1. Resume
Document Number 1
SAIBAL DATTA
ELECTRICAL ENGINEER
Saibal has over 29 years of experience in providing High Calibre Service
in Electrical Design and Technology thorough knowledge of Electrical
Infrastructure Design of :
- Power Distribution Networks
A keen Planner and Strategist with expertise in Planning and Executing
Projects.
Proficiency in Devising Maintenance (Preventive, Predictive & Systematic)
Strategies, Procedures and Methods; Diagnosing Breakdown problems.
Effective communicator with excellent relationship Management and
negotiation skills to maintain harmonious industrial relations and discipline
Countries of Work Experience:
India, Saudi Arabia, Qatar,
Areas of Expertise
Extensive experience in MEP Infrastructure Management and design;
Managing Construction, Operations and Maintenance of UG Power
Distribution Network upto 132 KV.
Competent in Planning the Power Distribution Network; Re-organisation
of Network and Town Planning, etc
Project Experience
From June 2012 till date
CONSULTING ENGINEERING SERVICES (I) Pvt. Ltd. (A Jacobs Group
Company)
General Manager – Electrical
Important Projects handled:
Project Name:Head and Neck Cancer Centre, Mumbai
Client:M/s Cancare Trust.
Title: Electrical Engineer
Start / End Dates: 2015 - Ongoing
Scope/Description: Concept & Detailed Design of MEP Services
including Architectural, Interior and Structural / MEP coordination
Responsibilities: Concept Design and Engineering.
Project Name: Preliminary Design Engineering for Proposed Electric
Locomotive Factory and Township at Madhepura, Bihar, Car Body
Manufacturing Facility at Aurangabad, Maharashtra & Heavy Maintenance
Depots (Nagpur and Saharanpur).
EDUCATION/QUALIFICATIONS
B.E. (Electrical) from Malaviya
Regional Engineering College,
Jaipur, Rajasthan in 1986
REGISTRATIONS /
CERTIFICATIONS
Nil
MEMBERSHIPS
AND AFFILIATIONS
Nil
AWARDS / HONORS
Nil
LANGUAGES
English - Excellent
Hindi – Excellent
Bangali- Excellent
OTHER
Joined CES-Jacobs in the June
2012
Positions held: General Manager
Office location – Mahape-2, India
Nationality- Indian
Year of Birth – 1961
2. Resume
Document Number 2
SAIBAL DATTA
ELECTRICAL ENGINEER
Client: M/s SIEMENS
Title: Electrical Engineer
Start / End Dates: 2015 - Ongoing
Scope/Description: Preliminary Design Engineering for Locomotive
factory and Township including preparation of Cost Estimate and Tender
document.
Responsibilities: Pre-bid Engineering support for SIEMENS Locomotive
project.
Project Name: Design, Management Services for Concept, Tender and
Detail for MEPF Engineering Design Services for Imperial Tower-3.
Client: M/s S.D Corporation Pvt. Ltd.
Title: Electrical Engineer
Start / End Dates: 2015 - Ongoing
Scope/Description: Concept and Detailed Engineering for Imperial
Tower 3 is one of the iconic high rise in Mumbai.
Responsibilities: Concept engineering for Electrical distribution network
of an 80 storied Residential Tower at Mumbai.
Project Name: IDC-2 at Jamnagar
Client: Reliance Ltd...
Title: Electrical Engineer
Start / End Dates: 2015 - Ongoing
Scope/Description: Design and Engineering of IDC-2 Centre.
Responsibilities: 4 Nos. Data Centre at Jamnagar with server area of
60000 sq.ft each. Power requirement 20 MVA for each Data Centre.
Project Name: Proposed Office Compound and Kodathi, Bangalore
Client: WIPRO Ltd..
Title: Electrical Engineer
Start / End Dates: 2014 - 2015
Scope/Description: Total Built-up Area 2.5 Million sq.ft with one Data
Centre.
Responsibilities: Technical Peer Review Services for Building Blocks
and Supporting Infrastructure.
Project Name: Data Centre Projects.
Client: M/s. Reliance Industries Ltd., Mumbai
Title: Electrical Engineer
Start / End Dates: 2012 - 2014
Scope/Description: Heading activities pertaining to Engineering Design
and Interdisciplinary Engineering Design Coordination :
o 2 Nos. Data Centre at Nagpur with server area of 60000 sq.ft each.
Power requirement 20 MVA for each Data Centre
o 2 Nos. Data Centre at Chennai with server area of 60000 sq.ft each.
Power requirement 20 MVA for each Data Centre
3. Resume
Document Number 3
SAIBAL DATTA
ELECTRICAL ENGINEER
Responsibilities: Conceptual and Detail Design of the Data Centre
Building and Utility area comprises of modification of 132 KV Switchyard,
11 KV Substation, DG House, Chiller House, Pump House.
o King Abdullah University of Science and Technology, Jeddah, Saudi
Arabia, a Saudi Aramco Project – Review and Validation of deficiency list
of 134 Residential Villa, Preparation of MTO and relevant supporting
markup drawings.
From April 2010 to May 2012
M/s. Reliance Communication Limited
HOD Electrical
Important Projects handled:
Heading activities pertaining to Engineering Design Coordination and
Project Management of :
o DC & DR for TNEB, Madurai with server area of 4000 sq.ft
o DC for Vikram Sarabhai Space Centre with server area of 1000 sq.ft
o Data Centre Expansion Projects in Mumbai with a server area of
25000 sq.ft
o Data Centre Expansion Project, Bangalore with a server area of 5000
sq.ft
o Data Centre for BSES, Jamuna, New Delhi with a server area of 500
sq.ft
o Data Centre at DAKC, Mumbai with an area of 550000 sq.ft and
Power requirement of 40 MVA
o Data Centre for Department of Post, Mysore with a server area of
4000 sq.ft
o Relocation of State Data Centre at Manipur with a server area of 1700
sq.ft
Non IT Electrical System for Data Centres comprise of Design,
Installation, Testing and Commissioning of Substations, UPS System, DG
Sets and Transformers and Downstream Distribution arrangement for
Data Centres as per TIA 942
Job Responsibilities –
A. Electrical Design : Preparation of Conceptual and Detail Design
comprises of preparation of SLD, Layouts, Sizing Calculation of various
Electrical Equipment, BoQ, formulating Utility requirement considering
Mechanical and Electrical Service Capacity and Budgetary Estimate of
High End and Low End works.
B. Engineering Coordination : Preparation of SoW, Vendor / Consultant
4. Resume
Document Number 4
SAIBAL DATTA
ELECTRICAL ENGINEER
Selection, Interfacing with Consultants for preparation of Detailed Design
Document, Calculations, Layouts and Drawings and Construction
Specifications, Validation of Technical Specification, Technical Bid
Evaluation, approval of Vendor Drawings and Layouts, Statutory
Approvals, Documentation.
C. Project / Construction Management : Monitoring day to day Activity,
Reviewing the Vendor Document, Liaising with Procurement Team for
ensuring on-time delivery of equipment as per project schedule, validation
of BoQ prepared by contractor, coordination with various Service
Contractors and Vendors, preparation of Project Progress Reports and
Material Status Report including Risk Analysis and Project Escalation
Plan, Certification of Bills and As Built Drawings, Commissioning and
Project Closure.
From : Oct. 2009 – Mar. 2010
M/s. Al Gihaz Holding Co., A Saudi Arabian Engineering &
Construction Company, Riyadh.
Technical Manager
Overseeing and Managing the Upgradation of Existing Data Center’s
M&E Infrastructure; looking after the Design & Construction of a New
Utility and ensuring Smooth Power Migration from Old System to New
Infrastructure inside King Abdul Aziz Telecommunication Centre of Saudi
Telecom Co.
Preparing technical and commercial bid with project plan for :
o 4 x 4.5 MW Al Batha Diesel Generating Power Station Extension
Project and
o 3 x 3.5 MW Jizan Port Diesel Generating Power Station at south of
Saudi Arabia
From : Apr. 2007 – Oct. 2009
M/s. Reliance Engineering Associates Limited.
General Manager – Project Engineering
Overseas Visit :
Hitec Factory at Almelo, Netherlands for Factory Acceptance Test of
Diesel Rotary UPS for IDC Project in June 2008.
Libert Factory at Slovakia for Factory Acceptance Test of 800 KVA UPS
System for IDC Project in July 2008.
SDMO Factory at Brest, France for Factory Acceptance Test for 3 MVA
DG Sets for IDC Project in August 2008.
5. Resume
Document Number 5
SAIBAL DATTA
ELECTRICAL ENGINEER May 1987 – Apr. 2007 M/s. CESC Limited, Kolkata, West Bengal.
Growth Path :
As Mains Engineer – Power Distribution (1987 to 1994)
Role :
Engaged in a wide gamut of activities encompassing :
o Installation and Commissioning of 132 KV, 33 KV & 11 KV Substations
o Operation & Maintenance of High Tension Underground Lines from 6
kV to 132 kV including Cable Laying.
o Operation & Maintenance of 132 KV, 33 KV & 11 KV Substations
including Transformers, Circuit Breakers, Isolators, CT, PT, etc.
o 33 & 11 KV Switchgear Commissioning & Maintenance at Consumer
End
o Breakdown Maintenance of Low Tension Underground & Overhead
Lines
o New Cable Laying, New Transformer Commissioning upto 33 KV
System
o Addressing both HT and LT Consumer Complaints
o Processing of applications for New Service Connections to various
Consumers upto 11 KV and 6 KV Voltage Level
As Senior Engineer - Operation and Maintenance of Electrical
Installations
Involved in Audit / System Assessment; Load Analysis of the Transformer
Area wise, Preparation of Schemes for Network Reorganisation,
preparing Equipment List / Spares, Budget for approval.
Preparing Single Line Diagram for New Scheme; Handling Technical
Specification & Bid Evaluation and Recommendation for Selection of
Vendor for Supply of Material.
Distribution Panning for New Area
As Dy. Manager – Corporate Planning (1994 to 1996)
Notable Accomplishments
Successfully conducted Energy Audit, carried out a Pilot Project in Medak
District of Andhra Pradesh near Hyderabad.
Consultancy Assignments managed for :
o Renovation of Power House Electrical System in Fertilizer Corporation
of India, Sindhri Unit.
o Conversion of LT and HT Overhead Distribution System to
Underground in Shillong, Meghalaya
6. Resume
Document Number 6
SAIBAL DATTA
ELECTRICAL ENGINEER o Revamping of 6 kV Distribution in ICI, India, Rishra Unit.
As Dy. Manager - Balagarh Project Cell (1997 to 2001)
Managing Project Development Activities involving preparation of
Specification for 47 km long 2 Nos. 33 kV Line for Construction Power
between SEB 132 KV / 33 KV Substation to the Project Site, Liaison with
WBSEB for various Clearance, Engineering, Tendering and Contract
Supervision work for Construction Power.
As Nodal Head - Loss Control Cell (2001 to April 2007)
Drafting and Implementing Strategies for Controlling Theft of Electricity
and Initiating Activities like Anti Pilferage Drives, Disconnection of Meters.
Voltage Engineering Limited, Doha, Qatar
Sr. Project Engineer (1996 to 1997)
Accountable for Erection and Commissioning of 2 Nos. 220 kV / 66 kV
Transformers and 66 kV GIS Board at Airport Substation at Doha, Qatar.