SlideShare uma empresa Scribd logo
1 de 9
Baixar para ler offline
KEMENTERIAN
PENDIDIKAN
MALAYSIA
BAHAGIAN PENDIDIKAN DAN LATIHAN
TEKNIKAL VOKASIONAL,
KEMENTERIAN PENDIDIKAN MALAYSIA,
ARAS 5&6, BLOK E14, PARCEL E,
PUSAT PENTADBIRAN KERAJAAN
PERSEKUTUAN,
62604 PUTRAJAYA
KERTAS PENERANGAN 7
KOD DAN NAMA PROGRAM
/
PROGRAM’S CODE & NAME
EE-320-2:2012
SINGLE PHASE ELECTRICAL INSTALLATION & MAINTENANCE
TAHAP / LEVEL LEVEL 2
KOD DAN NAMA UNIT
KOMPETENSI /
COMPETENCY UNIT NO.
AND NAME
EE-320-2:2012
C02 SINGLE PHASE WIRING INSTALLATION
NO. DAN PERNYATAAN
AKTIVITI KERJA / WORK
ACTIVITIES NO. AND
STATEMENT
1. IDENTIFY SINGLE PHASE WIRING SPECIFICATIONS
AND PROCEDURES
2. IDENTIFY SINGLE PHASE WIRING TOOLS, EQUIPMENT
AND MATERIALS
3. CARRY OUT WIRING ACTIVITIES
4. CARRY OUT SINGLE PHASE EARTHING SYSTEM
INSTALLATION
5. CARRY OUT SINGLE PHASE DISTRIBUTION BOARD
(DB) METALLIC OR INSULATED INSTALLATION
6. CARRY OUT FITTING AND ACCESSORIES
INSTALLATION
7. CARRY OUT WIRING SYSTEM VISUAL INSPECTION
8. CARRY OUT DEAD CIRCUIT TEST
9. CARRY OUT LIVE CIRCUIT TEST
10. PREPARE SINGLE PHASE WORK ACTIVITIES REPORT
NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10)
Muka Surat / Page : 1 Drp /
of : 9
TAJUK / TITLE : PENGENALAN KEPADA JENIS-JENIS PENGUJIAN SERTA ASAS
MENJALANKAN PEMERIKSAAN PENGLIHATAN (VISUAL)
TUJUAN / PURPOSE:
Kertas penerangan ini adalah bertujuan untuk menerangkan kepada pelajar-pelajar berkaitan tentang
pengenalan mengenai definisi pemeriksaan penglihatan keatas pepasangan. Helaian penerangan ini
juga menerangkan tujuannya, ujian-ujian yang dijalankan alat-alat uji yang digunakan.
NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10)
Muka Surat / Page : 2
Drp / of : 9
PENERANGAN:
7.1 PEMERIKSAAN PENGLIHATAN (VISUAL)
Definisi
Pemeriksaan dan pengujian adalah merupakan suatu kemestian terhadap tiap-tiap satu
pemasangan elektrik. Bekalan elektrik tidak boleh disambung sebelum ujian-ujian ini
dijalankan.
Tujuan
Tujuan utama pengujian ini dijalankan adalah untuk mempastikan bahawa sesuatu
pemasangan itu dilaksanakan dengan sempurna dan selamat, selaras dengan kehendak
undang-undang dan peraturan-peraturan pemasangan elektrik. Undang-undang dan
peraturan tersebut antara lain :-
 Peraturan Keselamatan
 Peraturan IEE untuk pemasangan elektrik
 Peraturan Suruhanjaya Tenaga
 Peraturan JKR
Peraturan IEE diterima sebagai peraturan piawaian bagi borang pemasangan elektrik,
walaupun dalam beberapa hal di ubah-suai mengikut keperluan-keperluan amalan di
Malaysia
Pemeriksaan Penglihatan (Visual Test) & Pengujian
Mengikut peraturan, pemeriksaan dan pengujian hendaklah dibuat terhadap pemasangan-
pemasangan berikut :-
 Pemasangan baru.
 Pemasangan sedia ada untuk tujuan tambahan dan ubah-suaian.
 Tambahan pemasangan, khususnya tambahan besar.
 Pemasangan sedia ada secara berkala mengikut perencanaan untuk tujuan
penyenggaran.
 Ujian atas permintaan pengguna atau arahan. Ini biasanya apabila berlaku
kerosakan pada pemasangan.
 Ujian untuk kemasukan Borang kepada Tenaga Nasional.
NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10)
Muka Surat / Page : 3
Drp / of : 9
Pemeriksaan penglihatan adalah dilakukan terlebih dahulu sebelum diadakan sebarang
ujian. Dengan tujuan :-
 Untuk mempastikan alat-alat yang dipasang adalah mengikut piawaian yang
diluluskan. Sekiranya alat-alat tersebut tiada sebarang tanda kelulusan, pihak
pemborong hendaklah mengemukakan surat kelulusan berkenaan.
 Untuk mempastikan bahawa keseluruhan pemasangan itu dijalankan mengikut
peraturan-peraturan IEE, JBE, JKR dan lain-lain peraturan seperti di perkara 2.1 di
atas.
 Untuk mempastikan bahawa tiada kerosakan zahir pada alat-alat pemasangan atau
yang disambung kepadanya.
7.2 LUKISAN PENDAWAIAN MENGIKUT SOP
Lukisan pendawaian perlu dilaksanakan bagi memastikan pelan yang dibangunkan tepat
mengikut susunatur yang betul
Rajah: 1 menunjukan garisan lurus selanjar; keliru dengan garisan bangunan
Rajah: 2 menunjukan garisan beriak; mudah, cepat, tidak guna alat lukisan
Bilik Tidur
Bilik stor
Bilik Tidur
Bilik stor
NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10)
Muka Surat / Page : 4
Drp / of : 9
a) Terdapat juga gaya garisan putus-putus berpenunjuk mudah, cepat, perlu lukisan anak
panah Rajah : 1.3
Rajah 3 : Garisan putus-putus
PELAN RUMAH KEDIAMAN
RUANG TAMU
BILIK 1
BILIK 2
BILIK 3
DAPUR
BILIK
MANDI TANDAS
TANDAS
RUANG MAKAN
A
C
A
C
BILIK UTAMA
MASUK
LAGENDA
KETERANGAN SIMBOL
Lampu pendarfluor
Lampu tungsten
glob
Kipas siling
Kipas ekzos
Unit kaw alan
pemassak
Soket alur keluar
13 A
Lampu tungsten
dinding
A
C
Unit penghaw a
dingin
Kotak fius agihan
Alat atur kipas
Suis 2 hala
Suis 1 hala
2
Bilik pejabat
Bilik ketua
NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10)
Muka Surat / Page : 5
Drp / of : 9
7.3 SAMBUNGAN PENDAWAIAN
Rajah 4: Sambungan pendawaian
Rajah 5 : Warna kabel
NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10)
Muka Surat / Page : 6
Drp / of : 9
Rajah 7 : Jenis penggunaan saiz kabel
NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10)
Muka Surat / Page : 7
Drp / of : 9
NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10)
Muka Surat / Page : 8
Drp / of : 9
Rajah 8: Jenis kesalahan pada sambungan kabel
NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10)
Muka Surat / Page : 9
Drp / of : 9
SOALAN / QUESTION :
1. Mengapakah ujian mata kasar penting bagi pendawaian elektrik
______________________________________________________________________
______________________________________________________________________
____________________________________________________
2. Siapakah yang akan melakukan ujian ini
______________________________________________________________________
______________________________________________________________________
____________________________________________________
RUJUKAN / REFERENCE :
1. Undang-Undang Malaysia. 2005. Akta Bekalan Elektrik 1990 dan Peraturan-Peraturan
Elektrik 1994, Pindaan sehingga 2005. MIDC Publisher Sdn Bhd Malaysia.
2. Suruhanjaya Tenaga Malaysia. Standard Pendawaian Malaysia (Electrical Installations
Of Buildings – Ms IEC 60364) Jabatan Standard Malaysia.
3. The Institution of Electrical Engineers, 1998, Peraturan-Peraturan bagi Pemasangan
Elektrik, Edisi 16. Golden Books Centre Sdn Bhd.
4. Giesecke, F. E. Et Al. 2002. Technical Drawing. Prentice Hall.
5. BS 7671: 2001 Requirements for Electrical Installations (IEE Wiring Regulations,
Sixteenth Edition) Institution of Electrical Engineers.
6. Lukisan Elektrik dan Elektronik – Abdul Samad Hanif
7. TEKNOLOGI ELEKTRIK (Untuk Sekolah Menengah Vokasional) Oleh; Abd. Samad Bin
Haji Hanif Mohd. Nazi Bin Haji Mustafa Editor : Amirudin Bin Abdullah Pustaka Sistem
Pelajaran Sdn. Bhd. ISBN 967-902-285-4

Mais conteúdo relacionado

Semelhante a IS - CU 7.pdf

Logam mesin installation and commisioning 2
Logam mesin installation and commisioning 2Logam mesin installation and commisioning 2
Logam mesin installation and commisioning 2Eko Supriyadi
 
Logam mesin installation and commisioning 10
Logam mesin installation and commisioning 10Logam mesin installation and commisioning 10
Logam mesin installation and commisioning 10Eko Supriyadi
 
Logam mesin maintenance and diagnostic electrical 18 (2)
Logam mesin maintenance and diagnostic electrical 18 (2)Logam mesin maintenance and diagnostic electrical 18 (2)
Logam mesin maintenance and diagnostic electrical 18 (2)Eko Supriyadi
 
2054 p3-spk teknik transmisi (4 tahun)
2054 p3-spk teknik transmisi  (4 tahun)2054 p3-spk teknik transmisi  (4 tahun)
2054 p3-spk teknik transmisi (4 tahun)Winarto Winartoap
 
2143 p2-p psp-teknik komputer dan jaringan (k13)
2143 p2-p psp-teknik komputer dan jaringan (k13)2143 p2-p psp-teknik komputer dan jaringan (k13)
2143 p2-p psp-teknik komputer dan jaringan (k13)Akhmad Subkhi
 
1112 p1-p psp-teknik distribusi tenaga listrik (2)
1112 p1-p psp-teknik distribusi tenaga listrik (2)1112 p1-p psp-teknik distribusi tenaga listrik (2)
1112 p1-p psp-teknik distribusi tenaga listrik (2)Winarto Winartoap
 
1112 p3-p psp-teknik distribusi tenaga listrik (1)
1112 p3-p psp-teknik distribusi tenaga listrik (1)1112 p3-p psp-teknik distribusi tenaga listrik (1)
1112 p3-p psp-teknik distribusi tenaga listrik (1)Winarto Winartoap
 
Logam mesin drawing,design and drafting 4
Logam mesin drawing,design and drafting 4Logam mesin drawing,design and drafting 4
Logam mesin drawing,design and drafting 4Eko Supriyadi
 
1112 p2-p psp-teknik distribusi tenaga listrik (2)
1112 p2-p psp-teknik distribusi tenaga listrik (2)1112 p2-p psp-teknik distribusi tenaga listrik (2)
1112 p2-p psp-teknik distribusi tenaga listrik (2)Winarto Winartoap
 
1112 p2-p psp-teknik distribusi tenaga listrik (1)
1112 p2-p psp-teknik distribusi tenaga listrik (1)1112 p2-p psp-teknik distribusi tenaga listrik (1)
1112 p2-p psp-teknik distribusi tenaga listrik (1)Winarto Winartoap
 
Presentasi Kelompok 2 AK3 Listrik 2022.pptx
Presentasi Kelompok 2 AK3 Listrik 2022.pptxPresentasi Kelompok 2 AK3 Listrik 2022.pptx
Presentasi Kelompok 2 AK3 Listrik 2022.pptxDalvinPratama
 
Opkr50 008 b electrical (3)
Opkr50 008 b electrical (3)Opkr50 008 b electrical (3)
Opkr50 008 b electrical (3)Eko Supriyadi
 
Soal ukom paket 1 teknik audio video
Soal ukom paket 1 teknik audio videoSoal ukom paket 1 teknik audio video
Soal ukom paket 1 teknik audio videoEko Supriyadi
 
Logam mesin maintenance and diagnostic electrical 18 (1)
Logam mesin maintenance and diagnostic electrical 18 (1)Logam mesin maintenance and diagnostic electrical 18 (1)
Logam mesin maintenance and diagnostic electrical 18 (1)Eko Supriyadi
 
Logam mesin surface finishing 1 (1)
Logam mesin surface finishing 1 (1)Logam mesin surface finishing 1 (1)
Logam mesin surface finishing 1 (1)Eko Supriyadi
 
1094 p2-p psp-teknik plumbing dan sanitasi
1094 p2-p psp-teknik plumbing dan sanitasi1094 p2-p psp-teknik plumbing dan sanitasi
1094 p2-p psp-teknik plumbing dan sanitasiWinarto Winartoap
 
2054 p1-spk-teknik transmisi (4 tahun)
2054 p1-spk-teknik transmisi (4 tahun)2054 p1-spk-teknik transmisi (4 tahun)
2054 p1-spk-teknik transmisi (4 tahun)Winarto Winartoap
 
Nota praktikal report senggaraan
Nota praktikal report senggaraanNota praktikal report senggaraan
Nota praktikal report senggaraanZunnur Zamzam
 

Semelhante a IS - CU 7.pdf (20)

Logam mesin installation and commisioning 2
Logam mesin installation and commisioning 2Logam mesin installation and commisioning 2
Logam mesin installation and commisioning 2
 
Logam mesin installation and commisioning 10
Logam mesin installation and commisioning 10Logam mesin installation and commisioning 10
Logam mesin installation and commisioning 10
 
Logam mesin maintenance and diagnostic electrical 18 (2)
Logam mesin maintenance and diagnostic electrical 18 (2)Logam mesin maintenance and diagnostic electrical 18 (2)
Logam mesin maintenance and diagnostic electrical 18 (2)
 
2054 p3-spk teknik transmisi (4 tahun)
2054 p3-spk teknik transmisi  (4 tahun)2054 p3-spk teknik transmisi  (4 tahun)
2054 p3-spk teknik transmisi (4 tahun)
 
2143 p2-p psp-teknik komputer dan jaringan (k13)
2143 p2-p psp-teknik komputer dan jaringan (k13)2143 p2-p psp-teknik komputer dan jaringan (k13)
2143 p2-p psp-teknik komputer dan jaringan (k13)
 
1112 p1-p psp-teknik distribusi tenaga listrik (2)
1112 p1-p psp-teknik distribusi tenaga listrik (2)1112 p1-p psp-teknik distribusi tenaga listrik (2)
1112 p1-p psp-teknik distribusi tenaga listrik (2)
 
1112 p3-p psp-teknik distribusi tenaga listrik (1)
1112 p3-p psp-teknik distribusi tenaga listrik (1)1112 p3-p psp-teknik distribusi tenaga listrik (1)
1112 p3-p psp-teknik distribusi tenaga listrik (1)
 
Logam mesin drawing,design and drafting 4
Logam mesin drawing,design and drafting 4Logam mesin drawing,design and drafting 4
Logam mesin drawing,design and drafting 4
 
1112 p2-p psp-teknik distribusi tenaga listrik (2)
1112 p2-p psp-teknik distribusi tenaga listrik (2)1112 p2-p psp-teknik distribusi tenaga listrik (2)
1112 p2-p psp-teknik distribusi tenaga listrik (2)
 
1112 p2-p psp-teknik distribusi tenaga listrik (1)
1112 p2-p psp-teknik distribusi tenaga listrik (1)1112 p2-p psp-teknik distribusi tenaga listrik (1)
1112 p2-p psp-teknik distribusi tenaga listrik (1)
 
Presentasi Kelompok 2 AK3 Listrik 2022.pptx
Presentasi Kelompok 2 AK3 Listrik 2022.pptxPresentasi Kelompok 2 AK3 Listrik 2022.pptx
Presentasi Kelompok 2 AK3 Listrik 2022.pptx
 
Opkr50 008 b electrical (3)
Opkr50 008 b electrical (3)Opkr50 008 b electrical (3)
Opkr50 008 b electrical (3)
 
Soal ukom paket 1 teknik audio video
Soal ukom paket 1 teknik audio videoSoal ukom paket 1 teknik audio video
Soal ukom paket 1 teknik audio video
 
Logam mesin maintenance and diagnostic electrical 18 (1)
Logam mesin maintenance and diagnostic electrical 18 (1)Logam mesin maintenance and diagnostic electrical 18 (1)
Logam mesin maintenance and diagnostic electrical 18 (1)
 
Logam mesin surface finishing 1 (1)
Logam mesin surface finishing 1 (1)Logam mesin surface finishing 1 (1)
Logam mesin surface finishing 1 (1)
 
Kertas penerangan mppu
Kertas penerangan mppuKertas penerangan mppu
Kertas penerangan mppu
 
1094 p2-p psp-teknik plumbing dan sanitasi
1094 p2-p psp-teknik plumbing dan sanitasi1094 p2-p psp-teknik plumbing dan sanitasi
1094 p2-p psp-teknik plumbing dan sanitasi
 
2054 p1-spk-teknik transmisi (4 tahun)
2054 p1-spk-teknik transmisi (4 tahun)2054 p1-spk-teknik transmisi (4 tahun)
2054 p1-spk-teknik transmisi (4 tahun)
 
Human resouce management
Human resouce managementHuman resouce management
Human resouce management
 
Nota praktikal report senggaraan
Nota praktikal report senggaraanNota praktikal report senggaraan
Nota praktikal report senggaraan
 

Último

Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxPresentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxyoodika046
 
LAJU RESPIRASI.teknologi hasil pertanianpdf
LAJU RESPIRASI.teknologi hasil pertanianpdfLAJU RESPIRASI.teknologi hasil pertanianpdf
LAJU RESPIRASI.teknologi hasil pertanianpdfIftitahKartika
 
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdf
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdfGambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdf
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdfYoyokSuwiknyo
 
Gambar kerja TUREN KETAWANG malang jawa timur.pdf
Gambar kerja TUREN KETAWANG malang jawa timur.pdfGambar kerja TUREN KETAWANG malang jawa timur.pdf
Gambar kerja TUREN KETAWANG malang jawa timur.pdfYoyokSuwiknyo
 
Presentasi gedung jenjang 6 - Isman Kurniawan.ppt
Presentasi gedung jenjang 6 - Isman Kurniawan.pptPresentasi gedung jenjang 6 - Isman Kurniawan.ppt
Presentasi gedung jenjang 6 - Isman Kurniawan.pptarifyudianto3
 
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptxVinaAmelia23
 
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdf
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdfPengeloaan Limbah NonB3 KLHK-Upik-090921.pdf
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdfPusatKeteknikanKehut
 
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptxUTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptxAndimarini2
 
Laporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
Laporan Tinjauan Manajemen HSE/Laporan HSE TriwulanpptxLaporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
Laporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptxilanarespatinovitari1
 
PPT AHLI MADYA BANGUNAN GEDUNGggggg.pptx
PPT AHLI MADYA BANGUNAN GEDUNGggggg.pptxPPT AHLI MADYA BANGUNAN GEDUNGggggg.pptx
PPT AHLI MADYA BANGUNAN GEDUNGggggg.pptxssuserdfcb68
 
perbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptxperbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptxMuhamadIrfan190120
 
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...rororasiputra
 
Bahan kuliah elemen mesin semester 2 rekayasa manufaktur
Bahan kuliah elemen mesin semester 2 rekayasa manufakturBahan kuliah elemen mesin semester 2 rekayasa manufaktur
Bahan kuliah elemen mesin semester 2 rekayasa manufakturAhmadAffandi36
 
BAB_3_Teorema superposisi_thevenin_norton (1).ppt
BAB_3_Teorema superposisi_thevenin_norton (1).pptBAB_3_Teorema superposisi_thevenin_norton (1).ppt
BAB_3_Teorema superposisi_thevenin_norton (1).pptDellaEkaPutri2
 
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxArisatrianingsih
 
Pengolahan Kelapa Sawit 1 pabrik pks.pdf
Pengolahan Kelapa Sawit 1 pabrik pks.pdfPengolahan Kelapa Sawit 1 pabrik pks.pdf
Pengolahan Kelapa Sawit 1 pabrik pks.pdffitriAnnisa54
 
Kalor dan Perpindahan Kalor presentasi.ppt
Kalor dan Perpindahan Kalor presentasi.pptKalor dan Perpindahan Kalor presentasi.ppt
Kalor dan Perpindahan Kalor presentasi.pptAchmadDwitamaKarisma
 
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptxManajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptxarifyudianto3
 

Último (19)

Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxPresentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
 
LAJU RESPIRASI.teknologi hasil pertanianpdf
LAJU RESPIRASI.teknologi hasil pertanianpdfLAJU RESPIRASI.teknologi hasil pertanianpdf
LAJU RESPIRASI.teknologi hasil pertanianpdf
 
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdf
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdfGambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdf
Gambar Rencana TOYOMARTO KETINDAN Malang jawa timur.pdf
 
Gambar kerja TUREN KETAWANG malang jawa timur.pdf
Gambar kerja TUREN KETAWANG malang jawa timur.pdfGambar kerja TUREN KETAWANG malang jawa timur.pdf
Gambar kerja TUREN KETAWANG malang jawa timur.pdf
 
Presentasi gedung jenjang 6 - Isman Kurniawan.ppt
Presentasi gedung jenjang 6 - Isman Kurniawan.pptPresentasi gedung jenjang 6 - Isman Kurniawan.ppt
Presentasi gedung jenjang 6 - Isman Kurniawan.ppt
 
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
 
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdf
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdfPengeloaan Limbah NonB3 KLHK-Upik-090921.pdf
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdf
 
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptxUTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
 
Laporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
Laporan Tinjauan Manajemen HSE/Laporan HSE TriwulanpptxLaporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
Laporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
 
PPT AHLI MADYA BANGUNAN GEDUNGggggg.pptx
PPT AHLI MADYA BANGUNAN GEDUNGggggg.pptxPPT AHLI MADYA BANGUNAN GEDUNGggggg.pptx
PPT AHLI MADYA BANGUNAN GEDUNGggggg.pptx
 
Abortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
Abortion Pills In Doha // QATAR (+966572737505 ) Get CytotecAbortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
Abortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
 
perbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptxperbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptx
 
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...
 
Bahan kuliah elemen mesin semester 2 rekayasa manufaktur
Bahan kuliah elemen mesin semester 2 rekayasa manufakturBahan kuliah elemen mesin semester 2 rekayasa manufaktur
Bahan kuliah elemen mesin semester 2 rekayasa manufaktur
 
BAB_3_Teorema superposisi_thevenin_norton (1).ppt
BAB_3_Teorema superposisi_thevenin_norton (1).pptBAB_3_Teorema superposisi_thevenin_norton (1).ppt
BAB_3_Teorema superposisi_thevenin_norton (1).ppt
 
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
 
Pengolahan Kelapa Sawit 1 pabrik pks.pdf
Pengolahan Kelapa Sawit 1 pabrik pks.pdfPengolahan Kelapa Sawit 1 pabrik pks.pdf
Pengolahan Kelapa Sawit 1 pabrik pks.pdf
 
Kalor dan Perpindahan Kalor presentasi.ppt
Kalor dan Perpindahan Kalor presentasi.pptKalor dan Perpindahan Kalor presentasi.ppt
Kalor dan Perpindahan Kalor presentasi.ppt
 
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptxManajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
 

IS - CU 7.pdf

  • 1. KEMENTERIAN PENDIDIKAN MALAYSIA BAHAGIAN PENDIDIKAN DAN LATIHAN TEKNIKAL VOKASIONAL, KEMENTERIAN PENDIDIKAN MALAYSIA, ARAS 5&6, BLOK E14, PARCEL E, PUSAT PENTADBIRAN KERAJAAN PERSEKUTUAN, 62604 PUTRAJAYA KERTAS PENERANGAN 7 KOD DAN NAMA PROGRAM / PROGRAM’S CODE & NAME EE-320-2:2012 SINGLE PHASE ELECTRICAL INSTALLATION & MAINTENANCE TAHAP / LEVEL LEVEL 2 KOD DAN NAMA UNIT KOMPETENSI / COMPETENCY UNIT NO. AND NAME EE-320-2:2012 C02 SINGLE PHASE WIRING INSTALLATION NO. DAN PERNYATAAN AKTIVITI KERJA / WORK ACTIVITIES NO. AND STATEMENT 1. IDENTIFY SINGLE PHASE WIRING SPECIFICATIONS AND PROCEDURES 2. IDENTIFY SINGLE PHASE WIRING TOOLS, EQUIPMENT AND MATERIALS 3. CARRY OUT WIRING ACTIVITIES 4. CARRY OUT SINGLE PHASE EARTHING SYSTEM INSTALLATION 5. CARRY OUT SINGLE PHASE DISTRIBUTION BOARD (DB) METALLIC OR INSULATED INSTALLATION 6. CARRY OUT FITTING AND ACCESSORIES INSTALLATION 7. CARRY OUT WIRING SYSTEM VISUAL INSPECTION 8. CARRY OUT DEAD CIRCUIT TEST 9. CARRY OUT LIVE CIRCUIT TEST 10. PREPARE SINGLE PHASE WORK ACTIVITIES REPORT NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10) Muka Surat / Page : 1 Drp / of : 9 TAJUK / TITLE : PENGENALAN KEPADA JENIS-JENIS PENGUJIAN SERTA ASAS MENJALANKAN PEMERIKSAAN PENGLIHATAN (VISUAL) TUJUAN / PURPOSE: Kertas penerangan ini adalah bertujuan untuk menerangkan kepada pelajar-pelajar berkaitan tentang pengenalan mengenai definisi pemeriksaan penglihatan keatas pepasangan. Helaian penerangan ini juga menerangkan tujuannya, ujian-ujian yang dijalankan alat-alat uji yang digunakan.
  • 2. NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10) Muka Surat / Page : 2 Drp / of : 9 PENERANGAN: 7.1 PEMERIKSAAN PENGLIHATAN (VISUAL) Definisi Pemeriksaan dan pengujian adalah merupakan suatu kemestian terhadap tiap-tiap satu pemasangan elektrik. Bekalan elektrik tidak boleh disambung sebelum ujian-ujian ini dijalankan. Tujuan Tujuan utama pengujian ini dijalankan adalah untuk mempastikan bahawa sesuatu pemasangan itu dilaksanakan dengan sempurna dan selamat, selaras dengan kehendak undang-undang dan peraturan-peraturan pemasangan elektrik. Undang-undang dan peraturan tersebut antara lain :-  Peraturan Keselamatan  Peraturan IEE untuk pemasangan elektrik  Peraturan Suruhanjaya Tenaga  Peraturan JKR Peraturan IEE diterima sebagai peraturan piawaian bagi borang pemasangan elektrik, walaupun dalam beberapa hal di ubah-suai mengikut keperluan-keperluan amalan di Malaysia Pemeriksaan Penglihatan (Visual Test) & Pengujian Mengikut peraturan, pemeriksaan dan pengujian hendaklah dibuat terhadap pemasangan- pemasangan berikut :-  Pemasangan baru.  Pemasangan sedia ada untuk tujuan tambahan dan ubah-suaian.  Tambahan pemasangan, khususnya tambahan besar.  Pemasangan sedia ada secara berkala mengikut perencanaan untuk tujuan penyenggaran.  Ujian atas permintaan pengguna atau arahan. Ini biasanya apabila berlaku kerosakan pada pemasangan.  Ujian untuk kemasukan Borang kepada Tenaga Nasional.
  • 3. NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10) Muka Surat / Page : 3 Drp / of : 9 Pemeriksaan penglihatan adalah dilakukan terlebih dahulu sebelum diadakan sebarang ujian. Dengan tujuan :-  Untuk mempastikan alat-alat yang dipasang adalah mengikut piawaian yang diluluskan. Sekiranya alat-alat tersebut tiada sebarang tanda kelulusan, pihak pemborong hendaklah mengemukakan surat kelulusan berkenaan.  Untuk mempastikan bahawa keseluruhan pemasangan itu dijalankan mengikut peraturan-peraturan IEE, JBE, JKR dan lain-lain peraturan seperti di perkara 2.1 di atas.  Untuk mempastikan bahawa tiada kerosakan zahir pada alat-alat pemasangan atau yang disambung kepadanya. 7.2 LUKISAN PENDAWAIAN MENGIKUT SOP Lukisan pendawaian perlu dilaksanakan bagi memastikan pelan yang dibangunkan tepat mengikut susunatur yang betul Rajah: 1 menunjukan garisan lurus selanjar; keliru dengan garisan bangunan Rajah: 2 menunjukan garisan beriak; mudah, cepat, tidak guna alat lukisan Bilik Tidur Bilik stor Bilik Tidur Bilik stor
  • 4. NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10) Muka Surat / Page : 4 Drp / of : 9 a) Terdapat juga gaya garisan putus-putus berpenunjuk mudah, cepat, perlu lukisan anak panah Rajah : 1.3 Rajah 3 : Garisan putus-putus PELAN RUMAH KEDIAMAN RUANG TAMU BILIK 1 BILIK 2 BILIK 3 DAPUR BILIK MANDI TANDAS TANDAS RUANG MAKAN A C A C BILIK UTAMA MASUK LAGENDA KETERANGAN SIMBOL Lampu pendarfluor Lampu tungsten glob Kipas siling Kipas ekzos Unit kaw alan pemassak Soket alur keluar 13 A Lampu tungsten dinding A C Unit penghaw a dingin Kotak fius agihan Alat atur kipas Suis 2 hala Suis 1 hala 2 Bilik pejabat Bilik ketua
  • 5. NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10) Muka Surat / Page : 5 Drp / of : 9 7.3 SAMBUNGAN PENDAWAIAN Rajah 4: Sambungan pendawaian Rajah 5 : Warna kabel
  • 6. NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10) Muka Surat / Page : 6 Drp / of : 9 Rajah 7 : Jenis penggunaan saiz kabel
  • 7. NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10) Muka Surat / Page : 7 Drp / of : 9
  • 8. NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10) Muka Surat / Page : 8 Drp / of : 9 Rajah 8: Jenis kesalahan pada sambungan kabel
  • 9. NO. KOD / CODE NO. EE-320-2:2012-C02/P(7/10) Muka Surat / Page : 9 Drp / of : 9 SOALAN / QUESTION : 1. Mengapakah ujian mata kasar penting bagi pendawaian elektrik ______________________________________________________________________ ______________________________________________________________________ ____________________________________________________ 2. Siapakah yang akan melakukan ujian ini ______________________________________________________________________ ______________________________________________________________________ ____________________________________________________ RUJUKAN / REFERENCE : 1. Undang-Undang Malaysia. 2005. Akta Bekalan Elektrik 1990 dan Peraturan-Peraturan Elektrik 1994, Pindaan sehingga 2005. MIDC Publisher Sdn Bhd Malaysia. 2. Suruhanjaya Tenaga Malaysia. Standard Pendawaian Malaysia (Electrical Installations Of Buildings – Ms IEC 60364) Jabatan Standard Malaysia. 3. The Institution of Electrical Engineers, 1998, Peraturan-Peraturan bagi Pemasangan Elektrik, Edisi 16. Golden Books Centre Sdn Bhd. 4. Giesecke, F. E. Et Al. 2002. Technical Drawing. Prentice Hall. 5. BS 7671: 2001 Requirements for Electrical Installations (IEE Wiring Regulations, Sixteenth Edition) Institution of Electrical Engineers. 6. Lukisan Elektrik dan Elektronik – Abdul Samad Hanif 7. TEKNOLOGI ELEKTRIK (Untuk Sekolah Menengah Vokasional) Oleh; Abd. Samad Bin Haji Hanif Mohd. Nazi Bin Haji Mustafa Editor : Amirudin Bin Abdullah Pustaka Sistem Pelajaran Sdn. Bhd. ISBN 967-902-285-4