BHAKRA WATER SERVICES CIRCLE,
SIRSA
Welcome
List of works of Rania
Constituency as on 03.05.2023
(In Progress & yet to be started)
ABSTRACT
Status of Work
No. of
Works
Amount
(In Lakh)
Works in progress 7 2076.52
AA Accorded & work yet to be
startted
15 3634.08
AA under process 3 3505.43
Total No of Works 25 9216.03
Detail of Works In Progress
Sr.
No.
Description Amount
(in lacs)
Date of
start of
work
Likely
date of
completio
n
No. of
Benifitted
Villages
Name of Benifitted Villages Status
1 Remodelling of Ghaggar Bani Sadewa
Mammerkhera Link Channel from RD. 0-
22000 off-taking at 29500-R of River
Ghaggar i/c E/Work excavation,
Construction of Head Regulator,
Aqueducts, V.R. Bridges and W/C x-ing's
1030.38 05.03.2019 31.12.2022 23 Balasar, Dhottar,
Dhudianwali, Dhanoor,
Fatehpuria, Gindran,
Jhorarnali, Kharian, Kussar,
Khajakhera, Mangalia,
Mohamadpuria,
Mehnakhera, Nanuana,
Naiwala, Ottu, Rania,
Sultanpuria, Sant Nagar,
Chakkan, Bhuna, Ghoranwali,
Sadewala & Mathuwala
Completed & worthy
CE/BWS/Irr.&W.R. Depttt. has
directed vide his office No.
26/NABARD/2022 dt. 04.01.2022
that the work may be finalized.
2 Remodelling for remodelling of Balasar
Minor from RD. 0 - 28200-Tail off-taking
at RD. 67270-L Bani Disty. (under State
Plan)
311.21 12.07.2022 11.07.2023 7 Fatehpuria, Rania, Nanuana,
Mohmadpuria, Balasar,
Bharolanwali & Sant Nagar
95% completed & balance work is
in progress
3 Remodelling for remodelling of Nanuana
Minor from RD. 0 - 14600-Tail off-taking
at RD. 58465-L Bani Disty. (under State
Plan)
164.32 09.08.2022 09.08.2023 5 Sultanpuria, Nanuana, Rania,
Abholi & Ottu.
90% completed & balance work is
in progress
4 Remodelling for remodelling of Abutgarh
Disty. from RD. 0 - 58105-Tail off-taking
at RD. 109500-TL Rori Branch (under
State Plan)
394.36 18.09.2022 17.09.2023 10 Panjuana, Burj Bhangu,
Khairekan, Saharani,
Bansudhar, Chamal,
Jhorarnali, Dhanoor,
Abutgarh & Ottu
91% completed & balance work is
in progress
5 Construction of Balasar Kharif Channel
from RD 0 to 12500 tail I/C earthwork
excavation on bridges W/C xing from RD
0 to tail (Balance work)
91.21 05.05.2022 31.03.2024 3 Balasar Dhani, Fatehpuria &
Mohmmadpuria
99% work completed site balance
is progress.
6 Remodelling of W/C of O/L RD. 13000-TC
Peerkhera Minor (Balance work 1695 rft)
6.63 12.07.2022 31.03.2023 3 Bukharakhera, Peerkhera &
Kharian.
96% completed & balance work is
in progress
7 Remodelling of W/C of O/L RD. 87480-L
Sadewa Disty. (C.M. Ann. Code No. 25437
dt. 08.03.2020). (Length 22677')
78.41 13.01.2022 31.03.2023 2 Ghoranwali & Kussasr 94% work completed and balance
work has been stopped due to
Court Case.
Total 2076.52
Detail of Works yet to be started
Sr.
No.
Description Amount
(in lacs)
Likely
date of
start of
work
Likely
date of
completio
n
No. of
Benefitted
Villages
Name of Benifitted
Villages
Status
1 Estimate for construction of an escape
for Hisar Ghaggar Multipurpose Drain
for 750 cs. At its outfall to river Ghaggar
by siphoning under Sheranwali parallel
channel, Southern Ghaggar Canal (Lined
and Unlined) and Ghaggar bandh.
394.95 12.05.2023 …… 6 Ottu, Firozabad, Moujdin,
Gindranwali, Dhani Partap
Singh, Chakraian
The agreement has been made &
the work will be started upto
12.05.2023.
2 Estimate For Construction of an
alternate Escape for Hisar Ghaggar Multi
Purpose Drain to Southern Ghaggar
Canal-Unlined at RD 5400 under
Sheranwali Parallel Channel and lifting
through electrical pumps.
152.92 …… …… 6 Ottu, Firozabad, Moujdin,
Gindranwali, Dhani Partap
Singh, Chakraian
The tender opened on dated
02.05.2023. The work will be
started after completing all
departmental formalties.
3 ESTIMATE FOR INLET & OUTLET
CONNECTING FOR VILLAGE POND OF
VILLAGE BALASAR (NEAR MAIN
CHOWK, GOGA MEDI & ALONG BABA
RAMDEV JI MANDIR) DISTRICT SIRSA
WITH RCC PIPE FROM 19500/R
BALASAR MINOR
16.10 20.05.2023 31.12.2023 1 Balasar Tender have been called/opened
on dt. 02.05.2023 & tender
allotment is under process.
4 Agenda Note for Internal Clearance of
Naiwala Kharif Channel from RD 0-
51000 off-taking at RD 22000-L GBSM
Link Channel.
15.78 15.05.2023 30.06.2023 18 Dhottar, Fatehpuria,
Mangalia, Nanuana, Balasar
& Kussar
The tender rates have been
approved and work will be
started up to 15.05.2023
5 Estimate for remodeling of MMK Disty.
from RD. 1347010 – 158500 off-taking
at RD. 258000-L B.M.B.
427.17 01.08.2023 31.03.2024 8 Chakkan, Bhuna, Ramgarh,
Banwala, Gindran,
Sadewala, Keharwala, Chak
Faridpur
Detailed estimate has been
approved/sanction on dt.
03.05.2023. Tender yet to be
called.
6 Re-construction of damaged V.R. Bridge
at RD. 10200 Bani Disty.
47.15 15.07.2023 31.12.2023 2 Khairekan & Panjuana The rough cost estimate has been
approved on dated 17.03.2023.
The deatil estimate stand
submitted on dated 25.04.2023
for sanction.
Sr.
No.
Description Amount
(in lacs)
Likely
date of
start of
work
Likely
date of
completio
n
No. of
Benefitted
Villages
Name of Benifitted
Villages
Status
7 Re-construction of damaged V.R. Bridge
at RD. 24784 Bani Disty.
50.27 15.07.2023 31.12.2023 2 Fatehpur Niamatkhan &
Chamal
The rough cost estimate has been
approved on dated 25.03.2023.
The deatil estimate stand
submitted on dated 26.04.2023
for sanction.
8 Lining of W/C of O/L RD. 21000-L Bani
Disty. (Ext. 9240 rft.)
42.77 15.06.2023 31.12.2023 2 Sheikhupuria & Chamal The rough cost estimate has been
approved on dated 20.03.2023.
The deatil estimate stand
submitted on dated 25.04.2023
for sanction.
9 Estimate for remodeling of Mehnakhera
Minor from RD. 0 – 11500-Tail off-
taking at RD. 70000-L Sadewa Disty.
89.42 01.08.2023 31.03.2024 4 Mehna Khera, Kharia,
Fatehpuria, Kussar.
Rough cost estimate has been
approved on dt. 16.11.2022.
Detailed estimate has been re-
submitted on dt. 16.02.2023 for
sanction.
10 Estimate for remodeling of Sadewa
Disty. from RD. 0 – 99000 off-taking at
RD. 68000-L MMK Disty.
1493.96 17.08.2023 31.08.2024 19 Raghuana, Baragudha,
Chhatrian, Bhangu,
Sahuwala 1st, Khuyian
Nepalpur, PanniwalaMota,
Karamgarh, Moranwali,
Fatehpur Niamatkhan,
Peerkhera, Jodhpuria,
Darewala,
Kharian,Mehnakhera
Bhuna, Kussar, Ghoranwali,
Chakkan, Gindran &
Sadewala etc.
Rough cost estimate has been
approved on dt. 09.01.2023.
Detailed estimate is under
preparation in Division office.
11 Re-construction of damaged V.R. Bridge
at RD. 68498 Bani Disty.
37.60 03.09.2023 31.03.2024 2 Fatehpuria &
Mohamadpuria
Rough cost estimate has been
approved on dt. 28.01.2023. A/A
re-submitted through e-office on
dt. 02.05.2023.
12 Lining of W/C of O/L RD. 87480-L
Sadewa Disty. (Ext. 6754 rft.)
34.83 20.07.2023 31.03.2024 2 Ghoranwali & Kussasr The rough cost estimate was
submitted on dt. 11.04.2023 but
received back for compliance on
dated 03.05.2023.
Sr.
No.
Description Amount
(in lacs)
Likely
date of
start of
work
Likely
date of
completio
n
No. of
Benefitted
Villages
Name of Benifitted
Villages
Status
13 ESTIMATE FOR INLET CONNECTION
FOR VILLAGE POND OF VILLAGE
FATHEPUR NIMAT KHAN (NEAR GOGA
MEDI) DISTRICT SIRSA WITH RCC PIPE
FROM 25000/R BANI DISTY.
29.88 20.07.202
3
31.03.202
4
1 Fatehpur Nimat Khan Admn. app. has been accorded on
dt. 04.10.2022. The estimate is
under preparation in Division
office.
14 ESTIMATE FOR CONNECTION FOR
VILLAGE POND OF VILLAGE KHARIA
(AT MEHTA MOHALLA FIRNI) DISTRICT
SIRSA WITH RCC PIPE FROM RD
65000/R SADEWA DISTY (INLET) & RD
5400/R SADEWA PARALLEL CHANNEL
(OUTLET).
2.28 20.07.202
3
31.03.202
4
1 Khariyan The rough cost estimate was
submitted but received back for
compliance on dated 03.05.2023.
15 Construction of extension of Branch of
Rattakhera Kharif Channel from RD
29200-41050-Tail off-taking at RD.
20000-R of Rattakhera Kharif Channel
799.00 4.12.2023 31.12.202
4
2 Sahuwala–I and Panniwala
Motta
Govt. has approved the proposal
for grant of permission for
purchase of 24.965 acres land
through e-bhoomi portal vide
memo No. 1IW-
280070/54/2022-XEN/BWS
dated Chandigarh, the 2nd
January, 2023. The same is under
process.
TOTAL 3634.08
AA under process
Sr.
No.
Description Amount
(in lacs)
Likely
date of
start of
work
Likely
date of
completio
n
No. of
Benefitted
Villages
Name of Benifitted
Villages
Status
1 Construction of Sultanpuria Kharif
Channel 1
st
from RD 0 – 18400-Tail off-
taking at RD.15700-L G.B.S.M. Link
Channel.
1064.23 01.12.2023 31.12.2024 6 Dhottar, Dhanoor, Ottu,
Sultanpuria, Nanuana and
Rania
The design/drawing of
underground pipeline, Head
Regulator, Haudi and pipe culvert
for the work of construction is
under process.
2 Construction of Sultanpuria Kharif
Channel 2nd from RD. 0 - 26000-Tail off-
taking at RD. 19800 R River Ghaggar.
2121.06 01.12.2023 31.12.2024 7 Dhanoor, Ottu, Sultanpuria,
Jhoranwali, Abutgarh,
Abholi and Rania
The design/drawing of
underground pipeline, Head
Regulator, Haudi and pipe culvert
for the work of construction is
under process.
3 Estimate for construction of syphon at
RD 1700 NGC and concrete lining of NGC
from its head to proposed syphon.
320.14 ……. …… 5 Ottu, Firozabad, Moujdin,
Gindranwali, Rania
The rough cost estimate has been
submitted to higher office
through HEWP. But same was
received back with some
observations. The same may be
submitted after compliance upto
12.05.2023.
TOTAL 3505.43
THANK YOU

Mais conteúdo relacionado

Semelhante a Rania Constituency.pptx

1.Monday_31.01.2022.pptx
1.Monday_31.01.2022.pptx1.Monday_31.01.2022.pptx
1.Monday_31.01.2022.pptxsuresh992118
 
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...RAHULKUMARSAW1
 
Presentation 1
Presentation 1Presentation 1
Presentation 1Baig Ali
 
Review of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptxReview of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptxMayankGandhi51
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxssuser3797b9
 
Line Deptt. Convergence Meeting_21-04-23.ppt
Line Deptt. Convergence Meeting_21-04-23.pptLine Deptt. Convergence Meeting_21-04-23.ppt
Line Deptt. Convergence Meeting_21-04-23.pptbhadratanusenapati1
 
Projects Review Report
Projects  Review ReportProjects  Review Report
Projects Review ReportRamuSekar4
 
PPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptxPPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptxSaketChandra4
 
Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Munir Hussain
 
1. CM Review Meeting-ATP-20-10-2022.pptx
1. CM Review Meeting-ATP-20-10-2022.pptx1. CM Review Meeting-ATP-20-10-2022.pptx
1. CM Review Meeting-ATP-20-10-2022.pptxEEMINandyal
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019Gensol Engineering Limited
 
Review_Key Infra Projects Mar 2021.pptx
Review_Key Infra Projects Mar 2021.pptxReview_Key Infra Projects Mar 2021.pptx
Review_Key Infra Projects Mar 2021.pptxSubhasishNath7
 
Dwarka expressway road of opportunies and abundance
Dwarka expressway  road of opportunies and abundanceDwarka expressway  road of opportunies and abundance
Dwarka expressway road of opportunies and abundanceEthical Consulting
 
Jirapur susner-mp-rj-border road ppt...7.01.19
Jirapur susner-mp-rj-border road ppt...7.01.19Jirapur susner-mp-rj-border road ppt...7.01.19
Jirapur susner-mp-rj-border road ppt...7.01.19ChandrakantSoni5
 
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptxPkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptxVenkatesh Dontha
 
Engineering performance reivew for GM ADB-MUE.pptx
Engineering performance reivew for GM ADB-MUE.pptxEngineering performance reivew for GM ADB-MUE.pptx
Engineering performance reivew for GM ADB-MUE.pptxFaizanRaza76
 
PPT on Solid Waste Management in Ganga Towns
PPT on Solid Waste Management in Ganga Towns PPT on Solid Waste Management in Ganga Towns
PPT on Solid Waste Management in Ganga Towns Dr Rajesh Kumar Prajapati
 
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019Das A. K.
 

Semelhante a Rania Constituency.pptx (20)

1.Monday_31.01.2022.pptx
1.Monday_31.01.2022.pptx1.Monday_31.01.2022.pptx
1.Monday_31.01.2022.pptx
 
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
 
Presentation 1
Presentation 1Presentation 1
Presentation 1
 
Review of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptxReview of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptx
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
 
Line Deptt. Convergence Meeting_21-04-23.ppt
Line Deptt. Convergence Meeting_21-04-23.pptLine Deptt. Convergence Meeting_21-04-23.ppt
Line Deptt. Convergence Meeting_21-04-23.ppt
 
Projects Review Report
Projects  Review ReportProjects  Review Report
Projects Review Report
 
PPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptxPPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptx
 
Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019
 
1. CM Review Meeting-ATP-20-10-2022.pptx
1. CM Review Meeting-ATP-20-10-2022.pptx1. CM Review Meeting-ATP-20-10-2022.pptx
1. CM Review Meeting-ATP-20-10-2022.pptx
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
 
Review_Key Infra Projects Mar 2021.pptx
Review_Key Infra Projects Mar 2021.pptxReview_Key Infra Projects Mar 2021.pptx
Review_Key Infra Projects Mar 2021.pptx
 
Dwarka expressway road of opportunies and abundance
Dwarka expressway  road of opportunies and abundanceDwarka expressway  road of opportunies and abundance
Dwarka expressway road of opportunies and abundance
 
Jirapur susner-mp-rj-border road ppt...7.01.19
Jirapur susner-mp-rj-border road ppt...7.01.19Jirapur susner-mp-rj-border road ppt...7.01.19
Jirapur susner-mp-rj-border road ppt...7.01.19
 
Dwarka expressway the golden road (1)
Dwarka expressway   the golden road (1)Dwarka expressway   the golden road (1)
Dwarka expressway the golden road (1)
 
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptxPkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
 
New mandovi bridge
New mandovi bridgeNew mandovi bridge
New mandovi bridge
 
Engineering performance reivew for GM ADB-MUE.pptx
Engineering performance reivew for GM ADB-MUE.pptxEngineering performance reivew for GM ADB-MUE.pptx
Engineering performance reivew for GM ADB-MUE.pptx
 
PPT on Solid Waste Management in Ganga Towns
PPT on Solid Waste Management in Ganga Towns PPT on Solid Waste Management in Ganga Towns
PPT on Solid Waste Management in Ganga Towns
 
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
 

Último

办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样umasea
 
Unit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfUnit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfRajjnish1
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsprasan26
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyKristineRoseCorrales
 
Slide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian ParliamentariansSlide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian Parliamentariansipcc-media
 
Making a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceMaking a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceSwag Cycle
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...CIFOR-ICRAF
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 
Water Conservation.pptxfgggggggggggggggggggggggggggggggggggggg
Water Conservation.pptxfggggggggggggggggggggggggggggggggggggggWater Conservation.pptxfgggggggggggggggggggggggggggggggggggggg
Water Conservation.pptxfggggggggggggggggggggggggggggggggggggggkhulekanimkhize2
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdfsrivastavaakshat51
 
Call Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any TimeCall Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any Timedelhimodelshub1
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhidelih Escorts
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfTheaMan11
 

Último (20)

办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
 
Unit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfUnit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdf
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnids
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copy
 
Slide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian ParliamentariansSlide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian Parliamentarians
 
Making a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceMaking a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling Difference
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 
Water Conservation.pptxfgggggggggggggggggggggggggggggggggggggg
Water Conservation.pptxfggggggggggggggggggggggggggggggggggggggWater Conservation.pptxfgggggggggggggggggggggggggggggggggggggg
Water Conservation.pptxfgggggggggggggggggggggggggggggggggggggg
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
Call Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any TimeCall Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any Time
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdf
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 

Rania Constituency.pptx

  • 1. BHAKRA WATER SERVICES CIRCLE, SIRSA Welcome List of works of Rania Constituency as on 03.05.2023 (In Progress & yet to be started)
  • 2. ABSTRACT Status of Work No. of Works Amount (In Lakh) Works in progress 7 2076.52 AA Accorded & work yet to be startted 15 3634.08 AA under process 3 3505.43 Total No of Works 25 9216.03
  • 3. Detail of Works In Progress Sr. No. Description Amount (in lacs) Date of start of work Likely date of completio n No. of Benifitted Villages Name of Benifitted Villages Status 1 Remodelling of Ghaggar Bani Sadewa Mammerkhera Link Channel from RD. 0- 22000 off-taking at 29500-R of River Ghaggar i/c E/Work excavation, Construction of Head Regulator, Aqueducts, V.R. Bridges and W/C x-ing's 1030.38 05.03.2019 31.12.2022 23 Balasar, Dhottar, Dhudianwali, Dhanoor, Fatehpuria, Gindran, Jhorarnali, Kharian, Kussar, Khajakhera, Mangalia, Mohamadpuria, Mehnakhera, Nanuana, Naiwala, Ottu, Rania, Sultanpuria, Sant Nagar, Chakkan, Bhuna, Ghoranwali, Sadewala & Mathuwala Completed & worthy CE/BWS/Irr.&W.R. Depttt. has directed vide his office No. 26/NABARD/2022 dt. 04.01.2022 that the work may be finalized. 2 Remodelling for remodelling of Balasar Minor from RD. 0 - 28200-Tail off-taking at RD. 67270-L Bani Disty. (under State Plan) 311.21 12.07.2022 11.07.2023 7 Fatehpuria, Rania, Nanuana, Mohmadpuria, Balasar, Bharolanwali & Sant Nagar 95% completed & balance work is in progress 3 Remodelling for remodelling of Nanuana Minor from RD. 0 - 14600-Tail off-taking at RD. 58465-L Bani Disty. (under State Plan) 164.32 09.08.2022 09.08.2023 5 Sultanpuria, Nanuana, Rania, Abholi & Ottu. 90% completed & balance work is in progress 4 Remodelling for remodelling of Abutgarh Disty. from RD. 0 - 58105-Tail off-taking at RD. 109500-TL Rori Branch (under State Plan) 394.36 18.09.2022 17.09.2023 10 Panjuana, Burj Bhangu, Khairekan, Saharani, Bansudhar, Chamal, Jhorarnali, Dhanoor, Abutgarh & Ottu 91% completed & balance work is in progress 5 Construction of Balasar Kharif Channel from RD 0 to 12500 tail I/C earthwork excavation on bridges W/C xing from RD 0 to tail (Balance work) 91.21 05.05.2022 31.03.2024 3 Balasar Dhani, Fatehpuria & Mohmmadpuria 99% work completed site balance is progress. 6 Remodelling of W/C of O/L RD. 13000-TC Peerkhera Minor (Balance work 1695 rft) 6.63 12.07.2022 31.03.2023 3 Bukharakhera, Peerkhera & Kharian. 96% completed & balance work is in progress 7 Remodelling of W/C of O/L RD. 87480-L Sadewa Disty. (C.M. Ann. Code No. 25437 dt. 08.03.2020). (Length 22677') 78.41 13.01.2022 31.03.2023 2 Ghoranwali & Kussasr 94% work completed and balance work has been stopped due to Court Case. Total 2076.52
  • 4. Detail of Works yet to be started Sr. No. Description Amount (in lacs) Likely date of start of work Likely date of completio n No. of Benefitted Villages Name of Benifitted Villages Status 1 Estimate for construction of an escape for Hisar Ghaggar Multipurpose Drain for 750 cs. At its outfall to river Ghaggar by siphoning under Sheranwali parallel channel, Southern Ghaggar Canal (Lined and Unlined) and Ghaggar bandh. 394.95 12.05.2023 …… 6 Ottu, Firozabad, Moujdin, Gindranwali, Dhani Partap Singh, Chakraian The agreement has been made & the work will be started upto 12.05.2023. 2 Estimate For Construction of an alternate Escape for Hisar Ghaggar Multi Purpose Drain to Southern Ghaggar Canal-Unlined at RD 5400 under Sheranwali Parallel Channel and lifting through electrical pumps. 152.92 …… …… 6 Ottu, Firozabad, Moujdin, Gindranwali, Dhani Partap Singh, Chakraian The tender opened on dated 02.05.2023. The work will be started after completing all departmental formalties. 3 ESTIMATE FOR INLET & OUTLET CONNECTING FOR VILLAGE POND OF VILLAGE BALASAR (NEAR MAIN CHOWK, GOGA MEDI & ALONG BABA RAMDEV JI MANDIR) DISTRICT SIRSA WITH RCC PIPE FROM 19500/R BALASAR MINOR 16.10 20.05.2023 31.12.2023 1 Balasar Tender have been called/opened on dt. 02.05.2023 & tender allotment is under process. 4 Agenda Note for Internal Clearance of Naiwala Kharif Channel from RD 0- 51000 off-taking at RD 22000-L GBSM Link Channel. 15.78 15.05.2023 30.06.2023 18 Dhottar, Fatehpuria, Mangalia, Nanuana, Balasar & Kussar The tender rates have been approved and work will be started up to 15.05.2023 5 Estimate for remodeling of MMK Disty. from RD. 1347010 – 158500 off-taking at RD. 258000-L B.M.B. 427.17 01.08.2023 31.03.2024 8 Chakkan, Bhuna, Ramgarh, Banwala, Gindran, Sadewala, Keharwala, Chak Faridpur Detailed estimate has been approved/sanction on dt. 03.05.2023. Tender yet to be called. 6 Re-construction of damaged V.R. Bridge at RD. 10200 Bani Disty. 47.15 15.07.2023 31.12.2023 2 Khairekan & Panjuana The rough cost estimate has been approved on dated 17.03.2023. The deatil estimate stand submitted on dated 25.04.2023 for sanction.
  • 5. Sr. No. Description Amount (in lacs) Likely date of start of work Likely date of completio n No. of Benefitted Villages Name of Benifitted Villages Status 7 Re-construction of damaged V.R. Bridge at RD. 24784 Bani Disty. 50.27 15.07.2023 31.12.2023 2 Fatehpur Niamatkhan & Chamal The rough cost estimate has been approved on dated 25.03.2023. The deatil estimate stand submitted on dated 26.04.2023 for sanction. 8 Lining of W/C of O/L RD. 21000-L Bani Disty. (Ext. 9240 rft.) 42.77 15.06.2023 31.12.2023 2 Sheikhupuria & Chamal The rough cost estimate has been approved on dated 20.03.2023. The deatil estimate stand submitted on dated 25.04.2023 for sanction. 9 Estimate for remodeling of Mehnakhera Minor from RD. 0 – 11500-Tail off- taking at RD. 70000-L Sadewa Disty. 89.42 01.08.2023 31.03.2024 4 Mehna Khera, Kharia, Fatehpuria, Kussar. Rough cost estimate has been approved on dt. 16.11.2022. Detailed estimate has been re- submitted on dt. 16.02.2023 for sanction. 10 Estimate for remodeling of Sadewa Disty. from RD. 0 – 99000 off-taking at RD. 68000-L MMK Disty. 1493.96 17.08.2023 31.08.2024 19 Raghuana, Baragudha, Chhatrian, Bhangu, Sahuwala 1st, Khuyian Nepalpur, PanniwalaMota, Karamgarh, Moranwali, Fatehpur Niamatkhan, Peerkhera, Jodhpuria, Darewala, Kharian,Mehnakhera Bhuna, Kussar, Ghoranwali, Chakkan, Gindran & Sadewala etc. Rough cost estimate has been approved on dt. 09.01.2023. Detailed estimate is under preparation in Division office. 11 Re-construction of damaged V.R. Bridge at RD. 68498 Bani Disty. 37.60 03.09.2023 31.03.2024 2 Fatehpuria & Mohamadpuria Rough cost estimate has been approved on dt. 28.01.2023. A/A re-submitted through e-office on dt. 02.05.2023. 12 Lining of W/C of O/L RD. 87480-L Sadewa Disty. (Ext. 6754 rft.) 34.83 20.07.2023 31.03.2024 2 Ghoranwali & Kussasr The rough cost estimate was submitted on dt. 11.04.2023 but received back for compliance on dated 03.05.2023.
  • 6. Sr. No. Description Amount (in lacs) Likely date of start of work Likely date of completio n No. of Benefitted Villages Name of Benifitted Villages Status 13 ESTIMATE FOR INLET CONNECTION FOR VILLAGE POND OF VILLAGE FATHEPUR NIMAT KHAN (NEAR GOGA MEDI) DISTRICT SIRSA WITH RCC PIPE FROM 25000/R BANI DISTY. 29.88 20.07.202 3 31.03.202 4 1 Fatehpur Nimat Khan Admn. app. has been accorded on dt. 04.10.2022. The estimate is under preparation in Division office. 14 ESTIMATE FOR CONNECTION FOR VILLAGE POND OF VILLAGE KHARIA (AT MEHTA MOHALLA FIRNI) DISTRICT SIRSA WITH RCC PIPE FROM RD 65000/R SADEWA DISTY (INLET) & RD 5400/R SADEWA PARALLEL CHANNEL (OUTLET). 2.28 20.07.202 3 31.03.202 4 1 Khariyan The rough cost estimate was submitted but received back for compliance on dated 03.05.2023. 15 Construction of extension of Branch of Rattakhera Kharif Channel from RD 29200-41050-Tail off-taking at RD. 20000-R of Rattakhera Kharif Channel 799.00 4.12.2023 31.12.202 4 2 Sahuwala–I and Panniwala Motta Govt. has approved the proposal for grant of permission for purchase of 24.965 acres land through e-bhoomi portal vide memo No. 1IW- 280070/54/2022-XEN/BWS dated Chandigarh, the 2nd January, 2023. The same is under process. TOTAL 3634.08
  • 7. AA under process Sr. No. Description Amount (in lacs) Likely date of start of work Likely date of completio n No. of Benefitted Villages Name of Benifitted Villages Status 1 Construction of Sultanpuria Kharif Channel 1 st from RD 0 – 18400-Tail off- taking at RD.15700-L G.B.S.M. Link Channel. 1064.23 01.12.2023 31.12.2024 6 Dhottar, Dhanoor, Ottu, Sultanpuria, Nanuana and Rania The design/drawing of underground pipeline, Head Regulator, Haudi and pipe culvert for the work of construction is under process. 2 Construction of Sultanpuria Kharif Channel 2nd from RD. 0 - 26000-Tail off- taking at RD. 19800 R River Ghaggar. 2121.06 01.12.2023 31.12.2024 7 Dhanoor, Ottu, Sultanpuria, Jhoranwali, Abutgarh, Abholi and Rania The design/drawing of underground pipeline, Head Regulator, Haudi and pipe culvert for the work of construction is under process. 3 Estimate for construction of syphon at RD 1700 NGC and concrete lining of NGC from its head to proposed syphon. 320.14 ……. …… 5 Ottu, Firozabad, Moujdin, Gindranwali, Rania The rough cost estimate has been submitted to higher office through HEWP. But same was received back with some observations. The same may be submitted after compliance upto 12.05.2023. TOTAL 3505.43