @759 yahoo.com  Certificates: o Bachelor of Civil Engineering (May, 1996), Faculty of Engineering, Cairo University, Fayoum Branch: Acceptable Achievement (Satisfactory) o Graduation Project: Irrigation (Good)  Computer Skills: Good at Office 2007, Auto CAD 2007  Experience: 18 Years as a civil engineer: o 6 years in Saudi Arabia o 12 years in Egypt  Practical Experience: o Decon Construction Company, Egypt (3-2013 – Present): A manager of a project constructing buildings and villas in Bani-Sueif Governorate 6-Year Experience in Saudi Arabia: o Al-Oteshan Consultant Engineers Office, Saudi Arabia ( 2009-2013):  A civil engineer supervising construction of Skaka Housing Project (1), by Housing Ministry, in Al-Jouf region  Prime contractor: Al-Ereeny Company  Project cost: 166, 000, 000 Saudi riyals  Project constructions: - 364 Villas consisting of a ground floor (150 m2) + an upper floor (75 m2) - 3 Mosques
  • 2. Page 2 of 4  A civil engineer supervising University of Hafr Al-Batin Staff Members Housing Project (University Faculties Compound)  Prime contractor: Al-Terees Company – Steeko, Saudi Arabia  Project cost: 479, 354, 908 Saudi riyals  Project constructions: - 13 (A) type buildings consisting of a ground floor + 4 upper floors (floor: 577m2) - 25 (B) type buildings consisting of a ground floor + 4 upper floors (floor: 496 m2) - General location - A ground water tank (8000 m3) for buildings - A ground water tank (8000 m3) for gardens - A Septic tank - Road works (4100 m long) - Car parks (1500 m2) - Note: ceilings were constructed according to (Post-Tension System) o E'maar Office for Constructional Consultations (2007-2009):  A civil engineer supervising Arar Obstetrics and Gynecology Hospital Project (200 beds)  Prime contractor: Al-Mashreq Company  Project cost: 57, 250, 825 Saudi riyals  Project constructions: - A main building consisting of a ground floor + first floor + second floor + a roof extension (floor: 7000 m2) - A service building consisting of a ground floor: 1276 m2 - A warehouse consisting of a ground floor: 1136.5 m2 - 3 Security rooms: 2 rooms without bed rooms (room: 25, 92 m2), and one room with a bed room (51, 84 m2) - A mosque consisting of a ground floor: 320 m2 - Aluminium fences are fixed onto concrete columns and ground beams - A ground water tank (4307 m3) - General location
  • 3. Page 3 of 4 12-Year Experience in Egypt: o Al-Marzooq Construction Company (2000-2006):  Al-Manal (1) Tourist Village belonging to Amigo Real Estate Investment Company, Al-Ein Al-Sokhna, Suez Governorate: a project manager managing concrete skeleton works and constructional, sanitary plus electrical finishes  Works cost: 2,000,000 Egyptian pounds  Project constructions: - 4 Buildings (each building: 250 m2) consisting of 4 (3-flat) floors, plus a surrounding garden (900 m2)  Amigo Beach Tourist Village, Ra's Sidr, Southern Sinai: a project manager managing concrete skeleton works and constructional, sanitary plus electrical finishes  Works cost: 2,700,000 Egyptian pounds  Project constructions: - 4 Buildings (each building: 450 m2) consisting of 3 (8-flat) floors, plus a surrounding garden (400 m2)  Amigo Beach Tourist Village, Ra's Sidr, Southern Sinai: a project manager managing electrical rooms works  Works cost: 32,000 Egyptian pounds  Project constructions: - 2 Electrical rooms (each room: 30 m2)  Amigo Beach Tourist Village, Ra's Sidr, Southern Sinai: a project manager managing main waterline works:  Works cost: 100,000 Egyptian pounds  Project constructions: - A pipe with a 6-inch . 8-inch diameter - Pressure 10 bar. - 1700 m long
  • 4. Page 4 of 4 o Al- Hamad Construction Company (1998-2000):  Development and Agricultural Credit Bank, Dermos town, Menia Governorate: a civil engineer working in concrete skeleton works and constructional, sanitary plus electrical finishes  Works cost: 750,000 Egyptian pounds  Project constructions: - A building consisting of a ground floor + first floor+ second floor (floor: 700 m2)  Development and Agricultural Credit Bank, Tonat Al-Gabal village, Malawy town, Menia Governorate: a civil engineer working in concrete skeleton works and constructional, sanitary plus electrical finishes  Works cost: 500,000 Egyptian pounds  Project constructions: - A building consisting of a ground floor + first floor (floor: 350 m2)