Carl Åge Bjørgan presented on ensuring ERTMS development in the Nordic countries at a rail conference in Oslo. Alstom offers a complete portfolio of ERTMS solutions, from individual products to integrated systems for trackside and onboard. They have experience delivering major ERTMS projects across Europe. In the Nordic region, Norway plans to request baseline 3, Sweden will use baseline 2.3.0.D initially, and it is essential to deliver a retro-compatible system. Denmark's total replacement of its old signaling system proved more cost effective than renewal and provided benefits to passengers faster. Their experience splitting the country into east and west contracts for the trackside work could inform other projects. Alstom can
3. A complete portfolio of ERTMS solutions
From individual products to global solutions
Track side
Products
Integrated
Security,
Passenger
Information &
Telecom
Interlocking Integrated Control
Centres
(ATS, SCADA)
Route Control Security and Control SmartsysMainline
On board
systems
Urban
Integrated
Signalling
Solutions
ATLASTM URBALISTM
SMARTLOCKTM
VPITM
SMARTWAYTM ICONISTM PACISTM (*)
4. A complete Service offer - Signaling
Programme is a System Endeavour
ERTMS
onboard
ERTMS
trackside
Interlocking
Track Products
TMS
Technical / Product
Project Management
Overall System
Integration
Evolution / upgrades
Deployment
Immobilization
Change Management
Operational Performance
5. ERTMS: Major TRACKSIDE Projects
NETHERLANDS
Betuweroute A15
L2 2007
BELGIUM
L3 High Speed Line
L1/L2
2009
2009
BELGIUM
L4 High Speed Line
L1/L2
2009
2010
NEW
SWITZERLAND
Mattstetten Rothrist
L2
2006
ITALY
Bologna Firenze High
Speed Line
L2 2009
Turkey
Eskisehir-Balikesir
L1-2
2014
SPAIN
Zaragoza - Huesca
L 1
2008
FRANCE
RFF
Corridors C& D
L 1 2012
GREECE
2004
Athens suburban
L1
SPAIN
2011
Castellbisbal – Can
Tunis
L 1
SPAIN
2011
Girona-Figueres
L 1
2008
NETHERLANDS
Havenspoorlijn
L1 2009
ITALY
Rome Naples
High Speed Line
L2 2005
ITALY
Bologna Passante
High Speed Line
L2 2012
In commercial service with
ETCS
Trackside Projects
* Date: commercial service
Completed
NEW
Romania
Curtici Arad
L2 2014
NEW
Spain
Albacente Alicante
L2
2014
NETHERLANDS
2012
Hanzelijn
L 2
GERMANY
Wuppertal Monorail
L3
2014
NEWDENMARK
Resignalling Program
L2
2016
NEW
6. Outlook for Onboard – Nordic region
416 TS & 184
Loc
Bl 23oD
SWSTM 2.3.0.D
Bl 3
SWSTM 2.3.0.D
Bl 3
STM 3
From 2016-
From 2016
111 TS
+ 60 TS
Cross border
From + 2018
From 2016
• Norway will request a baseline 3 and Sweden will in the short-run
go with a baseline 2.3.0.D, where it will be essential to deliver a
full retro-convertible system.
• Delivery and Timing of solutions to avoid any baselines gaps and
to support a ”harmonised” plan between the infrastructure
Managers.
155TS & +90
Loc
Bl 3
FISTM 2.3.0.D
From 2019
+470 TS & +142
Loc
7. Outlook for Trackside – Nordic region
Bl 23oD
Bl 3
Bl 3
Roll-out 2016 - 2030
Cross border
From + 2018
• The Nordic Trackside marked is developing.
• Denmark has chooesen a full country approach and split the
country into East & west contracts.
• Norway planning for ERTMS L2.
• Sweden are doing a partial ERTMS roll-out based on line pr. line
approach
Bl 3
2.100 km
+200 stations
4.100 km
+350 stations
+11.000 km
+350 stations
Roll-out 2012 - 2030
Roll-out 2016 - 2021
8. Experience from Denmark
• An old signaling system that needs to be
renewed also the situation in Norway
• Signal systems from the 50’s 60’s and 70’s
• Decline in punctuality due to the old
signaling program
• Expensive maintenance cost
• New system needed before 2020
• Difficult Interface between different
technologies
• Monopolistic marked situation – high entry
barriers
• Compliant with EU -> ERTMS level 2
8
9. Experience from Denmark:
A total renewal of the system
Total renewal of the system proved better than running renewal because:
• Cheaper and faster implementation
• Provides higher train punctuality and capacity
• Most benefits for the passengers
• Benefits are achieved faster
2006: Strategic political decision of total renewal
2007-08: Plans and budget for a total renewal program
January 2009: Final political decision for a fully financed total renewal program was decided by the
Danish parliament
10. Political vision:
− Doubling number of Passengers in 2030 (from 2011)
− Strengthen conditions for collective transport
− Decrease in CO2 emission
• Improved regularity in regional/local trains from 84 % to 94 %
• The new signaling program will mean savings of 1.2 BE. Compared to a modernization strategy.
• Government approved budget for the Signal Program 3.2 BE.
• As a result of the increased competitiveness and dialog with suppliers through the tender stage the
Signal Program performed savings of 0.7BE
• Inreased capacity after national roll-out 2021.
Experience from Denmark:
Benefits of to replacement strategy (less interfaces)
Passenger requires a high punctual
level
11. The Signal Program contract setup:
Design Build Maintain contracts – up to 25 years of maintenance
1. 2 Contracts on main & regional lines (East and West), with option to take over other contract
2. 1 Contract on the S-bane (S-train around CPH) including rolling stock
3. 1 Contract for on-board main & regional rolling stock
4. GSM-R data included in GSM-R tender starting now
Framework type contracts that allow fitting of new lines
Possible option for ERTMS regional
The 4 contracts are harmonised with
the overall project plan and timetable
for the Signal Program
(2.3 B€)
Banedanmark Signal Program
12. Experience from Denmark:
Full-country roll-out split in East and West
P 12
• It will take 10- 12 years to carry out the total
renewal
• Contracts:
− Two contracts for the Trackside (East and West)
• To be awarded to different Suppliers
• West contract must contain an option for East part, so
in case the awarded company for West contract can’t
fulfill its project it can be cancelled and re-assigned to
the winner of the East part (and viceversa)
− One framework contract for on-board equipment
• Track side contracts interface at Lillebælt
14. How :
Manage and coordinate system
integration and migration
process
Have a high level of Stakeholder
involvement and satisfaction
Minimal disruption during
migration of the on-board system
Delivery of :
Proven solutions
Product maturity
Short delivery time and
operational cost reduction
Success criterias – Take-aways from the DK experience
Meet the schedule
With minimal disruption
during migration
… to improve service
… with excellent Life Cycle Costover
25+ years
15. NTL project some figures
• The state owned national railway network are managed
by eight traffic control centres
• To increase safety and efficiency Trafikverket initiated
2012 an public procurement process, to buy a new,
nation-wide Centralized Traffic Control (CTC) system
for the Swedish railway network
• Number of stations: 718
• Number of point machines: 5894
• At least 400 active simultaneous users, and must be scalable.
• At least 1.200 interlockings and RBCs, and must be scalable.
• At least 150.000 field objects, and must be scalable.
• At least 10.000 trains per day, and must be scalable.
• At least 2.500 actively controlled authority areas
(system managed areas of railway infrastructure), and must be scalable.
• At least 1.500 simultaneous running trains, and must be scalable.
16. Alstom’s ICONIS TMS solution provides
Based on a technical advanced product,
knowledge about the local conditions, a
strong local presence, succesful references
and large synergies with Danish TMS
project, Alstom are able to offer:
• A well tested and mature solution
• High degree of automatic planning and
disturbance management
• High flexibility and scalability
• Well-developed task management and
system for follow-up of incidents
• User-friendliness and intuitive solution in
focus
17. SL X60B - Delivery overview
71 X60 trains
delivered from 2005 to 2008
12 additional X60-A trains
delivered in 2012
46 additional X60-B trains
to be delivered 2016 + 2017
18. Atlas: Nordic Onboard Solution used for X60B
• Alstom ETCS BL3 developed for Denmark
and reused for X60B
• ETCS Certified and DoC issued in December
2014
• STM provided from Ansaldo
• Certified and DoC issued in 2012
• Homologation in Sweden 2015
• Includes test on Swedish ATC and ERTMS track
19. Atlas: Nordic Onboard Solution
• Alstom is currently able to deliver an ERTMS Onboard Solution for
seamless operation throughout Norway, Sweden and Denmark
• ETCS BL3 is able to operate on any ERTMS track in Norway, Sweden and Denmark
• Operation on ATC track in Norway and Sweden is secured by STM from Ansaldo.
Currently integrated as part of contract with SL (X60B)
• Operation on ATP track in Denmark is secured by STM from Siemens
Currently integrated as part of contract with BDK.
20. … and Norway is full speed on the way to ERTMS implementation