SlideShare uma empresa Scribd logo
1 de 3
Sachin A. MAHAJAN .
Kavadi Malwadi,
In front of Hanuman temple,
Post Manjari Farm, Tal Haveli Dist. Pune -412307
(Maharashtra) India
Mobile : 0091 9881254387 & 9011052156
Email : sachinmahajan_1984@rediffmail.com
samahajan@icloud.com
OBJECTIVE
I would like to contribute my ability to an organization, which I face challenging
business realities in its endeavor to success.
AREAS OF EXPERTISE INCLUDES
(Post Diploma in Refrigeration & Air Conditioning) & Diploma in Mechanical
Engineering having 10+ yrs. of Industry Experience in Project, Production, Quality
Assurance, maintenance.
 Asst. Manager, Senior Engineer, engineer and Junior engineer in
Refrigeration & Air conditioning (Project implementation) from Sep. 07
to till date in Kirloskar Pneumatic LTD.
 Hallscrew compressor maintenance.
 Area Maintenance Engineer from Dec.06 to Sep. 07 in Eureka Forbes
Limited Aurangabad.
 1.5year HVAC (Heating Ventilation Air Condition) for Project
implementation in Blue Star Limited, Pune.

HVAC PROJECT IN BLUE STAR , PUNE
Role : Trainee Project Engineer
• Commisioning the Plant within the time frame.
• Manpower Handling.
• Ducting desigining as per requirement from customer.
• To control the system with the help of building management system
• Prepration of various documentaion.
• Resolving the problems occurred at site.
• Attending the daily meetings.
• After commisiong the system, to provide the service.
EUREKA FORBES LIMITED
Role : Area Maintenance Head
• Manpower handling
• Working in SAP ( R3 production,CRM, MI)
• Maintenance of all Nilfisk machines
• To Give Training to Technicians
• Maintain Costomer Relationship
KIRLOSKAR PNEUMATICS CO. LTD.
Role : Project Engineer
Project Planning.
• Planning Document, Procurement, manufacturing schedule of project.
• Planning for Critical Activity & Critical Material.
• Planning & Scheduling site Activity.
• Action & its effectiveness monitoring
• Using MS Project Planning & Scheduling the Project
Making Material Take-Off List of project
• Identification of Actual requirement of material for Project.
• Monitoring on Design & Procurement Activity.
Project Co-ordination
• Maintain Coordination in between various departments.
• Co-ordinating with Site & Site Representative.
• Maintaining control over erection & Packing activity at manufacturing
works as well as on site also.
• Generation of Enquiry.
• Guidelines to Site as well as to Contractor also.
• Solve Technical As well as commercial issue.
• Maintain coordination in between Client & company.
• Liaison with client for timely completion
• Liaison with consultant & inspection agency
Commissioning of Plant
• Commissioning of Air Conditioning & Refrigaration plants
• Recording/ Demonstrating the performance of plant to customer
/consultant
• Trouble shooting during commissioning & service.
• Obtain completion certificates from clients.
Project Documentation-
• Maintain Project Documentation from Start to End.
• Make Progress Reports.
• Plan & Maintain the Project Manufacturing Activity.
• GENERATING/COMPILE THE O&M MANUALS AND MTO
Implementation of Quality Management System : -
• Preparing for Audit, ISO audits
SKILLS
Business Skills:
Communications: Interpersonal /Negotiation/Planning skills; Team player
Irection
Personal Skills Professional Skills
a) Goal-Setting & Implementing a) Planning and Execution
b) Public Speaking b) Negotiation Skills
c) Listening Skills c) Presentation Skills
d) Thinking Skills- Logical & Lateral d) Leadership Skills
Computer Skills
a) Auto CAD b) CAD CAM
c) C++ d) DOS, Windows NT, Windows 2000, XP.
e) Packages : MS Office 2000
Training /work shops: -
Hallscrew compressor maintenance practical workshop at Cecchina
compressor facility ( Maqway Internationals) Diakin group of companies Rome Italy.
Extracurricular Achievements
An active Student of Marshal Arts & won the Gold Meddle in District
Level Championship.
PERSONAL DETAILS
Date of Birth : 04th
t Aug. 1984
Marital Status : Married
Gender : Male
Nationality : Indian
Language proficiency : Marathi, Hindi, English
Passport : F8067299
ACADEMIC BACKGROUND
Year Institution Degree % Marks Remarks
2000 R.R.High School,Jalgao SSC 62.42% I class
2004 New Polytechinc,Bambhori DME 56.74% II Class
Jalgaon
2006 Govt.Polytech. Jalgaon PDRAC 63.12% I Class
Current CTC Rs. 600000/- p.a.
Expected CTC Negotiable.
Notice Period Three Month
Current Location Pune ( Maharashtra, India )
Passport No. & Validity F8067299 14th
May 2016

Mais conteúdo relacionado

Mais procurados

cv of galisa
cv of galisacv of galisa
cv of galisa
shas gaib
 
Afzal Ahmed CV (2)
Afzal Ahmed CV (2)Afzal Ahmed CV (2)
Afzal Ahmed CV (2)
Afzal Soomro
 
Abuthaheer- Curriculum vitae
Abuthaheer- Curriculum vitaeAbuthaheer- Curriculum vitae
Abuthaheer- Curriculum vitae
abutha
 
Eddie Gamella_Resume
Eddie Gamella_ResumeEddie Gamella_Resume
Eddie Gamella_Resume
Eddie Gamella
 

Mais procurados (20)

Resume
ResumeResume
Resume
 
cv of galisa
cv of galisacv of galisa
cv of galisa
 
Resume New
Resume NewResume New
Resume New
 
Premchand's resume for Production Engineer
Premchand's resume for Production EngineerPremchand's resume for Production Engineer
Premchand's resume for Production Engineer
 
Afzal Ahmed CV (2)
Afzal Ahmed CV (2)Afzal Ahmed CV (2)
Afzal Ahmed CV (2)
 
SRIRAM
SRIRAMSRIRAM
SRIRAM
 
Seenivasn R_updated resume
Seenivasn R_updated resumeSeenivasn R_updated resume
Seenivasn R_updated resume
 
mohd irfan qureshi resume
mohd irfan qureshi resumemohd irfan qureshi resume
mohd irfan qureshi resume
 
Resume
ResumeResume
Resume
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
JEESMON - CV Engineer
JEESMON - CV EngineerJEESMON - CV Engineer
JEESMON - CV Engineer
 
ASHUTOSH CV
ASHUTOSH CVASHUTOSH CV
ASHUTOSH CV
 
Muhammad mohsin updated resume
Muhammad mohsin updated resumeMuhammad mohsin updated resume
Muhammad mohsin updated resume
 
attach(1)
attach(1)attach(1)
attach(1)
 
CV
CVCV
CV
 
Abuthaheer- Curriculum vitae
Abuthaheer- Curriculum vitaeAbuthaheer- Curriculum vitae
Abuthaheer- Curriculum vitae
 
Wilson Gonzales CV
Wilson Gonzales CVWilson Gonzales CV
Wilson Gonzales CV
 
Resume_Sachin
Resume_SachinResume_Sachin
Resume_Sachin
 
Eddie Gamella_Resume
Eddie Gamella_ResumeEddie Gamella_Resume
Eddie Gamella_Resume
 
Imran updated CV
Imran updated CVImran updated CV
Imran updated CV
 

Destaque

insulators matrial
insulators matrialinsulators matrial
insulators matrial
adeelshafiq
 
Fire safety and codes
Fire safety and codesFire safety and codes
Fire safety and codes
wcmc
 
Live line maintenance in power sector
Live line maintenance in power sectorLive line maintenance in power sector
Live line maintenance in power sector
UMESH THAKARE
 
9. plano ejecutivo y detalles constructivo
9. plano ejecutivo y detalles constructivo9. plano ejecutivo y detalles constructivo
9. plano ejecutivo y detalles constructivo
david Rock
 
Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design concept
Kumar VEL
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)
zeeshan715
 

Destaque (19)

insulators matrial
insulators matrialinsulators matrial
insulators matrial
 
Fire safety and codes
Fire safety and codesFire safety and codes
Fire safety and codes
 
Live line maintenance in power sector
Live line maintenance in power sectorLive line maintenance in power sector
Live line maintenance in power sector
 
Live Line Maintenance
Live Line MaintenanceLive Line Maintenance
Live Line Maintenance
 
Herramientas para realidad virtual
Herramientas para realidad virtualHerramientas para realidad virtual
Herramientas para realidad virtual
 
Sistemas de capacitación basados en Realidad Virtual para la industria energé...
Sistemas de capacitación basados en Realidad Virtual para la industria energé...Sistemas de capacitación basados en Realidad Virtual para la industria energé...
Sistemas de capacitación basados en Realidad Virtual para la industria energé...
 
Manufacturing and testing of Insulators at BHEL Jagdishpur
Manufacturing and testing of Insulators at BHEL JagdishpurManufacturing and testing of Insulators at BHEL Jagdishpur
Manufacturing and testing of Insulators at BHEL Jagdishpur
 
4.1 transformador monofasico en poste
4.1 transformador monofasico en poste4.1 transformador monofasico en poste
4.1 transformador monofasico en poste
 
concentracion de servicios aereo cfe
concentracion de servicios aereo cfeconcentracion de servicios aereo cfe
concentracion de servicios aereo cfe
 
9. plano ejecutivo y detalles constructivo
9. plano ejecutivo y detalles constructivo9. plano ejecutivo y detalles constructivo
9. plano ejecutivo y detalles constructivo
 
Transmision line construction
Transmision line constructionTransmision line construction
Transmision line construction
 
6.4 acometida media tensión
6.4 acometida media tensión6.4 acometida media tensión
6.4 acometida media tensión
 
Tl book
Tl bookTl book
Tl book
 
design of tower
design of towerdesign of tower
design of tower
 
Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design concept
 
transmission line
transmission line transmission line
transmission line
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission line
 

Semelhante a Resume (20)

Henry Suguna Raj.
Henry Suguna Raj.Henry Suguna Raj.
Henry Suguna Raj.
 
Abubacker Maheen
Abubacker MaheenAbubacker Maheen
Abubacker Maheen
 
PRASHANTH SHETTY
PRASHANTH SHETTYPRASHANTH SHETTY
PRASHANTH SHETTY
 
Mr L Mazimba CV
Mr L Mazimba CVMr L Mazimba CV
Mr L Mazimba CV
 
Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
My resume (1)
My resume  (1)My resume  (1)
My resume (1)
 
CV HENDRA PERMANA R1
CV HENDRA PERMANA R1CV HENDRA PERMANA R1
CV HENDRA PERMANA R1
 
saravana_new2
saravana_new2saravana_new2
saravana_new2
 
c.v moin mech. engg. oil
c.v moin mech. engg. oilc.v moin mech. engg. oil
c.v moin mech. engg. oil
 
LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02
 
0 b a levine mfg qc eng resume
0 b a levine mfg   qc eng resume0 b a levine mfg   qc eng resume
0 b a levine mfg qc eng resume
 
Resume
ResumeResume
Resume
 
resume: Achyut Sagun Kavathankar
resume: Achyut Sagun Kavathankarresume: Achyut Sagun Kavathankar
resume: Achyut Sagun Kavathankar
 
Thiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRPThiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRP
 
Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
CV - Jahangeer Raza
CV - Jahangeer RazaCV - Jahangeer Raza
CV - Jahangeer Raza
 

Resume

  • 1. Sachin A. MAHAJAN . Kavadi Malwadi, In front of Hanuman temple, Post Manjari Farm, Tal Haveli Dist. Pune -412307 (Maharashtra) India Mobile : 0091 9881254387 & 9011052156 Email : sachinmahajan_1984@rediffmail.com samahajan@icloud.com OBJECTIVE I would like to contribute my ability to an organization, which I face challenging business realities in its endeavor to success. AREAS OF EXPERTISE INCLUDES (Post Diploma in Refrigeration & Air Conditioning) & Diploma in Mechanical Engineering having 10+ yrs. of Industry Experience in Project, Production, Quality Assurance, maintenance.  Asst. Manager, Senior Engineer, engineer and Junior engineer in Refrigeration & Air conditioning (Project implementation) from Sep. 07 to till date in Kirloskar Pneumatic LTD.  Hallscrew compressor maintenance.  Area Maintenance Engineer from Dec.06 to Sep. 07 in Eureka Forbes Limited Aurangabad.  1.5year HVAC (Heating Ventilation Air Condition) for Project implementation in Blue Star Limited, Pune.  HVAC PROJECT IN BLUE STAR , PUNE Role : Trainee Project Engineer • Commisioning the Plant within the time frame. • Manpower Handling. • Ducting desigining as per requirement from customer. • To control the system with the help of building management system • Prepration of various documentaion. • Resolving the problems occurred at site. • Attending the daily meetings. • After commisiong the system, to provide the service. EUREKA FORBES LIMITED Role : Area Maintenance Head • Manpower handling
  • 2. • Working in SAP ( R3 production,CRM, MI) • Maintenance of all Nilfisk machines • To Give Training to Technicians • Maintain Costomer Relationship KIRLOSKAR PNEUMATICS CO. LTD. Role : Project Engineer Project Planning. • Planning Document, Procurement, manufacturing schedule of project. • Planning for Critical Activity & Critical Material. • Planning & Scheduling site Activity. • Action & its effectiveness monitoring • Using MS Project Planning & Scheduling the Project Making Material Take-Off List of project • Identification of Actual requirement of material for Project. • Monitoring on Design & Procurement Activity. Project Co-ordination • Maintain Coordination in between various departments. • Co-ordinating with Site & Site Representative. • Maintaining control over erection & Packing activity at manufacturing works as well as on site also. • Generation of Enquiry. • Guidelines to Site as well as to Contractor also. • Solve Technical As well as commercial issue. • Maintain coordination in between Client & company. • Liaison with client for timely completion • Liaison with consultant & inspection agency Commissioning of Plant • Commissioning of Air Conditioning & Refrigaration plants • Recording/ Demonstrating the performance of plant to customer /consultant • Trouble shooting during commissioning & service. • Obtain completion certificates from clients. Project Documentation- • Maintain Project Documentation from Start to End. • Make Progress Reports. • Plan & Maintain the Project Manufacturing Activity. • GENERATING/COMPILE THE O&M MANUALS AND MTO Implementation of Quality Management System : - • Preparing for Audit, ISO audits SKILLS
  • 3. Business Skills: Communications: Interpersonal /Negotiation/Planning skills; Team player Irection Personal Skills Professional Skills a) Goal-Setting & Implementing a) Planning and Execution b) Public Speaking b) Negotiation Skills c) Listening Skills c) Presentation Skills d) Thinking Skills- Logical & Lateral d) Leadership Skills Computer Skills a) Auto CAD b) CAD CAM c) C++ d) DOS, Windows NT, Windows 2000, XP. e) Packages : MS Office 2000 Training /work shops: - Hallscrew compressor maintenance practical workshop at Cecchina compressor facility ( Maqway Internationals) Diakin group of companies Rome Italy. Extracurricular Achievements An active Student of Marshal Arts & won the Gold Meddle in District Level Championship. PERSONAL DETAILS Date of Birth : 04th t Aug. 1984 Marital Status : Married Gender : Male Nationality : Indian Language proficiency : Marathi, Hindi, English Passport : F8067299 ACADEMIC BACKGROUND Year Institution Degree % Marks Remarks 2000 R.R.High School,Jalgao SSC 62.42% I class 2004 New Polytechinc,Bambhori DME 56.74% II Class Jalgaon 2006 Govt.Polytech. Jalgaon PDRAC 63.12% I Class Current CTC Rs. 600000/- p.a. Expected CTC Negotiable. Notice Period Three Month Current Location Pune ( Maharashtra, India ) Passport No. & Validity F8067299 14th May 2016