1. Saher Jehad
+966-59 425 0124 / +966-1-4763397
saherjehad@live.com
Profile
• Birth date : 14 August 1982
• Nationality : Jordanian
• Marital status: Married
• Address : Eastern Province of Saudi Arabia
• Languages : English, Turkish spoken languages and mother’s tongue (Arabic)
• Visa status (Iqama): Valid & Transferable
Objective
To secure a position where my skills and knowledge will be use to the fullest in the
achievement of the organization’s goal as well as to pursue personal advancement in
my career.
Experience
FEMCO FAISAL ELECTRO–MECHANICAL CO. LTD. (JULY 2005- up to date)
Technical Office Engineer
PROJECTS :
September 2007 KING FAISAL UNIVERSITY
up to date. Utility Buildings & Infrastructural Work, Phase-3, Stage-1
(KFU) AL-HASSA
Project Scope:
Service Buildings :
Stand-by Generator Building.
R.O. Plant.
Sewerage Treatment Plant (STP).
Chillers Building.
Infrastructural work:
MV Cables & Telecommunication DUCT BANKS
External street light
Package sub-stations
Storm lift stations & Sewer lift stations
In charge of:
Service Buildings:
Preparing Shop Drawing (Lighting, Power, Fire Alarm, IP Telephony,
Grounding System & Lightning Protection System.
Preparing load schedule and related calculation such as :
- cable sizing & voltage drop calculation.
- short circuit calculation.
- capacitance and power factor.
Preparing Material Submittal for generators, transformers, panels .. etc.
as per required specifications and international standards.
Follow up with the Consultant for approval.
Attending factory test before supplying the materials to site.
SCADA SYSTEM
- At R.0. PLANT:
Local control room contains the workstations and the interface units FIU,
Which will be connected with the 17 External Wells by the RTUs, also PLC
Panels for controlling Pump station, sweet & raw water Tank, Elevated water
tanks,
- At Sewerage Treatment Plant:
Local control room contains the workstations and the interface units FIU,
which will be connected with the 12 Lift Station by the RTUs, also PLC
panels for controlling the 3 stages of Pretreatment, Chemical & Filtration
procedures.
2. BMS:
At chiller plant, 11 DDC’s to control Chillers, Switchgear, RMU’s, Transformers,
Pumps, MCC’s, AHU’s, Exhaust Fans and Valves.
Infrastructural work:
Preparing shop drawings for duct bank (layout and profile), with the
coordination with the other infrastructural systems such as, sweet water, raw
water, sewer, storm & chiller lines.
Preparing shop drawings for streetlight, load calculation, and cable sizing
calculation.
Irrigation Control System (IRRInet-MOTOROLA) to cover a distance of
900,000 m² controlled by 10 RTU stations all connected in Wireless with the
main irrigation operating station which includes the Weather Station and the
Transceiver units.
SCADA SYSTEM
At the main control room in the administration building of the university, contains
the workstations and the interface units FIU, which will be connected with
6 fountains and the 18 street light substations by the RTUs.
Testing and Commissioning:
- MV & LV Cables : High pot Test and Insulation Test.
- Transformers : Ratio test, Insulation resistance, winding, No load losses, load losses.
- Switchgear: AC & DC Supply, VT & CT Testing, Circuit Breaker, Bus bar, Switchgear
Functional Testing, Meter Testing, Relay & Auxiliary relay, Primary
Injection and Switchgear High Voltage Testing.
- RMU: Insulation resistance, Trip test.
June 2007 SALINE WATER CONVERSSION CORPORATION
To September 2007 NEW WAREHOUSES GROUNDING SYSTEM
SWCC- YANBU-KSA
Site Engineer
Project Scope:
Grounding system for the new warehouses.
In charge of:
Preparing shop drawing & following up for approving
Materials take off & purchasing.
Supervising the installation, inspection of the complete
grounding system.
Testing and site hand over.
August 2006 SALINE WATER CONVERSSION CORPORATION
To June 2007 DISELINATION PLANT REFUBISHMENT WORKS PROJECT
SWCC - JEDDAH – PART 4
Site Engineer
Project Scope:
Refurbishment work of 10 Diselination plants, replacing control panels,
Detectors, mechanical pipes.
In charge of :
Electrical equipments installations.
Material control.
Steam control system.
Consulting with consultants for approvals.
3. September 2005
CITY FANAR PROJECT - Dammam, package-3
Project scope:
Infrastructural work, sewer system, lift station, preparation for package-5
that Includes, Street light, duct bank, and mechanical networks.
In charge of :
Preparing shop drawing for lift stations, and follow up for approval, which
includes:
Stand by generators, transformers and MCC and distribution panels
Site installation and inspection.
AL-HARBI HOLDONG (APRIL 2004-JULY 2005)
Riyadh-KSA
April 2004 WATER FEEDER LINES FOR RIYADH CITY
Site Engineer
Project scope:
Transferring the path for the main Riyadh water feeder lines
(3x2m dia. pipe) for a distance of 2km, with the insulation of the
Cathodic Protection System.
In charge of:
- Site coordination
- Work Inspections
- Material inspection
EDUCATION
2005 COLUMBUS UNIVERSITY, USA – Mississippi
Master Degree in Computer Engineering
2004 NEAR EAST UNIVERSITY, CYPRUS
B.Sc Degree IN ELECTRICAL & ELECTRONIC ENGINEERING
Graduation Project: Radio Interface in GSM (Architectures of GSM system, cell
designing structure, transmission& frequencies, interface in GSM between its
components)
COMPUTER SKILLS
PLC programming and checking for all controllable systems.
Computer programming languages:
PASCAL, C and C++ programming languages
Microsoft office.
CERTIFICATES, COURSES & WORKSHOP.
15-19 Nov 2008 ETAP 6.0 (Electrical Transient Analyzer Program )
Dahran International Hotel, 5 days workshop.
August 2002 Communications Development Company for two months
Build and repair wireless networks AMMAN - JORDAN
August 2003 Cyprus TV for two months TV transmission System
Feb 2009 ISO 9001:2008 Quality Management System Awareness
training
Personal Skills
Trust worthy, honest & loyal. Have a strong personality, Possesses good work
attitude, Punctual and hard working. Friendly and can maintain good relationship
within the work environment as a team leader.