SlideShare uma empresa Scribd logo
1 de 17
 GPS Team on floor, 20th July 2015, to begin with Fleet Monitoring for Angola.
 Operation Control Plan for Congo in Q4 2015.
 Target Countries – Indonesia, Bolivia, Myanmar
 Completed a Great Successful 01 Year.
 It is an informational work of data entry, made with the
intention of capturing the events (start/load/unload etc.)
from the vehicle trajectory to follow up on a particular trip
until finished.
 It is also known as Trip Analysis Report.
 Data Quality plays important role in this Report as it fits for
intended use in Operations, Decision Making & Planning.
Schedule Control Report
 To identify which Truck should not be ‘on the move’
 Comparison of Data Transmission between
Transics & NVT
 Comparison between ACTUAL & PLANNED
o Drivers
o Vehicle
o Start time of the Trip
All planned trips for day are recorded in NVT.
All trips that are planned are sent to the On Board Computer (OBC).
Drivers are trained & educated to use Transics to log trip information
o Start Trip / End Trip
o Load / End load
o Unload / End Unload
Report will be generated as and when (recommended quarter-hourly) to keep track of what
is planned vs what is happening on the road.
Final, adding your comments in the Last Column of the Report.
TRANSICS
Back Office Data Platform
 mytransics
(https://www.mytransics.com/)
 TX-Connect
 Best friend of a GPS Controller
The Distance from Start to Finish of the Vehicle Movement.
In NaviTrans, Initially, Trip nos. (for Angola) was configured to start with “V-00”. Now, its
configured with “VK-00”.
This is information flow from NaviTrans into Transics
Start Trip
Arrived at
Loading
Start
Load
End
Load
Arrived at
Unloading
Start
Unload
End Unload
& End Trip
 Pink = Not Started
 Orange = Trip in process
 White = Trip finished.
(Truck, if not planned for second trip, should not be ‘moving’)
Dates and times quoted are all per Angolan Hours
Trip Cancelled as per Transics
Trip started, Driving towards Loading
Trip Completed
Trip Started, Loading Done,
Driving towards Unloading
 Well Detailed
 Technology
 Customer Loyalty
 Time Gap
 Individual Differences
 Controller Restrictions
 New Location Ready
 Dynamic Report
 Signal Connectivity
 Sensor Issue
Schedule Control Report-2
Schedule Control Report-2

Mais conteúdo relacionado

Mais procurados

GEOSAT 3D measurement and modelling
GEOSAT 3D measurement and modelling GEOSAT 3D measurement and modelling
GEOSAT 3D measurement and modelling GEOSAT3D
 
Fleet management system mine excellence
Fleet management system  mine excellenceFleet management system  mine excellence
Fleet management system mine excellenceMason Taylor
 
Rancon holding hr & admin yearly report 15-16
Rancon holding hr & admin yearly report 15-16Rancon holding hr & admin yearly report 15-16
Rancon holding hr & admin yearly report 15-16Altaf Siddiqui
 
Hr & admin yearly report 15-16
Hr & admin yearly report 15-16Hr & admin yearly report 15-16
Hr & admin yearly report 15-16Altaf Siddiqui
 
RIPE Atlas & RIPEstat
RIPE Atlas & RIPEstatRIPE Atlas & RIPEstat
RIPE Atlas & RIPEstatRIPE NCC
 

Mais procurados (6)

Resuma 2016
Resuma 2016Resuma 2016
Resuma 2016
 
GEOSAT 3D measurement and modelling
GEOSAT 3D measurement and modelling GEOSAT 3D measurement and modelling
GEOSAT 3D measurement and modelling
 
Fleet management system mine excellence
Fleet management system  mine excellenceFleet management system  mine excellence
Fleet management system mine excellence
 
Rancon holding hr & admin yearly report 15-16
Rancon holding hr & admin yearly report 15-16Rancon holding hr & admin yearly report 15-16
Rancon holding hr & admin yearly report 15-16
 
Hr & admin yearly report 15-16
Hr & admin yearly report 15-16Hr & admin yearly report 15-16
Hr & admin yearly report 15-16
 
RIPE Atlas & RIPEstat
RIPE Atlas & RIPEstatRIPE Atlas & RIPEstat
RIPE Atlas & RIPEstat
 

Destaque

2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1reddvise
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - PresentationHassan Rizwan
 
Managing Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsManaging Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsAGC of California
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJTapesh Ajmera
 
PM Unit III - Project Cash Flows
PM   Unit III - Project Cash FlowsPM   Unit III - Project Cash Flows
PM Unit III - Project Cash FlowsGhaith Al Darmaki
 
Reconciliation of Cost & Financial Accounts
Reconciliation of Cost & Financial AccountsReconciliation of Cost & Financial Accounts
Reconciliation of Cost & Financial AccountsDhrumil Shah
 
1 project cash flow
1 project cash flow1 project cash flow
1 project cash flowBhumit Patel
 
Cost Control
Cost ControlCost Control
Cost Controlmudduckk
 
Cost management
Cost managementCost management
Cost managementshkadry
 
Project scheduling and control techniques
Project scheduling and control techniquesProject scheduling and control techniques
Project scheduling and control techniquesCjkayes CjKayes
 

Destaque (20)

2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 
Accounting and Finance
Accounting and FinanceAccounting and Finance
Accounting and Finance
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - Presentation
 
Managing Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsManaging Cash Flows On Construction Projects
Managing Cash Flows On Construction Projects
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
 
Cost Control Process for Construction
Cost Control Process for ConstructionCost Control Process for Construction
Cost Control Process for Construction
 
Schedule Updates
Schedule UpdatesSchedule Updates
Schedule Updates
 
PM Unit III - Project Cash Flows
PM   Unit III - Project Cash FlowsPM   Unit III - Project Cash Flows
PM Unit III - Project Cash Flows
 
Reconciliation of Cost & Financial Accounts
Reconciliation of Cost & Financial AccountsReconciliation of Cost & Financial Accounts
Reconciliation of Cost & Financial Accounts
 
1 project cash flow
1 project cash flow1 project cash flow
1 project cash flow
 
COST CONTROL
COST CONTROLCOST CONTROL
COST CONTROL
 
Cost Control
Cost ControlCost Control
Cost Control
 
Cost control
Cost controlCost control
Cost control
 
Cost management
Cost managementCost management
Cost management
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
 
Estimation of Cash Flow
Estimation of Cash FlowEstimation of Cash Flow
Estimation of Cash Flow
 
Project scheduling and control techniques
Project scheduling and control techniquesProject scheduling and control techniques
Project scheduling and control techniques
 
Spm unit 4
Spm unit 4Spm unit 4
Spm unit 4
 
Spm unit2
Spm unit2Spm unit2
Spm unit2
 

Semelhante a Schedule Control Report-2

Logistics Transportation Department SUMMER ITERNSHIP REPORT
Logistics Transportation Department SUMMER ITERNSHIP REPORTLogistics Transportation Department SUMMER ITERNSHIP REPORT
Logistics Transportation Department SUMMER ITERNSHIP REPORTSusitra Anandan
 
How to Execute Efficient Route Planning in the Logistics Industry.pptx
How to Execute Efficient Route Planning in the Logistics Industry.pptxHow to Execute Efficient Route Planning in the Logistics Industry.pptx
How to Execute Efficient Route Planning in the Logistics Industry.pptxTrackoBit
 
How to Execute Efficient Route Planning in the Logistics Industry
How to Execute Efficient Route Planning in the Logistics IndustryHow to Execute Efficient Route Planning in the Logistics Industry
How to Execute Efficient Route Planning in the Logistics IndustryTrackoBit
 
Tristar Internship Report
Tristar Internship ReportTristar Internship Report
Tristar Internship ReportAbdul Rauf Agha
 
Infomation Rmit Golden Dragon Eye Updated For Public Use 2010
Infomation Rmit Golden Dragon Eye Updated For Public Use 2010Infomation Rmit Golden Dragon Eye Updated For Public Use 2010
Infomation Rmit Golden Dragon Eye Updated For Public Use 2010Skeye
 
Presentation ITmobile Eurocities Mobility Forum Sofia 2015 Fleetsharing TANC
Presentation ITmobile Eurocities Mobility Forum Sofia 2015 Fleetsharing TANCPresentation ITmobile Eurocities Mobility Forum Sofia 2015 Fleetsharing TANC
Presentation ITmobile Eurocities Mobility Forum Sofia 2015 Fleetsharing TANCITmobile
 
TomTom Presentation.
TomTom Presentation.TomTom Presentation.
TomTom Presentation.alfiepanda
 
TrackYourTruck Vehicle Tracking
TrackYourTruck Vehicle TrackingTrackYourTruck Vehicle Tracking
TrackYourTruck Vehicle Trackingtarasul
 
Company Profile of ECO-COACH & TOURS (M) SDN BHD
Company Profile of ECO-COACH & TOURS (M) SDN BHDCompany Profile of ECO-COACH & TOURS (M) SDN BHD
Company Profile of ECO-COACH & TOURS (M) SDN BHDMarzieh Fallah, PhD
 
Transport & Cash Logistics Management Solution
Transport & Cash Logistics Management Solution Transport & Cash Logistics Management Solution
Transport & Cash Logistics Management Solution fleetrobo
 
Dinah Eremas Resume 2016
Dinah Eremas Resume 2016Dinah Eremas Resume 2016
Dinah Eremas Resume 2016Dinah Eremas
 
Avaal ACE / ACI e-Manifest Border Crossing Portal
Avaal ACE / ACI e-Manifest Border Crossing PortalAvaal ACE / ACI e-Manifest Border Crossing Portal
Avaal ACE / ACI e-Manifest Border Crossing PortalAjay Jha
 
Singapore Electronic Road Pricing System
Singapore Electronic Road Pricing SystemSingapore Electronic Road Pricing System
Singapore Electronic Road Pricing SystemSini Jince
 

Semelhante a Schedule Control Report-2 (20)

Logistics Transportation Department SUMMER ITERNSHIP REPORT
Logistics Transportation Department SUMMER ITERNSHIP REPORTLogistics Transportation Department SUMMER ITERNSHIP REPORT
Logistics Transportation Department SUMMER ITERNSHIP REPORT
 
How to Execute Efficient Route Planning in the Logistics Industry.pptx
How to Execute Efficient Route Planning in the Logistics Industry.pptxHow to Execute Efficient Route Planning in the Logistics Industry.pptx
How to Execute Efficient Route Planning in the Logistics Industry.pptx
 
How to Execute Efficient Route Planning in the Logistics Industry
How to Execute Efficient Route Planning in the Logistics IndustryHow to Execute Efficient Route Planning in the Logistics Industry
How to Execute Efficient Route Planning in the Logistics Industry
 
Tristar Internship Report
Tristar Internship ReportTristar Internship Report
Tristar Internship Report
 
Infomation Rmit Golden Dragon Eye Updated For Public Use 2010
Infomation Rmit Golden Dragon Eye Updated For Public Use 2010Infomation Rmit Golden Dragon Eye Updated For Public Use 2010
Infomation Rmit Golden Dragon Eye Updated For Public Use 2010
 
Presentation ITmobile Eurocities Mobility Forum Sofia 2015 Fleetsharing TANC
Presentation ITmobile Eurocities Mobility Forum Sofia 2015 Fleetsharing TANCPresentation ITmobile Eurocities Mobility Forum Sofia 2015 Fleetsharing TANC
Presentation ITmobile Eurocities Mobility Forum Sofia 2015 Fleetsharing TANC
 
Trade and Investment Forum
Trade and Investment ForumTrade and Investment Forum
Trade and Investment Forum
 
Introducing INFINITE CAB Taxi Dispatch software & Mobile App
Introducing INFINITE CAB Taxi Dispatch software & Mobile AppIntroducing INFINITE CAB Taxi Dispatch software & Mobile App
Introducing INFINITE CAB Taxi Dispatch software & Mobile App
 
TomTom Presentation.
TomTom Presentation.TomTom Presentation.
TomTom Presentation.
 
TrackYourTruck Vehicle Tracking
TrackYourTruck Vehicle TrackingTrackYourTruck Vehicle Tracking
TrackYourTruck Vehicle Tracking
 
SAP - Transportation Module Study material
SAP - Transportation Module Study materialSAP - Transportation Module Study material
SAP - Transportation Module Study material
 
Company Profile of ECO-COACH & TOURS (M) SDN BHD
Company Profile of ECO-COACH & TOURS (M) SDN BHDCompany Profile of ECO-COACH & TOURS (M) SDN BHD
Company Profile of ECO-COACH & TOURS (M) SDN BHD
 
Transport & Cash Logistics Management Solution
Transport & Cash Logistics Management Solution Transport & Cash Logistics Management Solution
Transport & Cash Logistics Management Solution
 
Dinah Eremas Resume 2016
Dinah Eremas Resume 2016Dinah Eremas Resume 2016
Dinah Eremas Resume 2016
 
Avaal ACE / ACI e-Manifest Border Crossing Portal
Avaal ACE / ACI e-Manifest Border Crossing PortalAvaal ACE / ACI e-Manifest Border Crossing Portal
Avaal ACE / ACI e-Manifest Border Crossing Portal
 
Bransys GPS
Bransys GPSBransys GPS
Bransys GPS
 
Singapore Electronic Road Pricing System
Singapore Electronic Road Pricing SystemSingapore Electronic Road Pricing System
Singapore Electronic Road Pricing System
 
B04401014016
B04401014016B04401014016
B04401014016
 
Resume-1
Resume-1Resume-1
Resume-1
 
Technocratz
TechnocratzTechnocratz
Technocratz
 

Schedule Control Report-2

  • 1.
  • 2.  GPS Team on floor, 20th July 2015, to begin with Fleet Monitoring for Angola.  Operation Control Plan for Congo in Q4 2015.  Target Countries – Indonesia, Bolivia, Myanmar  Completed a Great Successful 01 Year.
  • 3.  It is an informational work of data entry, made with the intention of capturing the events (start/load/unload etc.) from the vehicle trajectory to follow up on a particular trip until finished.  It is also known as Trip Analysis Report.  Data Quality plays important role in this Report as it fits for intended use in Operations, Decision Making & Planning. Schedule Control Report
  • 4.  To identify which Truck should not be ‘on the move’  Comparison of Data Transmission between Transics & NVT  Comparison between ACTUAL & PLANNED o Drivers o Vehicle o Start time of the Trip
  • 5. All planned trips for day are recorded in NVT. All trips that are planned are sent to the On Board Computer (OBC). Drivers are trained & educated to use Transics to log trip information o Start Trip / End Trip o Load / End load o Unload / End Unload Report will be generated as and when (recommended quarter-hourly) to keep track of what is planned vs what is happening on the road. Final, adding your comments in the Last Column of the Report.
  • 6. TRANSICS Back Office Data Platform  mytransics (https://www.mytransics.com/)  TX-Connect  Best friend of a GPS Controller
  • 7. The Distance from Start to Finish of the Vehicle Movement. In NaviTrans, Initially, Trip nos. (for Angola) was configured to start with “V-00”. Now, its configured with “VK-00”. This is information flow from NaviTrans into Transics Start Trip Arrived at Loading Start Load End Load Arrived at Unloading Start Unload End Unload & End Trip
  • 8.  Pink = Not Started  Orange = Trip in process  White = Trip finished. (Truck, if not planned for second trip, should not be ‘moving’)
  • 9. Dates and times quoted are all per Angolan Hours Trip Cancelled as per Transics Trip started, Driving towards Loading Trip Completed Trip Started, Loading Done, Driving towards Unloading
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.  Well Detailed  Technology  Customer Loyalty  Time Gap  Individual Differences  Controller Restrictions
  • 15.  New Location Ready  Dynamic Report  Signal Connectivity  Sensor Issue