SlideShare uma empresa Scribd logo
1 de 4
Saher Jehad
+966-59 425 0124 / +966-1-4763397
saherjehad@live.com
Profile
• Birth date : 14 August 1982
• Nationality : Jordanian
• Marital status: Married
• Address : Eastern Province of Saudi Arabia
• Languages : English, Turkish spoken languages and mother’s tongue (Arabic)
• Visa status (Iqama): Valid & Transferable
Objective
To secure a position where my skills and knowledge will be use to the fullest in the
achievement of the organization’s goal as well as to pursue personal advancement in
my career.
Experience
FEMCO FAISAL ELECTRO–MECHANICAL CO. LTD. (JULY 2005- up to date)
Technical Office Engineer
PROJECTS :
September 2007 KING FAISAL UNIVERSITY
up to date. Utility Buildings & Infrastructural Work, Phase-3, Stage-1
(KFU) AL-HASSA
Project Scope:
Service Buildings :
 Stand-by Generator Building.
 R.O. Plant.
 Sewerage Treatment Plant (STP).
 Chillers Building.
Infrastructural work:
 MV Cables & Telecommunication DUCT BANKS
 External street light
 Package sub-stations
 Storm lift stations & Sewer lift stations
In charge of:
Service Buildings:
 Preparing Shop Drawing (Lighting, Power, Fire Alarm, IP Telephony,
Grounding System & Lightning Protection System.
 Preparing load schedule and related calculation such as :
- cable sizing & voltage drop calculation.
- short circuit calculation.
- capacitance and power factor.
 Preparing Material Submittal for generators, transformers, panels .. etc.
as per required specifications and international standards.
 Follow up with the Consultant for approval.
 Attending factory test before supplying the materials to site.
 SCADA SYSTEM
- At R.0. PLANT:
Local control room contains the workstations and the interface units FIU,
Which will be connected with the 17 External Wells by the RTUs, also PLC
Panels for controlling Pump station, sweet & raw water Tank, Elevated water
tanks,
- At Sewerage Treatment Plant:
Local control room contains the workstations and the interface units FIU,
which will be connected with the 12 Lift Station by the RTUs, also PLC
panels for controlling the 3 stages of Pretreatment, Chemical & Filtration
procedures.
BMS:
At chiller plant, 11 DDC’s to control Chillers, Switchgear, RMU’s, Transformers,
Pumps, MCC’s, AHU’s, Exhaust Fans and Valves.
Infrastructural work:
 Preparing shop drawings for duct bank (layout and profile), with the
coordination with the other infrastructural systems such as, sweet water, raw
water, sewer, storm & chiller lines.
 Preparing shop drawings for streetlight, load calculation, and cable sizing
calculation.
 Irrigation Control System (IRRInet-MOTOROLA) to cover a distance of
900,000 m² controlled by 10 RTU stations all connected in Wireless with the
main irrigation operating station which includes the Weather Station and the
Transceiver units.
 SCADA SYSTEM
At the main control room in the administration building of the university, contains
the workstations and the interface units FIU, which will be connected with
6 fountains and the 18 street light substations by the RTUs.
Testing and Commissioning:
- MV & LV Cables : High pot Test and Insulation Test.
- Transformers : Ratio test, Insulation resistance, winding, No load losses, load losses.
- Switchgear: AC & DC Supply, VT & CT Testing, Circuit Breaker, Bus bar, Switchgear
Functional Testing, Meter Testing, Relay & Auxiliary relay, Primary
Injection and Switchgear High Voltage Testing.
- RMU: Insulation resistance, Trip test.
June 2007 SALINE WATER CONVERSSION CORPORATION
To September 2007 NEW WAREHOUSES GROUNDING SYSTEM
SWCC- YANBU-KSA
Site Engineer
Project Scope:
Grounding system for the new warehouses.
In charge of:
 Preparing shop drawing & following up for approving
 Materials take off & purchasing.
 Supervising the installation, inspection of the complete
grounding system.
 Testing and site hand over.
August 2006 SALINE WATER CONVERSSION CORPORATION
To June 2007 DISELINATION PLANT REFUBISHMENT WORKS PROJECT
SWCC - JEDDAH – PART 4
Site Engineer
Project Scope:
Refurbishment work of 10 Diselination plants, replacing control panels,
Detectors, mechanical pipes.
In charge of :
 Electrical equipments installations.
 Material control.
 Steam control system.
 Consulting with consultants for approvals.
September 2005
CITY FANAR PROJECT - Dammam, package-3
Project scope:
Infrastructural work, sewer system, lift station, preparation for package-5
that Includes, Street light, duct bank, and mechanical networks.
In charge of :
 Preparing shop drawing for lift stations, and follow up for approval, which
includes:
 Stand by generators, transformers and MCC and distribution panels
 Site installation and inspection.
AL-HARBI HOLDONG (APRIL 2004-JULY 2005)
Riyadh-KSA
April 2004 WATER FEEDER LINES FOR RIYADH CITY
Site Engineer
Project scope:
Transferring the path for the main Riyadh water feeder lines
(3x2m dia. pipe) for a distance of 2km, with the insulation of the
Cathodic Protection System.
In charge of:
 - Site coordination
 - Work Inspections
 - Material inspection
EDUCATION
2005 COLUMBUS UNIVERSITY, USA – Mississippi
Master Degree in Computer Engineering
2004 NEAR EAST UNIVERSITY, CYPRUS
B.Sc Degree IN ELECTRICAL & ELECTRONIC ENGINEERING
Graduation Project: Radio Interface in GSM (Architectures of GSM system, cell
designing structure, transmission& frequencies, interface in GSM between its
components)
COMPUTER SKILLS
 PLC programming and checking for all controllable systems.
 Computer programming languages:
PASCAL, C and C++ programming languages
 Microsoft office.
CERTIFICATES, COURSES & WORKSHOP.
15-19 Nov 2008 ETAP 6.0 (Electrical Transient Analyzer Program )
Dahran International Hotel, 5 days workshop.
August 2002 Communications Development Company for two months
Build and repair wireless networks AMMAN - JORDAN
August 2003 Cyprus TV for two months TV transmission System
Feb 2009 ISO 9001:2008 Quality Management System Awareness
training
Personal Skills
Trust worthy, honest & loyal. Have a strong personality, Possesses good work
attitude, Punctual and hard working. Friendly and can maintain good relationship
within the work environment as a team leader.
References Furnish Upon Request

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
CV PF
CV PFCV PF
CV PF
 
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park Substation
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
MEP engineer CV
MEP engineer CV MEP engineer CV
MEP engineer CV
 
Muhammad Danish Rafiq
Muhammad Danish RafiqMuhammad Danish Rafiq
Muhammad Danish Rafiq
 
Eng_Ahmad_Hamdy_CV
Eng_Ahmad_Hamdy_CVEng_Ahmad_Hamdy_CV
Eng_Ahmad_Hamdy_CV
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 
Ww cv 2016
Ww cv 2016Ww cv 2016
Ww cv 2016
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
 
Sujit Das
Sujit DasSujit Das
Sujit Das
 
Mohamed Saleh fathy final cv.doc
Mohamed Saleh fathy  final cv.docMohamed Saleh fathy  final cv.doc
Mohamed Saleh fathy final cv.doc
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
ajit-cv-updated
ajit-cv-updatedajit-cv-updated
ajit-cv-updated
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
Eng.Ahmed Madkour CV
Eng.Ahmed Madkour CVEng.Ahmed Madkour CV
Eng.Ahmed Madkour CV
 
cv umar
cv umarcv umar
cv umar
 

Destaque

3º básico a semana 28 noviembre al 02 diciembre
3º básico a  semana 28 noviembre al 02 diciembre3º básico a  semana 28 noviembre al 02 diciembre
3º básico a semana 28 noviembre al 02 diciembreColegio Camilo Henríquez
 
Primera guerra mundial
Primera guerra mundialPrimera guerra mundial
Primera guerra mundialAna Blanco
 
E- Portafolio Astrid Muñoz
E- Portafolio Astrid MuñozE- Portafolio Astrid Muñoz
E- Portafolio Astrid Muñozamunozmu
 
Presentación1 antropologia
Presentación1 antropologiaPresentación1 antropologia
Presentación1 antropologiaamunozmu
 
6° básico b semana del lunes 28 al viernes 02 de diciembre
6° básico b semana del lunes 28 al viernes 02 de diciembre6° básico b semana del lunes 28 al viernes 02 de diciembre
6° básico b semana del lunes 28 al viernes 02 de diciembreColegio Camilo Henríquez
 
02 guia potenciando_mi_experiencia_educativa_de_primera_fase.-3
02 guia potenciando_mi_experiencia_educativa_de_primera_fase.-302 guia potenciando_mi_experiencia_educativa_de_primera_fase.-3
02 guia potenciando_mi_experiencia_educativa_de_primera_fase.-3sandra robayoaviles
 
Primera guerra mundial
Primera guerra mundialPrimera guerra mundial
Primera guerra mundialAna Blanco
 
Β 4 1 7 Basic Formatting of Spreadsheets
Β 4 1 7 Basic Formatting of SpreadsheetsΒ 4 1 7 Basic Formatting of Spreadsheets
Β 4 1 7 Basic Formatting of Spreadsheetspapettas
 
Revelando são paulo
Revelando são pauloRevelando são paulo
Revelando são paulokayraluciana
 
Leadership Profile Paper
Leadership Profile PaperLeadership Profile Paper
Leadership Profile PaperNina Englund
 
Gregory Lengen - 2016
Gregory Lengen - 2016Gregory Lengen - 2016
Gregory Lengen - 2016Greg Lengen
 

Destaque (19)

3º básico a semana 28 noviembre al 02 diciembre
3º básico a  semana 28 noviembre al 02 diciembre3º básico a  semana 28 noviembre al 02 diciembre
3º básico a semana 28 noviembre al 02 diciembre
 
Primera guerra mundial
Primera guerra mundialPrimera guerra mundial
Primera guerra mundial
 
E- Portafolio Astrid Muñoz
E- Portafolio Astrid MuñozE- Portafolio Astrid Muñoz
E- Portafolio Astrid Muñoz
 
Presentación1 antropologia
Presentación1 antropologiaPresentación1 antropologia
Presentación1 antropologia
 
Rubén por el mundo.
Rubén por el mundo.Rubén por el mundo.
Rubén por el mundo.
 
Introdução
IntroduçãoIntrodução
Introdução
 
Hubspot presentation.pptx
Hubspot presentation.pptxHubspot presentation.pptx
Hubspot presentation.pptx
 
1 básico a semana del 28 al 2
1 básico a   semana del 28 al 21 básico a   semana del 28 al 2
1 básico a semana del 28 al 2
 
6° básico b semana del lunes 28 al viernes 02 de diciembre
6° básico b semana del lunes 28 al viernes 02 de diciembre6° básico b semana del lunes 28 al viernes 02 de diciembre
6° básico b semana del lunes 28 al viernes 02 de diciembre
 
02 guia potenciando_mi_experiencia_educativa_de_primera_fase.-3
02 guia potenciando_mi_experiencia_educativa_de_primera_fase.-302 guia potenciando_mi_experiencia_educativa_de_primera_fase.-3
02 guia potenciando_mi_experiencia_educativa_de_primera_fase.-3
 
Primera guerra mundial
Primera guerra mundialPrimera guerra mundial
Primera guerra mundial
 
Zapathy colorzz
Zapathy colorzzZapathy colorzz
Zapathy colorzz
 
Β 4 1 7 Basic Formatting of Spreadsheets
Β 4 1 7 Basic Formatting of SpreadsheetsΒ 4 1 7 Basic Formatting of Spreadsheets
Β 4 1 7 Basic Formatting of Spreadsheets
 
2º básico a semana del 28 al 02
2º básico a   semana del 28 al  022º básico a   semana del 28 al  02
2º básico a semana del 28 al 02
 
საათების სამეფო
საათების  სამეფო   საათების  სამეფო
საათების სამეფო
 
Revelando são paulo
Revelando são pauloRevelando são paulo
Revelando são paulo
 
Leadership Profile Paper
Leadership Profile PaperLeadership Profile Paper
Leadership Profile Paper
 
Seminar
SeminarSeminar
Seminar
 
Gregory Lengen - 2016
Gregory Lengen - 2016Gregory Lengen - 2016
Gregory Lengen - 2016
 

Semelhante a Engr.SaherCV (1)

Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071Nithy Anantham
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVMAHMOOD AHMED
 
electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BEmirza gulrez
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 

Semelhante a Engr.SaherCV (1) (20)

Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BE
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Chandru_CV
Chandru_CVChandru_CV
Chandru_CV
 

Engr.SaherCV (1)

  • 1. Saher Jehad +966-59 425 0124 / +966-1-4763397 saherjehad@live.com Profile • Birth date : 14 August 1982 • Nationality : Jordanian • Marital status: Married • Address : Eastern Province of Saudi Arabia • Languages : English, Turkish spoken languages and mother’s tongue (Arabic) • Visa status (Iqama): Valid & Transferable Objective To secure a position where my skills and knowledge will be use to the fullest in the achievement of the organization’s goal as well as to pursue personal advancement in my career. Experience FEMCO FAISAL ELECTRO–MECHANICAL CO. LTD. (JULY 2005- up to date) Technical Office Engineer PROJECTS : September 2007 KING FAISAL UNIVERSITY up to date. Utility Buildings & Infrastructural Work, Phase-3, Stage-1 (KFU) AL-HASSA Project Scope: Service Buildings :  Stand-by Generator Building.  R.O. Plant.  Sewerage Treatment Plant (STP).  Chillers Building. Infrastructural work:  MV Cables & Telecommunication DUCT BANKS  External street light  Package sub-stations  Storm lift stations & Sewer lift stations In charge of: Service Buildings:  Preparing Shop Drawing (Lighting, Power, Fire Alarm, IP Telephony, Grounding System & Lightning Protection System.  Preparing load schedule and related calculation such as : - cable sizing & voltage drop calculation. - short circuit calculation. - capacitance and power factor.  Preparing Material Submittal for generators, transformers, panels .. etc. as per required specifications and international standards.  Follow up with the Consultant for approval.  Attending factory test before supplying the materials to site.  SCADA SYSTEM - At R.0. PLANT: Local control room contains the workstations and the interface units FIU, Which will be connected with the 17 External Wells by the RTUs, also PLC Panels for controlling Pump station, sweet & raw water Tank, Elevated water tanks, - At Sewerage Treatment Plant: Local control room contains the workstations and the interface units FIU, which will be connected with the 12 Lift Station by the RTUs, also PLC panels for controlling the 3 stages of Pretreatment, Chemical & Filtration procedures.
  • 2. BMS: At chiller plant, 11 DDC’s to control Chillers, Switchgear, RMU’s, Transformers, Pumps, MCC’s, AHU’s, Exhaust Fans and Valves. Infrastructural work:  Preparing shop drawings for duct bank (layout and profile), with the coordination with the other infrastructural systems such as, sweet water, raw water, sewer, storm & chiller lines.  Preparing shop drawings for streetlight, load calculation, and cable sizing calculation.  Irrigation Control System (IRRInet-MOTOROLA) to cover a distance of 900,000 m² controlled by 10 RTU stations all connected in Wireless with the main irrigation operating station which includes the Weather Station and the Transceiver units.  SCADA SYSTEM At the main control room in the administration building of the university, contains the workstations and the interface units FIU, which will be connected with 6 fountains and the 18 street light substations by the RTUs. Testing and Commissioning: - MV & LV Cables : High pot Test and Insulation Test. - Transformers : Ratio test, Insulation resistance, winding, No load losses, load losses. - Switchgear: AC & DC Supply, VT & CT Testing, Circuit Breaker, Bus bar, Switchgear Functional Testing, Meter Testing, Relay & Auxiliary relay, Primary Injection and Switchgear High Voltage Testing. - RMU: Insulation resistance, Trip test. June 2007 SALINE WATER CONVERSSION CORPORATION To September 2007 NEW WAREHOUSES GROUNDING SYSTEM SWCC- YANBU-KSA Site Engineer Project Scope: Grounding system for the new warehouses. In charge of:  Preparing shop drawing & following up for approving  Materials take off & purchasing.  Supervising the installation, inspection of the complete grounding system.  Testing and site hand over. August 2006 SALINE WATER CONVERSSION CORPORATION To June 2007 DISELINATION PLANT REFUBISHMENT WORKS PROJECT SWCC - JEDDAH – PART 4 Site Engineer Project Scope: Refurbishment work of 10 Diselination plants, replacing control panels, Detectors, mechanical pipes. In charge of :  Electrical equipments installations.  Material control.  Steam control system.  Consulting with consultants for approvals.
  • 3. September 2005 CITY FANAR PROJECT - Dammam, package-3 Project scope: Infrastructural work, sewer system, lift station, preparation for package-5 that Includes, Street light, duct bank, and mechanical networks. In charge of :  Preparing shop drawing for lift stations, and follow up for approval, which includes:  Stand by generators, transformers and MCC and distribution panels  Site installation and inspection. AL-HARBI HOLDONG (APRIL 2004-JULY 2005) Riyadh-KSA April 2004 WATER FEEDER LINES FOR RIYADH CITY Site Engineer Project scope: Transferring the path for the main Riyadh water feeder lines (3x2m dia. pipe) for a distance of 2km, with the insulation of the Cathodic Protection System. In charge of:  - Site coordination  - Work Inspections  - Material inspection EDUCATION 2005 COLUMBUS UNIVERSITY, USA – Mississippi Master Degree in Computer Engineering 2004 NEAR EAST UNIVERSITY, CYPRUS B.Sc Degree IN ELECTRICAL & ELECTRONIC ENGINEERING Graduation Project: Radio Interface in GSM (Architectures of GSM system, cell designing structure, transmission& frequencies, interface in GSM between its components) COMPUTER SKILLS  PLC programming and checking for all controllable systems.  Computer programming languages: PASCAL, C and C++ programming languages  Microsoft office. CERTIFICATES, COURSES & WORKSHOP. 15-19 Nov 2008 ETAP 6.0 (Electrical Transient Analyzer Program ) Dahran International Hotel, 5 days workshop. August 2002 Communications Development Company for two months Build and repair wireless networks AMMAN - JORDAN August 2003 Cyprus TV for two months TV transmission System Feb 2009 ISO 9001:2008 Quality Management System Awareness training Personal Skills Trust worthy, honest & loyal. Have a strong personality, Possesses good work attitude, Punctual and hard working. Friendly and can maintain good relationship within the work environment as a team leader.