SlideShare uma empresa Scribd logo
1 de 14
Baixar para ler offline
1
Koya University
Faculty of Engineering
Petroleum Engineering Department
Third stage
Drilling Lab.
Lab No.: 3
Drilling Fluid
dilution
Prepared by : Sarwar Salam
Group: B
Date of Experiment:- Nov 26th 2015
Supervised by: Mr. Pshtiwan –Mr. Mohammed
Drilling Lab. Mud Density
2
The four-scale mud balance is used to determine the density or weight
of drilling fluids in two steps. At the beginning primary mud weight is
calculated and then measured by baroid, then fresh water is added to
the previous mud and then measured again and differences will be
obvious.
Drilling Lab. Mud Density
3
Dilution is one of the primary methods used to control solids in a
drilling mud. When water added to the system Base Oil to make
water/oil ratio as per program, the total weight of the solids remains
the same, while the volume is increased. Dilution results in a lower
percent by volume of total solids.
All of the physical properties in a drilling fluid are affected when the
solid content increases when the increase in solids is due to inactive
solids, the viscosity increase (due to an increased resistance to flow).
Also, an increase in inert solids uses up the available water & brings
whatever active solids are already in the system closer together.
This gives an increase in viscosity, due to the attractive forces
between charged particles. Generally this viscosity rise (PV) will be
rise will be greater than any density increase. When the solids
increase is due to active solids, the available water is unused up again.
This brings the solids already present closer together.
That, plus the reaction of the newly introduced solids, will give a
marked rise in the funnel viscosity. Dilution has a dual effect when
used to control both of these situations. It not only will supply the
water needed to wet these solids, but also will provide the necessary
water to keep these particles dispersed. The further apart the active
solids are kept, the lower the marsh funnel viscosity will be.
Plastic viscosity in an indication of the mechanical friction among
particles in a drilling fluid. It is worthwhile to note that the major
Drilling Lab. Mud Density
4
Factor affecting plastic viscosity is the amount of surface area. This is
due to not only the amount of solids present, but also to the size &
shape of these solids.
The smaller the particles, the greater the exposed surface area for a
given percent solids by volume. When a dilatant is added, the
percentage of concentration of solids in a given volume is reduced;
hence, the mechanical friction among particles is decreased.
Drilling Lab. Mud Density
5
Dilution refers to the process of adding a liquid phase to a drilling
fluid to decrease the drilled-solids concentration. Dilution is used in
several ways.
If no solids-control equipment is used or if the equipment is used
ineffectively, dilution may be the principal method of keeping drilled
solids to a reasonably low level. This is an expensive solution to the
problem.
For example, to decrease drilled solids by 50% requires that
50% of the system he discarded and replaced with clean drilling fluid.
Usually dilution is used after processing by solids-removal equipment
to dilute drilled solids remaining in the drilling fluid. Dilution may be
added as a clean drilling fluid or as the liquid phase of a drilling fluid
with the other necessary drilling fluid ingredient, usually through a
chemical barrel and a mud hopper.
In this discussion, dilution will refer specifically
to the clean drilling fluid (i.e. Fresh water) necessary to decrease
drilled-solids concentration. Clean drilling fluid is the liquid phase
with all necessary additives such as barite, polymers, clay. etc.
As an example of dilution, consider a well in which the drilling-fluid
specifications suggest that the volume percentage of (%vol) drilled-
solids concentration should be. And is 6%vol. Assume that 10 bbl of
formation solids are brought to the surface and that no solids-removal
equipment is used. All 10 bbl would be retained in the drilling-fluid
system. These solids would require dilution to maintain the 6%
volume concentration in the new drilling fluid.
Drilling Lab. Mud Density
6
The new drilling-fluid volume would consist of drilled solids (10 bbl)
and clean drilling fluid (dilution). If the drilled solids (lO bbl) are
6% volume of the new drilling fluid built, the volume of new drilling
fluid built would be 167 bbl (or lO bbl/0.06). The volume of clean
drilling fluid (dilution) required may be calculated from the statement
that the new drilling-fluid volume, 167 bbl, would consist of 10 bbl of
drilled solids plus the clean drilling fluid. Obviously the dilution, or
the clean drilling fluid, needed would be 157 bbl. This dilution would
increase the pit volume by 157 bbl.
When nothing is removed from the system, the pits would overflow if
they were originally full. The only volume available to accept dilution
would be the volume (liquid and solids) removed from the pit system.
The volume removed would include all fluid and solids removed by
the solids-removal equipment and any drilling fluid removed from the
system to be stored or discarded.
This is an important concept and is not trivial. Dilution calculations
are based
on simple material balances—addition and subtraction of volumes
added and removed. Before the dilution (clean drilling fluid) is added,
the pit levels would remain the same as they were before the
formation was drilled.
The solids that were drilled occupy the same volume as they did
before they were pulverized by the drill bit. The new hole volume is
exactly the volume of material added to the drilling fluid
system.(Drilling fluid processing Handbook, (Engineers, 2011)
Drilling Lab. Mud Density
7
After preparing a desired mud with the aid of the mathematical
equations which relates each of the solid and continuous phase of the
mud and the final mud data is determined. We are about to add a
specific amount of barite as calculated before to get the final mud
requirement.
During the mud sample preparation it will be necessary to use some
extra tools, which they are:
-Weighting balance
- Syringe
Fresh water
- Mixing tube
-Beaker
-Bentonite
- Mixing device
Drilling Lab. Mud Density
8
Figure 2 Test apparatuses-Lab. (Sarwar Salam 2015)
Every time when before measuring the density of the mud that we
have the pre-main test (i.e. calibration) is done to double check for the
most accurate reading during test in the following points:
 Clean and dry the mud balance before doing a re-calibration.
 Fit the knife edge of the balance arm into the fulcrum.
 Set the rider on 8.3 pounds per gallon or 1.0 specific gravity.
 Fill the cup with fresh water at around 70°F (21°C).
Drilling Lab. Mud Density
9
 Add or remove lead shot from the shotwell until the instrument is
in balance.
The main test procedure:.
1. Place the base (preferably in the carrying case) on a flat level
surface.
2. Fill the balance cup with the sample to be tested to the limit. Put
the lid onto the balance cup by pushing it downward with a slow
rotating motion until it is firmly seated. Make sure that some of the
test sample is forced out through the vent hole in the lid. This action
will also help to rid the sample of any entrained air of gas.
3. Cover the hole in the lid with a finger and wash all mud from the
outside of the cup and arm. Then thoroughly dry the entire balance.
4. Fit the knife edge of the balance arm into the fulcrum and balance
the assembly by moving the rider along the arm. The Mud Balance is
Drilling Lab. Mud Density
10
horizontal when the level bubble fluctuates an equal distance to either
side of the centre line.
5. Read the sample density from the top of the rider nearest the
balance cup. The measurement reading is equivalent to density of the
sample.
6- Add about 325cm3
of fresh water to the previous mud slowly at
mixing device,
7- Make sure previous mud particles and fresh water are forming a
homogenous mixture.
8- Re-measure the new mud density, which represents the diluted mud
density.
What is the primary objective of diluting drilling fluid?
 You sometimes need to reduce your mud weight in hole.
The method to reduce mud weight is dilution. The concept
of dilution is to add light weight fluid into heavy fluid and
when they mix together whole drilling fluid weight will
decrease. The light weight fluids frequently used are fresh
water, sea water, base oil, diesel, synthetic oil, etc. This is
normally your based fluid.
2- What are the drilling fluid additives?
Drilling Lab. Mud Density
11
 There are fundamental aspects that have to be controlled
in order to have an effective, successful, and purposeful
drilling fluid. These aspects can be categorized as:
-Weight Control
-Viscosity Control
-Fluid Loss Control
-Corrosion Control
3- What were the main factors which causes errors on your test
readings?
 The main factors that left impact on the test readings, use of
normal water instead of fresh distillate water in both mud
preparations , weighting balance sensitivity(i.e. we were about to
prepare 25.06gm of Bentonite but the balance was not so
sensitive so Bentonite weight was 25.0gm) When using the mixer
in preparing the mud, there was a lot of powder from the clay that
was not mixed in the mixing cup and even some that blew away
onto the table (first mud preparation).
The actual amount of clay added may be less than prepared. An
alternative way of adding the exact amount of clay is by having
the clay in tabulate forms or pill forms so that the clay cannot be
blown away, also there might be having loss of some fresh water
droplets during weighting on the balance, adding into the
prepared mud as well.
Drilling Lab. Mud Density
12
4- What is the mathematical equation used to determine the
diluting fluid quantity that should be added into previously
prepared mud?
 You can calculate how much light weight fluid in barrel or
any corresponding volume unit is required reducing original
mud weight to new mud weight with this following formula:
Mud weight reduction by diluting with light weight fluid/
V2 = V1 x (W1 – W2) ÷ (W2 – Dw)
Where;
V1 = Intial volume in bbl
V2=Volume of light fluid
W1 = Initial drilling fluid weight in ppg
W2 = Final drilling fluid weight in ppg
Dw = Density of light weight fluid in ppg
5- Solve this example using above equation,
Example_] Determine the number of barrels of base oil
7.0 ppg (Dw) required to reduce 150 bbl (V1) of 12.0
ppg (W1) to 8.68 ppg (W2):
Solution:
Light weight fluid volume in bbl = V1 x (W1 – W2) ÷ (W2 – Dw)
Light weight fluid volume in bbl = 150 x (12 –8.68) ÷ (8.68 – 7.0)
Light weight fluid volume in bbl = 296.43 bblYou need to mix
196.43 bbl of base oil 7.0 ppg into 150 bbl of 12 ppg in order
to achieve final mud weight of 8.68 ppg.
Drilling Lab. Mud Density
13
6- Why do we need to change mud density during drilling
operation?
Ans. As it is known by all, the earth’s crust has been made from
different formations and layers which they are differs in their specific
dependent physical properties, during drilling operation going down
in each formation based on its unique behaviour and formation fluid
content, it’s necessary to change in the drilling fluid properties as
well.
For instance, if we faced a low pressure formation which it’s a
function of pore fluid pressure, or having lost circulation due to high
density of mud, or even if the formation fracture gradient has passed..
It is crucial to decrease mud weight by dilution process.
7- What are the critical dilution factors?
Ans. Critical Dilution Factors Independent from the
previously mentioned list, critical dilution factors are only
those that are part of the math needed to calculate projected
dilution requirements. They are as follows: • Current and
target low gravity solids content • Specific gravity of drilled
solids • Current and target mud weight • Amount and specific
gravity of barite to be used • Amount and specific gravity of
each mud additive scheduled to be used • Rate of penetration •
Hole or bit size • Solids Removal Efficiency • Retained Low
Gravity Solids • Active pit volume • Cycle volume •
Percentage of total dilution from reserve pit or water-recovery
unit • Density and low gravity solids content of reserve pit
water.
Drilling Lab. Mud Density
14
1- Engineers, S. S. (2011). Drilling Fluid Processing
Handbook . Bostun,USA: ASME Shale Shaker
Committee .
2- Drilling Stuff. (2010) Dump, Dilute and Picket Fences
[Online] Avialable from:
http://drillingstuff.com/ExpDumpandDilute.htm.[Accessed:
Dec 12th 2015]
3- VN Drilling Forum. (2008). What is the corrective way to
dilute a mud system while drilling [Online] Available
from:http:// http://vndrilling.com/forum.aspx?g=posts&t=68.
[Accessed: Dec 12th
2015]
4- Drilling Formula. (2009). Reduce mud weight by dilution
[Online] Available from :
http://www.drillingformulas.com/reduce-mud-weight-by-
dilution/. [Accessed: Dec 12th
2015]
5- Elliot, J, Cervantez, R., Estep, J., Sills, B. “New Inhibitive
Water-Based Fluid Provided Drilling Performance Comparable
to Invert Emulsion Systems in Reactive Shale Sections,”
AADE- 05-NTCE-03

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Viscosity and yield point exp. by jarjis
Viscosity and yield point exp. by jarjisViscosity and yield point exp. by jarjis
Viscosity and yield point exp. by jarjis
 
Drilling Lab - Mud Dilution
Drilling Lab - Mud DilutionDrilling Lab - Mud Dilution
Drilling Lab - Mud Dilution
 
yield point and viscosity
yield point and viscosityyield point and viscosity
yield point and viscosity
 
Cementation
CementationCementation
Cementation
 
Drilling Lab - Mud Filtration
Drilling Lab - Mud FiltrationDrilling Lab - Mud Filtration
Drilling Lab - Mud Filtration
 
Rheology model 900 viscometer Mud Engineering Exp.
Rheology model 900 viscometer Mud Engineering Exp.Rheology model 900 viscometer Mud Engineering Exp.
Rheology model 900 viscometer Mud Engineering Exp.
 
Mud Filtration Test
Mud Filtration TestMud Filtration Test
Mud Filtration Test
 
Drilling Lab - Mud Weighting
Drilling Lab - Mud WeightingDrilling Lab - Mud Weighting
Drilling Lab - Mud Weighting
 
Exp2 mud weight
Exp2 mud weightExp2 mud weight
Exp2 mud weight
 
Mud duiltion-(Adding a liquid phase (water) to drilling fluid (mud))
Mud duiltion-(Adding a liquid phase (water) to drilling fluid (mud))Mud duiltion-(Adding a liquid phase (water) to drilling fluid (mud))
Mud duiltion-(Adding a liquid phase (water) to drilling fluid (mud))
 
Mud balance test (drilling fluid lab test)
Mud  balance test (drilling fluid lab test)Mud  balance test (drilling fluid lab test)
Mud balance test (drilling fluid lab test)
 
Funnel Viscosity (Marsh Funnel) Exp.
Funnel Viscosity (Marsh Funnel) Exp.Funnel Viscosity (Marsh Funnel) Exp.
Funnel Viscosity (Marsh Funnel) Exp.
 
Liquid permeability
Liquid permeabilityLiquid permeability
Liquid permeability
 
helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a Well
 
Plastic viscosity(mud properties test)
Plastic viscosity(mud properties test)Plastic viscosity(mud properties test)
Plastic viscosity(mud properties test)
 
BHA.pptx
BHA.pptxBHA.pptx
BHA.pptx
 
Drilling Lab - Sand Content
Drilling Lab - Sand ContentDrilling Lab - Sand Content
Drilling Lab - Sand Content
 
Discussion - Core Plugging Reservoir Lab
Discussion - Core Plugging Reservoir LabDiscussion - Core Plugging Reservoir Lab
Discussion - Core Plugging Reservoir Lab
 
Mud thinner
Mud thinnerMud thinner
Mud thinner
 

Destaque

Destaque (20)

Dilution
 Dilution  Dilution
Dilution
 
Mud density
Mud densityMud density
Mud density
 
Drilling Fluids Mud
Drilling Fluids MudDrilling Fluids Mud
Drilling Fluids Mud
 
marsh funnel
marsh funnelmarsh funnel
marsh funnel
 
capillary suction time
capillary suction timecapillary suction time
capillary suction time
 
Drilling Mud Laboratory
Drilling Mud LaboratoryDrilling Mud Laboratory
Drilling Mud Laboratory
 
Marsh funnel
Marsh funnel Marsh funnel
Marsh funnel
 
Core plug test
 Core plug test  Core plug test
Core plug test
 
ph concentration
ph concentrationph concentration
ph concentration
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
mud filtration
mud filtrationmud filtration
mud filtration
 
Core plug test
Core plug testCore plug test
Core plug test
 
porosity by saturation
porosity by saturationporosity by saturation
porosity by saturation
 
Dilution
DilutionDilution
Dilution
 
CARRYING CAPACITY OF DRILLING MUDS
CARRYING CAPACITY OF DRILLING MUDSCARRYING CAPACITY OF DRILLING MUDS
CARRYING CAPACITY OF DRILLING MUDS
 
spe fluid
spe fluidspe fluid
spe fluid
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Oil industry in Kurdistan
Oil industry in KurdistanOil industry in Kurdistan
Oil industry in Kurdistan
 
mud weighting
mud weightingmud weighting
mud weighting
 
core cleaning by soxhlete extractor
core cleaning by soxhlete extractorcore cleaning by soxhlete extractor
core cleaning by soxhlete extractor
 

Semelhante a Drilling fluid dilution

Lab 9 measurement of filtrate loss and mud cake thickness of drilling mud sam...
Lab 9 measurement of filtrate loss and mud cake thickness of drilling mud sam...Lab 9 measurement of filtrate loss and mud cake thickness of drilling mud sam...
Lab 9 measurement of filtrate loss and mud cake thickness of drilling mud sam...
Awais Qureshi
 
drillingfluids-121124044021-phpapp02.pdf
drillingfluids-121124044021-phpapp02.pdfdrillingfluids-121124044021-phpapp02.pdf
drillingfluids-121124044021-phpapp02.pdf
MuammerAlakary
 

Semelhante a Drilling fluid dilution (20)

Reservoir Rock Properties Laboratory Manual Exp (#4)
Reservoir Rock Properties Laboratory Manual Exp (#4)Reservoir Rock Properties Laboratory Manual Exp (#4)
Reservoir Rock Properties Laboratory Manual Exp (#4)
 
Thickener waste management in mineral processing to prevent environmental pol...
Thickener waste management in mineral processing to prevent environmental pol...Thickener waste management in mineral processing to prevent environmental pol...
Thickener waste management in mineral processing to prevent environmental pol...
 
Investigation for Strength of Layering of Pelletized Balls Used As Feed for G...
Investigation for Strength of Layering of Pelletized Balls Used As Feed for G...Investigation for Strength of Layering of Pelletized Balls Used As Feed for G...
Investigation for Strength of Layering of Pelletized Balls Used As Feed for G...
 
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
 
3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works
 
Drilling engineering laboratory manual by Muhammed Jamal Awl
Drilling engineering laboratory manual by Muhammed Jamal AwlDrilling engineering laboratory manual by Muhammed Jamal Awl
Drilling engineering laboratory manual by Muhammed Jamal Awl
 
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdfDrilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
 
CT-233 SOIL MECHANICS LAB MANUAL BSC Civil
CT-233 SOIL MECHANICS LAB MANUAL BSC Civil CT-233 SOIL MECHANICS LAB MANUAL BSC Civil
CT-233 SOIL MECHANICS LAB MANUAL BSC Civil
 
Lab 9 measurement of filtrate loss and mud cake thickness of drilling mud sam...
Lab 9 measurement of filtrate loss and mud cake thickness of drilling mud sam...Lab 9 measurement of filtrate loss and mud cake thickness of drilling mud sam...
Lab 9 measurement of filtrate loss and mud cake thickness of drilling mud sam...
 
Dissolution final
Dissolution final Dissolution final
Dissolution final
 
5.major project
5.major project5.major project
5.major project
 
GT Lab Manual
GT Lab ManualGT Lab Manual
GT Lab Manual
 
Atterberg limit test
Atterberg limit test Atterberg limit test
Atterberg limit test
 
Mud weight density1
Mud weight density1Mud weight density1
Mud weight density1
 
Drillling Fluid Engineering-Filtration Lab#8.pdf
Drillling Fluid Engineering-Filtration Lab#8.pdfDrillling Fluid Engineering-Filtration Lab#8.pdf
Drillling Fluid Engineering-Filtration Lab#8.pdf
 
Core cleaning
Core cleaningCore cleaning
Core cleaning
 
drillingfluids-121124044021-phpapp02.pdf
drillingfluids-121124044021-phpapp02.pdfdrillingfluids-121124044021-phpapp02.pdf
drillingfluids-121124044021-phpapp02.pdf
 
Drilling Fluid Engineering-Viscosity & Yeild Point.pdf
Drilling Fluid Engineering-Viscosity & Yeild Point.pdfDrilling Fluid Engineering-Viscosity & Yeild Point.pdf
Drilling Fluid Engineering-Viscosity & Yeild Point.pdf
 
34810.pptx
34810.pptx34810.pptx
34810.pptx
 
Soil Test and Surveys
Soil Test and SurveysSoil Test and Surveys
Soil Test and Surveys
 

Mais de SARWAR SALAM

Mais de SARWAR SALAM (17)

Drilling Fluid Engineering-Rheological Proporties-M900.pdf
Drilling Fluid Engineering-Rheological Proporties-M900.pdfDrilling Fluid Engineering-Rheological Proporties-M900.pdf
Drilling Fluid Engineering-Rheological Proporties-M900.pdf
 
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdfDrilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
 
WSM Yard-High-Pressure Safety-22.12.19
WSM Yard-High-Pressure Safety-22.12.19WSM Yard-High-Pressure Safety-22.12.19
WSM Yard-High-Pressure Safety-22.12.19
 
Hand and Power tools safety
Hand and Power tools safetyHand and Power tools safety
Hand and Power tools safety
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management System
 
Endless Round Web-sling
Endless Round Web-slingEndless Round Web-sling
Endless Round Web-sling
 
Lifting Safety
Lifting Safety  Lifting Safety
Lifting Safety
 
Rig move safety
Rig move safety Rig move safety
Rig move safety
 
Koya university induction
Koya university inductionKoya university induction
Koya university induction
 
Safety in working place
Safety in working placeSafety in working place
Safety in working place
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
General overview of Petroleum Engineering Depatment
General overview of Petroleum Engineering DepatmentGeneral overview of Petroleum Engineering Depatment
General overview of Petroleum Engineering Depatment
 
Experiment no 3 surface tension
Experiment no 3 surface tensionExperiment no 3 surface tension
Experiment no 3 surface tension
 
Core plugging
Core plugging Core plugging
Core plugging
 
Harvard referencing style quick guide
Harvard referencing style quick guideHarvard referencing style quick guide
Harvard referencing style quick guide
 
Krichhoff’s voltage law
Krichhoff’s voltage lawKrichhoff’s voltage law
Krichhoff’s voltage law
 
Drilling fluid
Drilling fluidDrilling fluid
Drilling fluid
 

Último

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 

Último (20)

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 

Drilling fluid dilution

  • 1. 1 Koya University Faculty of Engineering Petroleum Engineering Department Third stage Drilling Lab. Lab No.: 3 Drilling Fluid dilution Prepared by : Sarwar Salam Group: B Date of Experiment:- Nov 26th 2015 Supervised by: Mr. Pshtiwan –Mr. Mohammed
  • 2. Drilling Lab. Mud Density 2 The four-scale mud balance is used to determine the density or weight of drilling fluids in two steps. At the beginning primary mud weight is calculated and then measured by baroid, then fresh water is added to the previous mud and then measured again and differences will be obvious.
  • 3. Drilling Lab. Mud Density 3 Dilution is one of the primary methods used to control solids in a drilling mud. When water added to the system Base Oil to make water/oil ratio as per program, the total weight of the solids remains the same, while the volume is increased. Dilution results in a lower percent by volume of total solids. All of the physical properties in a drilling fluid are affected when the solid content increases when the increase in solids is due to inactive solids, the viscosity increase (due to an increased resistance to flow). Also, an increase in inert solids uses up the available water & brings whatever active solids are already in the system closer together. This gives an increase in viscosity, due to the attractive forces between charged particles. Generally this viscosity rise (PV) will be rise will be greater than any density increase. When the solids increase is due to active solids, the available water is unused up again. This brings the solids already present closer together. That, plus the reaction of the newly introduced solids, will give a marked rise in the funnel viscosity. Dilution has a dual effect when used to control both of these situations. It not only will supply the water needed to wet these solids, but also will provide the necessary water to keep these particles dispersed. The further apart the active solids are kept, the lower the marsh funnel viscosity will be. Plastic viscosity in an indication of the mechanical friction among particles in a drilling fluid. It is worthwhile to note that the major
  • 4. Drilling Lab. Mud Density 4 Factor affecting plastic viscosity is the amount of surface area. This is due to not only the amount of solids present, but also to the size & shape of these solids. The smaller the particles, the greater the exposed surface area for a given percent solids by volume. When a dilatant is added, the percentage of concentration of solids in a given volume is reduced; hence, the mechanical friction among particles is decreased.
  • 5. Drilling Lab. Mud Density 5 Dilution refers to the process of adding a liquid phase to a drilling fluid to decrease the drilled-solids concentration. Dilution is used in several ways. If no solids-control equipment is used or if the equipment is used ineffectively, dilution may be the principal method of keeping drilled solids to a reasonably low level. This is an expensive solution to the problem. For example, to decrease drilled solids by 50% requires that 50% of the system he discarded and replaced with clean drilling fluid. Usually dilution is used after processing by solids-removal equipment to dilute drilled solids remaining in the drilling fluid. Dilution may be added as a clean drilling fluid or as the liquid phase of a drilling fluid with the other necessary drilling fluid ingredient, usually through a chemical barrel and a mud hopper. In this discussion, dilution will refer specifically to the clean drilling fluid (i.e. Fresh water) necessary to decrease drilled-solids concentration. Clean drilling fluid is the liquid phase with all necessary additives such as barite, polymers, clay. etc. As an example of dilution, consider a well in which the drilling-fluid specifications suggest that the volume percentage of (%vol) drilled- solids concentration should be. And is 6%vol. Assume that 10 bbl of formation solids are brought to the surface and that no solids-removal equipment is used. All 10 bbl would be retained in the drilling-fluid system. These solids would require dilution to maintain the 6% volume concentration in the new drilling fluid.
  • 6. Drilling Lab. Mud Density 6 The new drilling-fluid volume would consist of drilled solids (10 bbl) and clean drilling fluid (dilution). If the drilled solids (lO bbl) are 6% volume of the new drilling fluid built, the volume of new drilling fluid built would be 167 bbl (or lO bbl/0.06). The volume of clean drilling fluid (dilution) required may be calculated from the statement that the new drilling-fluid volume, 167 bbl, would consist of 10 bbl of drilled solids plus the clean drilling fluid. Obviously the dilution, or the clean drilling fluid, needed would be 157 bbl. This dilution would increase the pit volume by 157 bbl. When nothing is removed from the system, the pits would overflow if they were originally full. The only volume available to accept dilution would be the volume (liquid and solids) removed from the pit system. The volume removed would include all fluid and solids removed by the solids-removal equipment and any drilling fluid removed from the system to be stored or discarded. This is an important concept and is not trivial. Dilution calculations are based on simple material balances—addition and subtraction of volumes added and removed. Before the dilution (clean drilling fluid) is added, the pit levels would remain the same as they were before the formation was drilled. The solids that were drilled occupy the same volume as they did before they were pulverized by the drill bit. The new hole volume is exactly the volume of material added to the drilling fluid system.(Drilling fluid processing Handbook, (Engineers, 2011)
  • 7. Drilling Lab. Mud Density 7 After preparing a desired mud with the aid of the mathematical equations which relates each of the solid and continuous phase of the mud and the final mud data is determined. We are about to add a specific amount of barite as calculated before to get the final mud requirement. During the mud sample preparation it will be necessary to use some extra tools, which they are: -Weighting balance - Syringe Fresh water - Mixing tube -Beaker -Bentonite - Mixing device
  • 8. Drilling Lab. Mud Density 8 Figure 2 Test apparatuses-Lab. (Sarwar Salam 2015) Every time when before measuring the density of the mud that we have the pre-main test (i.e. calibration) is done to double check for the most accurate reading during test in the following points:  Clean and dry the mud balance before doing a re-calibration.  Fit the knife edge of the balance arm into the fulcrum.  Set the rider on 8.3 pounds per gallon or 1.0 specific gravity.  Fill the cup with fresh water at around 70°F (21°C).
  • 9. Drilling Lab. Mud Density 9  Add or remove lead shot from the shotwell until the instrument is in balance. The main test procedure:. 1. Place the base (preferably in the carrying case) on a flat level surface. 2. Fill the balance cup with the sample to be tested to the limit. Put the lid onto the balance cup by pushing it downward with a slow rotating motion until it is firmly seated. Make sure that some of the test sample is forced out through the vent hole in the lid. This action will also help to rid the sample of any entrained air of gas. 3. Cover the hole in the lid with a finger and wash all mud from the outside of the cup and arm. Then thoroughly dry the entire balance. 4. Fit the knife edge of the balance arm into the fulcrum and balance the assembly by moving the rider along the arm. The Mud Balance is
  • 10. Drilling Lab. Mud Density 10 horizontal when the level bubble fluctuates an equal distance to either side of the centre line. 5. Read the sample density from the top of the rider nearest the balance cup. The measurement reading is equivalent to density of the sample. 6- Add about 325cm3 of fresh water to the previous mud slowly at mixing device, 7- Make sure previous mud particles and fresh water are forming a homogenous mixture. 8- Re-measure the new mud density, which represents the diluted mud density. What is the primary objective of diluting drilling fluid?  You sometimes need to reduce your mud weight in hole. The method to reduce mud weight is dilution. The concept of dilution is to add light weight fluid into heavy fluid and when they mix together whole drilling fluid weight will decrease. The light weight fluids frequently used are fresh water, sea water, base oil, diesel, synthetic oil, etc. This is normally your based fluid. 2- What are the drilling fluid additives?
  • 11. Drilling Lab. Mud Density 11  There are fundamental aspects that have to be controlled in order to have an effective, successful, and purposeful drilling fluid. These aspects can be categorized as: -Weight Control -Viscosity Control -Fluid Loss Control -Corrosion Control 3- What were the main factors which causes errors on your test readings?  The main factors that left impact on the test readings, use of normal water instead of fresh distillate water in both mud preparations , weighting balance sensitivity(i.e. we were about to prepare 25.06gm of Bentonite but the balance was not so sensitive so Bentonite weight was 25.0gm) When using the mixer in preparing the mud, there was a lot of powder from the clay that was not mixed in the mixing cup and even some that blew away onto the table (first mud preparation). The actual amount of clay added may be less than prepared. An alternative way of adding the exact amount of clay is by having the clay in tabulate forms or pill forms so that the clay cannot be blown away, also there might be having loss of some fresh water droplets during weighting on the balance, adding into the prepared mud as well.
  • 12. Drilling Lab. Mud Density 12 4- What is the mathematical equation used to determine the diluting fluid quantity that should be added into previously prepared mud?  You can calculate how much light weight fluid in barrel or any corresponding volume unit is required reducing original mud weight to new mud weight with this following formula: Mud weight reduction by diluting with light weight fluid/ V2 = V1 x (W1 – W2) ÷ (W2 – Dw) Where; V1 = Intial volume in bbl V2=Volume of light fluid W1 = Initial drilling fluid weight in ppg W2 = Final drilling fluid weight in ppg Dw = Density of light weight fluid in ppg 5- Solve this example using above equation, Example_] Determine the number of barrels of base oil 7.0 ppg (Dw) required to reduce 150 bbl (V1) of 12.0 ppg (W1) to 8.68 ppg (W2): Solution: Light weight fluid volume in bbl = V1 x (W1 – W2) ÷ (W2 – Dw) Light weight fluid volume in bbl = 150 x (12 –8.68) ÷ (8.68 – 7.0) Light weight fluid volume in bbl = 296.43 bblYou need to mix 196.43 bbl of base oil 7.0 ppg into 150 bbl of 12 ppg in order to achieve final mud weight of 8.68 ppg.
  • 13. Drilling Lab. Mud Density 13 6- Why do we need to change mud density during drilling operation? Ans. As it is known by all, the earth’s crust has been made from different formations and layers which they are differs in their specific dependent physical properties, during drilling operation going down in each formation based on its unique behaviour and formation fluid content, it’s necessary to change in the drilling fluid properties as well. For instance, if we faced a low pressure formation which it’s a function of pore fluid pressure, or having lost circulation due to high density of mud, or even if the formation fracture gradient has passed.. It is crucial to decrease mud weight by dilution process. 7- What are the critical dilution factors? Ans. Critical Dilution Factors Independent from the previously mentioned list, critical dilution factors are only those that are part of the math needed to calculate projected dilution requirements. They are as follows: • Current and target low gravity solids content • Specific gravity of drilled solids • Current and target mud weight • Amount and specific gravity of barite to be used • Amount and specific gravity of each mud additive scheduled to be used • Rate of penetration • Hole or bit size • Solids Removal Efficiency • Retained Low Gravity Solids • Active pit volume • Cycle volume • Percentage of total dilution from reserve pit or water-recovery unit • Density and low gravity solids content of reserve pit water.
  • 14. Drilling Lab. Mud Density 14 1- Engineers, S. S. (2011). Drilling Fluid Processing Handbook . Bostun,USA: ASME Shale Shaker Committee . 2- Drilling Stuff. (2010) Dump, Dilute and Picket Fences [Online] Avialable from: http://drillingstuff.com/ExpDumpandDilute.htm.[Accessed: Dec 12th 2015] 3- VN Drilling Forum. (2008). What is the corrective way to dilute a mud system while drilling [Online] Available from:http:// http://vndrilling.com/forum.aspx?g=posts&t=68. [Accessed: Dec 12th 2015] 4- Drilling Formula. (2009). Reduce mud weight by dilution [Online] Available from : http://www.drillingformulas.com/reduce-mud-weight-by- dilution/. [Accessed: Dec 12th 2015] 5- Elliot, J, Cervantez, R., Estep, J., Sills, B. “New Inhibitive Water-Based Fluid Provided Drilling Performance Comparable to Invert Emulsion Systems in Reactive Shale Sections,” AADE- 05-NTCE-03