INTRODUCTION ............................................................................................................................................3
CONSTRUCTION EQUIPMENTS.....................................................................................................................5
1.MOTER GRADER ....................................................................................................................................5
2.ASPHALT PAVER ....................................................................................................................................7
3.EXCAVATOR...........................................................................................................................................9
4.BACK HOE LOADER..............................................................................................................................11
5.ROAD ROLLER......................................................................................................................................13
CONSIDERING FOR SITE WORK..................................................................................................................14
SAFETY ........................................................................................................................................................14
MAINTENANCE ...........................................................................................................................................15
SELECT CORRECT EQUIPMENT ...................................................................................................................15
CONCLUSION ..............................................................................................................................................15
REFERENCES................................................................................................................................................15
2
EXECUTIVE SUMMARY
The constraction equpment visit is held on Thursday of 14th
may which is organize by Civil
Engineering department . The location of the site visit was at Maganagma training school at
kundagasala.we gained Knowledge about Motor grade , Asphalt paver, Excavater, Back hoe loader and
Road Roller.We studied how to maintain these equipments and what are the uses of these equipments.
3
INTRODUCTION
The maganaguma training school Located in Kundasale, just 7 km away from the City of Kandy,
350 m from the Kandy-Mahiyangaya main road (A26), the training Centre provides offers a fantastic
opportunity for school leavers or those without a relevant qualification in subject areas to obtain an
internationally recognized certification which can be vital in their career development.
Main Objectives of the Training School
 To train Construction Equipment Operators by using the latest Machinery in order to expose
them to new technology and enhance their competency to an established national skill standard
 Establish a National Trade Test for Construction Equipment Operators as well as create Custom
Designed Trade Tests for Construction Equipment operators
 To upgrade the technical knowledge and competency of Construction Equipment Operators to
perform their duties more efficiently and effectively
Benefits of the Training School
 Locally and internationally reputed certificates will be presented (NVQ) for Trainees who
successfully complete the training programme
 Assistance to find jobs in the State Sector as well as the Private Sector
Infrastructure for Trainees
The MagaNeguma Construction Equipment Training School offers the following infrastructural facilities
for those who join our training programmes.
 Large fleet of modern construction vehicles and equipment
 Dormitory facilities to provide accommodation for trainees
 An actual Worksite is available for trainees to operate the machinery at the training center
 A number of other worksites are also available for trainees to improve their competency levels
A total of approximately 52 students attended the site visit. Valuable information was shared
among students regarding the visit especially on the operation of the machines.
Purpose of this this visit is to study construction equipments ,
 Operations
 Major parts
4
 Engine Horse power
 Controlling levers & functions
 Uses of machines
 functions
 Weight of the equipments
 Cycle time
 Fuel consumption
 Safety protections
 Maintenance
 Daily maintenance
 Weekly maintenance
 Monthly maintenance
 Six month maintenance
 Annual maintenance
5
CONSTRUCTION EQUIPMENTS
1.MOTER GRADER
Blade Scerifier
Motor grader, also commonly referred to as a road grader, a blade, a maintainer, or a motor grader,
is a construction machine with a long blade used to create a flat surface during the grading process. Typical
models have three axles, with the engine and cab situated above the rear axles at one end of the vehicle and
a third axle at the front end of the vehicle, with the blade in between. In certain countries, for example
in Finland, almost every grader is equipped with a second blade that is placed in front of the front axle. Some
construction personnel refer to the entire machine as "the blade." Capacities range from a blade width of 2.50
to 7.30 m and engines from 93–373 kW(125–500 hp). Certain graders can operate multiple attachments, or be
used for separate tasks like underground mining.
In civil engineering, the grader's purpose is to "finish grade" (to refine or set precisely) the "rough
grading" performed by heavy equipment or engineering vehicles such as scrapers and bulldozers.
Moter Graders are commonly used in the construction and maintenance of dirt roads and gravel roads.
In the construction of paved roads they are used to prepare the base course to create a wide flat surface for
the asphalt to be placed on. Graders are also used to set native soilfoundation pads to finish grade prior to
Machanism for
The blade
Traction bar for
blade carrier
Engine
Operator
Cabin
6
the construction of large buildings. Graders can produce inclined surfaces, to give cant (camber) to roads. In
some countries they are used to produce drainage ditches with shallow V-shaped cross-sections on either side
of highways.
A more recent innovation is the outfitting of graders with GPS technology,
USES
 Makig road profile
 Remove damaged road surface
 Grading &spreading aggregates
 Leveling uneven road surface
 Cutting & finishing road side
 Cutting ditches
MAINTENANCE
 Daily maintenance
 Weekly maintenance
 Monthly maintenance
 Six month maintenance
 Annual maintenance
FUAL TANK CAPACITY
HYDRAULIC TANK CAPACITY
ENGINE OIL SUMP CAPASITY
ENGINE OIL TYPE
ENGINE POWER
FUAL CONSUMPTION PER HOUR
: 230L
: 75L
: 13L
: DS40
:150 HP
: 10L PER HOUR
7
2.ASPHALT PAVER
USES
 Paving asphalt
 Spreading Aggregates
 Leveling
 Partial Compaction
FUAL TANK CAPACITY
HYDRAULIC TANK CAPACITY
ENGINE OIL SUMP CAPASITY
ENGINE OIL TYPE
ENGINE POWER
FUAL CONSUMPTION PER HOUR
WEIGHT
: 50L
: 40L
: 8L
: DS40
: 55 HP
: 10L PER HOUR
: 7440 Kg
8
MAINTENANCE
 Engine oil filter : 250h
 Air clean : 5000h
DISADVANTAGES
We see that on is compact more then what expect. Because of the tires.
9
3.EXCAVATOR
Arm Cylinder
Bucket
A hydraulic excavator is a large vehicle that is designed for excavation and demolition purposes.
Hydraulic excavators consist of a chassis, boom, and bucket, and move via tracks or wheels. They range
in size and function, an example of which is the similar but smaller “mini excavator.” All versions are
generally designed for the same purposes. Hydraulic excavators weigh between 1360 and 90000 Kg and
their speed ranges between 19 HP and 4,500 HP.
Operator
Cabin
Engin
e
Arm
Boom
Front Idler Track
Spring
s
Bottom
Rollers
Final
Drive
FUAL TANK CAPACITY
HYDRAULIC TANK CAPACITY
ENGINE OIL SUMP CAPASITY
: 243L
: 90L
: 19L
10
USES
 Digging trench
 Loading loose materials to dump trucks.
 Loading & laying boulders
 Reducing the height of embankments
 Making the slope surfaces
 Digging cannels.
 Removing silt from cannels or lakes.
 Uprooting trees.
 Demolishing disused structures
ADVANTAGES
Hydraulic excavators have many advantages that allow them to be used in the ways that they are.
For example, they are small enough to work on specific tasks within a project area and can usually be
transported from one project to another by either being towed or stored on a large truck. Hydraulic
excavators can also take advantage of many different attachments: a mallet for demolition purposes, a
blade for scraping, or a grapple for picking up objects. Hydraulic excavators are also widely available and
can be purchased new or used.
DISADVANTAGES
Hydraulic excavators have few disadvantages, most of which are expected in such a vehicle.
For example, hydraulic excavators are heavy and cannot simply be driven across large distances or
on non-reinforced roads. Likewise, they generally use large amounts of fuel and can be a very
expensive investment, the latter being countered by the fact that they can remain operable for
decades. Additionally, hydraulic excavators can be difficult to repair due to their large size and many
moving parts.
ENGINE OIL TYPE
ENGINE POWER
FUAL CONSUMPTION PER HOUR
BUCKET SIZE
: DS40
:140 HP
: 12L PER HOUR
: 0.25- 0.65m3
11
4.BACK HOE LOADER
FUAL TANK CAPACITY
HYDRAULIC TANK CAPACITY
ENGINE OIL SUMP CAPASITY
ENGINE OIL TYPE
ENGINE POWER
FUAL CONSUMPTION PER HOUR
WEIGHT
BUCKET SIZE
PRESSURE OF TIRES
: 118L
: 118L
: 13
: DS40
: 100 HP
: 5L PER HOUR
: 8000 Kg
: FRONT 0.25 cube
REAR 0.05 cube
: FRONT 65 psi
REAR 35 psi
BBucket
BBoom
BLoader
Operator
Cabin
BTractor
BWheels
BEngine
Stabilizer
Legs
BBackhoe
12
USES
 Dozing (cut and pull)
 Loading loose materials to dump trucks
 Excavating
 Spreading loose materials
 Back dozing (collect soil)
 Grapping
MAINTENANCE
 Engine oil filter : 250h
 Hydroulic oil change : 1 year
 Apply grease everyday
DISADVANTAGES
Having said that, they are not cost effective, as well as severe. The chances of accidents
and injuries if he had sent his carefully. We cannot use them in hilly or steep ground.
13
5.ROAD ROLLER
USES
 compacting soil, aggregates, asphalts
DISADVANTAGES
What we have seen is the compaction is percentage is below the other kind. But we can
get smooth surface
FUAL TANK CAPACITY
HYDRAULIC TANK CAPACITY
ENGINE OIL SUMP CAPASITY
ENGINE OIL TYPE
ENGINE POWER
FUAL CONSUMPTION PER HOUR
: 60L
: 60L
: 8L
: DS40
:100 HP
: 3L PER HOUR
14
CONSIDERING FOR SITE WORK
 Safety
 Maintenance
 Correct selection of machine
SAFETY
 Machine operators
 Personal protective equipment (ex- claws, shoes, helmet, wearing cloths.)
 Physical and mental fitness (ex. Use mobile phone, drunk & drive, smoke are not
allow)
 Correct techniques (ex. Excavate the material, digging position)
 Outside safety
 Bounding the work area ( use the barricade tape)
 Keep safety sign boards
 Keep key with your own
 Machines
 Carrying out maintenance one time
 Check and remove obstacles
 Keep the fire extinguishers
 Properties
 Remove any valuables. (which may be damaged on operation)
 Get correct information.
 Mark items to be removed or demolished
15
MAINTENANCE
 Find the manufacture’s maintenance manual
 Prepare the check list as per the manufacture’s manuals.
 Supply materials to be required
 Get the service of qualified personnel
SELECT CORRECT EQUIPMENT
It is very important to select correct equipment.If not we have to waste more money. We have
to consider following factor for select correct machine
 Size of the job
 Activity time constraints
 Availability of
 Cost of transportation of equipment
 Soil characteristics
 Geometric characteristics of elements to be excavated
 Space constraints: The performance of equipment is influenced by the spatial limitations
for the movement of excavators.
 Location of dumping areas: The distance between the construction site and dumping
areas could be relevant not only for selecting the type and number of haulers, but also the
type of excavators.
 Weather and temperature: Rain, snow and severe temperature conditions affect the
job-site productivity of labor and equipment.
 Engine and bucket size
CONCLUSION
It was a wonderful learning experiance at Maganaguma training office.We studied lot of things
about road constranction equipments.we were given opportunity to maintain the equipments also. I
hope this experience will surely help me in my future and also in shaping my career.
REFERENCES
 http://maganeguma.lk/training-school/
 http://www.mohsl.gov.lk/web/index.php?option=com_content&view=article&id=54&Itemid=61
&lang=en

Mais conteúdo relacionado

Mais procurados

REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)Ratnesh Kushwaha
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESHImrul Quesh
 
Reinforced earth walls
Reinforced earth wallsReinforced earth walls
Reinforced earth wallsRaju Sabarish
 
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTUVATSAL PATEL
 
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTUVATSAL PATEL
 
Highway & road geomatric and its component
Highway & road geomatric and its component Highway & road geomatric and its component
Highway & road geomatric and its component Sumit Kumar
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavementpradip dangar
 
Types of failure in rigid pavements
Types of failure in rigid pavementsTypes of failure in rigid pavements
Types of failure in rigid pavementsAglaia Connect
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementNIWASHISH VISWAS
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADGLA University
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONGLA University
 

Mais procurados (20)

REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
Reinforced earth walls
Reinforced earth wallsReinforced earth walls
Reinforced earth walls
 
Dewatering by well point system
Dewatering by well point systemDewatering by well point system
Dewatering by well point system
 
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
 
Cbr test
Cbr testCbr test
Cbr test
 
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
 
Highway & road geomatric and its component
Highway & road geomatric and its component Highway & road geomatric and its component
Highway & road geomatric and its component
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 
Bearings in bridges
Bearings in bridgesBearings in bridges
Bearings in bridges
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Grouting
GroutingGrouting
Grouting
 
Types of failure in rigid pavements
Types of failure in rigid pavementsTypes of failure in rigid pavements
Types of failure in rigid pavements
 
Well foundation
Well foundationWell foundation
Well foundation
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 

Destaque

Destaque (20)

Correct distance unit
Correct distance unitCorrect distance unit
Correct distance unit
 
Kungfu math p3 slide9 (length)
Kungfu math p3 slide9 (length)Kungfu math p3 slide9 (length)
Kungfu math p3 slide9 (length)
 
Process section mass
Process section massProcess section mass
Process section mass
 
Process section length
Process section lengthProcess section length
Process section length
 
Volume and mass
Volume and massVolume and mass
Volume and mass
 
The states of matter
The states of matterThe states of matter
The states of matter
 
Training Programs
Training ProgramsTraining Programs
Training Programs
 
Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...
Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...
Massive Advantage in Mining - Using Scrapers for Efficient Material Transport...
 
Surface Miner
Surface MinerSurface Miner
Surface Miner
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
 
Surface miner
Surface minerSurface miner
Surface miner
 
Dragline exclavator
Dragline exclavatorDragline exclavator
Dragline exclavator
 
SURFACE MINERS
SURFACE MINERSSURFACE MINERS
SURFACE MINERS
 
Fraction To Decimal
Fraction To DecimalFraction To Decimal
Fraction To Decimal
 
Topic 4: Mine wastes
Topic 4: Mine wastesTopic 4: Mine wastes
Topic 4: Mine wastes
 
Scraper ripper-grader-dozer
Scraper ripper-grader-dozerScraper ripper-grader-dozer
Scraper ripper-grader-dozer
 
Slope stability
Slope stabilitySlope stability
Slope stability
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Dragline Planning
Dragline PlanningDragline Planning
Dragline Planning
 
Working of dragline
Working of draglineWorking of dragline
Working of dragline
 

Semelhante a Site visit road constraction

Mechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kilnMechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kilnmkpq pasha
 
Construction Equipments.ppt
Construction Equipments.pptConstruction Equipments.ppt
Construction Equipments.pptVinayakNaik80
 
IRJET- Design and Fabrication of Remote Controlled Hydraulic Jack
IRJET- Design and Fabrication of Remote Controlled Hydraulic JackIRJET- Design and Fabrication of Remote Controlled Hydraulic Jack
IRJET- Design and Fabrication of Remote Controlled Hydraulic JackIRJET Journal
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training reportPrashantSharma897
 
Auxiliary machinery installation
Auxiliary machinery installationAuxiliary machinery installation
Auxiliary machinery installationGuddu Yadav
 
Soft binding ganga b.tech
Soft binding ganga b.techSoft binding ganga b.tech
Soft binding ganga b.techAjay Rohilla
 
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...ABHINAV KUMAR
 
Full Line Brochure -Sage Oil Vac
Full Line Brochure -Sage Oil VacFull Line Brochure -Sage Oil Vac
Full Line Brochure -Sage Oil VacDallas A. Dixon
 
bottle neck operation through critical path method
bottle neck operation through critical path methodbottle neck operation through critical path method
bottle neck operation through critical path methodSaurav Kumar
 
What is a Telescopic Cylinder.pdf
What is a Telescopic Cylinder.pdfWhat is a Telescopic Cylinder.pdf
What is a Telescopic Cylinder.pdfDynamic Hydrofab
 
Mahindra-EarthMaster-VX90-4WD-Brochure-2021.pdf
Mahindra-EarthMaster-VX90-4WD-Brochure-2021.pdfMahindra-EarthMaster-VX90-4WD-Brochure-2021.pdf
Mahindra-EarthMaster-VX90-4WD-Brochure-2021.pdfPopJindavanich
 
Major project report vi sem
Major project report   vi semMajor project report   vi sem
Major project report vi semRajat Dhiman
 
REVIEW ON DESIGN AND DEVELOPMENT OF AUTOMATED HYDRAULIC JACK
REVIEW ON DESIGN AND DEVELOPMENT OF AUTOMATED HYDRAULIC JACKREVIEW ON DESIGN AND DEVELOPMENT OF AUTOMATED HYDRAULIC JACK
REVIEW ON DESIGN AND DEVELOPMENT OF AUTOMATED HYDRAULIC JACKIRJET Journal
 

Semelhante a Site visit road constraction (20)

Mechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kilnMechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kiln
 
Construction Equipments.ppt
Construction Equipments.pptConstruction Equipments.ppt
Construction Equipments.ppt
 
IRJET- Design and Fabrication of Remote Controlled Hydraulic Jack
IRJET- Design and Fabrication of Remote Controlled Hydraulic JackIRJET- Design and Fabrication of Remote Controlled Hydraulic Jack
IRJET- Design and Fabrication of Remote Controlled Hydraulic Jack
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
 
Mr82 264
Mr82 264Mr82 264
Mr82 264
 
Auxiliary machinery installation
Auxiliary machinery installationAuxiliary machinery installation
Auxiliary machinery installation
 
CLUTCH BELL EDITED
CLUTCH BELL EDITEDCLUTCH BELL EDITED
CLUTCH BELL EDITED
 
Soft binding ganga b.tech
Soft binding ganga b.techSoft binding ganga b.tech
Soft binding ganga b.tech
 
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
 
Shipbuilding-web
Shipbuilding-webShipbuilding-web
Shipbuilding-web
 
AXLE HOUSING
AXLE HOUSINGAXLE HOUSING
AXLE HOUSING
 
CLAM SHELL BUCKETS
CLAM SHELL BUCKETSCLAM SHELL BUCKETS
CLAM SHELL BUCKETS
 
Full Line Brochure -Sage Oil Vac
Full Line Brochure -Sage Oil VacFull Line Brochure -Sage Oil Vac
Full Line Brochure -Sage Oil Vac
 
report
reportreport
report
 
DOM PPT.pptx
DOM PPT.pptxDOM PPT.pptx
DOM PPT.pptx
 
bottle neck operation through critical path method
bottle neck operation through critical path methodbottle neck operation through critical path method
bottle neck operation through critical path method
 
What is a Telescopic Cylinder.pdf
What is a Telescopic Cylinder.pdfWhat is a Telescopic Cylinder.pdf
What is a Telescopic Cylinder.pdf
 
Mahindra-EarthMaster-VX90-4WD-Brochure-2021.pdf
Mahindra-EarthMaster-VX90-4WD-Brochure-2021.pdfMahindra-EarthMaster-VX90-4WD-Brochure-2021.pdf
Mahindra-EarthMaster-VX90-4WD-Brochure-2021.pdf
 
Major project report vi sem
Major project report   vi semMajor project report   vi sem
Major project report vi sem
 
REVIEW ON DESIGN AND DEVELOPMENT OF AUTOMATED HYDRAULIC JACK
REVIEW ON DESIGN AND DEVELOPMENT OF AUTOMATED HYDRAULIC JACKREVIEW ON DESIGN AND DEVELOPMENT OF AUTOMATED HYDRAULIC JACK
REVIEW ON DESIGN AND DEVELOPMENT OF AUTOMATED HYDRAULIC JACK
 

Último

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 

Último (20)

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Site visit road constraction

  • 1. 1 Table of Contents EXECUTIVE SUMMARY .................................................................................................................................2 INTRODUCTION ............................................................................................................................................3 CONSTRUCTION EQUIPMENTS.....................................................................................................................5 1.MOTER GRADER ....................................................................................................................................5 2.ASPHALT PAVER ....................................................................................................................................7 3.EXCAVATOR...........................................................................................................................................9 4.BACK HOE LOADER..............................................................................................................................11 5.ROAD ROLLER......................................................................................................................................13 CONSIDERING FOR SITE WORK..................................................................................................................14 SAFETY ........................................................................................................................................................14 MAINTENANCE ...........................................................................................................................................15 SELECT CORRECT EQUIPMENT ...................................................................................................................15 CONCLUSION ..............................................................................................................................................15 REFERENCES................................................................................................................................................15
  • 2. 2 EXECUTIVE SUMMARY The constraction equpment visit is held on Thursday of 14th may which is organize by Civil Engineering department . The location of the site visit was at Maganagma training school at kundagasala.we gained Knowledge about Motor grade , Asphalt paver, Excavater, Back hoe loader and Road Roller.We studied how to maintain these equipments and what are the uses of these equipments.
  • 3. 3 INTRODUCTION The maganaguma training school Located in Kundasale, just 7 km away from the City of Kandy, 350 m from the Kandy-Mahiyangaya main road (A26), the training Centre provides offers a fantastic opportunity for school leavers or those without a relevant qualification in subject areas to obtain an internationally recognized certification which can be vital in their career development. Main Objectives of the Training School  To train Construction Equipment Operators by using the latest Machinery in order to expose them to new technology and enhance their competency to an established national skill standard  Establish a National Trade Test for Construction Equipment Operators as well as create Custom Designed Trade Tests for Construction Equipment operators  To upgrade the technical knowledge and competency of Construction Equipment Operators to perform their duties more efficiently and effectively Benefits of the Training School  Locally and internationally reputed certificates will be presented (NVQ) for Trainees who successfully complete the training programme  Assistance to find jobs in the State Sector as well as the Private Sector Infrastructure for Trainees The MagaNeguma Construction Equipment Training School offers the following infrastructural facilities for those who join our training programmes.  Large fleet of modern construction vehicles and equipment  Dormitory facilities to provide accommodation for trainees  An actual Worksite is available for trainees to operate the machinery at the training center  A number of other worksites are also available for trainees to improve their competency levels A total of approximately 52 students attended the site visit. Valuable information was shared among students regarding the visit especially on the operation of the machines. Purpose of this this visit is to study construction equipments ,  Operations  Major parts
  • 4. 4  Engine Horse power  Controlling levers & functions  Uses of machines  functions  Weight of the equipments  Cycle time  Fuel consumption  Safety protections  Maintenance  Daily maintenance  Weekly maintenance  Monthly maintenance  Six month maintenance  Annual maintenance
  • 5. 5 CONSTRUCTION EQUIPMENTS 1.MOTER GRADER Blade Scerifier Motor grader, also commonly referred to as a road grader, a blade, a maintainer, or a motor grader, is a construction machine with a long blade used to create a flat surface during the grading process. Typical models have three axles, with the engine and cab situated above the rear axles at one end of the vehicle and a third axle at the front end of the vehicle, with the blade in between. In certain countries, for example in Finland, almost every grader is equipped with a second blade that is placed in front of the front axle. Some construction personnel refer to the entire machine as "the blade." Capacities range from a blade width of 2.50 to 7.30 m and engines from 93–373 kW(125–500 hp). Certain graders can operate multiple attachments, or be used for separate tasks like underground mining. In civil engineering, the grader's purpose is to "finish grade" (to refine or set precisely) the "rough grading" performed by heavy equipment or engineering vehicles such as scrapers and bulldozers. Moter Graders are commonly used in the construction and maintenance of dirt roads and gravel roads. In the construction of paved roads they are used to prepare the base course to create a wide flat surface for the asphalt to be placed on. Graders are also used to set native soilfoundation pads to finish grade prior to Machanism for The blade Traction bar for blade carrier Engine Operator Cabin
  • 6. 6 the construction of large buildings. Graders can produce inclined surfaces, to give cant (camber) to roads. In some countries they are used to produce drainage ditches with shallow V-shaped cross-sections on either side of highways. A more recent innovation is the outfitting of graders with GPS technology, USES  Makig road profile  Remove damaged road surface  Grading &spreading aggregates  Leveling uneven road surface  Cutting & finishing road side  Cutting ditches MAINTENANCE  Daily maintenance  Weekly maintenance  Monthly maintenance  Six month maintenance  Annual maintenance FUAL TANK CAPACITY HYDRAULIC TANK CAPACITY ENGINE OIL SUMP CAPASITY ENGINE OIL TYPE ENGINE POWER FUAL CONSUMPTION PER HOUR : 230L : 75L : 13L : DS40 :150 HP : 10L PER HOUR
  • 7. 7 2.ASPHALT PAVER USES  Paving asphalt  Spreading Aggregates  Leveling  Partial Compaction FUAL TANK CAPACITY HYDRAULIC TANK CAPACITY ENGINE OIL SUMP CAPASITY ENGINE OIL TYPE ENGINE POWER FUAL CONSUMPTION PER HOUR WEIGHT : 50L : 40L : 8L : DS40 : 55 HP : 10L PER HOUR : 7440 Kg
  • 8. 8 MAINTENANCE  Engine oil filter : 250h  Air clean : 5000h DISADVANTAGES We see that on is compact more then what expect. Because of the tires.
  • 9. 9 3.EXCAVATOR Arm Cylinder Bucket A hydraulic excavator is a large vehicle that is designed for excavation and demolition purposes. Hydraulic excavators consist of a chassis, boom, and bucket, and move via tracks or wheels. They range in size and function, an example of which is the similar but smaller “mini excavator.” All versions are generally designed for the same purposes. Hydraulic excavators weigh between 1360 and 90000 Kg and their speed ranges between 19 HP and 4,500 HP. Operator Cabin Engin e Arm Boom Front Idler Track Spring s Bottom Rollers Final Drive FUAL TANK CAPACITY HYDRAULIC TANK CAPACITY ENGINE OIL SUMP CAPASITY : 243L : 90L : 19L
  • 10. 10 USES  Digging trench  Loading loose materials to dump trucks.  Loading & laying boulders  Reducing the height of embankments  Making the slope surfaces  Digging cannels.  Removing silt from cannels or lakes.  Uprooting trees.  Demolishing disused structures ADVANTAGES Hydraulic excavators have many advantages that allow them to be used in the ways that they are. For example, they are small enough to work on specific tasks within a project area and can usually be transported from one project to another by either being towed or stored on a large truck. Hydraulic excavators can also take advantage of many different attachments: a mallet for demolition purposes, a blade for scraping, or a grapple for picking up objects. Hydraulic excavators are also widely available and can be purchased new or used. DISADVANTAGES Hydraulic excavators have few disadvantages, most of which are expected in such a vehicle. For example, hydraulic excavators are heavy and cannot simply be driven across large distances or on non-reinforced roads. Likewise, they generally use large amounts of fuel and can be a very expensive investment, the latter being countered by the fact that they can remain operable for decades. Additionally, hydraulic excavators can be difficult to repair due to their large size and many moving parts. ENGINE OIL TYPE ENGINE POWER FUAL CONSUMPTION PER HOUR BUCKET SIZE : DS40 :140 HP : 12L PER HOUR : 0.25- 0.65m3
  • 11. 11 4.BACK HOE LOADER FUAL TANK CAPACITY HYDRAULIC TANK CAPACITY ENGINE OIL SUMP CAPASITY ENGINE OIL TYPE ENGINE POWER FUAL CONSUMPTION PER HOUR WEIGHT BUCKET SIZE PRESSURE OF TIRES : 118L : 118L : 13 : DS40 : 100 HP : 5L PER HOUR : 8000 Kg : FRONT 0.25 cube REAR 0.05 cube : FRONT 65 psi REAR 35 psi BBucket BBoom BLoader Operator Cabin BTractor BWheels BEngine Stabilizer Legs BBackhoe
  • 12. 12 USES  Dozing (cut and pull)  Loading loose materials to dump trucks  Excavating  Spreading loose materials  Back dozing (collect soil)  Grapping MAINTENANCE  Engine oil filter : 250h  Hydroulic oil change : 1 year  Apply grease everyday DISADVANTAGES Having said that, they are not cost effective, as well as severe. The chances of accidents and injuries if he had sent his carefully. We cannot use them in hilly or steep ground.
  • 13. 13 5.ROAD ROLLER USES  compacting soil, aggregates, asphalts DISADVANTAGES What we have seen is the compaction is percentage is below the other kind. But we can get smooth surface FUAL TANK CAPACITY HYDRAULIC TANK CAPACITY ENGINE OIL SUMP CAPASITY ENGINE OIL TYPE ENGINE POWER FUAL CONSUMPTION PER HOUR : 60L : 60L : 8L : DS40 :100 HP : 3L PER HOUR
  • 14. 14 CONSIDERING FOR SITE WORK  Safety  Maintenance  Correct selection of machine SAFETY  Machine operators  Personal protective equipment (ex- claws, shoes, helmet, wearing cloths.)  Physical and mental fitness (ex. Use mobile phone, drunk & drive, smoke are not allow)  Correct techniques (ex. Excavate the material, digging position)  Outside safety  Bounding the work area ( use the barricade tape)  Keep safety sign boards  Keep key with your own  Machines  Carrying out maintenance one time  Check and remove obstacles  Keep the fire extinguishers  Properties  Remove any valuables. (which may be damaged on operation)  Get correct information.  Mark items to be removed or demolished
  • 15. 15 MAINTENANCE  Find the manufacture’s maintenance manual  Prepare the check list as per the manufacture’s manuals.  Supply materials to be required  Get the service of qualified personnel SELECT CORRECT EQUIPMENT It is very important to select correct equipment.If not we have to waste more money. We have to consider following factor for select correct machine  Size of the job  Activity time constraints  Availability of  Cost of transportation of equipment  Soil characteristics  Geometric characteristics of elements to be excavated  Space constraints: The performance of equipment is influenced by the spatial limitations for the movement of excavators.  Location of dumping areas: The distance between the construction site and dumping areas could be relevant not only for selecting the type and number of haulers, but also the type of excavators.  Weather and temperature: Rain, snow and severe temperature conditions affect the job-site productivity of labor and equipment.  Engine and bucket size CONCLUSION It was a wonderful learning experiance at Maganaguma training office.We studied lot of things about road constranction equipments.we were given opportunity to maintain the equipments also. I hope this experience will surely help me in my future and also in shaping my career. REFERENCES  http://maganeguma.lk/training-school/  http://www.mohsl.gov.lk/web/index.php?option=com_content&view=article&id=54&Itemid=61 &lang=en