1. BHAKRA WATER SERVICES CIRCLE,
SIRSA
Welcome
List of works of Rania
Constituency as on 03.05.2023
(In Progress & yet to be started)
2. ABSTRACT
Status of Work
No. of
Works
Amount
(In Lakh)
Works in progress 7 2076.52
AA Accorded & work yet to be
startted
15 3634.08
AA under process 3 3505.43
Total No of Works 25 9216.03
3. Detail of Works In Progress
Sr.
No.
Description Amount
(in lacs)
Date of
start of
work
Likely
date of
completio
n
No. of
Benifitted
Villages
Name of Benifitted Villages Status
1 Remodelling of Ghaggar Bani Sadewa
Mammerkhera Link Channel from RD. 0-
22000 off-taking at 29500-R of River
Ghaggar i/c E/Work excavation,
Construction of Head Regulator,
Aqueducts, V.R. Bridges and W/C x-ing's
1030.38 05.03.2019 31.12.2022 23 Balasar, Dhottar,
Dhudianwali, Dhanoor,
Fatehpuria, Gindran,
Jhorarnali, Kharian, Kussar,
Khajakhera, Mangalia,
Mohamadpuria,
Mehnakhera, Nanuana,
Naiwala, Ottu, Rania,
Sultanpuria, Sant Nagar,
Chakkan, Bhuna, Ghoranwali,
Sadewala & Mathuwala
Completed & worthy
CE/BWS/Irr.&W.R. Depttt. has
directed vide his office No.
26/NABARD/2022 dt. 04.01.2022
that the work may be finalized.
2 Remodelling for remodelling of Balasar
Minor from RD. 0 - 28200-Tail off-taking
at RD. 67270-L Bani Disty. (under State
Plan)
311.21 12.07.2022 11.07.2023 7 Fatehpuria, Rania, Nanuana,
Mohmadpuria, Balasar,
Bharolanwali & Sant Nagar
95% completed & balance work is
in progress
3 Remodelling for remodelling of Nanuana
Minor from RD. 0 - 14600-Tail off-taking
at RD. 58465-L Bani Disty. (under State
Plan)
164.32 09.08.2022 09.08.2023 5 Sultanpuria, Nanuana, Rania,
Abholi & Ottu.
90% completed & balance work is
in progress
4 Remodelling for remodelling of Abutgarh
Disty. from RD. 0 - 58105-Tail off-taking
at RD. 109500-TL Rori Branch (under
State Plan)
394.36 18.09.2022 17.09.2023 10 Panjuana, Burj Bhangu,
Khairekan, Saharani,
Bansudhar, Chamal,
Jhorarnali, Dhanoor,
Abutgarh & Ottu
91% completed & balance work is
in progress
5 Construction of Balasar Kharif Channel
from RD 0 to 12500 tail I/C earthwork
excavation on bridges W/C xing from RD
0 to tail (Balance work)
91.21 05.05.2022 31.03.2024 3 Balasar Dhani, Fatehpuria &
Mohmmadpuria
99% work completed site balance
is progress.
6 Remodelling of W/C of O/L RD. 13000-TC
Peerkhera Minor (Balance work 1695 rft)
6.63 12.07.2022 31.03.2023 3 Bukharakhera, Peerkhera &
Kharian.
96% completed & balance work is
in progress
7 Remodelling of W/C of O/L RD. 87480-L
Sadewa Disty. (C.M. Ann. Code No. 25437
dt. 08.03.2020). (Length 22677')
78.41 13.01.2022 31.03.2023 2 Ghoranwali & Kussasr 94% work completed and balance
work has been stopped due to
Court Case.
Total 2076.52
4. Detail of Works yet to be started
Sr.
No.
Description Amount
(in lacs)
Likely
date of
start of
work
Likely
date of
completio
n
No. of
Benefitted
Villages
Name of Benifitted
Villages
Status
1 Estimate for construction of an escape
for Hisar Ghaggar Multipurpose Drain
for 750 cs. At its outfall to river Ghaggar
by siphoning under Sheranwali parallel
channel, Southern Ghaggar Canal (Lined
and Unlined) and Ghaggar bandh.
394.95 12.05.2023 …… 6 Ottu, Firozabad, Moujdin,
Gindranwali, Dhani Partap
Singh, Chakraian
The agreement has been made &
the work will be started upto
12.05.2023.
2 Estimate For Construction of an
alternate Escape for Hisar Ghaggar Multi
Purpose Drain to Southern Ghaggar
Canal-Unlined at RD 5400 under
Sheranwali Parallel Channel and lifting
through electrical pumps.
152.92 …… …… 6 Ottu, Firozabad, Moujdin,
Gindranwali, Dhani Partap
Singh, Chakraian
The tender opened on dated
02.05.2023. The work will be
started after completing all
departmental formalties.
3 ESTIMATE FOR INLET & OUTLET
CONNECTING FOR VILLAGE POND OF
VILLAGE BALASAR (NEAR MAIN
CHOWK, GOGA MEDI & ALONG BABA
RAMDEV JI MANDIR) DISTRICT SIRSA
WITH RCC PIPE FROM 19500/R
BALASAR MINOR
16.10 20.05.2023 31.12.2023 1 Balasar Tender have been called/opened
on dt. 02.05.2023 & tender
allotment is under process.
4 Agenda Note for Internal Clearance of
Naiwala Kharif Channel from RD 0-
51000 off-taking at RD 22000-L GBSM
Link Channel.
15.78 15.05.2023 30.06.2023 18 Dhottar, Fatehpuria,
Mangalia, Nanuana, Balasar
& Kussar
The tender rates have been
approved and work will be
started up to 15.05.2023
5 Estimate for remodeling of MMK Disty.
from RD. 1347010 – 158500 off-taking
at RD. 258000-L B.M.B.
427.17 01.08.2023 31.03.2024 8 Chakkan, Bhuna, Ramgarh,
Banwala, Gindran,
Sadewala, Keharwala, Chak
Faridpur
Detailed estimate has been
approved/sanction on dt.
03.05.2023. Tender yet to be
called.
6 Re-construction of damaged V.R. Bridge
at RD. 10200 Bani Disty.
47.15 15.07.2023 31.12.2023 2 Khairekan & Panjuana The rough cost estimate has been
approved on dated 17.03.2023.
The deatil estimate stand
submitted on dated 25.04.2023
for sanction.
5. Sr.
No.
Description Amount
(in lacs)
Likely
date of
start of
work
Likely
date of
completio
n
No. of
Benefitted
Villages
Name of Benifitted
Villages
Status
7 Re-construction of damaged V.R. Bridge
at RD. 24784 Bani Disty.
50.27 15.07.2023 31.12.2023 2 Fatehpur Niamatkhan &
Chamal
The rough cost estimate has been
approved on dated 25.03.2023.
The deatil estimate stand
submitted on dated 26.04.2023
for sanction.
8 Lining of W/C of O/L RD. 21000-L Bani
Disty. (Ext. 9240 rft.)
42.77 15.06.2023 31.12.2023 2 Sheikhupuria & Chamal The rough cost estimate has been
approved on dated 20.03.2023.
The deatil estimate stand
submitted on dated 25.04.2023
for sanction.
9 Estimate for remodeling of Mehnakhera
Minor from RD. 0 – 11500-Tail off-
taking at RD. 70000-L Sadewa Disty.
89.42 01.08.2023 31.03.2024 4 Mehna Khera, Kharia,
Fatehpuria, Kussar.
Rough cost estimate has been
approved on dt. 16.11.2022.
Detailed estimate has been re-
submitted on dt. 16.02.2023 for
sanction.
10 Estimate for remodeling of Sadewa
Disty. from RD. 0 – 99000 off-taking at
RD. 68000-L MMK Disty.
1493.96 17.08.2023 31.08.2024 19 Raghuana, Baragudha,
Chhatrian, Bhangu,
Sahuwala 1st, Khuyian
Nepalpur, PanniwalaMota,
Karamgarh, Moranwali,
Fatehpur Niamatkhan,
Peerkhera, Jodhpuria,
Darewala,
Kharian,Mehnakhera
Bhuna, Kussar, Ghoranwali,
Chakkan, Gindran &
Sadewala etc.
Rough cost estimate has been
approved on dt. 09.01.2023.
Detailed estimate is under
preparation in Division office.
11 Re-construction of damaged V.R. Bridge
at RD. 68498 Bani Disty.
37.60 03.09.2023 31.03.2024 2 Fatehpuria &
Mohamadpuria
Rough cost estimate has been
approved on dt. 28.01.2023. A/A
re-submitted through e-office on
dt. 02.05.2023.
12 Lining of W/C of O/L RD. 87480-L
Sadewa Disty. (Ext. 6754 rft.)
34.83 20.07.2023 31.03.2024 2 Ghoranwali & Kussasr The rough cost estimate was
submitted on dt. 11.04.2023 but
received back for compliance on
dated 03.05.2023.
6. Sr.
No.
Description Amount
(in lacs)
Likely
date of
start of
work
Likely
date of
completio
n
No. of
Benefitted
Villages
Name of Benifitted
Villages
Status
13 ESTIMATE FOR INLET CONNECTION
FOR VILLAGE POND OF VILLAGE
FATHEPUR NIMAT KHAN (NEAR GOGA
MEDI) DISTRICT SIRSA WITH RCC PIPE
FROM 25000/R BANI DISTY.
29.88 20.07.202
3
31.03.202
4
1 Fatehpur Nimat Khan Admn. app. has been accorded on
dt. 04.10.2022. The estimate is
under preparation in Division
office.
14 ESTIMATE FOR CONNECTION FOR
VILLAGE POND OF VILLAGE KHARIA
(AT MEHTA MOHALLA FIRNI) DISTRICT
SIRSA WITH RCC PIPE FROM RD
65000/R SADEWA DISTY (INLET) & RD
5400/R SADEWA PARALLEL CHANNEL
(OUTLET).
2.28 20.07.202
3
31.03.202
4
1 Khariyan The rough cost estimate was
submitted but received back for
compliance on dated 03.05.2023.
15 Construction of extension of Branch of
Rattakhera Kharif Channel from RD
29200-41050-Tail off-taking at RD.
20000-R of Rattakhera Kharif Channel
799.00 4.12.2023 31.12.202
4
2 Sahuwala–I and Panniwala
Motta
Govt. has approved the proposal
for grant of permission for
purchase of 24.965 acres land
through e-bhoomi portal vide
memo No. 1IW-
280070/54/2022-XEN/BWS
dated Chandigarh, the 2nd
January, 2023. The same is under
process.
TOTAL 3634.08
7. AA under process
Sr.
No.
Description Amount
(in lacs)
Likely
date of
start of
work
Likely
date of
completio
n
No. of
Benefitted
Villages
Name of Benifitted
Villages
Status
1 Construction of Sultanpuria Kharif
Channel 1
st
from RD 0 – 18400-Tail off-
taking at RD.15700-L G.B.S.M. Link
Channel.
1064.23 01.12.2023 31.12.2024 6 Dhottar, Dhanoor, Ottu,
Sultanpuria, Nanuana and
Rania
The design/drawing of
underground pipeline, Head
Regulator, Haudi and pipe culvert
for the work of construction is
under process.
2 Construction of Sultanpuria Kharif
Channel 2nd from RD. 0 - 26000-Tail off-
taking at RD. 19800 R River Ghaggar.
2121.06 01.12.2023 31.12.2024 7 Dhanoor, Ottu, Sultanpuria,
Jhoranwali, Abutgarh,
Abholi and Rania
The design/drawing of
underground pipeline, Head
Regulator, Haudi and pipe culvert
for the work of construction is
under process.
3 Estimate for construction of syphon at
RD 1700 NGC and concrete lining of NGC
from its head to proposed syphon.
320.14 ……. …… 5 Ottu, Firozabad, Moujdin,
Gindranwali, Rania
The rough cost estimate has been
submitted to higher office
through HEWP. But same was
received back with some
observations. The same may be
submitted after compliance upto
12.05.2023.
TOTAL 3505.43