SlideShare uma empresa Scribd logo
1 de 6
SAJITH N NAIR
Phone: +91-9995395562 Email: saji194@gmail.com
EXPERIENCE SUMMARY- PLANNING ENGINEER
• Overall 8 years experienced in Oil & Gas Platform at Project Management Field, Project Controls
by using Primavera Software for Engineering, Procurement & Construction (EPC) Project,
Shutdown & Plant Maintenance Project. Engineering, Procurement, Construction Sequence of
activities in Process Plant.
EDUCATIONAL PROFILE
• Bachelor of Mechanical Engineering (BE) from Nitte Meenakshi Institute of Technology
/Visveswaraiah Technological University, Belgaum (2003- 2007)
SOFTWARE SKILLS
• Primavera P6.8.2
• MS Project.
• MS Excel, MS Word, MS Power point.
• Maximo
PROFESSIONAL PROFILE
Working as Planning Engineer in DOPET, Qatar. – November 2014 – Present.
• Projects:
1. Major Shutdown at North Field Alpha -2015 PS4 Platform(Offshore).
2. Mechanical Static Equipment Inspection and Overhauling During QATOFIN General
Shutdown.
3. Shutdown Maintenance works at FNGLCS TA-2014.
 Preparation of detailed shutdown schedule, daily monitoring, prepare daily schedule update
using Primavera 8.2.
 Monitoring of Progress on daily basis and preparation Daily, Weekly and Monthly project
progress reports.
 Preparation, submission and updating of the resource loaded Project Master Schedule using
primavera P6.
Sheet No: 1/5
 Preparation and updating of project S Curves, bar charts / manpower (histograms) & equipment.
 Close coordination with Planning Manager & Project Manager.
 Lead development of baseline schedule and support Project Manager (PM) in Integrated
Baseline Review (IBR).
 Preparation of 2-week schedule based on work front availability though Primavera P6.
 Preparation of Monthly cost/planning status reports to Management.
 Preparation of project budget including contractors tools, equipment and manpower.
 Preparation of close out report for shutdown projects.
Worked as Planning Engineer in Petrofac International UAE LLC. – October 2011 – September 2014
• Responsibilities in Inspection, Maintenance and Repair Contract, Rumaila Field – Southern Iraq
(Client : British Petroleum)
 Provide planning/Scheduling and system support for TAR maintenance work activities at Site.
 Close liaison with the BP TAR Planning Team and Maintenance group.
 Prepares TAR Maintenance schedules, monitors completion of the work carried out and
forecasts activities.
 Defines TAR maintenance activities, defining manpower and logistic requirements.
 Responsible to conduct planning, monitoring and control functions as per BP approved
procedure.
 Responsible for attending all the queries and clarification from client regarding the
Planning/scheduling.
 Preparation of Level 3 schedule for Total Station Shutdown and Turnaround of degassing
stations.
 Preparation & Implementation of the Progress Measurement System as per Progress
Measurement Procedure, & Schedule Levels, Work break down Structure, assign milestones and
constraints by using Critical Path Method (CPM).
 Monitoring of Progress on daily basis and preparation Daily, Weekly and Monthly project
progress reports.
 Preparation, submission and updating of the resource loaded Project Master Schedule using
primavera P6.
 Preparation and updating of project S Curves, bar charts / manpower (histograms) & equipment.
 Close coordination with Planning Manager & Project Manager.
 Lead development of baseline schedule and support Project Manager (PM) in Integrated
Baseline Review (IBR).
 Preparation of 2-week schedule based on work front availability though Primavera P6.
Sheet No: 2/5
 Preparation of Monthly cost/planning status reports to Management.
 Preparation of project budget including contractors tools, equipment and manpower.
 Plan, coordinate and monitor activities of assigned projects to develop and implement
procedures, processes and systems.
 Prepare short and long-term resource allocation plans.
 Oversee schedules and risk management plans and provide serious deviations warnings
hindering project results.
 Ensure to take appropriate planning measures with all clients to reassess, renegotiate and
amend scope of work responsibilities, proposals, contracts and budgets.
 Carrying out of cost and revenue variance analysis.
 Prepare and present regular internal and external project reports for management.
Worked as a Planning Engineer in Madina Group. W.L.L, Qatar – March 2010 – August 2011
• Responsibilities in PCI Service Contract for RAS GAS
 Develop & Maintain the Project Plan, Scheduling & monitoring the Project activities by Using
Primavera Project Planner for Enterprise P6.1 Software
 Prepare the Short term & Long term Construction Schedules & monitoring the completion of
Activities (Civil, Piping, Heat Exchangers, Pressure Vessels , Filters ,Structural works , E & I
Works)
 Preparation of Shutdown schedule for shutdown activities in various Trains.
 Coordinate with Operation Group to get the clear sequence of various activities in LNG Trains,
LNG Berth & Offshore Facilities
 Clearly Identify the Procurement & Construction Activities, Manpower, Tools, machineries &
Equipment requirement of each work packs.
 Preparation the Project Construction Reports (Daily, weekly, Monthly), which includes the
Project Schedule & S- curve, Resource Analysis, Material & document Status.
 Clearly Identify the Procurement & Construction Activities, Manpower, Tools, machineries &
Equipment requirement of each work packs.
 Preparation of Overall Weekly Progress Report & Productivity Report.
 Preparation of Manpower Histogram highlighting the manpower plan, forecast and updating the
actual.
 Reporting to Site Manager & Corporate Planning Manager
 Following Corporate HSE , Quality Procedures
Sheet No: 3/5
Worked as a Planning Engineer in Tech Sharp Engineers Pvt. Ltd. – July 2007 – March 2010
• Responsibilities in Capacity Expansion Projects in Bharat Petroleum Corporation Ltd.
 Develop & Maintain the Project Planning, Scheduling & monitoring the Project activities by Using
Primavera Project Planner for Enterprise P6.1 Software & MS Project.
 Coordination with Engineering, Procurement, Construction & Communicate with our Sub
contractors for Planning, Execution of the Projects on Time & on Budget.
 Study of Engineering drawings and technical specifications
 Define the WBS Levels & Activity code Levels for having effective control over the project.
 Identifying the Areas of concern and Critical path of the project.
 Preparation of the Look ahead Schedule that effectively drives and control the Project.
 Preparation & Maintaining the Progress Calculation, Estimated Bill of Quantity.
 Measuring the progress Performed and compare the Baseline Plan Vs Actual Progress to analyze
the delay.
 Monitoring and Update the day-to-day site activities, manpower, Equipments Utilization and
Construction activities.
 Preparation the Project Construction Reports (Daily, weekly, Monthly), which includes the
Project Schedule & S- curve, Resource Analysis, Material & document Status.
 Reporting to Site Manager & Site Project Control Manager
PROJECT DETAILS:
 Project Name: Inspection, Maintenance and Repair Contract, Rumaila Field – Southern Iraq
Client: British Petroleum, Iraq.
Project Overview: Inspection, Maintenance and Repair of Degassing stations, Rotating
equipments & Cluster stations.
 Project Name: PCI Service Contract for RAS GAS - CT/RG27/G204/08
Client: Rasgas Company Limited, Qatar
Project Overview: Procurement, Construction & Installation of LNG Train, Berth & Offshore
Facilities Maintenance works, which includes Civil, Piping, Equipment Erection (Heat Exchangers,
Turbine, Pressure Vessels, and Filters), Structural works and E & I Works.
 Project Name: CDU II Revamp for Capacity Expansion cum Modernization (CEMP Phase II)
Project.
Sheet No: 4/5
Client: Bharat Petroleum Corporation Ltd. Kochi Refinery.
Project Overview: Installation of Equipments (Heat Exchangers, Vessels, Columns and Pumps),
Modification of piping system.
 Project Name: Tankage work for Capacity Expansion cum Modernization (CEMP Phase II)
Project.
Client: Bharat Petroleum Corporation Ltd. Kochi Refinery.
Project Overview: Design, Fabrication and Erection of Storage Tanks.
PERSONAL PROFILE
Name
Address
SAJITH NEELAKANTAN NAIR
Sreesaji (H), Changampuzha Nagar P.O, Thrikkakara, Kerala.
Cochin-682033
D.O.B 26 April 1985
Age 30
Sex
Marital Status
Male
Married
Nationality Indian
Languages English, Hindi & Malayalam
Passport Z2305206
Alternate E-mail saji194@yahoo.com
Sheet No: 5/5
Client: Bharat Petroleum Corporation Ltd. Kochi Refinery.
Project Overview: Installation of Equipments (Heat Exchangers, Vessels, Columns and Pumps),
Modification of piping system.
 Project Name: Tankage work for Capacity Expansion cum Modernization (CEMP Phase II)
Project.
Client: Bharat Petroleum Corporation Ltd. Kochi Refinery.
Project Overview: Design, Fabrication and Erection of Storage Tanks.
PERSONAL PROFILE
Name
Address
SAJITH NEELAKANTAN NAIR
Sreesaji (H), Changampuzha Nagar P.O, Thrikkakara, Kerala.
Cochin-682033
D.O.B 26 April 1985
Age 30
Sex
Marital Status
Male
Married
Nationality Indian
Languages English, Hindi & Malayalam
Passport Z2305206
Alternate E-mail saji194@yahoo.com
Sheet No: 5/5

Mais conteúdo relacionado

Mais procurados

Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBaneshwar Pai
 
Mehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab Zaidi
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMohammed Akbar
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Mehtab Zaidi
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)S Ajith
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineersailesh konduru
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor Danger Riyas
 
Sadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq Ali
 
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractSession W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractProject Controls Expo
 
Furrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad
 
مقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافيةمقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافيةM Maged Hegazy, LLM, MBA, CCP, P3O
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016D Venkatesh
 

Mais procurados (20)

Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
 
Mehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cv
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineer
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor
 
VIZAG REVIT RESUME
VIZAG REVIT RESUMEVIZAG REVIT RESUME
VIZAG REVIT RESUME
 
Sadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq-CV- Document Controller
Sadiq-CV- Document Controller
 
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractSession W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
 
Prolongation and HOOH Costs
Prolongation and HOOH CostsProlongation and HOOH Costs
Prolongation and HOOH Costs
 
Delay - EOT claims
Delay - EOT claimsDelay - EOT claims
Delay - EOT claims
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Furrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity Surveyor
 
مقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافيةمقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافية
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016
 

Destaque (20)

Tarek Mamdouh CV Aug 2016
Tarek Mamdouh CV Aug 2016Tarek Mamdouh CV Aug 2016
Tarek Mamdouh CV Aug 2016
 
Hyder -CV.1
Hyder -CV.1Hyder -CV.1
Hyder -CV.1
 
harold cv
harold cvharold cv
harold cv
 
Rabih_Rabah_Resume
Rabih_Rabah_ResumeRabih_Rabah_Resume
Rabih_Rabah_Resume
 
QS - CV
QS - CVQS - CV
QS - CV
 
Update CV 01.08.15
Update CV 01.08.15Update CV 01.08.15
Update CV 01.08.15
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Resume Kevin Deysenroth
Resume Kevin DeysenrothResume Kevin Deysenroth
Resume Kevin Deysenroth
 
BAHA AL DEN AL JOBOURI, MSc.CV
BAHA AL DEN AL JOBOURI, MSc.CVBAHA AL DEN AL JOBOURI, MSc.CV
BAHA AL DEN AL JOBOURI, MSc.CV
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
CARICULAMVITAE OF MR. PAUL VICTOR (07 10 20)
CARICULAMVITAE OF MR. PAUL VICTOR (07 10 20)CARICULAMVITAE OF MR. PAUL VICTOR (07 10 20)
CARICULAMVITAE OF MR. PAUL VICTOR (07 10 20)
 
CV
CVCV
CV
 
Omar Abdel Aty 2016 CV
Omar Abdel Aty 2016 CVOmar Abdel Aty 2016 CV
Omar Abdel Aty 2016 CV
 
new cv najah
new cv najahnew cv najah
new cv najah
 
Quantity Surveyor CV
Quantity Surveyor CVQuantity Surveyor CV
Quantity Surveyor CV
 
C.V OF M.BASHIR SURVEYOR
C.V OF M.BASHIR  SURVEYORC.V OF M.BASHIR  SURVEYOR
C.V OF M.BASHIR SURVEYOR
 
Quantity Surveyor
Quantity SurveyorQuantity Surveyor
Quantity Surveyor
 
ANTHONY A. BERNALDO SAFETY OFFICER SUPERVISOR(CV)
ANTHONY A. BERNALDO  SAFETY OFFICER SUPERVISOR(CV)ANTHONY A. BERNALDO  SAFETY OFFICER SUPERVISOR(CV)
ANTHONY A. BERNALDO SAFETY OFFICER SUPERVISOR(CV)
 
Ashwin_Planning Engineer-new
Ashwin_Planning Engineer-newAshwin_Planning Engineer-new
Ashwin_Planning Engineer-new
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 

Semelhante a Planning Engineer _CV

Semelhante a Planning Engineer _CV (20)

CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineer
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
Vignesh Nagarajan CV
Vignesh Nagarajan CVVignesh Nagarajan CV
Vignesh Nagarajan CV
 
Resume
ResumeResume
Resume
 
Nestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning EngineerNestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning Engineer
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
Vinoth
VinothVinoth
Vinoth
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cv
 
Mahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CV
 
selva-cv
selva-cvselva-cv
selva-cv
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning Engineer
 
JakeA_resume Oct14
JakeA_resume Oct14JakeA_resume Oct14
JakeA_resume Oct14
 
Planning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu PPlanning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu P
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
CV Shray Jain
CV Shray Jain CV Shray Jain
CV Shray Jain
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
Vineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCX
 

Planning Engineer _CV

  • 1. SAJITH N NAIR Phone: +91-9995395562 Email: saji194@gmail.com EXPERIENCE SUMMARY- PLANNING ENGINEER • Overall 8 years experienced in Oil & Gas Platform at Project Management Field, Project Controls by using Primavera Software for Engineering, Procurement & Construction (EPC) Project, Shutdown & Plant Maintenance Project. Engineering, Procurement, Construction Sequence of activities in Process Plant. EDUCATIONAL PROFILE • Bachelor of Mechanical Engineering (BE) from Nitte Meenakshi Institute of Technology /Visveswaraiah Technological University, Belgaum (2003- 2007) SOFTWARE SKILLS • Primavera P6.8.2 • MS Project. • MS Excel, MS Word, MS Power point. • Maximo PROFESSIONAL PROFILE Working as Planning Engineer in DOPET, Qatar. – November 2014 – Present. • Projects: 1. Major Shutdown at North Field Alpha -2015 PS4 Platform(Offshore). 2. Mechanical Static Equipment Inspection and Overhauling During QATOFIN General Shutdown. 3. Shutdown Maintenance works at FNGLCS TA-2014.  Preparation of detailed shutdown schedule, daily monitoring, prepare daily schedule update using Primavera 8.2.  Monitoring of Progress on daily basis and preparation Daily, Weekly and Monthly project progress reports.  Preparation, submission and updating of the resource loaded Project Master Schedule using primavera P6. Sheet No: 1/5
  • 2.  Preparation and updating of project S Curves, bar charts / manpower (histograms) & equipment.  Close coordination with Planning Manager & Project Manager.  Lead development of baseline schedule and support Project Manager (PM) in Integrated Baseline Review (IBR).  Preparation of 2-week schedule based on work front availability though Primavera P6.  Preparation of Monthly cost/planning status reports to Management.  Preparation of project budget including contractors tools, equipment and manpower.  Preparation of close out report for shutdown projects. Worked as Planning Engineer in Petrofac International UAE LLC. – October 2011 – September 2014 • Responsibilities in Inspection, Maintenance and Repair Contract, Rumaila Field – Southern Iraq (Client : British Petroleum)  Provide planning/Scheduling and system support for TAR maintenance work activities at Site.  Close liaison with the BP TAR Planning Team and Maintenance group.  Prepares TAR Maintenance schedules, monitors completion of the work carried out and forecasts activities.  Defines TAR maintenance activities, defining manpower and logistic requirements.  Responsible to conduct planning, monitoring and control functions as per BP approved procedure.  Responsible for attending all the queries and clarification from client regarding the Planning/scheduling.  Preparation of Level 3 schedule for Total Station Shutdown and Turnaround of degassing stations.  Preparation & Implementation of the Progress Measurement System as per Progress Measurement Procedure, & Schedule Levels, Work break down Structure, assign milestones and constraints by using Critical Path Method (CPM).  Monitoring of Progress on daily basis and preparation Daily, Weekly and Monthly project progress reports.  Preparation, submission and updating of the resource loaded Project Master Schedule using primavera P6.  Preparation and updating of project S Curves, bar charts / manpower (histograms) & equipment.  Close coordination with Planning Manager & Project Manager.  Lead development of baseline schedule and support Project Manager (PM) in Integrated Baseline Review (IBR).  Preparation of 2-week schedule based on work front availability though Primavera P6. Sheet No: 2/5
  • 3.  Preparation of Monthly cost/planning status reports to Management.  Preparation of project budget including contractors tools, equipment and manpower.  Plan, coordinate and monitor activities of assigned projects to develop and implement procedures, processes and systems.  Prepare short and long-term resource allocation plans.  Oversee schedules and risk management plans and provide serious deviations warnings hindering project results.  Ensure to take appropriate planning measures with all clients to reassess, renegotiate and amend scope of work responsibilities, proposals, contracts and budgets.  Carrying out of cost and revenue variance analysis.  Prepare and present regular internal and external project reports for management. Worked as a Planning Engineer in Madina Group. W.L.L, Qatar – March 2010 – August 2011 • Responsibilities in PCI Service Contract for RAS GAS  Develop & Maintain the Project Plan, Scheduling & monitoring the Project activities by Using Primavera Project Planner for Enterprise P6.1 Software  Prepare the Short term & Long term Construction Schedules & monitoring the completion of Activities (Civil, Piping, Heat Exchangers, Pressure Vessels , Filters ,Structural works , E & I Works)  Preparation of Shutdown schedule for shutdown activities in various Trains.  Coordinate with Operation Group to get the clear sequence of various activities in LNG Trains, LNG Berth & Offshore Facilities  Clearly Identify the Procurement & Construction Activities, Manpower, Tools, machineries & Equipment requirement of each work packs.  Preparation the Project Construction Reports (Daily, weekly, Monthly), which includes the Project Schedule & S- curve, Resource Analysis, Material & document Status.  Clearly Identify the Procurement & Construction Activities, Manpower, Tools, machineries & Equipment requirement of each work packs.  Preparation of Overall Weekly Progress Report & Productivity Report.  Preparation of Manpower Histogram highlighting the manpower plan, forecast and updating the actual.  Reporting to Site Manager & Corporate Planning Manager  Following Corporate HSE , Quality Procedures Sheet No: 3/5
  • 4. Worked as a Planning Engineer in Tech Sharp Engineers Pvt. Ltd. – July 2007 – March 2010 • Responsibilities in Capacity Expansion Projects in Bharat Petroleum Corporation Ltd.  Develop & Maintain the Project Planning, Scheduling & monitoring the Project activities by Using Primavera Project Planner for Enterprise P6.1 Software & MS Project.  Coordination with Engineering, Procurement, Construction & Communicate with our Sub contractors for Planning, Execution of the Projects on Time & on Budget.  Study of Engineering drawings and technical specifications  Define the WBS Levels & Activity code Levels for having effective control over the project.  Identifying the Areas of concern and Critical path of the project.  Preparation of the Look ahead Schedule that effectively drives and control the Project.  Preparation & Maintaining the Progress Calculation, Estimated Bill of Quantity.  Measuring the progress Performed and compare the Baseline Plan Vs Actual Progress to analyze the delay.  Monitoring and Update the day-to-day site activities, manpower, Equipments Utilization and Construction activities.  Preparation the Project Construction Reports (Daily, weekly, Monthly), which includes the Project Schedule & S- curve, Resource Analysis, Material & document Status.  Reporting to Site Manager & Site Project Control Manager PROJECT DETAILS:  Project Name: Inspection, Maintenance and Repair Contract, Rumaila Field – Southern Iraq Client: British Petroleum, Iraq. Project Overview: Inspection, Maintenance and Repair of Degassing stations, Rotating equipments & Cluster stations.  Project Name: PCI Service Contract for RAS GAS - CT/RG27/G204/08 Client: Rasgas Company Limited, Qatar Project Overview: Procurement, Construction & Installation of LNG Train, Berth & Offshore Facilities Maintenance works, which includes Civil, Piping, Equipment Erection (Heat Exchangers, Turbine, Pressure Vessels, and Filters), Structural works and E & I Works.  Project Name: CDU II Revamp for Capacity Expansion cum Modernization (CEMP Phase II) Project. Sheet No: 4/5
  • 5. Client: Bharat Petroleum Corporation Ltd. Kochi Refinery. Project Overview: Installation of Equipments (Heat Exchangers, Vessels, Columns and Pumps), Modification of piping system.  Project Name: Tankage work for Capacity Expansion cum Modernization (CEMP Phase II) Project. Client: Bharat Petroleum Corporation Ltd. Kochi Refinery. Project Overview: Design, Fabrication and Erection of Storage Tanks. PERSONAL PROFILE Name Address SAJITH NEELAKANTAN NAIR Sreesaji (H), Changampuzha Nagar P.O, Thrikkakara, Kerala. Cochin-682033 D.O.B 26 April 1985 Age 30 Sex Marital Status Male Married Nationality Indian Languages English, Hindi & Malayalam Passport Z2305206 Alternate E-mail saji194@yahoo.com Sheet No: 5/5
  • 6. Client: Bharat Petroleum Corporation Ltd. Kochi Refinery. Project Overview: Installation of Equipments (Heat Exchangers, Vessels, Columns and Pumps), Modification of piping system.  Project Name: Tankage work for Capacity Expansion cum Modernization (CEMP Phase II) Project. Client: Bharat Petroleum Corporation Ltd. Kochi Refinery. Project Overview: Design, Fabrication and Erection of Storage Tanks. PERSONAL PROFILE Name Address SAJITH NEELAKANTAN NAIR Sreesaji (H), Changampuzha Nagar P.O, Thrikkakara, Kerala. Cochin-682033 D.O.B 26 April 1985 Age 30 Sex Marital Status Male Married Nationality Indian Languages English, Hindi & Malayalam Passport Z2305206 Alternate E-mail saji194@yahoo.com Sheet No: 5/5